Institutional PrioritiesProjects now finished or commencing in 2013 include:• Rehab Wicks Hall 2nd Floor($3,234,100) – This project consists ofrehabilitation of the 2nd floor of WicksHall including, but not limited to mechanical,electrical, plumbing, fire alarmsystems, sprinkler systems, building controlsystems, information technology andinterior finishes. Project also includesreplacement of building exterior envelopeincluding roof, fascia, soffit, exterior lighting,and windows.• Rehab Pedestrian Footbridges($1,375,558) - Project consists of replacingtwo (2) existing pedestrian bridgeswith two (2) new covered bridges including,but not limited to, inspection andrepair to abutments and piers, replacementof site lighting, blue light telephone,and asphalt paved walk.• Rehab Nevaldine North ($2,050,000) -Project consists of replacing the buildingexterior envelope including roof, fascia,soffit, exterior lighting, windows, exteriordoors, and vestibules.• Rehab Building 18 ($305,000) - Projectconsists of replacing the building exteriorenvelope including siding, roof, fascia,soffit, exterior lighting, windows, exteriordoors and vestibules. Project also includesexposing the foundation and installingfoundation waterproofing and drainagesystems, select interior demolition, andremoval of hazardous building material.• Rehab Chaney Phase I ($1,200,000) -Project consists of replacing electrical ductbank and transformers, various plumbingsystems, deteriorated floor finishes, andconstruction of required fire separationsbetween the kitchen and the dining room.• Replace Windows in Payson Hall($502,892) - Project consists of the replacementof all exterior windows.• Rehab Cook Hall Phase I ($1,714,317) -Project consists of rehabilitation of CookHall following the events of a fire onFebruary 10, 2012 including, but notlimited to, mechanical, electrical,plumbing, fire alarm systems, buildingcontrol systems, information technologyand interior finishes. Project also includesreplacement of building exterior envelopeincluding roof, fascia, soffit, exteriorlighting, and windows.A-5State University of New York at <strong>Canton</strong>
Institutional PrioritiesProjects currently in design or ready to be bid:• Site Utility Survey ($834,085) – Projectplans to complete campus-wide survey ofall site utilities including but not limitedto water, storm, sanitary, electrical,natural gas, and information technology.Survey includes, but not limited to, documentationof existing conditions, capacityassessment, recommendations for repair/replacement, and design and maintenancerecommendations.• Replace Windows Various ($2,323,108)- Project plans to replace windows inseveral buildings including French Halland Southworth Library.• Rehab Chaney Phase II ($1,200,000)- Project plans to be a continuation ofcurrent project in which electrical ductbank and transformers are being replacedincluding various plumbing systems,deteriorated floor finishes, and constructionof required fire separations betweenthe kitchen and the dining room area.This project would include, but is notlimited to, replacing the building exteriorenvelope including siding, roof, fascia,soffit, exterior lighting, windows, exteriordoors and vestibules, removal of hazardousbuilding materials and replacementof mechanical, electrical, plumbing, firealarm systems, sprinkler systems, buildingcontrol systems, information technologyand interior finishes.• Rehab Cook Phase II ($3,911,683) -Project plans to be a continuation ofcurrent project to rehabilitate Cook Hallfollowing the events of the February 10,2012 fire concentrating on the north ofthe building where the fire and waterdamage were most severe. The projectincludes but is not limited to mechanical,electrical, plumbing, fire alarm systems,building control systems, informationtechnology, and interior finishes in supportof tiered classroom areas located onthe second floor, the Funeral Services Administrationprogram as well as generalclassroom space located on the first floor.Wicks HallThe project also includes, replacement of building exteriorenvelope including roof, fascia, soffit, exterior lighting, andwindows.• Site and Athletic Field Improvements ($2,000,000) - Projectplans to further improve site and athletic venues associatedwith the new Convocation, Athletic, and RecreationCenter (CARC). Design/construction of this project shallinclude, but not be limited to, improved pedestrian accessfrom Parking Lot 3 crossing Cornell Drive, improved sitelighting along pedestrian access from Parking Lot 3 crossingCornell Drive, site lighting along existing pedestrianwalk within NYPA R.O.W., site lighting along existing drivecircling CARC, improved site lighting at rear of CARC,additional parking and site lighting (existing asphalt pavedarea utilized as staging area during construction), emergencyaccess to athletic fields and athletic field improvementsincluding spectator seating, baseball dugouts, softballdugouts, and press box.2012-2013 <strong>Consolidated</strong> <strong>Financial</strong> <strong>Report</strong>A-6