HVDCFY<strong>2005</strong>4.2 Phase 2 Operational IssuesThere is a large fire protection project underway at Sandy Pond. The VESDA(Very Early Smoke Detection and Alarming) System used as part of the ValveHall fire protection system is required. The present VESDA System’s smokedetectors no longer have direct replacements available. Initiatives on his projectand other asset strategies for Sandy Pond are managed by <strong>Transmission</strong> AssetStrategy Department.While HVDC technical personnel continue to support the facility, availability ofreplacement parts and expertise are important issues.34 <strong>National</strong> <strong>Grid</strong> <strong>Performance</strong> <strong>Report</strong>