RESOLUTION NO.<br />

A RESOLUTION ADOPTING OMNITRANS FISCAL YEARS<br />

<strong>2008</strong>-<strong>2013</strong> SHORT RANGE TRANSIT PLAN (SRTP).<br />

WHEREAS, <strong>Omnitrans</strong>’ Mission is to provide the San Bernardino Valley with comprehensive<br />

public mass transportation services which maximize customer use, comfort, safety, and satisfaction while<br />

efficiently using financial and other resources, in an environmentally sensitive manner;<br />

WHEREAS, transit is important for the economy, community, air quality, congestion mitigation<br />

and overall mobility;<br />

WHEREAS, <strong>Omnitrans</strong> seeks to expand its value to the San Bernardino Valley in the above<br />

areas, by becoming a more critical and useful part of the transportation infrastructure;<br />

WHEREAS, population, housing and job growth in the region require increasingly proactive<br />

planning to ensure that transit can expand to meet the resulting demand;<br />

WHEREAS, rising fuel costs and increasing concerns about climate change make it prudent to<br />

create the most versatile and useful transit system possible, by providing an alternative to driving;<br />

WHEREAS, <strong>Omnitrans</strong> also recognizes the importance of transit to meeting lifeline mobility needs<br />

throughout the region, including but not limited to the mobility needs of seniors and persons with<br />

disabilities;<br />

WHEREAS, all-day, early morning, and late evening transit service at reasonable frequencies is<br />

crucial to enable employees to reach their job sites,<br />

WHEREAS, <strong>Omnitrans</strong>, like many transit agencies, is currently experiencing declining ridership<br />

and increasing operating costs, and must restructure its routes and schedules to better serve the<br />

community and to respond to a decline in operating speeds due to increasing congestion;<br />

WHEREAS, the <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> provides budgetary guidelines for a six-year period, in<br />

this case Fiscal Years <strong>2008</strong>-<strong>2013</strong>;<br />

WHEREAS, the <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> identifies three scenarios – Constrained, Partially<br />

Constrained, and Unconstrained, where additional funding necessary to meet the mass transit needs of<br />

the San Bernardino Valley has been identified, but not secured;<br />

WHEREAS, the Constrained Scenario that is described here does not fully draw-down the funds<br />

potentially available to <strong>Omnitrans</strong> which varies somewhat from the industry-standard definition.<br />

WHEREAS, the <strong>Omnitrans</strong> Board of Directors reaffirms its desire to provide the resources<br />

needed to ensure the achievement of a 25% farebox recovery ratio by <strong>2013</strong> to provide a buffer against<br />

future cost increases and ridership decreases while ensuring the continued receipt of available operating<br />

funds;<br />

WHEREAS, the resulting <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> is a culmination of information from meetings<br />

with the <strong>Omnitrans</strong> Board of Directors, member City and County staff, our customers, county and<br />

community groups representing the social needs of the community <strong>Omnitrans</strong> serves, and both internal<br />

and contractor staff;


NOW, THEREFORE, BE IT RESOLVED BY THE OMNITRANS BOARD OF DIRECTORS:<br />

1. <strong>Omnitrans</strong> hereby adopts the <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> for <strong>2008</strong>-<strong>2013</strong> as its guiding policy document,<br />

governing service initiatives during that period and policy initiatives that can begin at once.<br />

2. Service allocation at <strong>Omnitrans</strong> will be governed by the following overarching goals:<br />

a. <strong>Omnitrans</strong> will aim for an ultimate goal of 25% farebox recovery by <strong>2013</strong> in apportioning its<br />

operating resources<br />

b. <strong>Omnitrans</strong> will move toward the goal expressed in 2(a) above by redirecting some existing<br />

resources, and devoting most new resources as they become available, to service that<br />

improve productivity and farebox recovery.<br />

c. <strong>Omnitrans</strong> will pursue an aggressive capital program to enhance its fleet, facilities, transit<br />

centers, new technologies (ITS) and on-street amenities. Federal funds to be pursued include<br />

Federal <strong>Transit</strong> Administration (FTA) Section 5307 Formula and FTA Section 5309 Bus and<br />

Bus Facilities funds. Other federal funding sources available to <strong>Omnitrans</strong> include FTA<br />

Section 5308 Clean Fuels, FTA Section 5310 Transportation for Elderly Persons and Persons<br />

with Disabilities, Section 5316 Job Access and Reverse Commute (JARC), and Section 5317<br />

New Freedoms. SANBAG is currently developing a Public <strong>Transit</strong>-Human Services<br />

Transportation Coordination <strong>Plan</strong> for San Bernardino County. Once complete this plan will<br />

provide governance, administration, maintenance and operation of Sections 5316 and 5317.<br />

At that time, <strong>Omnitrans</strong> will be able to obtain this funding for use on its projects. Other FTA<br />

discretionary funding sources will be pursued as they become available. State <strong>Transit</strong><br />

Assistance (STA) funds will be the primary source of required local match in the pursuit of<br />

these Federal funds. Local Transportation Funds (LTF) will be used when STA funds are<br />

unavailable due to statutory requirements.<br />

d. <strong>Omnitrans</strong> will continue to develop and implement the sbX BRT project. <strong>Omnitrans</strong> is applying<br />

for FTA Section 5309 New/Small Starts funds. In addition, <strong>Omnitrans</strong> would utilize FTA<br />

Section 5307 Formula, STA, LTF, CMAQ, State Transportation Improvement Program (STIP),<br />

Proposition 1B infrastructure bonds, and San Bernardino County Measure I funding program<br />

funds. <strong>Omnitrans</strong> is also securing in-kind transfers of land and/or facilities from other<br />

government agencies and private developers.<br />

e. <strong>Omnitrans</strong> will define its existing and planned routes that run every 15 minutes or better all<br />

day as its “Base <strong>Transit</strong> Network”, and will work, both internally and with member jurisdictions<br />

to:<br />

1. Market the Base <strong>Transit</strong> Network as the “backbone” of the system, much as the Interstate<br />

Highway System is the backbone of the road network.<br />

2. Encourage transit-oriented land uses to locate on the existing or planned Base <strong>Transit</strong><br />

Network, so as to minimize new transit costs that such development would otherwise<br />

impose on <strong>Omnitrans</strong>.<br />

3. Develop operating speed, policies, and strategies that streamline operations to minimize<br />

delay, thereby both making transit more attractive and minimizing the cost of adding new<br />

service to accommodate transit delay due to congestion.<br />

4. <strong>Omnitrans</strong> will acquire facility and capital equipment funding to support implementation of<br />

the “Constrained” financial scenario, including, but not limited to:<br />

a. The acquisition of 90 replacement transit coaches for fixed route operations at an<br />

estimated cost of $39.7 million.<br />

b. The acquisition of 85 replacement paratransit vehicles for OmniLink and ADA<br />

complementary service at an estimated cost of $7.9 million.<br />

c. The acquisition of 16 bus rapid transit vehicles for the sbX service at an<br />

estimated cost of $18.0 million.<br />

d. The estimated $163 million cost associated with the implementation of the sbX<br />

BRT system along E Street through Loma Linda and San Bernardino.<br />

e. The construction of or improvements to the Chino Transcenter ($2.5 million), the<br />

Ontario Transcenter ($0.6 million), and the Chaffey Transcenter ($3.0 million).


CERTIFICATION<br />

The undersigned duly qualified CEO/General Manager acting on behalf of the <strong>Omnitrans</strong> certifies that the<br />

foregoing is a true and correct copy of a resolution adopted at a legally convened meeting of the<br />

<strong>Omnitrans</strong> Board of Directors held on this 11 th day of July 2007, by the following vote to wit:<br />

AYES:<br />

NOES:<br />

ABSENT:<br />

_______________________________<br />

Durand L. Rall, CEO/General Manager<br />

Secretary, <strong>Omnitrans</strong> Board of Directors<br />

The foregoing resolution is hereby approved this 11 th day of July 2007.<br />

_______________________________<br />

John B. Roberts, Jr.<br />

Board Chair, <strong>Omnitrans</strong> Board of Directors<br />

Approved as to form:<br />

____________________________<br />

Fiona G. Luke<br />

Chief Deputy Counsel for <strong>Omnitrans</strong>


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

FOREWORD ....................................................................................................................I<br />

1. INTRODUCTION........................................................................................1<br />

1.1 Mission.............................................................................................................................................2<br />

1.2 <strong>Omnitrans</strong> 2015 Strategic <strong>Plan</strong>.......................................................................................................2<br />

1.3 The Role of Public <strong>Transit</strong> ..............................................................................................................2<br />

1.4 Benefits of Public <strong>Transit</strong> ...............................................................................................................3<br />

1.5 Traffic ...............................................................................................................................................4<br />

1.6 Population and Employment Growth ............................................................................................4<br />

1.7 Economy ..........................................................................................................................................5<br />

1.8 Seniors and Persons with Disabilities...........................................................................................5<br />

1.9 Financial Performance....................................................................................................................5<br />

1.10 Customer Service............................................................................................................................6<br />

1.11 Accomplishments ...........................................................................................................................6<br />

1.12 Local and National Mobility Objectives.......................................................................................10<br />

1.13 Role of the FY <strong>2008</strong>-<strong>2013</strong> SRTP....................................................................................................11<br />

1.14 SRTP Preparation Process/COA..................................................................................................11<br />

1.15 Ongoing Studies and Initiatives That Will Impact This SRTP ...................................................12<br />

1.15.1 Other <strong>Omnitrans</strong> Studies & Intiatives ................................................................ 12<br />

1.15.2 Other <strong>Plan</strong>ning Initiatives ................................................................................ 14<br />

1.16 Distribution of the SRTP...............................................................................................................14<br />

2. EXISTING OMNITRANS TRANSIT SERVICES ......................................16<br />

2.1 System Description.......................................................................................................................16<br />

2.2 Fixed Route Service ......................................................................................................................16<br />

2.2.1 Definition of Fixed Route Service ..................................................................... 16<br />

2.2.2 Service Characteristics ................................................................................... 16<br />

2.2.3 Fleet ............................................................................................................ 24<br />

2.2.4 Facilities....................................................................................................... 25<br />

2.2.5 Fare Structure ............................................................................................... 26<br />

2.2.6 Rider Profile.................................................................................................. 26<br />

2.2.7 Travel Characteristics..................................................................................... 26<br />

2.2.8 Performance Characteristics and Forecast for FY <strong>2008</strong>-<strong>2013</strong>................................ 27<br />

2.3 Access Service..............................................................................................................................29<br />

2.3.1 Definition of Access Service ............................................................................ 29<br />

2.3.2 Service Characteristics ................................................................................... 29<br />

2.3.3 Fleet ............................................................................................................ 31<br />

2.3.4 Facilities....................................................................................................... 32<br />

2.3.5 Fare Structure ............................................................................................... 32<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2.3.6 Rider Profile.................................................................................................. 35<br />

2.3.7 Travel Characteristics..................................................................................... 35<br />

2.3.8 Performance Characteristics and Forecast for FY <strong>2008</strong>-<strong>2013</strong>................................ 38<br />

2.4 OmniLink Service..........................................................................................................................41<br />

2.4.1 Definition of OmniLink Service ......................................................................... 41<br />

2.4.2 Service Characteristics ................................................................................... 41<br />

2.4.3 Fleet ............................................................................................................ 46<br />

2.4.4 Facilities....................................................................................................... 47<br />

2.4.5 Fare Structure ............................................................................................... 47<br />

2.4.6 Rider Profile.................................................................................................. 47<br />

2.4.7 Travel Characteristics..................................................................................... 48<br />

2.4.8 Performance Characteristics and Forecast for FY <strong>2008</strong>-<strong>2013</strong>................................ 54<br />

3. REGIONAL TRANSIT SERVICES...........................................................56<br />

3.1 Riverside <strong>Transit</strong> Agency .............................................................................................................56<br />

3.2 Foothill <strong>Transit</strong> ..............................................................................................................................56<br />

3.3 Orange County Transportation Authority ...................................................................................57<br />

3.4 Los Angeles County Metropolitan Transportation Authority....................................................58<br />

3.5 Pomona Valley Transportation Authority....................................................................................58<br />

3.6 Mountain Area Regional <strong>Transit</strong> Authority .................................................................................58<br />

3.7 Victor Valley <strong>Transit</strong> Authority.....................................................................................................58<br />

3.8 Southern California Regional Rail Authority (Metrolink) ...........................................................58<br />

3.9 Greyhound .....................................................................................................................................59<br />

3.10 Amtrak............................................................................................................................................59<br />

3.11 Ontario International Airport ........................................................................................................59<br />

3.12 San Bernardino International Airport ..........................................................................................59<br />

3.13 Transfer and Cooperative Service Agreements .........................................................................60<br />

4. SERVICE AREA PROFILE (AS OF JULY 1, 2007).................................61<br />

4.1 Service Area...................................................................................................................................61<br />

4.2 Demographics of the Service Area..............................................................................................61<br />

4.2.1 Population Growth.......................................................................................... 61<br />

4.2.2 <strong>Transit</strong> Dependence........................................................................................ 62<br />

4.3 <strong>Transit</strong> Orientation Index..............................................................................................................67<br />

4.4 General <strong>Plan</strong> Summaries ..............................................................................................................71<br />

4.5 City Profiles ...................................................................................................................................71<br />

4.6 Community-Specific Effects of Economic Change on Population, Employment Growth and<br />

<strong>Transit</strong> Use.....................................................................................................................................73<br />

4.7 Hot Spots .......................................................................................................................................75<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4.7.1 Population Growth.......................................................................................... 75<br />

4.7.2 High Density.................................................................................................. 75<br />

4.7.3 Senior Concentrations .................................................................................... 76<br />

4.7.4 Poverty and Vehicle Ownership ........................................................................ 76<br />

4.7.5 New Development........................................................................................... 76<br />

5. REGIONAL PLANNING ACTIVITIES ......................................................87<br />

5.1 <strong>Omnitrans</strong> sbX (BRT) Systemwide <strong>Plan</strong>......................................................................................87<br />

5.2 <strong>Omnitrans</strong> sbX E Street Corridor Project....................................................................................89<br />

5.3 SCAG 2004 Regional Transportation <strong>Plan</strong> (RTP) .......................................................................92<br />

5.4 SANBAG Redlands Passenger Rail Station Area <strong>Plan</strong> ..............................................................93<br />

5.5 SANBAG Public <strong>Transit</strong>-Human Services Transportation Coordination <strong>Plan</strong> for San<br />

Bernardino County........................................................................................................................95<br />

5.6 SANBAG Comprehensive Transportation <strong>Plan</strong> (CTP)................................................................97<br />

5.7 SCAG Compass Blueprint 2% Strategy.......................................................................................97<br />

5.8 Gold Line Extension....................................................................................................................100<br />

5.9 SCRRA Strategic Assessment (Metrolink)................................................................................102<br />

5.10 Intelligent Transportation Systems (ITS)/Traffic Management <strong>Plan</strong>s .....................................102<br />

5.10.1 Inland ITS Strategic <strong>Plan</strong> ...............................................................................102<br />

5.10.2 San Bernardino Valley Coordinated Traffic Signal System <strong>Plan</strong> ...........................103<br />

