12.07.2015 Views

LIT194-Handbook of TII.pdf - Diamond Head Sprinkler Supply

LIT194-Handbook of TII.pdf - Diamond Head Sprinkler Supply

LIT194-Handbook of TII.pdf - Diamond Head Sprinkler Supply

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Example:A zone in your system is irrigating established warm season turf which is growing in a sandyloam on a slight slope with an available water holding capacity <strong>of</strong> 1" per foot <strong>of</strong> soil. The rootdepth <strong>of</strong> the turf is 9". The average precipitation rate is 0.49 inches/hour. The system is locatedin San Marcos, CA where the daily moisture loss (ET o ) to be replenished is 0.20 inches. The cropcoefficient (K c ) is set at 70%. The allowable water depletion will be 50%.F = 1.0" x 0.75' x 50% = 1.0 x 0.75 x 0.50 = 2.68 = 2 days0.20" x 0.70 0.20 x 0.70<strong>Sprinkler</strong> Run TimeThe sprinkler run time formula calculates the number <strong>of</strong> minutes required to apply enoughwater to replace the water lost by evapotranspiration for a specific crop irrigated with a system at aparticular precipitation rate and efficiency.The "run time" is calculated using the following formula.T = 60 x D x Et o x K cPR x IEWhere:T = sprinkler run time in minutes60 = constant for conversion <strong>of</strong> area, flow, inches per hour and inches per day intocommon unitsD = watering frequency in daysEt o = reference evapotranspiration rate, in inches per dayK c = crop coefficient, decimalPR = precipitation rate <strong>of</strong> the area, in inches per hourIE = application efficiency <strong>of</strong> the system, percentExample:Determine the sprinkler run time for an athletic field with a daily Et o <strong>of</strong> 0.15 inches and a cropcoefficient for the warm season turf <strong>of</strong> 0.70. The watering schedule is set for every three days. Thesprinkler precipitation rate is 0.50 in./hr. with an application efficiency <strong>of</strong> 75%.T = 60 x 3 x 0.15" x .70 = 60 x 3 x 0.15 x .700.50" x 75% 0.50 x 0.75T = 50 minutes every 3 days®<strong>Handbook</strong> <strong>of</strong> Technical Irrigation Information29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!