12.07.2015 Views

ARC Submittal - Sun City Oro Valley

ARC Submittal - Sun City Oro Valley

ARC Submittal - Sun City Oro Valley

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Architectural Review Committee <strong>Submittal</strong> FormFollow up: [ ]<strong>ARC</strong> Rep [ ]NOTE: Please refer to the guidelines on the front of this form. Form must be LEGIBLE; print or type:<strong>Submittal</strong> Date:1. Owner’s name Phone Number: Email:2. Unit: Lot Property Address: ______________________________________________________________3. Mailing Address (if different from property address):4. Property Location (if applicable) [ ] golf course [ ] common area [ ] Green Tree or Ember Ridge HOA5. Contractor name*, phone (if applicable):Address:* For contractor recommendations, contact CONSUMER REFERRAL SERVICES located in the Social Hall or call 520-917-8079.6. [ ] INITIAL SUBMISSION [ ] RESUBMITTED REQUESTWork Description: (if more than one, please number them; use separate sheet if more room is needed)[ ] Awning(s) [ ] Patio Cover [ ] Window(s)/Door(s) [ ] Other (Describe Below)[ ] Driveway Coating [ ] Post Light [ ] Wall(s)/Fence(s)[ ] Flag Pole [ ] Rolling Shutters [ ] Security Door[ ] Landscape [ ] Room Addition [ ] Roof Replacement7. Type of materials to be used:8. Colors to be used:Attach 3x3" samples of paint, fabric, etc.9. Scheduled Start Date: Scheduled Completion Date:Project must be started within 1 year from the date of the <strong>ARC</strong> approval. If not you are required to make a new submittal. Are-Inspection is at the discretion of the SCOV <strong>ARC</strong>. Please notify CSC when project is completed.10. Items submitted with this form: Yes Noa. $10.00 submittal fee (required for all new submittals) [ ] [ ]b. Copy of <strong>Oro</strong> <strong>Valley</strong> Building Permit [ ] [ ]c. Blue prints/sketches [ ] [ ]d. Legible plot plan showing location of work [ ] [ ]e. Letters from neighbors (i.e., for common walls) [ ] [ ]f. Material sample (i.e., awnings) [ ] [ ]NOTE: You are required to contact the <strong>Oro</strong> <strong>Valley</strong> Building Department (229-4800) as to the necessity of obtaining abuilding permit. If required, submit a copy.The undersigned acknowledges that if any work has commenced prior to the approval of the <strong>ARC</strong>, the undersigned will be subject to afine (see SCV fine schedule). If any work does not conform to the CC&R’ or Development Standards, the undersigned will be liable for allcosts necessary to bring the work into compliance plus any fines imposed by the <strong>ARC</strong>.No submittals will be accepted without HOMEOWNER’S signature.Homeowner’s SignatureC:\Users\kmosier\Documents\<strong>ARC</strong>\<strong>ARC</strong> <strong>Submittal</strong> 06-15-2014.docx1


Architectural Review Committee <strong>Submittal</strong> FormSUN CITY ORO VALLEY COMMUNITY ASSOCIATION<strong>ARC</strong>HITECTURAL REVIEW COMMITTEE SUBMITTAL GUIDELINES1. Please refer to the <strong>Sun</strong> <strong>City</strong> <strong>Oro</strong> <strong>Valley</strong> MASTER DECLARATION and the <strong>Sun</strong> <strong>City</strong> <strong>Oro</strong> <strong>Valley</strong> DEVELOPMENT STANDARDS for guidelines. Allhomeowners have received copies. Additional copies are available from the Community Services Coordinator or on the <strong>Sun</strong> <strong>City</strong>website.2. Your submittal must be given to the Community Services Coordinator in person. Please make sure that you, the homeowner, haveincluded all of the required information and have completed the forms in their entirety. If you do not, your request could be delayedtwo weeks or longer. In addition homeowners, or their decision-making representative must be available onsite to meet with an <strong>ARC</strong>committee member to review the submittal. A form is available for you to sign to designate a decision making representative if youwill not be available. If no one is available submittals cannot be processed.3. All submittals require payment of a $10.00 fee; check should be made out to: SCVCAI, except for House Painting, Satellite Dishes,Pavers, Solar Tubes, Air Conditioning units. These must be approved in advance by the Community Services Coordinator.4. An accurate drawing must be submitted along with a plot plan showing the exact location of construction or proposed structure. Forroom additions or anything that must tie into the roofline, an elevation of the proposed structure must also be submitted.5. A working set of blueprints must be submitted if your request is of construction nature; such as: remodeling, room expansion, roomadditions, patio cover, etc.6. If submitting a request for a wall and the wall is to split a common property line, a letter from the neighboring homeowners approvingyour request must be submitted.7. If submitting for approval for security doors/enclosures/entryway of any type, you must submit a drawing of proposed securitydoor/enclosure/entryway along with a floor plan and plot plan indicating the exact proposed location of such.8. If submitting for an awning of any type, submit a drawing/sketch of proposed awning, a 3x3" sample of material, a floor plan and plotplan indicating the exact proposed location. If awning is retractable, show the distance between the property line and awning when itis extended. An awning, addition, etc. must maintain the prescribed setbacks. Setbacks are measured from the property line to thefurthermost extension of the awning, addition, etc.9. The Architectural Review Committee does not have the time to look at any other property as an example of what you would like to do.Your submittal must include all the required information.10. Your request will be reviewed per the <strong>Sun</strong> <strong>City</strong> <strong>Oro</strong> <strong>Valley</strong> “Master Declaration” and “Development Standards”. Approved as submitted,approved as noted, not approved or tabled (returned for additional information) within one week of an official meeting of theArchitectural Review Committee.11. For appeal process, see the Master Declaration: Article XI, Section 3.NOTE: All submittals must be received by noon on the Tuesday prior to the next <strong>ARC</strong> Meeting . The <strong>ARC</strong> meets thesecond and fourth Tuesday of every month.C:\Users\kmosier\Documents\<strong>ARC</strong>\<strong>ARC</strong> <strong>Submittal</strong> 06-15-2014.docx2


Architectural Review Committee <strong>Submittal</strong> FormDesignated Resident Representativefor <strong>ARC</strong> <strong>Submittal</strong>sTo:<strong>Sun</strong> <strong>City</strong> <strong>Oro</strong> <strong>Valley</strong>Architectural Review Committee1565 E. Rancho Vistoso Blvd.<strong>Oro</strong> <strong>Valley</strong>, AZ 85755From: _____________________________________Resident(s)To Whom It May Concern:I (we) are currently engaged in the planning and execution of modifications to our home. We understand that certain thesemodifications may require approval of the Architectural Review Committee (<strong>ARC</strong>).On my (our) behalf, I grant authority to and designate the following designee to represent our interests to the <strong>ARC</strong> and towork with the <strong>ARC</strong> to obtain the permissions and approvals that may be necessary to complete the work on themodifications listed in the attached <strong>Submittal</strong> dated ____________________.___________________________________________________________Designated Representative___________________________________________________________Company (if applicable)___________________________________________________________Address___________________________________________________________Contact Telephone Number(s)Resident:_____________________________________________Resident Name_____________________________________________Resident(s) Signature_______________________Date of Signature_____________________________________________________________________________Address____________________________________________________________________Unit / Lot NumberTelephone Number(s)C:\Users\kmosier\Documents\<strong>ARC</strong>\<strong>ARC</strong> <strong>Submittal</strong> 06-15-2014.docx3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!