12.07.2015 Views

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Mn</strong>/<strong>DOT</strong> <strong>SD</strong>-<strong>15</strong> <strong>April</strong> 2, <strong>2012</strong> <strong>Schedule</strong> <strong>of</strong> <strong>Materials</strong> <strong>Control</strong> P a g e 9I. Grading and Base Construction Items 2005 and <strong>2012</strong> Spec Book (www.dot.state.mn.us/materials/gradingandbase.html)Pay ItemNumberMaterialSpec.No.Minimum ContractorQuality <strong>Control</strong> TestingRateMinimum Agency Verification(Acceptance) Field Testing(see note 1)Minimum Companion(Lab) Sample(See Note 2)Rate Size Rate SizeForm No.(See Note 4)(a) 2211(b) 22212. Proctor Test(a) Aggregate Base(b) Aggregate Shoulder2211,2221,&SpecialProvisions(c) 2105 (c) Embankment Soil 2105 2005 Spec Book:(See Note 10)2005 Spec Book:1 per source<strong>2012</strong> Spec Book1 per source2005 & <strong>2012</strong> Specs Book : ForSpecified Density: 1/major soil type.50 lbOne perproject25 lb. G&B-303(24587-01)<strong>2012</strong> Spec Book:1 major soil type(See Note 6)<strong>2012</strong> Spec Book:For all other compaction requirements:One Contractor Companion/project(a) 2211(b) 22213. Specified Density Test(Sand Cone or other)(a) Aggregate Base(b) Aggregate Shoulder2211, 2221&SpecialProvisions(See Note 10)1/1,000 yd 3 (CV) G&B-001(021<strong>15</strong>-03)(c) 2105(c) Embankment Soil(Excavation & Borrow)2105&SpecialProvisions1/4,000 yd 3 (CV)G&B-304(02140-03)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!