12.07.2015 Views

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

Mn/DOT SD-15 April 2, 2012 Schedule of Materials Control P a g e 1 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Mn</strong>/<strong>DOT</strong> <strong>SD</strong>-<strong>15</strong> <strong>April</strong> 2, <strong>2012</strong> <strong>Schedule</strong> <strong>of</strong> <strong>Materials</strong> <strong>Control</strong> P a g e 28IV. Concrete Construction Items (cont.) (www.dot.state.mn.us/materials/concrete.html)Concrete Pavement - Concrete Plant ProductionPay ItemNo.Test TypeSpec.No.Producer/Contractor Testing Agency Testing Form No.2301 Water ContentVerificationTesting(MicrowaveOvenVerification)(5-694.532)2301 Obtain the plastic concrete sample at the plant. If w/c incentives apply:Microwave oven verification testing to verify the w/c ratio iscompleted in conjunction with Agency aggregate moisturetesting.Do not leave samples unattended.For a concrete paving batchplant:For a certified readymixplant:Concrete W/CRatioCalculationWorksheetUnit Weight(QC)(5-694.542)Air Content(QC)(5-694.541)Test one load <strong>of</strong> concrete per day at the plant.Take initial sample formicrowave oven verificationtesting within the first 175 m 3(250 yd 3 ).At least one additionalverification test should be takenif more than 750 m 3 (1000 yd 3 )is produced in a day.None2461 Test the first load <strong>of</strong> concrete at the plant. NoneTake initial sample formicrowave ovenverification testing withinthe first 100 m 3 (yd 3 ).At least one additionalverification test should betaken if more than 400 m 3(yd 3 ) is produced in aday.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!