12.07.2015 Views

Prepared Direct Testimony of Robert McCullough on Behalf of the ...

Prepared Direct Testimony of Robert McCullough on Behalf of the ...

Prepared Direct Testimony of Robert McCullough on Behalf of the ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

summarizes <strong>the</strong>ir c<strong>on</strong>clusi<strong>on</strong>s as:The IS0 and <strong>the</strong> Commissi<strong>on</strong> staff agree <strong>on</strong> a number <str<strong>on</strong>g>of</str<strong>on</strong>g> crucialsubstantive points, namely:Generators did not bid all <strong>the</strong>ir capacity into <strong>the</strong> ISO's markets. Thisin turn forced <strong>the</strong> IS0 to fmd and procure resources in "real time" (thatis, under pressure at <strong>the</strong> last minute) in order to serve load.Generators did not follow dispatch instructi<strong>on</strong>s. Those failures t<str<strong>on</strong>g>of</str<strong>on</strong>g>ollow dispatch instructi<strong>on</strong>s during system emergencies imperiled <strong>the</strong>system and <strong>the</strong> provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> reliable electrical service to <strong>the</strong> State.Generators declined Automatic Dispatch System instructi<strong>on</strong>s, citing"ec<strong>on</strong>omic c<strong>on</strong>siderati<strong>on</strong>s," c<strong>on</strong>duct which was not reas<strong>on</strong>able under <strong>the</strong>circumstances. By Commissi<strong>on</strong> staffs count, generators refused in thisway to increase power producti<strong>on</strong> 311 times (even ignoring dispatchesfor less than 5 megawatts) because <strong>the</strong> IS0 tried to dispatch many bidsmultiple times during a particular hour. (Meanwhile, in <strong>the</strong> same period,generators did not resp<strong>on</strong>d to <strong>the</strong> IS0 instructi<strong>on</strong>s for 5 megawatts ormore <str<strong>on</strong>g>of</str<strong>on</strong>g> power 1623 times. More than a third <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong>se 1623 instructi<strong>on</strong>swere IS0 requests for 50 or more megawatts <str<strong>on</strong>g>of</str<strong>on</strong>g> power.The IS0 encountered circumstances where generators refused to run,citing lack <str<strong>on</strong>g>of</str<strong>on</strong>g> operating pers<strong>on</strong>nel, or argued with IS0 operators over

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!