5.10.3 San Bernardino County Carpool Lanes .............................................................103<br />

5.10.4 Park and Ride Lots........................................................................................104<br />

5.10.5 511 Motorist Assistance Traveler Information System (MATIS) ............................104<br />

5.10.6 City of Ontario Transportation Systems Communications Master <strong>Plan</strong>...................104<br />

5.10.7 E Street <strong>Transit</strong> Corridor Project .....................................................................104<br />

5.11 Federal and State Compliance Information ..............................................................................104<br />

5.11.1 Environmental Justice....................................................................................104<br />

5.11.2 Contingency Fleet .........................................................................................116<br />

5.11.3 ADA Compliance ...........................................................................................116<br />

5.11.4 Bus Stop Announcements/Passenger Assistance ...............................................117<br />

5.11.5 Bus Stop Design Guidelines............................................................................117<br />

5.11.6 Accessibility between Bus Stops and Facilities/Developments .............................117<br />

5.11.7 Bus Stop Survey ...........................................................................................117<br />

5.11.8 Fare Requirements and Premium Service .........................................................117<br />

6. SERVICE GOALS AND POLICIES........................................................119<br />

6.1 <strong>Omnitrans</strong> Service Goals and Objectives .................................................................................119<br />

6.1.1 <strong>Omnitrans</strong> Service Goal .................................................................................119<br />

6.1.2 <strong>Omnitrans</strong> Service Objectives .........................................................................119<br />

6.2 Service Principles .......................................................................................................................119<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

6.3 Productivity/Coverage Tradeoff................................................................................................. 120<br />

6.4 Service Deployment Standards..................................................................................................120<br />

6.4.1 Fixed Route Service Deployment Standards ......................................................121<br />

6.4.2 OmniLink Service Deployment Standards..........................................................122<br />

6.4.3 Access Service Deployment Standards.............................................................122<br />

6.5 Service Monitoring/Evaluation Process....................................................................................122<br />

6.5.1 Systemwide Service Monitoring and Evaluation .................................................123<br />

6.5.2 Fixed Route Service Monitoring and Evaluation .................................................123<br />

6.5.3 OmniLink Service Monitoring and Evaluation.....................................................125<br />

6.5.4 Access Service Monitoring and Evaluation ........................................................127<br />

6.6 Service Design Guidelines .........................................................................................................129<br />

6.6.1 Fixed Route Service Design............................................................................129<br />

6.6.2 OmniLink Service Design................................................................................132<br />

6.6.3 Access Service Design...................................................................................132<br />

6.7 Bus Stop Placement Standard ...................................................................................................132<br />

6.8 Public Involvement/Outreach <strong>Plan</strong> ............................................................................................132<br />

6.9 Title VI ..........................................................................................................................................138<br />

6.10 Accessibility Improvement <strong>Plan</strong> ................................................................................................138<br />

6.11 <strong>Transit</strong> Infrastructure Development Policy ...............................................................................139<br />

6.12 Service Implementation Policy...................................................................................................141<br />

7. PERFORMANCE STANDARDS............................................................142<br />

7.1 Fixed Route Performance Standards ........................................................................................143<br />

7.1.1 Fixed Route Performance Against Standards.....................................................148<br />

7.1.2 Routes on Probation ......................................................................................148<br />

7.2 OmniLink Performance Standards ............................................................................................148<br />

7.2.1 OmniLink Performance Against Standards ........................................................154<br />

7.2.2 Routes on Probation ......................................................................................154<br />

7.3 Access Performance Standards ................................................................................................154<br />

7.3.1 Access Performance Against Standards............................................................158<br />

7.3.2 Routes on Probation ......................................................................................158<br />

8. FARE POLICY FY <strong>2008</strong>-<strong>2013</strong>................................................................160<br />

8.1 Fixed Route..................................................................................................................................161<br />

8.2 OmniLink......................................................................................................................................163<br />

8.3 Combined General Public Service.............................................................................................165<br />

8.4 Access..........................................................................................................................................167<br />

9. NEEDS ASSESSMENT/COA FINDINGS ..............................................170<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

9.1 Route Assessment (Fixed Route) ..............................................................................................170<br />

9.1.1 EAST VALLEY ROUTES .................................................................................170<br />

9.1.2 WEST VALLEY ROUTES.................................................................................178<br />

9.2 Route Deficiencies (Fixed Route) ..............................................................................................180<br />

9.3 Unmet Needs ...............................................................................................................................182<br />

9.4 Fixed Route Improvement Strategies........................................................................................184<br />

9.5 OmniLink Service Assessment..................................................................................................197<br />

9.6 Potential OmniLink Service Improvements ..............................................................................197<br />

9.7 Potential Access Service Improvements ..................................................................................200<br />

9.7.1 Evaluation Framework....................................................................................200<br />

9.7.2 Operations ...................................................................................................201<br />

9.7.3 Administrative Processes ...............................................................................203<br />

9.7.4 Demand Management.....................................................................................204<br />

9.7.5 Technology <strong>Plan</strong> ...........................................................................................205<br />

10. SERVICE PLAN – FINANCIALLY CONSTRAINED..............................206<br />

10.1 Stage 1 FY 2007...........................................................................................................................206<br />

10.2 Stage 2 FY <strong>2008</strong>...........................................................................................................................210<br />

10.3 Stage 3 FY 2009...........................................................................................................................214<br />

10.4 Stage 4 FY 2010/2011 ..................................................................................................................218<br />

11. FINANCIAL PLAN – FINANCIALLY CONSTRAINED ..........................223<br />

11.1 Revenue Sources ........................................................................................................................229<br />

11.1.1 Local Transportation Funds (LTF)....................................................................229<br />

11.1.2 State <strong>Transit</strong> Assistance Funds (STAF) ............................................................230<br />

11.1.3 FTA Formula Funds .......................................................................................230<br />

11.1.4 FTA Discretionary Funds ................................................................................231<br />

11.1.5 New Starts/Small Starts/Very Small Starts ........................................................232<br />

11.1.6 Congestion Mitigation and Air Quality (CMAQ) ..................................................232<br />

11.1.7 Measure I Local Sales Tax for <strong>Transit</strong> ..............................................................233<br />

11.1.8 Other Federal Grant Programs ........................................................................233<br />

11.1.9 State Transportation Improvement Program (STIP) ............................................234<br />

11.1.10 Proposition 1B State Infrastructure Bonds ........................................................234<br />

11.1.11 In-Kind Transfers ..........................................................................................234<br />

11.1.12 Advertising and Auxiliary Revenues .................................................................234<br />

11.2 Financial <strong>Plan</strong> – Capital and Operating.....................................................................................235<br />

11.3 Capital Projects ...........................................................................................................................244<br />

12. UNCONSTRAINED SERVICE PLANS ..................................................249<br />

12.1 Partially Constrained Service <strong>Plan</strong> ............................................................................................249<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

12.2 Unconstrained Service <strong>Plan</strong>.......................................................................................................253<br />

12.3 Resource Impacts .......................................................................................................................258<br />

13. IMPLEMENTATION STRATEGY...........................................................259<br />

13.1 Steps Towards Implementation .................................................................................................259<br />

13.2 Phasing ........................................................................................................................................259<br />

13.3 Achieving Service Change Adoption.........................................................................................261<br />

13.4 From Adoption to Implementation.............................................................................................264<br />

13.5 Monitoring After Implementation...............................................................................................267<br />

13.6 Proactive <strong>Plan</strong>ning and <strong>Plan</strong>ning for the Unexpected .............................................................267<br />

13.7 Supporting Policies.....................................................................................................................269<br />

13.8 Marketing Strategies ...................................................................................................................270<br />

13.8.1 Marketing Opportunities .................................................................................270<br />

13.8.2 Other Public Relations Opportunities ...............................................................270<br />

13.9 Long <strong>Range</strong> <strong>Plan</strong>.........................................................................................................................270<br />

APPENDIX A – CURRENT VEHICLE LISTING AND DESCRIPTION OF<br />

COACHES .............................................................................................272<br />

APPENDIX B – TRANSCENTER AND FACILITY DESCRIPTIONS ..........................285<br />

APPENDIX C – CAPITAL PROJECT DESCRIPTIONS..............................................304<br />

APPENDIX D – CITY GENERAL PLAN SUMMARIES...............................................326<br />

APPENDIX E – GLOSSARY AND ACRONYMS.........................................................348<br />

APPENDIX F – CITY PROFILE SUMMARIES............................................................351<br />

APPENDIX G – INDIVIDUAL ROUTE MAPS, CONSTRAINED AND<br />

UNCONSTRAINED PLANS...................................................................352<br />

APPENDIX H – LEDGER VERSIONS OF SELECTED MAPS ...................................393<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

LIST OF FIGURES<br />

Figure 1-1: <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP Process ..................................................................................... 12<br />

Figure 2-1: Fixed Route Service (as of July 1, 2007) ................................................................................ 17<br />

Figure 2-2: <strong>Omnitrans</strong> Fixed Route Service Span Summary by Route (as of July 1, 2007) ..................... 18<br />

Figure 2-3: Fixed Route Fleet (as of July 1, 2007) .................................................................................... 19<br />

Figure 2-4: Fixed Route Revenue Vehicle Summary (2007) ..................................................................... 24<br />

Figure 2-5: Fixed Route and Regional Express Bus Fares (as of July 1, 2007)........................................ 26<br />

Figure 2-6: Projected Characteristics for <strong>Omnitrans</strong> Fixed Route ............................................................. 28<br />

Figure 2-7: Access Service Days and Span of Service (as of July 1, 2007) ............................................. 29<br />

Figure 2-8: Access Telephone Performance (August 2006)...................................................................... 30<br />

Figure 2-9: Cancellations and No-Shows (July-October 2006) ................................................................. 31<br />

Figure 2-10: Access Fleet (as of July 1, 2007) .......................................................................................... 32<br />

Figure 2-11: Access Bus Fares (as of July 1, 2007).................................................................................. 33<br />

Figure 2-12: Access Subscription Passes (as of July 1, 2007).................................................................. 33<br />

Figure 2-13: Access Fare Zones................................................................................................................ 34<br />

Figure 2-14: Trip Origins and Destinations – West Valley ......................................................................... 36<br />

Figure 2-15: Trip Origins and Destinations – East Valley .......................................................................... 37<br />

Figure 2-16: Access Paratransit Statistical Profile (2006) ......................................................................... 38<br />

Figure 2-17: Key Historical Performance Data .......................................................................................... 39<br />

Figure 2-18: Projected Characteristics for Access Service........................................................................ 40<br />

Figure 2-19: OmniLink Chino Hills Service Area........................................................................................ 42<br />

Figure 2-20: OmniLink Yucaipa Service Area............................................................................................ 43<br />

Figure 2-21: OmniLink Fleet (as of July 1, 2007)....................................................................................... 47<br />

Figure 2-22: OmniLink Bus Fares (as of July 1, 2007) .............................................................................. 47<br />

Figure 2-23: OmniLink Ridership by Market Segment (FY 2005/06)......................................................... 48<br />

Figure 2-24: Chino Hills OmniLink Origins/Destinations............................................................................ 49<br />

Figure 2-25: Chino Hills OmniLink Passenger Loadings and Bus Pullout by Weekday Hour ................... 50<br />

Figure 2-26: Yucaipa OmniLink Origins/Destinations ................................................................................ 52<br />

Figure 2-27: Yucaipa OmniLink Passenger Loadings and Bus Pullout by Weekday Hour ....................... 53<br />

Figure 2-28: Projected Characteristics for OmniLink ................................................................................. 55<br />

Figure 4-1: San Bernardino Valley Population Projections by Community (2005-2030)........................... 61<br />

Figure 4-2: Distribution of Ages by City ..................................................................................................... 62<br />

Figure 4-3: Poverty Thresholds.................................................................................................................. 64<br />

Figure 4-4: Percentage of Population Living Below the Poverty Line........................................................ 65<br />

Figure 4-5: Percentage of Household Vehicle Availability ......................................................................... 66<br />

Figure 4-6: Correlation Between Poverty and Vehicle Ownership ............................................................ 67<br />

Figure 4-7: <strong>Omnitrans</strong> East Valley Fixed Route Weekday Coverage (6:00 a.m.) and Residential and Job<br />

Concentrations (2006) ...................................................................................................... 69<br />

Figure 4-8: <strong>Omnitrans</strong> West Valley Fixed Route Weekday Coverage (6:00 a.m.) and Residential and Job<br />

Concentrations (2006) ...................................................................................................... 70<br />

Figure 4-9: <strong>Omnitrans</strong> Member City Overview........................................................................................... 72<br />

Figure 4-10: City of San Bernardino Projected Population and Employment............................................ 73<br />

Figure 4-11: City of Ontario Projected Population and Employment ......................................................... 74<br />

Figure 5-1: <strong>Omnitrans</strong>' Major Systemwide <strong>Transit</strong> Corridors..................................................................... 88<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-2: Locally Preferred E Street sbX Alternative .............................................................................. 91<br />

Figure 5-3: Redlands Passenger Rail Alignment and Stations.................................................................. 94<br />

Figure 5-4: Compass Strategic Opportunity Areas .................................................................................... 99<br />

Figure 5-5: Proposed Gold Line Extension.............................................................................................. 101<br />

Figure 5-6: Low-Income and Minority Population Beyond 15-Minute Service Area (West Valley).......... 106<br />

Figure 5-7: Low-Income and Minority Population Beyond 15-Minute Service Area (East Valley)........... 107<br />

Figure 5-8: Low-Income and Minority Population Beyond 30-Minute Service Area (West Valley).......... 108<br />

Figure 5-9: Low-Income and Minority Population Beyond 30-Minute Service Area (East Valley)........... 109<br />

Figure 5-10: Low-Income and Minority Population Beyond 60-Minute Service Area (West Valley)........ 110<br />

Figure 5-11: Low-Income and Minority Population Beyond 60-Minute Service Area (East Valley)......... 111<br />

Figure 5-12: LIM and Non-LIM Populations Served by <strong>Omnitrans</strong>.......................................................... 112<br />

Figure 5-13: Percentage of LIM and Non-LIM Populations Near <strong>Omnitrans</strong> Bus Stop Amenities .......... 113<br />

Figure 5-14: Bus Stop, Benches, and Shelters (East Valley) .................................................................. 114<br />

Figure 5-15: Bus Stops, Benches, and Shelters (West Valley) ............................................................... 115<br />

Figure 6-1: New Fixed Route Service Warrants ...................................................................................... 121<br />

Figure 6-2: Fixed Route Ridership and Performance Monitoring and Evaluation ................................... 125<br />

Figure 6-3: OmniLink Performance Monitoring and Evaluation............................................................... 126<br />

Figure 6-4: Access Service Performance Monitoring and Evaluation ..................................................... 128<br />

Figure 6-5: Fixed Route Service Design Guidelines................................................................................ 130<br />

Figure 6-6: Types of Agency Actions and Programs ............................................................................... 134<br />

Figure 7-1: Proposed Fixed Route Service Standards ............................................................................ 144<br />

Figure 7-2: Fixed Route Operating Effectiveness Indicators ................................................................... 146<br />

Figure 7-3: Fixed Route Vehicle Efficiency Indicators ............................................................................. 146<br />

