12.07.2015 Views

performance evaluation of swarm intelligence based power system ...

performance evaluation of swarm intelligence based power system ...

performance evaluation of swarm intelligence based power system ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B, coefficient matrix:The unit operating ranges are100 MW 5 PI 5600 MW ;lOOMW5P25400MW ;50MW5P,5200MW;Test Case 2: Two Thermal Units and One CCCP SystemIn this case, the first two units are the same as 3-unit <strong>system</strong> and the third unitis replaced with a combined cycle cogeneration plant (CCCP). In CCCP. gas andsteam turbines are working in combination to generate electric <strong>power</strong>. CCCP has two75 MW gas turbine units and one 50 MW steam turbine unit [82]. The fuel costcharacteristics <strong>of</strong> this plant is shown in Fig. 2.4Generator Power (MW) --+Fig. 2.4. Fuel cost characteristics <strong>of</strong> CCCP <strong>system</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!