Concrete Project Division (CPD) project consultation<br />

Solutions “off the shelf” do not meet all requirements. In special projects in particular, intelligent and economic individual<br />

concepts are required.<br />

Economical concrete conveying beyond<br />

the reach of truck-mounted concrete pumps<br />

Just like in sports, <strong>Putzmeister</strong> had to<br />

work hard for the many, worldwide pump<br />

records in its history in concrete high-rise<br />

and long-distance placement.<br />

Essentially, these records were achieved<br />

by the right solutions to engineering<br />

requests or, in other words, the successful<br />

implementation of customer requirements.<br />

This decade-long development of concrete<br />

placement concepts is today the foundation<br />

of machine technology and, above all, the<br />

knowledge to which the <strong>Putzmeister</strong> engineers<br />

from the Concrete Project Division<br />

(CPD) refer in their engineering services.<br />

The field of application here ranges from<br />

high-rise, power plant, water, dam and<br />

bridge construction to tunnelling, longdistance<br />

concrete placement and excavation.<br />

The CPD contacts will be at Bauma, in hall<br />

6 or outside, ready to answer your questions<br />

or discuss your individual Projects.<br />

Wie present you the following machines<br />

and aspects of stationary concrete placement<br />

technology at Bauma:<br />

• Concrete placement climbing system<br />

RS 850 with the new boom MX 30(33)-3<br />

• Stationary pumps from various service<br />

classes in electric and diesel versions<br />

• System parts from the <strong>Putzmeister</strong><br />

concrete delivery line, coupling and gate<br />

valve systems, designed for concrete<br />

pressures of 85 bar to over 200 bar.<br />

The <strong>Putzmeister</strong> Concrete Project Division<br />

(CPD) is your partner for:<br />

• Demanding concrete delivery tasks<br />

in construction engineering<br />

• Consultation in the fields of concreting<br />

logistics, concrete technology with the<br />

focus on „pumpability of concretes“ and<br />

concreting processes<br />

25<br />

The aim: Increased profitability through<br />

timely planning of the correct machine<br />

technology and the right concrete placement<br />

processes. n<br />

Special cases require individual<br />

solutions: For example, the “Dubai<br />

gate valve”, which was responsible for<br />

enabling the record-breaking delivery<br />

heights of over 600 metres during the<br />

construction of the Burj Khalifa.<br />

26<br />

Concrete work on Block 3 of the Finnish KKW Olkiluoto<br />

Concreting of the huge cavern of the Austrian pump accumulator power plant KOPS II<br />

Super high-pressure pumps BSA 14,000 SMPD in use for<br />

high-rise pumping at the Burj Khalifa (formerly Burj Dubai).<br />

Concrete Project Division (CPD) project consultation<br />

27<br />

28<br />

29<br />

Sample applications of <strong>Putzmeister</strong><br />

concrete delivery line systems and<br />

concrete gate valve systems<br />

Concrete pressure < 130 bar<br />

High, deep and long-distance placement<br />

• Economical solution for common<br />

applications with stationary concrete<br />

pumps<br />

• Low material weight, short assembly<br />

times, easy handling<br />

Concrete pressure 130 – 200 bar<br />

High-rise construction up to<br />

approx. 450 m, far and deep placement<br />

• Economical solution for large outputs at<br />

high pressures<br />

• Very good line stability and flexibility<br />

• High wear-resistance and long<br />

service life<br />

Concrete pressure > 200 bar<br />

Extremely high and long-distance<br />

concrete placement<br />

• Very good stability in the event of load<br />

shifting during concrete pump switchover<br />

at very high pump pressures<br />

• Very good line stability and assembly<br />

High wear-resistance and long<br />

service life<br />

10 PM 4300 GB PM 4300 GB 11