Figure 7-4: Labor Productivity Indicators ................................................................................................. 147<br />

Figure 7-5: OmniLink Financial Performance .......................................................................................... 149<br />

Figure 7-6: OmniLink Cost Effectiveness................................................................................................. 149<br />

Figure 7-7: OmniLink Cost Efficiency....................................................................................................... 149<br />

Figure 7-8: OmniLink Service Coverage.................................................................................................. 150<br />

Figure 7-9: OmniLink Service Utilization.................................................................................................. 151<br />

Figure 7-10: Amount of OmniLink Service Provided................................................................................ 151<br />

Figure 7-11: OmniLink Service Quality .................................................................................................... 152<br />

Figure 7-12: OmniLink Service Reliability................................................................................................ 153<br />

Figure 7-13: Access Financial Performance............................................................................................ 155<br />

Figure 7-14: Access Cost Effectiveness .................................................................................................. 155<br />

Figure 7-15: Access Cost Efficiency ........................................................................................................ 156<br />

Figure 7-16: Access Service Utilization ................................................................................................... 156<br />

Figure 7-17: Access Service Quality........................................................................................................ 157<br />

Figure 7-18: Access Service Reliability.................................................................................................... 157<br />

Figure 8-1: Proposed Fixed Route Fare Structure and Policies .............................................................. 162<br />

Figure 8-2: Proposed OmniLink Fare Structure and Policies .................................................................. 164<br />

Figure 8-3: Proposed General Public Fare Structure and Policies.......................................................... 166<br />

Figure 8-4: Proposed Access Fare Structure and Policies ...................................................................... 168<br />

Figure 9-1: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route East Valley Routes (May 2006<br />

Weekday) – (a)................................................................................................................ 171<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-2: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route East Valley Routes (May 2006<br />

Weekday) – (b)................................................................................................................ 172<br />

Figure 9-3: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route West Valley Routes (May 2006<br />

Weekday) – (a)................................................................................................................ 173<br />

Figure 9-4: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route West Valley Routes (May 2006<br />

Weekday) – (b)................................................................................................................ 174<br />

Figure 9-5: Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a) ........... 186<br />

Figure 9-6: Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b) ........... 187<br />

Figure 9-7: Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)................... 188<br />

Figure 9-8: Partially Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)190<br />

Figure 9-9: Partially Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b)191<br />

Figure 9-10: Partially Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)... 192<br />

Figure 9-11: Unconstrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a) ..... 194<br />

Figure 9-12: Unconstrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b) ..... 195<br />

Figure 9-13: Unconstrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)............. 196<br />

Figure 9-14: Proposed Chino Hills OmniLink Weekday Shift Coverage.................................................. 198<br />

Figure 9-15: Proposed Yucaipa OmniLink Weekday Shift Coverage...................................................... 198<br />

Figure 9-16: Access Evaluation Framework ............................................................................................ 201<br />

Figure 9-17: Trip Management Evaluation............................................................................................... 202<br />

Figure 9-18: Service Delivery/Fleet Mix Evaluation ................................................................................. 203<br />

Figure 10-1: Stage 1 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)............................................................................................................. 207<br />

Figure 10-2: Stage 1 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)............................................................................................................. 208<br />

Figure 10-3: Stage 1 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays) ..................................................................................................................... 209<br />

Figure 10-4: Stage 2 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)............................................................................................................. 211<br />

Figure 10-5: Stage 2 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)............................................................................................................. 212<br />

Figure 10-6: Stage 2 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays) ..................................................................................................................... 213<br />

Figure 10-7: Stage 3 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)............................................................................................................. 215<br />

Figure 10-8: Stage 3 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)............................................................................................................. 216<br />

Figure 10-9: Stage 3 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays) ..................................................................................................................... 217<br />

Figure 10-10: Stage 4 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)............................................................................................................. 219<br />

Figure 10-11: Stage 4 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)............................................................................................................. 220<br />

Figure 10-12: Stage 4 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays) ..................................................................................................................... 221<br />

Figure 10-13: Resource Impacts of the Constrained Service <strong>Plan</strong> (FY 2007 – FY 2011)....................... 222<br />

Figure 11-1: Financially Constrained <strong>Plan</strong>............................................................................................... 224<br />

Figure 11-2: LTF Requirements for the Financially Constrained <strong>Plan</strong>..................................................... 226<br />

Figure 11-3: Performance Indicators by Service Type – Financially Constrained <strong>Plan</strong> .......................... 228<br />

July 11, 2007


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-4: Base and Average Fares..................................................................................................... 235<br />

Figure 11-5: Operating Ratios.................................................................................................................. 236<br />

Figure 11-6: Projected Characteristics <strong>Omnitrans</strong> Total.......................................................................... 237<br />

Figure 11-7: Projected Characteristics Fixed Route Total ....................................................................... 238<br />

Figure 11-8: Projected Characteristics Fixed Route ................................................................................ 239<br />

Figure 11-9: Projected Characteristics OmniLink .................................................................................... 240<br />

Figure 11-10: Projected Characteristics Access...................................................................................... 241<br />

Figure 11-11: Summary of Six-Year (FY <strong>2008</strong>-<strong>2013</strong>) Operating Expenses and Revenues ($000) ........ 242<br />

Figure 11-12: Six-Year (FY <strong>2008</strong>-<strong>2013</strong>) Fund Balance Estimates .......................................................... 243<br />

Figure 11-13: Summary of Six-Year (FY <strong>2008</strong>-<strong>2013</strong>) Capital Costs and Funding ($000)....................... 248<br />

Figure 12-1: Partially Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)............................................................................................................. 250<br />

Figure 12-2: Partially Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)............................................................................................................. 251<br />

Figure 12-3: Partially Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays) ..................................................................................................................... 252<br />

Figure 12-4: Unconstrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) –<br />

(a).................................................................................................................................... 255<br />

Figure 12-5: Unconstrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) –<br />

(b).................................................................................................................................... 256<br />

Figure 12-6: Unconstrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays) 257<br />

Figure 12-7: Resource Impacts................................................................................................................ 258<br />

Figure 13-1: Basic Links Between Transportation and Land Use............................................................ 269<br />

July 11, 2007


IBI GROUP<br />

FOREWORD<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The provision of <strong>Omnitrans</strong> transit services in Southwestern San Bernardino County is at a critical juncture. On<br />

the one hand, transit continues to provide an essential social service, providing youths, seniors, and low-income<br />

workers who have limited or no access to an automobile with the means to access employment, educational,<br />

medical and social destinations. With road congestion continuing to increase in the County, and with it concerns<br />

about air quality and global warming, transit will be asked to shoulder a growing share of trip making.<br />

At the same time, the provision of high-quality, cost-effective transit services in the <strong>Omnitrans</strong> service area has<br />

never been more challenging. In the simplest of terms, ridership has been decreasing over the past several<br />

years, while costs have been increasing. There are many factors contributing to this situation, only some of which<br />

are in the direct control of <strong>Omnitrans</strong>. On the ridership side, while population and employment in the service area<br />

have continued to grow at a robust pace, they have continued to do so largely at the margins of the urbanized<br />

area, in single-family subdivisions and suburban business parks that are difficult to serve effectively if at all.<br />

Despite this, <strong>Omnitrans</strong> has been able to grow ridership in the quickly-developing West Valley, but that growth<br />

has been offset by job losses in the older East Valley communities, with the recent loss of key anchors such as<br />

the Carousel Mall and other retailers and office uses in downtown San Bernardino. Additionally, increasing<br />

congestion has significantly lowered the reliability of <strong>Omnitrans</strong> services in certain corridors at certain times of<br />

day, particularly in the East Valley where the system relies of a high number of route-to-route transfers. Finally,<br />

while <strong>Omnitrans</strong> is achieving its systemwide “pullout” goal (which measures missed trips due to personnel or<br />

mechanical reasons), any missed trip further erodes reliability and therefore ridership.<br />

The combination of decreasing ridership and increasing costs has led to a situation where <strong>Omnitrans</strong> is under<br />

threat of not meeting its State-mandated farebox recovery target of 20%, a situation that would exacerbate the<br />

current situation by endangering a key source of operating funds. Addressing the factors that have jeopardized<br />

achieving the mandated farebox recovery target will be a multi-year effort.<br />

This <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> represents the first necessary step towards putting <strong>Omnitrans</strong> back on the road of<br />

increasing ridership and controlling costs. Reflecting the current financial situation, the plan presents a realistic,<br />

fiscally conservative scenario. First and foremost, it presents a series of service reductions and restructurings,<br />

and fare increases, aimed at not merely meeting the 20% farebox recovery ratio, but providing <strong>Omnitrans</strong> with a<br />

safety cushion to buffer against future cost spikes or ridership decreases, incrementally working towards a<br />

recovery ratio of 25% in the six-year timeframe of the <strong>Plan</strong>. The need to provide such a buffer effectively means<br />

that, using the conservative assumptions of the <strong>Plan</strong>, <strong>Omnitrans</strong> cannot be assumed to grow ridership until 2012,<br />

when the sbX Bus Rapid <strong>Transit</strong> system begins service.<br />

However, the <strong>Plan</strong> does provide some of the tools necessary to put <strong>Omnitrans</strong> once more on a healthy path of<br />

ridership growth. For example, while the recommended service reductions and restructuring will result in a shortterm<br />

drop in ridership, they will also free resources (buses and drivers), some of which can be redeployed to<br />

improve reliability in the corridors and times of day when this is an issue. If these strategies are successful,<br />

ridership will see an improvement. Also, in <strong>2008</strong> <strong>Omnitrans</strong> will undertake an update of its Strategic <strong>Plan</strong> which<br />

will look at all aspects of how <strong>Omnitrans</strong> conducts its business, with a view to revamping the organization to better<br />

utilize funding and resources. While this <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> must be conservative and therefore cannot<br />

account for the potential cost savings from the Strategic <strong>Plan</strong>, it is likely that <strong>Omnitrans</strong> will be able to realize such<br />

savings, meaning that more resources can be put into new or expanded services. To this end, in the two<br />

Unconstrained Scenarios that are also a part of this <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong>, a menu of new services is<br />

provided. These include options such as reinstating the reduced services, further improvements in <strong>Omnitrans</strong>’<br />

core system (aimed at providing more consistent headways and spans of service), pilot projects to serve<br />

emerging <strong>Transit</strong>-Oriented Development areas, the extension of service to new high-density areas, and the<br />

provision of “precursor” limited-stop services along the sbX and other future Bus Rapid <strong>Transit</strong> corridors.<br />

This <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> therefore fulfills two key objectives – a short-term plan to put <strong>Omnitrans</strong> once again<br />

on a solid financial footing, and the long-range service concepts that provide a blueprint for growing ridership<br />

once the immediate challenges are overcome.<br />

July 11, 2007<br />

i


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

1. INTRODUCTION<br />

<strong>Omnitrans</strong> was established as a regional transit authority in 1976 through a Joint Powers Authority (JPA)<br />

that included the cities of Chino, Colton, Fontana, Loma Linda, Montclair, Ontario, Redlands, Rialto, San<br />

Bernardino, Upland and the County of San Bernardino. The cities of Chino Hills, Grand Terrace,<br />

Highland, Rancho Cucamonga, and Yucaipa have since joined the JPA. The County and all member<br />

cities are represented on the <strong>Omnitrans</strong> Board of Directors.<br />

<strong>Omnitrans</strong> serves a 456 square mile service area in Southwestern San Bernardino County with a<br />

population close to 1.4 million. The range of <strong>Omnitrans</strong> services includes:<br />

• 29 fixed bus routes, including 17 routes in the East Valley (east of I-15), 11<br />

routes in the West Valley (west of I-15), and 1 regional express route to the City<br />

of Riverside.<br />

• Two OmniLink general public demand-response services in Chino Hills and<br />

Yucaipa.<br />

• An ADA complementary paratransit service, Access, operated throughout the<br />

<strong>Omnitrans</strong> service area.<br />

The <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP is organized into 13 chapters and eight appendices:<br />

Chapter 1: Introduces the <strong>Omnitrans</strong> Mission Statement; provides an overview of the role and benefits of<br />

public transit; identifies issues confronting <strong>Omnitrans</strong> in the <strong>2008</strong>-<strong>2013</strong> timeframe; summarizes <strong>Omnitrans</strong><br />

accomplishment over the last five years; and provides an overview of the SRTP process.<br />

Chapter 2: Provides a summary of <strong>Omnitrans</strong> organizational structure and an overview of the services<br />

provided.<br />

Chapter 3: Provides an overview of regional transit services that interface with <strong>Omnitrans</strong> services and<br />

facilitate regional connectivity.<br />

Chapter 4: Provides a profile of the <strong>Omnitrans</strong> service area, including a demographic overview and a<br />

profile of the cities served by <strong>Omnitrans</strong>.<br />

Chapter 5: Summarizes regional planning activities that impact or are impacted by <strong>Omnitrans</strong> services.<br />

Chapter 6: Recommends service goals, policies and design standards.<br />

Chapter 7: Recommends and summarizes service performance standards.<br />

Chapter 8: Documents the <strong>Omnitrans</strong> fare policy for the <strong>2008</strong>-<strong>2013</strong> SRTP.<br />

Chapter 9: Summarizes the needs assessment and COA findings.<br />

Chapter 10: Documents the recommended Service <strong>Plan</strong> (Financially Constrained).<br />

Chapter 11: Documents the Financial <strong>Plan</strong> for the recommended Service <strong>Plan</strong> (Financially Constrained).<br />

Chapter 12: Documents the service plans and financial plans for the Partially Constrained and<br />

Unconstrained <strong>Plan</strong> Scenarios.<br />

Chapter 13: Outlines implementation strategies to achieve the report’s recommendations.<br />

July 11, 2007 1


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

1.1 Mission<br />

The development of public transit service is an evolutionary process. <strong>Transit</strong> alternatives and service<br />

networks change with technology and changing service priorities and markets. Reflecting this constant<br />

change, the <strong>Omnitrans</strong> Management <strong>Plan</strong>’s goals and objectives are reviewed and updated (if required)<br />

on an annual basis.<br />

The <strong>Omnitrans</strong> Mission Statement sets the framework for the development of service goals and<br />

objectives. As with goals and objectives, the <strong>Omnitrans</strong> Mission Statement should be subject to review.<br />

At a minimum this review should be part of the SRTP process.<br />

The <strong>Omnitrans</strong> Mission Statement reflects a philosophy for service delivery. It reflects the collective<br />

vision of the Board, Management and <strong>Omnitrans</strong> staff of how transit should operate, and whom it should<br />

serve. The current <strong>Omnitrans</strong> Mission Statement is as follows:<br />

“To provide the San Bernardino Valley with comprehensive mass transportation<br />

services which maximize customer use, comfort, safety, and satisfaction while<br />

efficiently using financial and other resources in an environmentally sensitive<br />

manner.”<br />

1.2 <strong>Omnitrans</strong> 2015 Strategic <strong>Plan</strong><br />

The <strong>Omnitrans</strong> Mission Statement reflects the current strategic plan, established in the <strong>Omnitrans</strong> 2015<br />

