Mining and tunneling<br />

Deep in the heart<br />

of the dark continent<br />

The <strong>Putzmeister</strong> wet shotcrete machines<br />

are used worldwide.<br />

Here, the SPM 407 P works in a copper<br />

mine in the “copper belt”. This is the name<br />

for Africa‘s biggest copper mining region<br />

deep in the heart of the continent.<br />

50 51<br />

52 53 54<br />

55 56<br />

57<br />

Handmade shotcrete<br />

The SPM 702 is represented at the trade<br />

fair stand by its big brother. The lightweight,<br />

compact concrete pump can be<br />

used for a wide range of applications,<br />

such as concrete spraying, mortar injection<br />

and other concreting projects.<br />

It is very well suited to narrow tunnel<br />

pipes and can be used optimally both for<br />

securing the head with shotcrete, and for<br />

floor and arch concreting of crossways.<br />

The pump is available with a truck-mounted<br />

chassis or a carriage-like base structure.<br />

Of course, the machine operators have<br />

received intensive training at the time of<br />

commissioning. This is part of the worldwide<br />

<strong>Putzmeister</strong> Service, which ensures that<br />

our customers are able to make the most of<br />

their new machines. n<br />

If equipped with an additive tank, it is constructed<br />

on a double-axle long trailer.<br />

The integrated metering device guarantees<br />

additive delivery proportional to the concrete<br />

output and therefore guarantees economical<br />

and efficient use of the expensive<br />

chemicals. n<br />

The new SPM 4207: concrete spraying<br />

specially for small tunnel cross-sections<br />

The Bauma innovation for concrete<br />

spatter in mines and tunnels is specially<br />

designed for small cross-sections, with<br />

its boom reach of 8.5 m.<br />

The new SPM 4207 is the result of the<br />

experience made on construction sites<br />

throughout the world in recent years with<br />

the predecessor model SPM 407.<br />

The highlight:<br />

Even in the PC variant with additionally<br />

integrated screw compressor, it remains<br />

as compact and flexible as the predecessor<br />

model. This was a particular request from<br />

customers and makes its use significantly<br />

more mobile and independent than with<br />

the previously available machines with<br />

similar dimensions.<br />

The basis for this is an intelligent chassis<br />

concept as a platform, on which different<br />

customer-specific requirements can be realised.<br />

During development, great emphasis<br />

was placed on a very robust frame, which<br />

is adapted to the highest stresses of working<br />

in a tunnel.<br />

Other advantages of the new<br />

shotcrete machine:<br />

• a cost-saving Additive Management<br />

System<br />

• an on-board computer with multi-<br />

linguistic colour display for showing per-<br />

formance data, mixture breakdown,<br />

error diagnostics, warnings, etc.<br />

• safety driver‘s cab in accordance with<br />

the ROPS/FOPS ordinance<br />

• xenon working lights<br />

• protected support legs<br />

• optional turbocharger for diesel engine<br />

for use at high altitudes<br />

In addition, there are option packages,<br />

which can be adapted to the different conditions<br />

in mines and tunnels, such as: mine<br />

tyres, cable drum with up to 100 m, catalytic<br />

converter, diesel particle filter, integrated<br />

fire protection system, high-pressure<br />

cleaner or a water pump (operable both via<br />

diesel and electric motor). n<br />

The SPM 4207 PC in use in a copper mine in Aljustrel (Portugal)<br />

Basic data SPM 4207 P SPM 4207 PC<br />

Lenght 6,250 mm 6,970 mm<br />

Width 2,000 mm 2,000 mm<br />

Height 2,450 mm 2,450 mm<br />

Weight 6,900 Kg 8,400 Kg<br />

Spraying arm / Reach Aliva 302 / 8,5 m Aliva 302 / 8,5 m<br />

Theoretical output 4 – 20 m3 /h 4 – 20 m3 /h<br />

Concrete maximal pressure 65 bar 65 bar<br />

Climbing ability longitude (SAE norm) 48 % 35 %<br />

Engine 47.5 kW 47.5 kW<br />

Further information: marketing@putzmeister.es<br />

59<br />

Dry run in simulation<br />

Mining and tunneling<br />

You have to learn the right way to control<br />

shotcrete machines. In order to avoid<br />

unnecessary material consumption<br />

and beginner‘s operating errors, <strong>Putzmeister</strong><br />

has developed a simulation programme<br />

with which you can learn and<br />

practice the operation of the control<br />

units virtually.<br />

You are welcome to try out our<br />

simulation at Bauma.<br />

18 PM 4300 GB PM 4300 GB 19<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!