12.07.2015 Views

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WP2‐005.030.000‐SRS‐002Revision : BIdent Requirement Applicability Parent VerificationSYS_REQ_2210M&C performance monitoring.<strong>The</strong> monitoring and controlfunction shall provide TBDperformance monitoring data tousers.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2220M&C monitoring data. All SKA1sub<strong>system</strong>s shall providemonitoring data to themonitoring and control function(for performance monitoring andclosed‐loop control functions)TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2230M&C logging. <strong>The</strong> monitoring andcontrol function shall provide fora long‐term logging sub‐functionwith workflow support for theOperational Team and withsufficient information to relate<strong>system</strong> events to artefacts in thedata.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2240M&C observation interrupt. Itshall be possible to abort anobservation if monitorparameters exceed user specifiedlimits (including RFI mitigationperformance indicationparameters).TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2250M&C calibration information.Individual element calibrationinformation shall be available tothe measurement function.TBD<strong>The</strong> <strong>requirements</strong> on the M&C function related to Health and Safety still needs to be analysed,verified and added.2011‐02‐14 Page 23 of 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!