Strategic <strong>Plan</strong>. In <strong>2008</strong>, <strong>Omnitrans</strong> will be updating its strategic plan, looking forward to 2030, and will<br />

consider revising its Mission Statement at that point.<br />

The following longer range visions were also established in the <strong>Omnitrans</strong> 2015 Strategic <strong>Plan</strong>:<br />

• <strong>Omnitrans</strong> is accepted by the public as the prime provider of quality<br />

transportation service.<br />

• <strong>Omnitrans</strong> is one of the best places of employment in the Inland Empire.<br />

• <strong>Omnitrans</strong> is recognized in its industry as an innovative leader in providing<br />

transportation services.<br />

• <strong>Omnitrans</strong> ensures that there are adequate resources to achieve its visions.<br />

In addition to the <strong>Omnitrans</strong> Mission Statement, the <strong>Omnitrans</strong> 2015 Strategic <strong>Plan</strong> helps determine the<br />

annual goals and objectives for which the agency strives, and helps provide the framework for<br />

documents, such as the SRTP, which are created not only to meet mandates at the federal, state, and<br />

local levels, but also to give the agency direction and plans for the future.<br />

1.3 The Role of Public <strong>Transit</strong><br />

Public transit is a means to an end. That end is getting people where they need (or want) to go.<br />

Basically, public transit connects individuals with the range of goods, services, and activities that affect<br />

social well-being and quality of life. <strong>Transit</strong> should also support community goals, which can include<br />

equity issues, environmental goals, and economic and land use development goals.<br />

Public transit cannot be everything to everyone. It has a key role within the “family of transportation<br />

options” that include a wide range of public transit modes, private automobiles, taxis and private shuttles,<br />

as well as carpools and vanpools. Each has its place in meeting the diverse range of trip patterns and<br />

July 11, 2007 2


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

travel time requirements. Fixed route transit can effectively serve high-density corridors or connect highdensity<br />

residential concentrations with activity centers, where ridership is sufficient to meet the minimum<br />

farebox recovery requirements. While productivity can be less for lower cost demand-response transit<br />

services, the density of demand must still be sufficient to meet minimum farebox recovery requirements;<br />

albeit that the farebox recovery goal for such services can be lower than the systemwide goal, providing<br />

that the higher-productivity fixed route services achieve more than the systemwide goal, bringing the<br />

entire system into compliance.<br />

In a truly mature regional transportation mix, each mode should complement the others and be focused<br />

on serving those needs that it can most effectively and efficiently serve. A mature transportation system<br />

and plan attempts to balance those modes through the coordinated mix of public resources and private<br />

alternatives.<br />

1.4 Benefits of Public <strong>Transit</strong><br />

Social Well-Being and Quality of Life<br />

Access to goods, services and activities located throughout the developed environment is critical to<br />

individual well-being and the richness of one’s life experience. Important destinations include health<br />

facilities, employment opportunities, educational institutions, social service programs, government<br />

services, entertainment centers, recreational activities, and retail outlets. Transportation connects the<br />

individual to these resources. For transit-dependent seniors, youth, low-income, persons with disabilities<br />

and members of single car households, public transit is often the only means of accessing the goods,<br />

services and activities that impact their well-being. For those who own and can operate a private vehicle,<br />

public transit provides an alternative means of accessing what they need and want in their environment.<br />

Community Land Use Goals<br />

Public transit can support transit-oriented development (TOD) that concentrates compact, pedestrianfriendly<br />

housing, jobs and activities at locations easily served by transit. TOD developments reduce lowdensity<br />

urban sprawl, single occupancy vehicle (SOV) dependency, and traffic congestion; they also<br />

enhance air quality through the reduction of vehicular emissions. TOD and its attendant transit services<br />

also support more livable communities through the reduction of vehicular circulation within residential and<br />

multi-use activity centers.<br />

<strong>Transit</strong>-friendly urban design is better facilitated if transit agencies such as <strong>Omnitrans</strong> are formally<br />

involved in the development approval process where transit operational issues are incorporated into the<br />

decision-making process.<br />

<strong>Transit</strong>’s Potential Impact on Traffic Congestion<br />

Traffic congestion continues to be a critical issue in the Inland Empire. Enhanced public transit services<br />

can attract choice riders, reducing the concentration of SOVs on key corridors or at peak travel times.<br />

The example often used to illustrate this point is the potential of a fully loaded transit coach taking 40<br />

private vehicles off the road. The sbX project and enhanced Route 90 services are <strong>Omnitrans</strong>’ most<br />

promising initiatives to attract choice ridership, and possibly effect a mode shift to transit.<br />

<strong>Transit</strong>’s Potential Impact on Air Quality<br />

Transportation emissions have a significant impact on regional air quality and respiratory disease, and<br />

upper atmosphere ozone depletion and global warming. By attracting persons away from SOV use,<br />

public transit can have a positive impact on air quality and respiratory health. A fully loaded bus produces<br />

fewer emissions per passenger trip than a SOV per passenger trip. This impact is further enhanced by<br />

<strong>Omnitrans</strong>’ compressed natural gas (CNG) alternative fuel policy and electric/gasoline hybrid bus<br />

program.<br />

July 11, 2007 3


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Enhance Economic Development<br />

Public transit provides access to jobs, retail concentrations and local attractions. High quality public<br />

transit allows employers to better fill positions and retain employees, and gives improved access to retail<br />

concentrations and local recreation/entertainment attractions, increasing market size and sales volumes.<br />

1.5 Traffic<br />

Traffic congestion continues to increase with population growth, low-density development and a high<br />

reliance on SOV use. The 2005 Urban Mobility Report 1 ranked Riverside and San Bernardino Counties<br />

ninth in the nation in terms of traveler delays due to congestion. Increasing traffic congestion poses two<br />

critical challenges for <strong>Omnitrans</strong>: 1) increased bus running times, which have a negative impact on ontime<br />

performance, service reliability, and ridership; and 2) finding a practical and effective role for public<br />

transit in a strategic effort to move travelers from SOV to High Occupancy Vehicle (HOV) use.<br />

Traffic congestion will continue to be a critical issue in the <strong>Omnitrans</strong> service area, resulting in longer<br />

regional commute times, increases in local travel times for work and non-work related trips, increases in<br />

parking capacity requirements, higher household travel costs, and a general deterioration of the quality of<br />

life. A significant mode shift to public transit will not be possible until land use development goals reflect<br />

an urban landscape that supports efficient and effective transit service.<br />

1.6 Population and Employment Growth<br />

<strong>Omnitrans</strong> service area population is projected to grow from 1,342,465 in FY 2004/05 to 1,427,242 in FY<br />

2009/10 (a 6% increase), and to 1,536,138 in FY 2014/15 (a 14% increase). During the same period,<br />

150,191 new jobs will be created in the <strong>Omnitrans</strong> service area. The majority of these will be created in<br />

the trade, transportation and utilities industries (approximately 54%) and in the office and administrative<br />

support sectors (approximately 26%).<br />

While this is healthy growth for San Bernardino’s economy, it does not necessarily translate to growth in<br />

<strong>Omnitrans</strong>’ market. Much of this growth will occur at the periphery of <strong>Omnitrans</strong>’ service area, in lowdensity,<br />

geographically dispersed business parks and subdivisions that are difficult to serve costeffectively<br />

with transit. And while there will be an overall net increase in employment and population,<br />

some of <strong>Omnitrans</strong>’ core service areas are losing jobs and people, which has contributed to the current<br />

decline in systemwide ridership.<br />

Nevertheless, <strong>Omnitrans</strong> has seen ridership increases in parts of its service area that are adding<br />

population and employment, and it is in such areas that future opportunities for growing ridership will<br />

come. Currently, high-density areas with over 7,500 people per square mile and over 5,000 jobs per<br />

square mile in the <strong>Omnitrans</strong> service area include:<br />

• Southeast Upland, south of SR-66 and north of I-10.<br />

• Southern Montclair, along Holt.<br />

• Central Rialto, south of SR-66 along Riverside Avenue.<br />

By 2015, these three areas will be joined by four other areas with high population and job densities earlier<br />

specified. These additional areas are:<br />

• San Bernardino, east of I-215 along Highland and Baseline.<br />

1<br />

2005 Urban Mobility Report, David Schrank and Tim Lomax, Texas Transportation Institute, (May 2005), p.12.<br />

July 11, 2007 4


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Colton, North of I-10 along Mt. Vernon.<br />

• Chino, between SR-60 and Riverside Drive, east of Monte Vista and west of<br />

Mountain.<br />

• Ontario, along SR-83 near Holt.<br />

While the Constrained Service <strong>Plan</strong> cannot provide the resources necessary to immediately serve these<br />

new areas, as the <strong>Plan</strong> is implemented and <strong>Omnitrans</strong>’ financial situation improves, it may be possible to<br />

introduce new or restructured services from the Unconstrained <strong>Plan</strong>s that address these growing areas.<br />

1.7 Economy<br />

The <strong>Omnitrans</strong> service area and the greater Inland Empire have experienced dramatic change in the last<br />

decade. Economic growth in job creation, retail sales and services will continue to increase, with<br />

population growth largely fueled by continued in-migration into the Inland Empire in search of relatively<br />

more affordable housing. Economic growth will create both opportunities and challenges for <strong>Omnitrans</strong> in<br />

the <strong>2008</strong>-<strong>2013</strong> SRTP timeframe. Population increases will result in increased transit ridership if<br />

<strong>Omnitrans</strong> can continue to develop attractive, marketable services. An expanding job market could<br />

reduce the pool of job seekers that <strong>Omnitrans</strong> can recruit from, and cost of living increases will in turn<br />

increase <strong>Omnitrans</strong> operating costs.<br />

1.8 Seniors and Persons with Disabilities<br />

Approximately 8% of the population in the <strong>Omnitrans</strong> service area are 65 years and older. The need for<br />

accessible transit and paratransit services and discounted fares will increase as the population ages in<br />

place. This trend will become more apparent as the current baby boomers reach 75 years of age, begin<br />

to lose their driver’s licenses, and begin to experience cognitive, locomotive and sensory impairments.<br />

More seniors will become members of the transportation disability population. Based on projections of<br />

the transportation disability population and ridership demand forecasts, and in the absence of any<br />

(demand management) interventions, travel demand for Access (<strong>Omnitrans</strong>’ ADA paratransit service) is<br />

projected to increase by approximately 36% between 2005 and 2015. However, near-term fare increases<br />

as well as other demand management interventions (eligibility and certification processes, booking<br />

policies, scheduling parameters, etc.) will mitigate this anticipated growth in Access demand.<br />

1.9 Financial Performance<br />

A number of key financial issues challenge the administration and delivery of <strong>Omnitrans</strong> service. These<br />

include:<br />

• Operating Cost Increases – The systemwide operating cost per revenue hour is<br />

projected to increase by 36% between FY 2006/07 and FY 2012/13.<br />

• High Administrative Overhead Costs – Administrative overhead costs are<br />

approximately 19% of the annual operating costs (based on FY 2006/07 budget<br />

figures).<br />

• Decreasing Farebox Recovery – The systemwide farebox recovery ratio has<br />

dropped from 22% in FY 2001/02 to 20% in FY 2005/06. Decreasing farebox<br />

recovery is the result of rising operating costs and declining ridership.<br />

Although fixed route ridership increased annually between FY 1992/93 and FY 2001/02, ridership has<br />

actually declined in recent years. Fixed route ridership dropped from 16,925,613 in FY 2001/02 to<br />

July 11, 2007 5


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

15,420,783 in FY 2005/06 (a 9% decrease). Although increasing operating costs have a significant<br />

impact on farebox recovery, declining ridership exacerbates the problem. Ridership declines may be the<br />

result of fixed route schedule adherence issues related to increasing traffic congestion problems, and an<br />

increasing reliance on private vehicles in a continuing pattern of low-density development that cannot be<br />

effectively served by public transit.<br />

Rising operating and overhead costs, decreasing farebox recovery and declining ridership pose critical<br />

challenges to the delivery of public transit services within the initial years of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong><br />

SRTP. In order to help meet these challenges, it was assumed that <strong>Omnitrans</strong> will control its future<br />

administrative labor costs by limiting their annual increase to no more than inflation after FY <strong>2008</strong>.<br />

1.10 Customer Service<br />

<strong>Omnitrans</strong> Customer Service has developed procedures for handling customer comments that will help:<br />

• Expedite the process of comments/complaints<br />

• Ascertain the trends to take a proactive approach<br />

• Ensure a response to the customer<br />

• Provide a centralized location for handling and processing<br />

• Adhere to Federal guidelines, where appropriate<br />

Customer Contacts are most often expressed either in a letter or a telephone call to the Information<br />

Office. The Information Office Clerk enters the details of the incident in the Trapeze COMM database<br />

which tracks all contact forms. Comments are categorized into Feedback Types which include:<br />

• Complaint<br />

• Commendation<br />

• Lost and Found<br />

• Inquiry<br />

• Comment/Request<br />

• Other<br />

Customer Contacts are then further segregated into Feedback Subtypes which include several<br />

categories. Once the Customer Contact is completely entered into Trapeze, the Contact is forwarded to<br />

the appropriate investigating department for investigation. The response time for a Customer Contact<br />

generally varies pending the response from the assigned investigating party which can be <strong>Plan</strong>ning,<br />

Operations or Marketing.<br />

1.11 Accomplishments<br />

Over the past five years, <strong>Omnitrans</strong> has worked to improve the services it provides to the public, while<br />

remaining as cost-efficient and environmentally sound as possible. Blending these three goals is not<br />

always an easy task to accomplish; however, each year <strong>Omnitrans</strong> works towards this balance with the<br />

well-defined goals and objectives it has in place. Despite the challenges <strong>Omnitrans</strong> has experienced<br />

July 11, 2007 6


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

lately, these accomplishments indicate that the agency is capable, after a period of belt-tightening, of<br />

following the recommendations in this SRTP to again grow ridership. The following items by no means<br />

describe each and every accomplishment and event that has occurred in the past five years, but focus on<br />

some of the highlights.<br />

East Valley and West Valley LCNG Stations<br />

<strong>Omnitrans</strong> began operation of both its new, odorless liquefied compressed natural gas (LCNG) fueling<br />

stations at the San Bernardino and Montclair operations facilities by June 2002. The stations fuel the<br />

agency's alternatively fueled fleet of 168 buses. The East Valley station houses two 30,000 gallon<br />

double-walled storage tanks, and the West Valley station houses a 20,000 gallon double-walled storage<br />

tank. The tanks store liquefied natural gas (LNG) at -250 degrees Fahrenheit, using vacuum pressure<br />

and insulation to keep the fuel cold. As needed, the liquid is pumped out of the tanks and passed through<br />

a vaporizer, which changes the fuel from a liquid to compressed gas state for transfer to the bus fuel<br />

tanks. In order to keep up with approximately 18,000 gallons of fuel demand daily, and to ensure that<br />

tanks are "topped off," LNG is delivered to the facility via tanker truck.<br />

Environmental Review of <strong>Omnitrans</strong> Facilities<br />

In March 2004, Komex H2O Science completed a study to evaluate any potential environmental and<br />

health impacts of <strong>Omnitrans</strong>' three fueling facilities, located at 1700 W. Fifth Street, 234 South I Street in<br />

