Insurance Underwriters Roadshow 2012 January - Petrotrin
Insurance Underwriters Roadshow 2012 January - Petrotrin
Insurance Underwriters Roadshow 2012 January - Petrotrin
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2011 Risk Events and Mitigation<br />
• Fire at No. 2 HTU Fractionator Overhead Condensers on 2011 July 02<br />
– Auto-ignition of a mixture of light hydrocarbon which leaked from plugs and<br />
header expansion joints on overhead coolers following a loss of power on<br />
the plant<br />
– All major recommendations following the incident investigation have been<br />
implemented<br />
– Learnings from incident shared with all stakeholders<br />
• Loss of Power and Flooding Incidents<br />
– Two incidents of loss of power in the last year<br />
– Continued discussions with service provider on reliability<br />
– Upgrade of emergency power equipment in progress and installation of<br />
satellite diesel units for basic emergency systems<br />
– Some drainage work done but major study is to be initiated along with<br />
dredging of main river course<br />
• No Extreme Weather Conditions Experienced<br />
– Decision taken to lease Salt Water Reverse Osmosis (SWRO) systems in the<br />
short term<br />
– A permanent SWRO Plant is to be constructed<br />
30