12.07.2015 Views

Transmission Network Performance Report 2005 - National Grid

Transmission Network Performance Report 2005 - National Grid

Transmission Network Performance Report 2005 - National Grid

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HVDCFY<strong>2005</strong>4.2 Phase 2 Operational IssuesThere is a large fire protection project underway at Sandy Pond. The VESDA(Very Early Smoke Detection and Alarming) System used as part of the ValveHall fire protection system is required. The present VESDA System’s smokedetectors no longer have direct replacements available. Initiatives on his projectand other asset strategies for Sandy Pond are managed by <strong>Transmission</strong> AssetStrategy Department.While HVDC technical personnel continue to support the facility, availability ofreplacement parts and expertise are important issues.34 <strong>National</strong> <strong>Grid</strong> <strong>Performance</strong> <strong>Report</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!