San Bernardino, and 4748 Arrow Hwy in Montclair. The study was mandated by legislation (SB1927)<br />

authored by State Senator Nell Soto, and its purpose was to determine whether or not <strong>Omnitrans</strong>’ fueling<br />

facilities pose a health threat to surrounding neighborhoods. It was found that the risk from <strong>Omnitrans</strong><br />

does not exceed risk management guidelines set out by the United States Environmental Protection<br />

Agency and the California Environmental Protection Agency.<br />

Hybrid Vehicles<br />

In November 2002, <strong>Omnitrans</strong> put the nation’s first electric/gasoline hybrid transit bus into service. Since<br />

then, two additional hybrid buses have become operational. The buses utilize the latest in alternative fuel<br />

technology to drastically cut smog-producing emissions.<br />

The <strong>Omnitrans</strong> hybrid buses are the first in the United States to feature the ISE Research ThunderVolt<br />

TB40-H drive system. According to a study conducted by the California Air Resources Board, this system<br />

provides a significant reduction in smog-producing emissions, over and above both diesel and<br />

comparable alternatively-fueled vehicles. The final vehicle has been awarded the Air Resources Board’s<br />

first (and only) non-diesel hybrid certification for use as an alternative fuel system in California’s transit<br />

vehicles. Simply replacing one diesel bus with another that utilizes the Siemens-ISE-Ford ThunderVolt<br />

hybrid system (as <strong>Omnitrans</strong>’ does) has the same effect on emissions as removing more than 200 cars<br />

per year from the road.<br />

The Board’s certification opens the door to the widespread use of this electric/gasoline hybrid system,<br />

which combines unleaded gasoline with electricity instead of diesel or compressed natural gas (CNG).<br />

This combination has proven to create the lowest emission system of any type for a 40-foot vehicle. In<br />

terms of nitrous oxides (NOx) emissions, for example, <strong>Omnitrans</strong>’ electric/gasoline hybrid bus releases 4<br />

grams per mile, compared to 30 grams per mile for a diesel bus and 14.34 grams for a CNG bus.<br />

Similarly, when measuring particulate matter (PM) emissions, <strong>Omnitrans</strong>’ electric/gasoline hybrid bus<br />

releases NO measurable particulate matter, in comparison to nearly 0.25 grams per mile of emissions<br />

from a diesel bus, and 0.03 grams for a CNG bus.<br />

July 11, 2007 7


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Fleet Communications and GPS Procurement<br />

In FY 2003, Siemens Transportations Systems, Inc. was awarded the contract for the installation of a<br />

fleet-wide (fixed route and paratransit) communication and on-line real time management control and<br />

reporting/information system. The procurement included voice/data communications equipment for<br />

directly operated, contracted fixed route and paratransit revenue fleets, GPS technology, and automatic<br />

vehicle location. It also included a schedule adherence monitoring system, an audio and visual<br />

annunciator system that utilizes GPS technology, and automatic passenger counters. This project has<br />

improved service efficiencies, provided valuable and diverse data through GPS technology, assisted in<br />

ensuring the safety and security of its employees and passengers, aided in appropriate emergency<br />

response time, and enhanced communications throughout the fleet. The system’s complete installation<br />

date was July 1, 2007.<br />

Future <strong>Transit</strong> Investment Study<br />

A Future <strong>Transit</strong> Investment Study (FTIS) was created in FY 2003 to develop transit, and related funding,<br />

to meet the needs of the growing number of people and jobs in the San Bernardino Valley. The FTIS<br />

includes programs designed to accommodate both the expected population and employment growth, and<br />

an increasingly aging population. It was also the first step in identifying the future BRT corridors for the<br />

San Bernardino Valley. The renewal of Measure I in November 2004 was a necessary step to making<br />

this study a reality.<br />

Fontana Transcenter Expansion<br />

In FY 2003, <strong>Omnitrans</strong>, in coordination with the City of Fontana, completed a renovation and expansion of<br />

the Fontana Transcenter, located at Orange Way and Sierra Avenue in the City of Fontana. The<br />

renovation/expansion added four bus bays and permits easier transfers between bus routes and<br />

Metrolink, as now all bus transfers occur within the Transcenter, and not on the adjacent streets. More<br />

information on this Transcenter can be found in Appendix B.<br />

Chino/Ontario Agricultural Preserve <strong>Transit</strong> <strong>Plan</strong><br />

In FY 2004, <strong>Omnitrans</strong>, the City of Chino, and the City of Ontario were awarded a grant by Caltrans to<br />

develop a specific transportation plan for the newly developing Agricultural Preserve areas of Chino and<br />

Ontario. This area in particular presents a unique opportunity in that it is the largest undeveloped area<br />

left in Southern California. By integrating transit into the initial design stages, a community can be built<br />

around multiple modes of transportation, giving the residents the opportunity to choose how they would<br />

like to travel, rather than restricting them to the automobile. As discussed in Section 4.7, integrating<br />

transit development into fast-growing “Hot Spots” such as this provides <strong>Omnitrans</strong> an opportunity to grow<br />

new ridership, even while following a fiscally conservative plan.<br />

The benefits of performing the transit planning tasks before development goes in is that the infrastructure<br />

that needs to be in place to support transit (such as right-of-way, easements, sidewalks, curb cuts and<br />

bus turnouts) can be planned and designed during the development review period and the engineering<br />

phase rather than after the fact. Advanced planning will result in fewer costs to the agencies involved and<br />

more expeditious delivery of service to the occupants of the area.<br />

Chino Transcenter<br />

Construction of the Chino Transcenter was completed in January 2005. This facility is located on Sixth<br />

Street in between Chino Avenue and D Street. It has seven bus bays with shelters, information kiosks,<br />

and a Coach Operator restroom facility. In February 2005, Foothill <strong>Transit</strong> Line 497 started providing<br />

service from the Chino Transcenter to the Chino Park-and-Ride, the City of Industry Park-and-Ride, and<br />

Downtown Los Angeles. The Orange County Transportation Authority (OCTA) also serves this facility,<br />

and the Riverside <strong>Transit</strong> Agency (RTA) may do so in the future.<br />

July 11, 2007 8


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Employee Kiosks<br />

During FY 2004, <strong>Omnitrans</strong> implemented Employee Kiosks throughout its East and West Valley facilities<br />

for the purpose of employee retention and promotion. The kiosks were funded by a grant from the<br />

Workforce Investment Act. Currently there are six employee kiosks. Four are located at the <strong>Omnitrans</strong><br />

East Valley Facility and two are located at the West Valley Facility. The kiosks offer the opportunity for<br />

employees who may not work a traditional schedule (8:00 am to 5:00 pm) to communicate effectively with<br />

administrative staff. Employees are also able to explore promotional opportunities available within the<br />

agency and educational advancements. It is proposed that in the future, the kiosks will also give<br />

employees the opportunity to submit benefits changes electronically. In FY <strong>2008</strong>, staff will explore the<br />

possibility of submitting benefit changes through the kiosks.<br />

September 2003 Fare Change<br />

In September 2003, a fare change was implemented. It had been four years since the previous fare<br />

structure was put in place. Within those four years, the cost of providing transit services for <strong>Omnitrans</strong><br />

increased to a point that it was no longer possible to obtain a 20% farebox recovery ratio (a State<br />

mandate in order to continue to receive operating and capital funds). The fare change also eliminated the<br />

10-trip pass, but added a new 7-day pass to the system. In addition, the standard for children riding free<br />

was changed, so that it is no longer age-based (previously it was two children under four years of age<br />

rode free with a paying adult), but height-based (children under 46” now ride free). This simplified the<br />

boarding and payment procedures for both the coach operators and passengers.<br />

Access Zone Restructuring<br />

Also in September 2003, in conjunction with a fare change, the Access Zone system was simplified from<br />

39 small zones to 6 large ones. This change not only simplifies the system for passengers, but also for<br />

dispatchers and drivers, who need to determine the correct fare payment.<br />

Facility Expansion<br />

In March 2003, new office space was created at the <strong>Omnitrans</strong> Montclair Facility. This expansion was<br />

necessary to accommodate the growth that had occurred in the west end of <strong>Omnitrans</strong> service area, and<br />

necessary staff additions to meet this growth. With a complete overhaul, new office space, dispatch<br />

office, driver’s lounge, workout room, and kitchen were created. Prior to the expansion, many spaces had<br />

to perform double duty. Currently, the East Valley facility’s administrative area is being remodeled.<br />

Additional expansions are planned in the coming years, as the future Mid-Valley facility in Rancho<br />

Cucamonga becomes funded and additional space is required at <strong>Omnitrans</strong>’ East Valley facility in San<br />

Bernardino.<br />

Trapeze Software Implementation<br />

In FY 2004, <strong>Omnitrans</strong> began the process of upgrading its existing radio system to a more sophisticated<br />

and useful voice-data radio communication system. The existing radio system for the paratransit fleet<br />

(installed in 1987) and the fixed route fleet (installed in 1994) had become outdated and unreliable, and<br />

did not have the functionality that is possible with the use of current communications technologies. In<br />

addition, the system was no longer supported, as the manufacturer is no longer in the transit market. The<br />

new system assists in operating efficiencies, ensures appropriate emergency response and full<br />

compliance with the provisions of the Americans with Disabilities Act (ADA) and provides valuable data<br />

that can be used to analyze performance and usage. Installation of the new system was completed in FY<br />

2006/2007.<br />

July 11, 2007 9


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Bus Stop Design Guidelines Report<br />

<strong>Omnitrans</strong> Bus Stop Design Guidelines were submitted in September 2006 and approved by <strong>Omnitrans</strong>’<br />

Board on October 4, 2006. The goal of the guidelines is to provide comfortable and convenient high<br />

quality facilities at bus stop locations, while considering the operational needs of <strong>Omnitrans</strong>, the<br />

requirements of the Americans with Disabilities Act (ADA), and public safety. These guidelines are<br />

intended for use by city planners, designers, traffic engineers, developers, and other public officials, and<br />

define the responsibilities of local jurisdictions and <strong>Omnitrans</strong> staff in the provision of transit facilities to<br />

the public. Bus stop spacing, placement, dimensions, signage and amenity guidelines are summarized in<br />

the <strong>Omnitrans</strong> Bus Stop Design Guidelines report.<br />

sbX<br />

The E Street <strong>Transit</strong> Corridor Project – Phase I Final Alternatives Analysis Report (12/07/05)<br />

recommended the implementation of sbX BRT service to the E Street corridor in FY 2011/12. The<br />

introduction of a limited stop express as a Route 2 overlay has been considered in the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP Scenarios 2 and 3 service plans to develop a market for higher speed transit along the<br />

E street corridor. sbX bus storage and maintenance needs have been considered in the Capital/Facilities<br />

<strong>Plan</strong> and Financial <strong>Plan</strong>. Implementation of sbX will require some East Valley route restructuring to<br />

accommodate east-west transfers to sbX. A Route 2 limited stop express (proposed Route 302) is<br />

recommended as a precursor to the E Street sbX in the Partially Constrained Scenario (Scenario 2,<br />

discussed in Chapter 12). Although Route 302 is not included in the recommended Financially<br />

Constrained Scenario (Scenario 1, discussed in Chapter 10), it could be considered for implementation in<br />

the later years of the SRTP timeframe if overall systemwide ridership and farebox revenue recovery<br />

improve. If implemented, Route 302 would be discontinued with the implementation of the E Street sbX.<br />

In addition, the reduction of Route 2 Local frequency to 30 minutes should be considered.<br />

1.12 Local and National Mobility Objectives<br />

Local Objectives<br />

<strong>Omnitrans</strong> mobility objectives reflect the provision of affordable and safe public transportation options to<br />

all residents and visitors of the San Bernardino Valley. This fundamental mobility objective is supportive<br />

of Federal <strong>Transit</strong> Administration objectives for public transit.<br />

National Objectives<br />

National mobility objectives are reflected in the Federal <strong>Transit</strong> Administration’s stated role for public<br />

transit, which includes: affordable mobility, congestion management, and supporting neighborhoods<br />

served by intensive transit services.<br />

• Affordable Mobility: Affordable mobility for all is the most fundamental reason<br />

for offering transit service. All transit systems provide low-cost mobility for<br />

people who do not, or cannot, operate a motor vehicle because of personal<br />

preference, low income, disability, youth or old age. An important characteristic<br />

of affordable mobility service is that regular access is provided to as many<br />

destinations as possible.<br />

• Congestion Management: <strong>Transit</strong> services that can compete effectively with<br />

the automobile are the most effective in mitigating traffic congestion. Rapid and<br />

direct transit services should be designed to reduce travel time.<br />

July 11, 2007 10


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Supporting <strong>Transit</strong>-Intensive Neighborhoods: Public transit and land use<br />

should be integrated to support pedestrian-oriented and higher density, mixed<br />

land use developments.<br />

1.13 Role of the FY <strong>2008</strong>-<strong>2013</strong> SRTP<br />

Under Federal planning rules, transit agencies receiving federal funds are required to prepare an SRTP<br />

on a regular basis. Besides meeting this regulatory requirement, the purpose of this SRTP is to provide a<br />

service and financial plan to set <strong>Omnitrans</strong>’ priorities for the next six years from FY 2007/08 to FY<br />

2012/13. It provides an opportunity to re-examine transit needs based on changing demographics and<br />

land use patterns, changes in the relative importance of destinations within the service area that influence<br />

travel patterns, and funding capacity. Besides recommending operational and service design changes,<br />

an SRTP establishes new (or amends existing) service priorities, policies, and performance/design<br />

standards.<br />

This SRTP document is intended as a pragmatic tool to guide <strong>Omnitrans</strong> in the ongoing operation,<br />

planning, financing, and management of transit services in Southwestern San Bernardino County.<br />

1.14 SRTP Preparation Process/COA<br />

Figure 1-1 summarizes the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP process. The <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP<br />

includes a Comprehensive Operational Assessment (COA) in support of the SRTP update. Key elements<br />

of the COA/SRTP include:<br />

• Collection and Analysis of Current Service Data – Reviewed existing transit<br />

and transportation studies, local general plans, regional plans, ridership counts,<br />

passenger survey results, scheduling and operational data, customer service<br />

reports, and financial reports.<br />

• Market and Travel Pattern Identification – Developed population projections,<br />

demographic profiles and travel pattern trends for <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP<br />

timeframe.<br />

• Stakeholder Consultation – Determined needs, issues, the perceived role for<br />

transit, and priorities. Stakeholders included <strong>Omnitrans</strong> Board members,<br />

management and staff; Amalgamated <strong>Transit</strong> Union (ATU) Local 1704 and<br />

International Brotherhood of Teamsters Local 166 officials; SCAG, SANBAG and<br />

Caltrans representatives; and administrative staff from the <strong>Omnitrans</strong> member<br />

communities.<br />

• Public Meetings – Three public meetings were held in September, 2006 to<br />

collect public input on issues and needs. Seven meetings were held in February<br />

2007 to collect public feedback on SRTP recommendations.<br />

• Line Segment Analysis – Stop-by-stop analysis of fixed route service by time<br />

period and route segment.<br />

• Service Evaluation – Assessment of how well <strong>Omnitrans</strong> fixed route, OmniLink<br />

and Access services are performing (efficiency and effectiveness).<br />

• Service Policy Evaluation – Reviewed existing service policies, performance<br />

standards and service design standards.<br />

July 11, 2007 11


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Needs Assessment – Identified transit needs for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong><br />

