Concrete Project Division (CPD) project consultation<br />
Solutions “off the shelf” do not meet all requirements. In special projects in particular, intelligent and economic individual<br />
concepts are required.<br />
Economical concrete conveying beyond<br />
the reach of truck-mounted concrete pumps<br />
Just like in sports, <strong>Putzmeister</strong> had to<br />
work hard for the many, worldwide pump<br />
records in its history in concrete high-rise<br />
and long-distance placement.<br />
Essentially, these records were achieved<br />
by the right solutions to engineering<br />
requests or, in other words, the successful<br />
implementation of customer requirements.<br />
This decade-long development of concrete<br />
placement concepts is today the foundation<br />
of machine technology and, above all, the<br />
knowledge to which the <strong>Putzmeister</strong> engineers<br />
from the Concrete Project Division<br />
(CPD) refer in their engineering services.<br />
The field of application here ranges from<br />
high-rise, power plant, water, dam and<br />
bridge construction to tunnelling, longdistance<br />
concrete placement and excavation.<br />
The CPD contacts will be at Bauma, in hall<br />
6 or outside, ready to answer your questions<br />
or discuss your individual Projects.<br />
Wie present you the following machines<br />
and aspects of stationary concrete placement<br />
technology at Bauma:<br />
• Concrete placement climbing system<br />
RS 850 with the new boom MX 30(33)-3<br />
• Stationary pumps from various service<br />
classes in electric and diesel versions<br />
• System parts from the <strong>Putzmeister</strong><br />
concrete delivery line, coupling and gate<br />
valve systems, designed for concrete<br />
pressures of 85 bar to over 200 bar.<br />
The <strong>Putzmeister</strong> Concrete Project Division<br />
(CPD) is your partner for:<br />
• Demanding concrete delivery tasks<br />
in construction engineering<br />
• Consultation in the fields of concreting<br />
logistics, concrete technology with the<br />
focus on „pumpability of concretes“ and<br />
concreting processes<br />
25<br />
The aim: Increased profitability through<br />
timely planning of the correct machine<br />
technology and the right concrete placement<br />
processes. n<br />
Special cases require individual<br />
solutions: For example, the “Dubai<br />
gate valve”, which was responsible for<br />
enabling the record-breaking delivery<br />
heights of over 600 metres during the<br />
construction of the Burj Khalifa.<br />
26<br />
Concrete work on Block 3 of the Finnish KKW Olkiluoto<br />
Concreting of the huge cavern of the Austrian pump accumulator power plant KOPS II<br />
Super high-pressure pumps BSA 14,000 SMPD in use for<br />
high-rise pumping at the Burj Khalifa (formerly Burj Dubai).<br />
Concrete Project Division (CPD) project consultation<br />
27<br />
28<br />
29<br />
Sample applications of <strong>Putzmeister</strong><br />
concrete delivery line systems and<br />
concrete gate valve systems<br />
Concrete pressure < 130 bar<br />
High, deep and long-distance placement<br />
• Economical solution for common<br />
applications with stationary concrete<br />
pumps<br />
• Low material weight, short assembly<br />
times, easy handling<br />
Concrete pressure 130 – 200 bar<br />
High-rise construction up to<br />
approx. 450 m, far and deep placement<br />
• Economical solution for large outputs at<br />
high pressures<br />
• Very good line stability and flexibility<br />
• High wear-resistance and long<br />
service life<br />
Concrete pressure > 200 bar<br />
Extremely high and long-distance<br />
concrete placement<br />
• Very good stability in the event of load<br />
shifting during concrete pump switchover<br />
at very high pump pressures<br />
• Very good line stability and assembly<br />
High wear-resistance and long<br />
service life<br />
10 PM 4300 GB PM 4300 GB 11