12.07.2015 Views

In-service safety inspection and testing of electrical equipment

In-service safety inspection and testing of electrical equipment

In-service safety inspection and testing of electrical equipment

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.3.3.2 Testing <strong>of</strong> insulation<strong>In</strong>sulation resistance tests shall be performed with the switch in the 'on'position. If the <strong>equipment</strong> must beenergized to close or operate a switching device, then a leakage current test shall be performed.Equipment shall be tested:(a)(b)With a leakage current test performed at rated voltage with values not exceeding those specified inTable 1; orWARNING – When performing leakage current tests with the <strong>equipment</strong> energized, the protective earthconductor may be live <strong>and</strong> present a shock hazard.Alternatively, measure insulation resistance in accordance with Appendix B at 500 V d.c. oralternatively, to avoid the <strong>equipment</strong> apparently failing the test because the metal oxide varistors(MOVs), or electro-magnetic interference (EMI) suppression has triggered, for <strong>equipment</strong>containing voltage limiting devices such as MOVs, or EMI suppression, at 250 V d.c. Theinsulation resistance between parts <strong>of</strong> the <strong>equipment</strong> shall be as specified in Table 2.TABLE 1 - Leakage current limitsEquipmentClass IClass IIPortable RCDs with functionalearthCord extension sets, portableoutlets <strong>and</strong> portable RCDsLeakage testMeasure the current flowing in theprotective earth conductorMeasure the current flowing betweenaccessible unearthed metal <strong>and</strong> earthMeasure the current flowing in thefunctional earth conductorMeasure the current flowing in theprotective earth conductorMaximum leakagemA512.51EquipmentClass IClass IITABLE 2 - <strong>In</strong>sulation resistance limits<strong>In</strong>sulation testMeasure between live parts <strong>and</strong>accessible earthed partsWith live <strong>and</strong> neutral conductors<strong>electrical</strong>ly connected, measurebetween live parts <strong>and</strong> any accessiblemetal partsMinimum insulationresistance M1.01.0Portable RCDs with functionalearthMeasure between live parts <strong>and</strong> thefunctional earthing conductor0.1Cord extension sets, cord sets,portable outlets <strong>and</strong> portableRCDsMeasure between live parts <strong>and</strong> theprotective earthing conductor 1.0Mineral insulated metal sheathheating elementsMeasure between live parts <strong>and</strong>accessible earthed parts0.0113 <strong>of</strong> 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!