SRTP framework from demographic and travel data review, stakeholder<br />

consultation and service evaluation.<br />

• Service <strong>Plan</strong> Preparation – Preparation of fixed route, OmniLink and Access<br />

service plans for three scenarios – Scenario 1: Financially Constrained,<br />

Scenario 2: Partially Constrained, and Scenario 3: Unconstrained.<br />

• Financial <strong>Plan</strong> Preparation – Performed a financial capacity analysis,<br />

developed a fare policy and a series of operational and capital financial plans in<br />

conjunction with each scenario service plan.<br />

• <strong>Plan</strong> Review and Approval – Recommended plan was reviewed with <strong>Omnitrans</strong><br />

Board members, management and staff, and the public prior to finalization and<br />

approval by the <strong>Omnitrans</strong> Board.<br />

Figure 1-1: <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP Process<br />

1.15 Ongoing Studies and Initiatives That Will Impact This SRTP<br />

1.15.1 OTHER OMNITRANS STUDIES & INTIATIVES<br />

FY 2004 – FY <strong>2008</strong> Fare Policy and Implementation <strong>Plan</strong> (03/05/03) – The plan developed a series of<br />

fare policy objectives, and recommended fare policy and an implementation plan to guide <strong>Omnitrans</strong> fare<br />

policy decisions over the period FY 2003/04 to FY 2007/08. The development of the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP Financial <strong>Plan</strong> included a review and assessment of the FY 2004 – FY <strong>2008</strong> Fare Policy<br />

and Implementation <strong>Plan</strong> recommendations in the finalization of a fare policy.<br />

The Systemwide <strong>Transit</strong> Corridor <strong>Plan</strong> for the San Bernardino Valley – The plan identified seven key<br />

transit corridors for the introduction of higher quality transit service (higher frequency, express or BRT<br />

services) to attract choice riders and effect a positive transit mode shift. Major transit corridors include<br />

Corridor 1 (E Street), Corridor 2 (Foothill East), Corridor 3 (Foothill West), Corridor 4 (Mountain & Euclid),<br />

Corridor 5 (San Bernardino Avenue), Corridor 6 (Holt & Fourth Street), and Corridor 7 (Grand & Edison).<br />

Corridor 1 was identified as the highest priority corridor with the planned implementation of the E Street<br />

July 11, 2007 12


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

sbX in FY 2010/11. The remaining corridors form the framework for the establishment of a base 2 fixed<br />

route network, with the possible introduction of limited stop or full express services as a precursor to sbX<br />

network expansion. See Section 5.1 for more detail about the plan.<br />

Evaluation of <strong>Omnitrans</strong>’ Administrative Operations Final Report (01/23/06) – The project reviewed<br />

the internal controls of <strong>Omnitrans</strong> procurement, finance, human resources and information management<br />

processes and implementation of prior recommendation, and developed a series of 37 corrective<br />

recommendations.<br />

FY 2003-2005 Triennial Performance Audit of <strong>Omnitrans</strong> (05/06) – The audit recommended the<br />

improvement of farebox recovery and the development of more productive services in the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP. Both are considered critical issues in the current SRTP.<br />

Multi-Dimensional Benchmarking – <strong>Transit</strong> System Cost and Performance (2006) – This study<br />

involved a comparative analysis of <strong>Omnitrans</strong>’ cost and performance for the period 1998 through 2005<br />

based on research of over 100 western United States transit systems reporting data to the National<br />

<strong>Transit</strong> Database (NTD). This study recommended that <strong>Omnitrans</strong> do the following: identify potential<br />

areas of cost reduction that need additional management focus; set realistic strategic and cost<br />

performance targets; and negotiate quantitative performance targets for the management team. With<br />

respect to the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP recommendation to reduce operating costs, <strong>Omnitrans</strong> staff is<br />

currently addressing the recommendations from the Multi-Dimensional Benchmarking Study.<br />

Review of Ontario Mills Bus Stop Accessibility and Safety (08/06/06) – Recommendations to improve<br />

accessibility and passenger amenities at the Ontario Mills Mall bus stop were provided to the mall owner<br />

and are under consideration.<br />

User Intercept Survey of <strong>Omnitrans</strong> Riders at the Ontario Mills Mall Final Report (06/27/06) – A key<br />

finding concluded that 63% of passengers using the Ontario Mills Mall transfer site were going to the mall<br />

and not transferring to another bus. Only 37% of the respondents used the site as a transfer site. This<br />

suggests the potential staggering of bus arrival/departure times to reduce bus and passenger congestion<br />

at this location.<br />

On-Board User Intercept Surveys of <strong>Omnitrans</strong> Riders (08/31/06) – In a SANBAG-funded project, a<br />

weekday, on-board survey of <strong>Omnitrans</strong> fixed route riders and a mail-back intercept survey of OmniLink<br />

and Access riders were conducted by <strong>Omnitrans</strong>. A total of 4,055 completed fixed route questionnaires<br />

and 165 completed demand-response questionnaires were returned. Findings provide a recent overview<br />

of transit travel patterns and rider profiles for <strong>Omnitrans</strong> fixed route and demand-response services. Key<br />

fixed route origins and destinations included home, work and school. Sixty-six percent of fixed route<br />

riders were aged 22 to 49, the majority have low incomes (53% of respondents cite annual incomes of<br />

less than $20,000), and the majority are transit-dependent (only 15% cite the availability of an automobile<br />

for the trip surveyed). Key trip origins and destinations for OmniLink and Access riders were home and<br />

work. The majority of demand-response riders are 40 or older (70%) and have low incomes (64% report<br />

an annual income of less than $20,000). Almost all of the demand-response riders (95%) have a<br />

disability. Of those riders with a disability, 55% have a disability that affects their mobility.<br />

San Bernardino Transcenter Project – Upon completion of the land acquisition, which is currently<br />

underway, <strong>Omnitrans</strong> will begin to construct the San Bernardino Transcenter at Rialto and E Street. This<br />

new facility will serve as a multi-modal hub for <strong>Omnitrans</strong>’ sbX, fixed route, regional bus, Metrolink, and<br />

Redlands Passenger Rail services. The new San Bernardino Transcenter will replace the Fourth Street<br />

<strong>Transit</strong> Mall. The new San Bernardino Transcenter site straddles the Redlands Subdivision to the<br />

immediate west of E Street and to the immediate south of Rialto Avenue. This new facility will improve<br />

<strong>Omnitrans</strong> service connections in Downtown San Bernardino. <strong>Transit</strong>-oriented development (TOD)<br />

2<br />

Base routes are the core routes in the transit system, operating in a straight-line route structure on the main arterial roads<br />

throughout the service area. They are oriented as much as possible to the main travel destinations and corridors, and form a grid<br />

route network that can provide a basic level of mobility to residents.<br />

July 11, 2007 13


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

associated with the new Transcenter will also act as a trip generator and attractor for <strong>Omnitrans</strong> routes<br />

serving Downtown San Bernardino. <strong>Omnitrans</strong> routing in Downtown San Bernardino will have to be<br />

restructured to accommodate this new site. Individual route running times and schedules will also have to<br />

be adjusted.<br />

<strong>Plan</strong>ned Yucaipa Transcenter – The new Yucaipa Transcenter is scheduled to open in FY 2007/08 and<br />

will serve as the eastern terminus for <strong>Omnitrans</strong> fixed route services. This off-street facility will have eight<br />

bus bays and accommodate higher-capacity 60-foot articulated buses. Yucaipa is currently served by<br />

<strong>Omnitrans</strong> Routes 8 and 9 and OmniLink service. The new Yucaipa Transcenter can serve as a transfer<br />

site between <strong>Omnitrans</strong> fixed route services and Yucaipa OmniLink service, and could eventually<br />

accommodate regional connections if service extensions from neighboring Riverside County are<br />

warranted. The new Transcenter could also accommodate new bus feeder services to the planned<br />

Redlands Passenger Rail service.<br />

<strong>Plan</strong>ned Chaffey College Transcenter – The Chaffey College Transcenter is still in the initial planning<br />

stages and will eventually serve as a terminus for north-south services in the Western Valley and for<br />

potential limited stop commuter services operating along I-210 in the future.<br />

1.15.2 OTHER PLANNING INITIATIVES<br />

I-210 Completion (FY 2007/08) – When completed in FY 2007/08, I-210 (also known as the Foothill<br />

Freeway) will provide an eight lane east-west freeway through the San Bernardino County cities of San<br />

Bernardino, Rialto, Fontana, Rancho Cucamonga, and Upland, with access into Los Angeles County.<br />

With a carpool lane in each direction, I-210 provides a strategic alignment for the Foothill East and<br />

Foothill West <strong>Transit</strong> Corridors for future sbX expansion. West Valley segments of I-210 could also be<br />

used to avoid operation along congested arterials as higher speed Metrolink feeders are considered in<br />

the future in conjunction with residential development north of I-210.<br />

Redlands Passenger Rail – Redlands Passenger Rail is a planned passenger rail service between the<br />

planned San Bernardino Transcenter and the City of Redlands along the Redlands Subdivision. On April<br />

4, 2007, the SANBAG Board authorized additional studies that would examine the potential for this<br />

service. The introduction of this rail commute service will impact east-west <strong>Omnitrans</strong> ridership in the<br />

East Valley and also require East Valley service restructuring as feeders around the series of nine<br />

possible Redlands Passenger Rail stations. TOD development proposed around each station will<br />

concentrate densities and activities, potentially generating increased local transit demand. Shuttle<br />

service between specific stations and San Bernardino International Airport, Loma Linda Medical<br />

University and Medical Center, Loma Linda VA Hospital, University of Redlands, Crafton Hills College and<br />

the planned Yucaipa Transcenter may be warranted. With the exception of the initial San Bernardino<br />

Transcenter development, Redlands Passenger Rail <strong>Plan</strong> impacts are anticipated to occur beyond the<br />

<strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe.<br />

1.16 Distribution of the SRTP<br />

As the guiding document for the development of the <strong>Omnitrans</strong>’ transit services, the SRTP will be widely<br />

distributed throughout the service area and beyond. The region’s planning and programming agencies<br />

(SANBAG and SCAG) need the SRTP for their programming and administrative activities. Neighboring<br />

transit systems such as RTA, LACMTA, and OCTA will make use of the document as they plan<br />

coordination and interaction with <strong>Omnitrans</strong> services and facilities. Member cities will use the document<br />

to help with their review of future developments and compilation of their capital improvement programs.<br />

Existing and future riders will find the SRTP to be a valuable source of information for their travel,<br />

housing, and employment choices. To maximize the availability of the SRTP, the document will be<br />

available in several forms, including on-line at the <strong>Omnitrans</strong> website, on CDs, and hard copies.<br />

With this wide array of use in mind, the SRTP will be distributed to the following parties.<br />

July 11, 2007 14


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2. EXISTING OMNITRANS TRANSIT SERVICES<br />

2.1 System Description<br />

Under authority of Title 1, Division 7, Chapter 5, as amended, of the Government Code of the State of<br />

California, <strong>Omnitrans</strong> was created in 1976 by a Joint Powers Agreement (JPA) among the County of San<br />

Bernardino and the cities of Chino, Colton, Fontana, Loma Linda, Montclair, Ontario, Redlands, Rialto,<br />

San Bernardino and Upland. Since that time, five additional cities (Chino Hills, Highland, Grand Terrace,<br />

Rancho Cucamonga, and Yucaipa) have joined and make up the current JPA. (See Chapter 1 for<br />

complete list of JPA members.) <strong>Omnitrans</strong> was created primarily to provide a standardized system of<br />

fares, a universal system of transfers, and expanded transit services and facilities for the benefit of the<br />

residents of its members.<br />

Contracted services are currently provided by the private transportation company First <strong>Transit</strong>. Effective<br />

July 1, 2006, First <strong>Transit</strong> is responsible for the operations of both Access and OmniLink services under a<br />

single, three-year service agreement, with two optional single year extensions.<br />

2.2 Fixed Route Service<br />

2.2.1 DEFINITION OF FIXED ROUTE SERVICE<br />

<strong>Omnitrans</strong>’ fixed route transit system provides scheduled, general public service along planned,<br />

predetermined routes in accordance with established frequencies. Those frequencies are generally<br />

based on passenger volumes: enough people have to ride each bus so that productivity and farebox<br />

recovery standards are met.<br />

2.2.2 SERVICE CHARACTERISTICS<br />

<strong>Omnitrans</strong> operates 29 fixed bus routes, including 17 routes in the East Valley (east of I-15), 11 routes in<br />

the West Valley (west of I-15), and 1 regional express route to the City of Riverside. The following<br />

provides a route by route description. Figure 2-1 provides an overview of <strong>Omnitrans</strong> fixed route service<br />

(for a larger version of the map, see Appendix H). Figure 2-2 provides a service span summary by route.<br />

Figure 2-3 provides a fleet summary by route.<br />

July 11, 2007 16


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-1: Fixed Route Service (as of July 1, 2007)<br />

July 11, 2007 17


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Route<br />

Count<br />

Figure 2-2: <strong>Omnitrans</strong> Fixed Route Service Span Summary by Route (as of July 1, 2007)<br />

Route<br />

Route Name<br />

Service Hours<br />

Weekday Saturday Sunday<br />

FIXED ROUTE EAST VALLEY<br />

1 1 ARMC - San Bernardino - Del Rosa 4:38 - 22:49 6:32 - 19:25 6:32 - 19:25<br />

2 2 Cal State - E Street - Loma Linda 4:21 - 22:41 6:35 - 20:02 6:32 - 19:30<br />

3 3 Baseline - Highland - San Bernardino 4:34 - 23:30 6:04 - 19:15 6:04 - 19:15<br />

4 4 Baseline - Highland - San Bernardino 4:35 - 22:56 6:25 - 19:26 6:25 - 19:10<br />

5 5 San Bernardino - Del Rosa - Cal State 4:47 - 22:25 6:28 - 19:25 6:38 - 19:25<br />

6 7 N. San Bernardino - Sierra Way - San Bernardino 5:11 - 19:52 6:50 - 18:50 7:30 - 18:00<br />

7 8 San Bernardino - Mentone - Yucaipa 4:43 - 21:15 6:43 - 19:20 8:05 - 19:00<br />

8 9 San Bernardino - Redlands - Yucaipa 4:13 - 22:44 5:13 - 22:48 7:05 - 18:48<br />

9 10 Fontana - Baseline - San Bernardino 5:10 - 20:15 6:20 - 19:25 7:20 - 18:15<br />

10 11 San Bernardino - Muscoy - Cal State 5:25 - 22:43 6:58 - 19:22 7:25 - 19:22<br />

11 14 Fontana - Foothill - San Bernardino 3:48 - 23:07 6:05 - 21:45 6:05 - 19:35<br />

12 15 Fontana - San Bndo/Highland - Redlands 5:05 - 22:44 6:35 - 19:58 6:35 - 19:28<br />

