12.07.2015 Views

An overview of PGM Smelting in Zimbabwe – Zimplats ... - saimm

An overview of PGM Smelting in Zimbabwe – Zimplats ... - saimm

An overview of PGM Smelting in Zimbabwe – Zimplats ... - saimm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Construction <strong>of</strong> the Smelter commenced <strong>in</strong> 1995, under the BHP / Delta Gold <strong>of</strong>Australia jo<strong>in</strong>t venture. The furnace was l<strong>in</strong>ed mid-1996, and smelt<strong>in</strong>goperations commenced <strong>in</strong> 1997. Due to design challenges, the Elkem furnacewas modified by Hatch <strong>in</strong> 1998, and the smelter had not reached full capacitywhen operations were suspended <strong>in</strong> 1999.Each <strong>of</strong> the unit operations <strong>of</strong> the smelter is described <strong>in</strong> greater detail below.Figure 1 shows how concentrate is handled at the smelter.Figure 1: Concentrate handl<strong>in</strong>g at <strong>Zimplats</strong> Smelter64FILTRATION PLANTThickened concentrate (45% solids) is pumped from the thickener <strong>in</strong>to one <strong>of</strong>the two receiv<strong>in</strong>g tanks equipped with agitators. The tanks are mounted onload cells, for metallurgical account<strong>in</strong>g purposes, and each full tank receipt istreated as a batch. Concentrate from receiv<strong>in</strong>g tanks is then pumped to anagitated storage tank.Dur<strong>in</strong>g the BHP operation up to November 2002, the concentrate was be<strong>in</strong>gfiltered <strong>in</strong> two horizontal pressure presses (Perr<strong>in</strong> Presses).The filter presses were designed for a comb<strong>in</strong>ed output <strong>of</strong> 17 metric tons perhour (dry), at 85% runn<strong>in</strong>g time. The design figure for product moisturecontent was 14%, and the two presses were designed to operate <strong>in</strong> parallel, withone press be<strong>in</strong>g filled whilst the other press was be<strong>in</strong>g pressed and cleaned.The two filter presses operated at 110 tons per day per press, at 24% cake

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!