12.07.2015 Views

Prepared Direct Testimony of Robert McCullough on Behalf of the ...

Prepared Direct Testimony of Robert McCullough on Behalf of the ...

Prepared Direct Testimony of Robert McCullough on Behalf of the ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 38 <str<strong>on</strong>g>of</str<strong>on</strong>g> 76SEATAC-400Enr<strong>on</strong>'s traders developed a number <str<strong>on</strong>g>of</str<strong>on</strong>g> finely tuned schemes that manipulated <strong>the</strong> CaliforniaISO's computer systems in order to receive c<strong>on</strong>gesti<strong>on</strong> fees. The schemes appear to be simplecommercial fraud since, by design, no actual generati<strong>on</strong> was ever envisaged as ~vnning to support<strong>the</strong> schedules filed with <strong>the</strong> California ISO. One scheme in particular, <strong>the</strong> Forney PerpetualLoop," is designed to create an illusi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> power flowing in a circle h m John :Day in Oreg<strong>on</strong>through Mead in Nevada, through <strong>the</strong> critical c<strong>on</strong>gested pathways in California, without any input<str<strong>on</strong>g>of</str<strong>on</strong>g> energy whatsoever.Each <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong>se schemes is a subset <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> generic scheme, Death Star, where an iinaginaryschedule is filed with <strong>the</strong> IS0 that elicits payments for <strong>the</strong> alleviati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>gesti<strong>on</strong>. Since <strong>the</strong>IS0 is rule based ra<strong>the</strong>r than results based, no actual generati<strong>on</strong> is required for <strong>the</strong> right to fileschedules. The <strong>on</strong>ly issues within <strong>the</strong> IS0 pertained to whe<strong>the</strong>r <strong>the</strong> schedules met <strong>the</strong> rules -even if <strong>the</strong>y failed to meet any engineerkng logic.Each scheme is based <strong>on</strong> <strong>the</strong> fact that schedules are <strong>on</strong>ly plans that are filed days and hoursbefore energy flows take place. This allowed Enr<strong>on</strong> to create an imaginary cycle <str<strong>on</strong>g>of</str<strong>on</strong>g> tradesthrough <strong>the</strong> ISO. A good analogy to this scheme is <strong>the</strong> comm<strong>on</strong> form <str<strong>on</strong>g>of</str<strong>on</strong>g> financial fraud known as"check kiting." In this ftaud, a c<strong>on</strong> man writes checks between a cycle <str<strong>on</strong>g>of</str<strong>on</strong>g> bank accounts. Thefrequent deposits and withdrawals lull <strong>the</strong> bank into believing that real transacti<strong>on</strong>s are takingplace. Eventually, <strong>the</strong> c<strong>on</strong> man withdraws all <strong>the</strong> deposits at <strong>on</strong>ce, leaving <strong>the</strong> bank to discoverthat recently deposited checks will bounce since <strong>the</strong> accounts <strong>the</strong>y were written <strong>on</strong> have beenclosed.')John Forney's Perpetual Loop Diagram, Exhibit SEATAC42I.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!