13 19 Redlands - Colton - Fontana 4:50 - 22:35 6:00 - 19:35 5:15 - 19:00<br />

14 20 Fontana Metrolink - Via Hemlock - Kaiser 4:57 - 21:42 6:27 - 18:27 6:57 - 17:57<br />

15 22 North Rialto - Riverside Ave - ARMC 4:30 - 22:08 7:30 - 19:17 6:55 - 19:45<br />

16 28 Southridge - Slover Ave - Kaiser<br />

6:02 - 8:56<br />

No service<br />

16:02 - 18:52<br />

No service<br />

17 29 Bloomington - Valley Blvd - Kaiser 6:45 - 18:35 7:45 - 18:35 No service<br />

18 90 Inland Empire Connection 4:05 - 22:45 6:35 - 22:25 7:05 - 19:30<br />

FIXED ROUTE WEST VALLEY<br />

19 60 Ont Conv Cntr - Chaffey College - Ont Mills 4:40 - 21:50 6:40 - 19:20 6:40 - 19:20<br />

20 61 Fontana - Ontario Mills - Pomona 4:20 - 23:06 5:50 - 22:14 6:02 - 19:53<br />

21 62 Montclair - Ontario - Chino 5:26 - 22:00 6:48 - 19:19 6:48 - 19:19<br />

22 63 Chino - Ontario - Upland 5:45 - 21:43 6:45 - 18:42 6:45 - 19:41<br />

23 65 Montclair - Chino Hills 4:50 - 22:49 6:20 - 19:14 6:20 - 18:22<br />

24 66 Fontana - Foothill - Montclair 4:19 - 23:22 5:46 - 22:16 5:51 - 19:36<br />

25 67 Ontario - Baseline - Fontana 5:35 - 20:20 6:35 - 19:15 6:35 - 19:17<br />

26 68 Chino - Montclair - Chaffey College 4:49 - 22:39 6:05 - 19:25 No service<br />

27 70 Ontario - Creekside - Ontario Mills 6:35 - 21:21 6:45 - 18:29 6:45 - 18:29<br />

28 71 Kaiser - South Ridge - Rancho Cucamonga 4:51 - 21:48 6:35 - 20:23 6:35 - 18:48<br />

29 75 Ontario - Via Francis - Ontario Mills<br />

6:05 - 9:00<br />

No service<br />

15:05 - 18:00<br />

No service<br />

July 11, 2007 18


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Route<br />

Count<br />

Route<br />

Figure 2-3: Fixed Route Fleet (as of July 1, 2007)<br />

Route Name<br />

Peak Fleet<br />

Weekday Saturday Sunday<br />

1 1 ARMC - San Bernardino - Del Rosa 7 3 3<br />

2 2 Cal State - E Street - Loma Linda 10 7 7<br />

3 3 Baseline - Highland - San Bernardino CCW 5 5 5<br />

4 4 Baseline - Highland - San Bernardino CW 5 5 5<br />

5 5 San Bernardino - Del Rosa - Cal State 4 4 2<br />

6 7 N. San Bernardino - Sierra Way - San Bernardino 3 2 2<br />

7 8 San Bernardino - Mentone - Yucaipa 3 3 1.5<br />

8 9 San Bernardino - Redlands - Yucaipa 3 3 1.5<br />

9 10 Fontana - Baseline - San Bernardino 4 2 2<br />

10 11 San Bernardino - Muscoy - Cal State 4 4 2<br />

11 14 Fontana - Foothill - San Bernardino 8 7 7<br />

12 15 Fontana - San Bdno/Highland - Redlands 8 8 4<br />

13 19 Redlands - Colton - Fontana 7 4 4<br />

14 20 Fontana Metrolink - Via Hemlock - Kaiser 2 2 1<br />

15 22 North Rialto - Riverside Ave - ARMC 4 4 2<br />

16 28 Southridge - Slover Ave - Kaiser 1 No service No service<br />

17 29 Bloomington - Valley Blvd - Kaiser 1 1 No service<br />

18 90 Inland Empire Connection 2 2 2<br />

East Valley Peak Fleet - Sub Total 81 66 51<br />

EV Spares 18 18 18<br />

EV Spare Ratio 22% 27% 35%<br />

19 60 Ont Conv Cntr - Chaffey College - Ont Mills 3 3 3<br />

20 61 Fontana - Ontario Mills - Pomona 14 14 14<br />

21 62 Montclair - Ontario - Chino 5 3 3<br />

22 63 Chino - Ontario - Upland 4 2 2<br />

23 65<br />

65A Montclair - Chino Hills Via Chino Ave<br />

65B Montclair - Chino Hills via Edison Ave<br />

4 2 2<br />

24 66 Fontana - Foothill - Montclair 11 6 6<br />

25 67 Ontario - Baseline - Fontana 3 3 3<br />

26 68 Chino - Montclair - Chaffey College 7 3<br />

27 70 Ontario - Creekside - Ontario Mills 2 2 2<br />

28 71 Kaiser - South Ridge - Rancho Cucamonga 3 3 3<br />

29 75 Ontario - Via Francis - Ontario Mills 1 No service No service<br />

West Valley Peak Fleet - Sub Total 57 41 38<br />

WV Spares 10 10 10<br />

WV Spare Ratio 18% 24% 26%<br />

Total Fixed Route Peak Fleet 138 107 89<br />

Total Fixed Route Spares 28 28 28<br />

Total Fixed Route Service Fleet 166 135 117<br />

Total Spare Ratio 20% 26% 31%<br />

Surplus 5 5 5<br />

Energy Contingency Fleet (up to seven buses) 7 7 7<br />

July 11, 2007 19


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

East Valley Base Route Description<br />

The East Valley (east of I-15) has nine base routes, eight local routes and one express route, using 81 inservice<br />

buses to cover the cities of Colton, Fontana, Grand Terrace, Highland, Loma Linda, Redlands,<br />

Rialto, San Bernardino, and Yucaipa.<br />

Base Route 1: ARMC-San Bernardino-Del Rosa – This East Valley base route serves Colton and San<br />

Bernardino. It provides 15-30 minute daytime and 30-minute evening service on weekdays, and 30-60<br />

minute daytime service on weekends. On weekdays, the south section in Colton provides 15-minute<br />

service all day in the Valley/Mt. Vernon corridor between the Arrowhead Regional Medical Center and the<br />

Fourth Street <strong>Transit</strong> Mall in downtown San Bernardino. The north section in San Bernardino provides<br />

30-minute service in the Waterman corridor between the <strong>Transit</strong> Mall and Del Rosa. When considering<br />

Route 5 in the Waterman corridor, the corridor receives a combined 10-20 minute service on weekdays<br />

and 20-minute service on weekends. Popular destinations along this route include: Aquinas, Sierra, and<br />

Colton High Schools; St. Bernardine Medical Center and Arrowhead Regional Medical Center; San<br />

Bernardino City Hall and DMV; San Bernardino Valley College; and Carousel Mall. The Transcenters<br />

served by this route are the Fourth Street <strong>Transit</strong> Mall and the Arrowhead Regional Medical Center<br />

Transcenter.<br />

Base Route 2: Cal State-E Street-Loma Linda – This East Valley base route serves Loma Linda and<br />

San Bernardino. It provides 15-minute daytime service and 30-minute evening service on weekdays, and<br />

20-minute weekend daytime service. Popular destinations along this route include: Cal State San<br />

Bernardino and Loma Linda University; Loma Linda and San Bernardino City Halls; Cajon and San<br />

Bernardino High Schools, Loma Linda Academy, and the San Bernardino Adult School; Loma Linda<br />

University Medical Center and the Veteran’s Administration; the Route 66 Museum; the San Bernardino<br />

Stadium; the Hall of Records; the Ronald McDonald House; and the Carousel and Inland Center Malls.<br />

The Transcenters served by this route are the Fourth Street <strong>Transit</strong> Mall and the Inland Center Mall<br />

Transcenter.<br />

Base Routes 3/4: Baseline-Highland-San Bernardino – These East Valley base routes serve the<br />

Baseline East and Highland East corridors out of the Fourth Street <strong>Transit</strong> Mall in downtown San<br />

Bernardino. The routes provide 20-minute daytime and 30-minute evening service on weekdays and 20-<br />

minute daytime service on weekends. Popular destinations along these routes include: Patton Hospital,<br />

Beaver Medical Clinic, San Bernardino Community Hospital, Ballard Rehab Center, St. Bernardine<br />

Medical Center; Target and Wal*Mart; and San Bernardino High School. The Transcenter served by<br />

these routes is the Fourth Street <strong>Transit</strong> Mall.<br />

Base Route 10: Fontana-Baseline-San Bernardino – This East Valley base route serves the Baseline<br />

East/Citrus corridor between downtown San Bernardino and the Fontana Metrolink Station. It provides<br />

30-minute daytime service on weekdays and 60-minute daytime service on weekends. Popular<br />

destinations along this route include: AB Miller, Eisenhower, and Arroyo Valley High Schools; and the<br />

Carousel Mall. The Transcenters served by this route are the Fourth Street <strong>Transit</strong> Mall and the Fontana<br />

Metrolink Station Transcenter.<br />

Base Route 14: Fontana-Foothill-San Bernardino – This East Valley base route serves the Foothill<br />

East corridor between the Fourth Street <strong>Transit</strong> Mall and the Fontana Metrolink Station. It provides 15-<br />

minute daytime and 30-60 minute evening service Monday – Sunday. Popular destinations along this<br />

route include: the Fontana and San Bernardino City Halls; the San Bernardino Senior Center; and<br />

Carousel Mall. The Transcenters served by this route are the Fontana Metrolink Station Transcenter and<br />

the Fourth Street <strong>Transit</strong> Mall.<br />

Base Route 15: Fontana-San Bernardino/Highland-Redlands – This East Valley base route serves<br />

the Merrill, Baseline and Orange corridors between the Fontana Metrolink Station and Redlands Mall<br />

Transcenter. It provides 30-minute daytime and evening service on weekdays, 30-minute daytime<br />

service on Saturdays, and 60-minute daytime service on Sundays. Popular destinations along this route<br />

include: the San Bernardino County Court Building; Carousel Mall, Redlands Mall, and Citrus Plaza; the<br />

July 11, 2007 20


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

San Bernardino Stadium; the Jerry Lewis Community Center; TEAM House; Rialto High School; and San<br />

Bernardino Valley College. The Transcenters served by this route are the Fourth Street <strong>Transit</strong> Mall,<br />

Redlands Mall Transcenter, and the Fontana Metrolink Station Transcenter.<br />

Base Route 19: Redlands-Colton-Fontana – This East Valley base route serves the San Bernardino<br />

corridor in Fontana between the South Fontana Transcenter and the Arrowhead Medical Center, and<br />

through Colton and Loma Linda to the Redlands Mall via Barton/Redlands Blvd. It provides 30-minute<br />

daytime and evening service on weekdays, and 60-minute daytime service on weekends. Popular<br />

destinations along this route include: Kaiser Hospital, Arrowhead Regional Medical Center, Kaiser Clinic,<br />

the VA Hospital, and the Loma Linda Medical Center; Colton City Hall; and Wal*Mart, Citrus Plaza, and<br />

Redlands Mall. The Transcenters served by this route are the South Fontana Transcenter, Redlands Mall<br />

Transcenter, and the Arrowhead Regional Medical Center Transcenter.<br />

Base Route 22: North Rialto-Riverside-ARMC – This East Valley base route serves the Riverside<br />

corridor between North Rialto and the Arrowhead Medical Center in Colton. It provides 30-minute<br />

daytime and evening service on weekdays, 30-minute daytime service on Saturdays, and 60-minute<br />

daytime service on Sundays. Popular destinations along this route include: Kolb Jr. High School; Carter<br />

and Eisenhower High Schools; the Rialto Civic Center; Wal*Mart; and Arrowhead Regional Medical<br />

Center. The Transcenter served by this route is Arrowhead Regional Medical Center Transcenter.<br />

East Valley Local Route Description<br />

Local Route 5: San Bernardino-Del Rosa-Cal State – This East Valley local route provides Northeast<br />

San Bernardino with 30-minute daytime and evening service on weekdays, 30-minute daytime service on<br />

Saturdays, and 60-minute daytime service on Sundays. Popular destinations along this route include:<br />

Cal State San Bernardino; Pacific and Cajon High Schools; and the San Bernardino post office. The<br />

Transcenter served by this route is the Fourth Street <strong>Transit</strong> Mall.<br />

Local Route 7: North San Bernardino-Sierra Way-San Bernardino – This East Valley local route<br />

serves the Sierra Way/Northpark/Kendall corridor between downtown San Bernardino and North San<br />

Bernardino and Cal State. It provides 30-60 minute daytime service on weekdays and 60-minute daytime<br />

service on weekends. On weekdays, the Kendall section north of the University has 60-minute service.<br />

The Northpark section serving the University has 60-minute service. The Sierra Way section has 30-<br />

minute service. Popular destinations along this route include: Cal State San Bernardino; Cajon High<br />

School; the Norman Feldheym Library in San Bernardino; Al Guhin Park; and Carousel Mall. The<br />

Transcenter served by this route is the Fourth Street <strong>Transit</strong> Mall.<br />

Local Route 8: San Bernardino-Mentone-Yucaipa – This East Valley local route operates out of the<br />

Fourth Street <strong>Transit</strong> Mall and serves the Tippecanoe corridor in San Bernardino, the Redlands corridor in<br />

Loma Linda, the Mentone corridor in Redlands and the Yucaipa corridor in Yucaipa. It provides 60-<br />

minute daytime service on weekdays and Saturdays, and 120-minute daytime headways on Sundays.<br />

Popular destinations along this route include: the Loma Linda post office; Redlands Mall; Crafton Hills<br />

College; and Yucaipa High School. The Transcenters served by this route are the Fourth Street <strong>Transit</strong><br />

Mall and Redlands Mall Transcenter.<br />

Local Route 9: San Bernardino-Redlands-Yucaipa – This East Valley local route operates out of the<br />

Fourth Street <strong>Transit</strong> Mall and serves the Waterman corridor in San Bernardino, the Barton corridor in<br />

Loma Linda, the Citrus corridor in Redlands, and the Yucaipa corridor in Yucaipa. It provides 60-minute<br />

daytime and evening service on weekdays, 60-minute daytime service on Saturdays and 120-minute<br />

daytime service on Sundays. Popular destinations along this route include: the San Bernardino County<br />

Health Department; the Carousel and Redlands Malls; the Loma Linda post office; Loma Linda Medical<br />

Center and the VA Hospital; Yucaipa and Redlands High Schools; and Crafton Hills College. The<br />

Transcenters served by this route are the Fourth Street <strong>Transit</strong> Mall and Redlands Mall Transcenter.<br />

Local Route 11: San Bernardino-Muscoy-Cal State – This East Valley local route serves Muscoy and<br />

Cal State from the Fourth Street <strong>Transit</strong> Mall. It provides 30-minute daytime and evening service on<br />

July 11, 2007 21


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

weekdays, 30-minute daytime service on Saturdays and 60-minute daytime service on Sundays. Popular<br />

destinations along this route include: Cal State San Bernardino; Carousel Mall; the San Bernardino Civic<br />

