12.07.2015 Views

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WP2‐005.030.000‐SRS‐002Revision : B4.3 Start‐up and shutdownThis section gives <strong>system</strong> level <strong>requirements</strong> for SKA 1 start‐up and shutdown, including check‐out atinitialization.Ident Requirement Applicability Parent VerificationSYS_REQ_3160Full remote control. It shall bepossible to control all SKA1functions from the operationalcentre, without requiring physicalaccess to the instrument,including start‐up and shut down.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_3170Start‐up sequence. <strong>The</strong> start‐upof SKA1 functions shall follow apre‐defined sequence taking notlonger than:10 minutes for a hot start (=restart)24 hours for a cold startTBDTo be added: definition of hot and cold start.Ident Requirement Applicability Parent VerificationSYS_REQ_3180Start‐up and shut‐downindividual antenna <strong>system</strong>s. Itshall be possible to start‐up orshutdown individual dishes oraperture arrays withoutdisturbance [TBC] of routineoperations.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_3190Shut‐down sequence. <strong>The</strong>shutdown of SKA1 shall follow apre‐defined sequence taking notlonger than TBD minutes. SKA1shall also have an emergencyshut‐down for wind (stowingdishes), lightning, and electricpower anomalies.TBD2011‐02‐14 Page 29 of 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!