12.07.2015 Views

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Mn</strong>/<strong>DOT</strong> <strong>SD</strong>-<strong>15</strong> <strong>April</strong> 2, <strong>2012</strong> <strong>Schedule</strong> <strong>of</strong> <strong>Materials</strong> <strong>Control</strong> P a g e 24IV. Concrete Construction Items (cont.) (www.dot.state.mn.us/materials/concrete.html)Certified Ready-Mix - Concrete Plant ProductionRemarks:(1) Mix design is provided by <strong>Mn</strong>/<strong>DOT</strong> unless otherwise specified in the Contract.(2) All gradation and quality tests require companion samples. Samples taken at location identified on Contact Report located at plant.(3) Perform Quality testing as directed by the Concrete Engineer.Minimum Sample Sizes:Gradation Test: Moisture Test: Quality Sample Size for Lab Submittal:+19 mm (3/4” Plus) 12 kg (25 lb.) Coarse Aggregate 2000 g +19 mm (3/4” Plus) 24 kg (50 lb.)–19 mm (3/4” Minus) 5 kg (10 lb.) Fine Aggregate 500 g –19 mm (3/4” Minus) <strong>15</strong> kg (30 lb.)CA-70, CA-80 2.5 kg (6 lb.) Fine Aggregate <strong>15</strong> kg (30 lb.)Sand500 g (1.1 lb.)Pay ItemNo.Test TypeSpec.No.Producer/Contractor Testing Agency Testing Form No.230224012405241124122422245224612506251125142519252125312533254525502554255725642565Gradation Testing(QC/QA)(5-694.145and5-694.148)246131263137When over 20 m 3 (yd 3 ) <strong>of</strong> Agency concrete produced perday:Coarse: 1 per 100 m 3 (yd 3 )Fine: 1 per 200 m 3 (yd 3 )Passing aggregate gradations are required prior to the start <strong>of</strong>concrete production each day. Performing testing onrepresentative material at the end <strong>of</strong> the most recent day <strong>of</strong>production is allowed.Washing the fine aggregate gradation (QC) sample is notrequired when the result on the -75µm (#200) sieve <strong>of</strong> theunwashed sample is less than 1.0%,Hold QA (QC companion) samples until they are picked upby the Agency monitor. Discard after 14 calendar days if notpicked up.For Contractor Mix Designs utilizing an approved JMF:1 per 400 m 3 (yd 3 ) or completed every 4 hours, whicheverresults in the higher sampling rate.None 21763ConcreteAggregateWorksheet(QC/QA)2449WeeklyConcreteAggregateReport

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!