12.07.2015 Views

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.10.3 Monitoring <strong>requirements</strong>WP2‐005.030.000‐SRS‐002Revision : BRequirements regarding monitoring the status of the instrument (configuration and health)Ident Requirement Applicability Parent VerificationSYS_REQ_2410Monitoring data consolidation. Itshall be possible to consolidatemonitoring information toproduce high‐level monitoringinformation from low‐levelmonitoring information.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2420Sub<strong>system</strong>‐M&C action reports.Sub<strong>system</strong>s shall reportcompletion of actions to M&CTBDIdent Requirement Applicability Parent VerificationSYS_REQ_2430M&C summary reports. It shall bepossible for all user roles(<strong>specification</strong> of these roles TBD)to produce summarized historicalmonitoring information.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2440Control data augmentation. <strong>The</strong>results of control actions shall beverified with measurements madeexpressly for the purpose.If the normal measurementsequence does not provide forcontrol verification in a timelyfashion, such measurements shallbe made out of sequence.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2450Monitoring informationconsolidation. It shall be possibleto consolidate monitoringinformation both on the physicalinstrument status and ondesignated logical concepts likeobservation, correlator.TBD2011‐02‐14 Page 25 of 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!