12.07.2015 Views

Administrative & Finance Committee Meeting - April 8 ... - Omnitrans

Administrative & Finance Committee Meeting - April 8 ... - Omnitrans

Administrative & Finance Committee Meeting - April 8 ... - Omnitrans

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OMNITRANSsbX E Street Corridor Bus Rapid Transit (BRT) ProjectContract No.: PLN09-21COR # Potential Change Order Description Amount*79Remove Center Median along Hospitality from Carnegie West to Tippecanoe toExpedite Construction$280,00083 Solar Panel ($407,035)99Landscape and Irrigation Revisions - North Side of Hospitality from Carnegie West toCarnegie East$120,000102 Landscape and Irrigation Modifications Hospitality STA 695+00 to 704+00 $15,000105 World Oil Gas Station Revisions $50,000106 Revised Pedestrian Access North Side of Hospitality STA 620+00 and 621+00. $40,000107 Tree Plan Modifications along Hospitality Lane $75,000108A Station Flowline Revisions to Rialto $50,000108B Station Flowline Revisions to North Mall $50,000108C Station Flowline Revisions to Court $50,000108D Station Flowline Revisions to Carnegie $50,000108E Station Flowline Revisions to Tippecanoe $50,000108F Station Flowline Revisions to Hunts Lane $50,000110A110BLandscape and Irrigation Modifications On South Side of Hospitality from Costco to EStreet (Civil Work Only)Landscape and Irrigation Modifications On South Side of Hospitality from Costco to EStreet$120,000111 Revisions to Loma Linda Park-N-Ride Civil Scope $29,981113 Revisions to Loma Linda Park-N-Ride Landscape and Irrigation $40,000118 Additional Traffic Signal controller on E St and Rialto $10,000119 Repair damaged block wall at Kendall/Marshall Park & Ride $20,000120Water valves in conflict with the curb and gutter line on Hospitality from Hunts Lane toWaterman Ave. on the south side.$52,450121 Low rail at back of station adjacent to the V-ditch at Kendall Palm Station $15,000123 Buy America $10,000124 Plan revisions for Elimination of Palm Trees at the Sturgeon Building $5,000125 Theft Along the Corridor – Comet $18,864126 Delete restoration of turf on E and North Mall way ($10,014)127 Conflict with Edison and Verison;Storm Drain Redesign on Hospitality and Tippecanoe $29,9821420

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!