ska phase 1 system requirements specification - The Square ...
ska phase 1 system requirements specification - The Square ...
ska phase 1 system requirements specification - The Square ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
WP2‐005.030.000‐SRS‐002Revision : BIdent Requirement Applicability Parent VerificationSYS_REQ_2210M&C performance monitoring.<strong>The</strong> monitoring and controlfunction shall provide TBDperformance monitoring data tousers.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2220M&C monitoring data. All SKA1sub<strong>system</strong>s shall providemonitoring data to themonitoring and control function(for performance monitoring andclosed‐loop control functions)TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2230M&C logging. <strong>The</strong> monitoring andcontrol function shall provide fora long‐term logging sub‐functionwith workflow support for theOperational Team and withsufficient information to relate<strong>system</strong> events to artefacts in thedata.TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2240M&C observation interrupt. Itshall be possible to abort anobservation if monitorparameters exceed user specifiedlimits (including RFI mitigationperformance indicationparameters).TBDIdent Requirement Applicability Parent VerificationSYS_REQ_2250M&C calibration information.Individual element calibrationinformation shall be available tothe measurement function.TBD<strong>The</strong> <strong>requirements</strong> on the M&C function related to Health and Safety still needs to be analysed,verified and added.2011‐02‐14 Page 23 of 58