Center; San Bernardino Community Hospital; and the Greyhound Depot. The Transcenter served by this<br />

route is the Fourth Street <strong>Transit</strong> Mall.<br />

Local Route 20: Fontana Metrolink-Hemlock-Kaiser – This East Valley local route serves the Merrill<br />

and Randall corridors between the Fontana Metrolink Station and the South Fontana Transcenter. It<br />

provides 30-minute daytime and evening service on weekdays, 30-minute daytime service on Saturdays,<br />

and 60-minute daytime service on Sundays. Popular destinations along this route include: the Fontana<br />

DMV; Kaiser Hospital; and Fontana High School. The Transcenters served by this route are the South<br />

Fontana Transcenter and the Fontana Metrolink Station Transcenter.<br />

Local Route 28: South Ridge-Slover Ave-Kaiser – This East Valley local route serves the South Ridge<br />

community and the Slover corridor between Banana & Mulberry and the South Fontana Transcenter. It<br />

provides 60-minute daytime service during peak hours on weekdays and no service on weekends.<br />

Popular destinations along this route include: Kaiser Hospital; and Kaiser High School. The Transcenter<br />

served by this route is the South Fontana Transcenter.<br />

Local Route 29: Bloomington-Valley Blvd-Kaiser – This East Valley local route circulates through<br />

Bloomington and connects it to the South Fontana Transcenter at Kaiser Hospital. It provides 60-minute<br />

daytime service on weekdays and Saturdays, and no service on Sundays. Popular destinations along<br />

this route include: Kaiser Hospital; Bloomington High School; and Bloomington Jr. High School. The<br />

Transcenter served by this route is the South Fontana Transcenter.<br />

East Valley Regional Express Route Description<br />

Express Route 90: Inland Empire Connection – This East Valley express route provides 30-minute<br />

service all day on weekdays and Saturdays, and 30-minute daytime service on Sundays between the<br />

Fourth Street <strong>Transit</strong> Mall and RTA Downtown Terminal via I-215. Popular destinations along this route<br />

include: San Bernardino City Hall; Kaiser Hospital, Arrowhead Regional Medical Center; and the<br />

Carousel Mall. The Transcenter served by this route is the Fourth Street <strong>Transit</strong> Mall.<br />

West Valley Base Route Description<br />

The West Valley (west of I-15) has six base routes and five local routes, using 57 in-service buses to<br />

cover the cities of Chino, Chino Hills, Montclair, Ontario, Rancho Cucamonga, and Upland.<br />

Base Route 61: Fontana-Ontario Mills-Pomona – This West Valley base route serves the Holt/San<br />

Bernardino corridor through Ontario and the Airport, and South Rancho Cucamonga between the<br />

Pomona Transcenter, the Ontario Transcenter and South Fontana Transcenter. It provides 15-minute<br />

daytime and 30-minute evening service on weekdays and Saturdays, and 15-minute daytime service on<br />

Sundays. Popular destinations along this route include: the Ontario Civic Center; Kaiser Hospital; West<br />

Valley Detention Center; Ontario Airport; Cucamonga Guasti Regional Park; the Indian Hills and Ontario<br />

Mills Malls; and the Ontario Convention Center. The Transcenters served by this route are the South<br />

Fontana Transcenter, the Ontario Transcenter, the Ontario Airport Transcenter, the Pomona Transcenter,<br />

and the Ontario Mills Mall Transcenter.<br />

Base Route 62: Montclair-Ontario-Chino – This West Valley base route serves the Chino/Euclid<br />

corridor between the Chino Transcenter and the Ontario Transcenter, the Mountain/5 th corridor between<br />

the Ontario Transcenter and the Montclair Transcenter, and the Mountain corridor between the Montclair<br />

Transcenter and 19 th in North Upland. It provides 30-minute daytime and evening service on weekdays<br />

and 60-minute daytime service on weekends. Popular destinations along this route include: Chaffey<br />

High School; Kmart; the Ontario and Chino Civic Centers; and Montclair Plaza. The Transcenters served<br />

by this route are the Montclair Transcenter, the Ontario Transcenter, the Chino Transcenter, and the<br />

Montclair Plaza Transcenter.<br />

July 11, 2007 22


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Base Route 65A/B: Montclair-Chino Hills – This West Valley base route serves the Central corridor in<br />

Montclair between the Montclair Transcenter and the Chino Transcenter, the Chino and Edison corridors<br />

south of the Chino Transcenter, and Chino Hills by means of a one-way loop through Los Serranos. The<br />

combined A and B branches in the Central corridor and Chino Hills provide an average 30-minute<br />

daytime and evening service on weekdays, and an average 60-minute service on weekends. On<br />

weekdays, the Central corridor section has 30-minute service on average. The Chino Avenue section<br />

served by 65A and the Edison Avenue section served by 65B each have 60-minute service. The Los<br />

Serranos loop has 30-minute service on average. On weekends, the route provides 60-120 minute<br />

service. Popular destinations along this route include: Montclair Plaza; Chino Town Square and City<br />

Hall; Chino Community Hospital, U.S. Family Care Hospital; the California Institute For Men; Don Lugo<br />

High School; the Montclair Civic Center; and Chino Hills Marketplace. The Transcenters served by this<br />

route are the Montclair Transcenter, the Chino Transcenter, and the Montclair Plaza Transcenter.<br />

Base Route 66: Fontana-Foothill-Montclair – This West Valley base route serves the Foothill corridor<br />

between the Fontana Metrolink Station and Montclair Transcenter. On weekdays, the route provides 15-<br />

minute daytime service and 30-minute evening service. On Saturdays, the route provides 30-minute<br />

daytime service and 60-minute evening service. On Sundays, the route provides 30-minute daytime<br />

service. Popular destinations along this route include: Montclair Plaza; Upland High School; San Antonio<br />

Hospital, Rancho San Antonio Medical Center; Victoria Gardens; Rancho Cucamonga Justice Center;<br />

Foothill Marketplace; and Epicenter Stadium. The Transcenters served by this route are the Montclair<br />

Transcenter, the Montclair Plaza Transcenter, and the Fontana Metrolink Transcenter.<br />

Base Route 67: Ontario-Baseline-Fontana – This West Valley base route serves the Baseline corridor<br />

between the Fontana Metrolink Station and Euclid in Fontana, and the Euclid corridor in Ontario between<br />

Baseline and the Ontario Transcenter. It provides 60-minute service during the daytime seven days a<br />

week. Popular destinations along this route include: Alta Loma, Etiwanda, and Rancho Cucamonga High<br />

Schools; Etiwanda Intermediate; and the Ontario Civic Center. The Transcenters served by this route are<br />

the Ontario Transcenter and the Fontana Metrolink Transcenter.<br />

Base Route 68: Chino-Montclair-Chaffey College – This base route in the West Valley serves the<br />

Chino Transcenter and the Ramona corridor to the Montclair Transcenter, and the Arrow/Haven corridor<br />

in Upland to Chaffey College. On weekdays, the route provides 30-minute daytime service and 60-<br />

minute evening service. On Saturdays, it provides 60-minute service. Popular destinations along this<br />

route include: Montclair Plaza; Montclair High School; the Upland Civic Center; San Antonio Hospital,<br />

Kaiser Clinic; San Bernardino County offices; the Rancho Cucamonga Justice Center; and Chaffey<br />

College. The Transcenters served by this route are the Montclair Transcenter, the Chino Transcenter,<br />

and the Montclair Plaza Transcenter.<br />

West Valley Local Route Description<br />

Local Route 60: Ontario Convention Center-Chaffey College-Ontario Mills – This West Valley local<br />

route serves the Vineyard and Milliken/Day Creek corridors in Rancho Cucamonga between the Ontario<br />

Convention Center, Chaffey College and Ontario Mills. The route provides 60-minute service all day,<br />

Monday – Sunday. Popular destinations along this route include: Chaffey College; Victoria Gardens;<br />

Ontario Mills Mall; and Alta Loma High School. The Transcenter served by this route is the Ontario Mills<br />

Mall Transcenter.<br />

Local Route 63: Chino-Ontario-Upland – This West Valley local route serves the Campus corridor in<br />

Upland between the San Antonio Hospital and the Ontario Transcenter, and the Mountain/Riverside<br />

corridor in Ontario and Chino between the Ontario Transcenter and the Chino Transcenter. Both sections<br />

of the route have 30-minute service all day on weekdays, and 60-minute service on weekends. Popular<br />

destinations along this route include: San Antonio Medical Center and Chino Community Hospital; the<br />

Ontario and Chino Civic Centers; Kmart; and Ontario High School. The Transcenters served by this route<br />

are the Ontario Transcenter and the Chino Transcenter.<br />

July 11, 2007 23


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Local Route 70: Ontario-Creekside-Ontario Mills – This West Valley local route serves the<br />

Walnut/Riverside corridor in Ontario between the Ontario Transcenter and Ontario Mills Mall. It provides<br />

60-minute service all day, Monday – Sunday. Popular destinations along this route include the Ontario<br />

Civic Center and the Ontario Mills Mall. The Transcenters served by this route are the Ontario<br />

Transcenter and the Ontario Mills Mall Transcenter.<br />

Local Route 71: Kaiser-South Ridge-Rancho Cucamonga – This West Valley local route serves the<br />

Haven/Milliken corridor in Ontario and San Sevaine in Riverside, and the Jurupa/Sierra corridor in<br />

Fontana to the Fontana Metrolink Station. The route provides 60-minute service all day, Monday –<br />

Sunday. Popular destinations along this route include: Kaiser High School; Kaiser Hospital; and Ontario<br />

Mills Mall. The Transcenters served by this route are the South Fontana Transcenter, the Ontario Mills<br />

Mall Transcenter, and the Fontana Metrolink Transcenter.<br />

Local Route 75: Ontario-Via Francis-Ontario Mills – This West Valley local route serves the<br />

Philadelphia/Francis corridor in Ontario between the Ontario Transcenter and Ontario Mills Mall during<br />

peak periods only. It provides 60-minute service during the peak period on weekdays. Popular<br />

destinations along this route include the Ontario Civic Center and Ontario Mills Mall. The Transcenters<br />

served by this route are the Ontario Transcenter and the Ontario Mills Mall Transcenter.<br />

2.2.3 FLEET<br />

<strong>Omnitrans</strong> currently operates a fleet of 166 fixed route vehicles with a current peak hour bus pullout of<br />

138. Figure 2-4 provides information related to the different coach types currently in <strong>Omnitrans</strong>’ fleet. In<br />

addition to its Revenue Vehicle fleet, <strong>Omnitrans</strong> also has an original 1958 GM TDH 4801, which has been<br />

restored with <strong>Omnitrans</strong> original paint scheme and logo and is used for local events. Also shown in<br />

Figure 2-4 is one of the three hybrid electric buses currently in active service. A detailed list of current<br />

<strong>Omnitrans</strong> Revenue Vehicles can be found in Appendix A.<br />

Figure 2-4: Fixed Route Revenue Vehicle Summary (2007)<br />

Vehicle Type<br />

Manufacture<br />

Date<br />

Number<br />

in Fleet<br />

Vehicle<br />

Length (Ft.)<br />

Seats<br />

Available Fuel Type<br />

New Flyer 2000 - 2005 127 39.9 - 40.8 37 CNG<br />

Orion 1996 24 40.8 37 CNG<br />

TMC 1994 10 40.0 - 40.3 37 Diesel<br />

New Flyer<br />

Gas /<br />

2000 3 40.8 37<br />

Hybrid<br />

Electric<br />

Thomas 2003 12* 32.9 37 CNG<br />

* Five Thomas coaches are part of the active fleet; seven are assigned to the contingency fleet (see Section 5.11.2)<br />

Source: <strong>Omnitrans</strong> Comprehensive Operational Assessment & <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> Capital<br />

Improvement <strong>Plan</strong><br />

July 11, 2007 24


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Transcenters<br />

2.2.4 FACILITIES<br />

Transcenters are a key component of <strong>Omnitrans</strong> service. <strong>Omnitrans</strong>’ service is designed on a hub-andspoke<br />

principle where the Transcenter functions as the hub and routes radiate out to major destinations.<br />

Transfers typically occur at these hubs but also occur at timed transfer points throughout the region.<br />

There are two types of Transcenters; on-street facilities and off-street facilities. Transcenters are located<br />

near major destinations, downtowns, and civic centers. With the opening of the Chino Transcenter in FY<br />

2005, <strong>Omnitrans</strong> has a total of 13 Transcenters, including Transcenters located in Pomona, Montclair,<br />

Ontario, and South Fontana, and the Fourth Street <strong>Transit</strong> Mall located in downtown San Bernardino.<br />

The remaining Transcenters include Montclair Plaza, Redlands Mall, Inland Center Mall, Ontario Mills<br />

Mall, Chino Transcenter, Fontana Metrolink Station, Ontario Airport and the Arrowhead Regional Medical<br />

Center. Each Transcenter varies in size and amenities. Please note a list of Transcenters and major<br />

transfer points are located in Appendix B of this document.<br />

On-street facilities share the roadway with vehicular traffic. Examples of these facilities are the Chino<br />

Transcenter, the Downtown Ontario Transcenter and the Fourth Street <strong>Transit</strong> Mall in San Bernardino.<br />

Off-street Transcenters are areas strictly dedicated for buses and patrons. They can also include an<br />

intermodal component providing connections to rail service. Examples of these facilities include the<br />

Montclair Transcenter and the Fontana Metrolink Station where transit users can use both <strong>Omnitrans</strong> bus<br />

service and Metrolink commuter rail service.<br />

There is a difference between major transfer points and Transcenters. A key component of the hub-andspoke<br />

system is the availability of timed transfers between routes. While Transcenters provide a location<br />

for a number of routes to converge, they should not be mistaken for transfer points. Major transfer<br />

locations include Ontario Mills, the South Fontana Transcenter, and the Jerry L. Pettis Veterans Memorial<br />

Hospital.<br />

In addition to the 13 Transcenters located within the <strong>Omnitrans</strong> service area, <strong>Omnitrans</strong> intercounty<br />

services operate into the Pomona Transcenter and the Riverside <strong>Transit</strong> Authority Downtown Riverside<br />

Station.<br />

In the future, <strong>Omnitrans</strong> has plans to expand the Transcenters in its service area to include Chaffey<br />

College and Yucaipa. In addition, plans are underway to relocate the Fourth Street <strong>Transit</strong> Mall to<br />

enhance passenger transfers as part of a major downtown redevelopment program. The new location will<br />

have many new amenities and will be located adjacent to a new Metrolink station. It will also be a major<br />

station on the future Bus Rapid <strong>Transit</strong> (BRT) Corridor which will travel north-south on E Street.<br />

Fixed Route <strong>Transit</strong> Maintenance and Operations Facilities<br />

There are two facilities for fixed route operations: the main <strong>Omnitrans</strong> facility in San Bernardino, located<br />

at 1700 West Fifth Street in San Bernardino, and the West Valley Facility, located at 4748 Arrow Highway<br />

in Montclair.<br />

The San Bernardino Facility accommodates most <strong>Omnitrans</strong> administrative staff and coach operators. It<br />

also houses the <strong>Omnitrans</strong> Board of Directors meeting room. Also located at this facility is the main<br />

maintenance facility, updated in December 1999. This facility includes a full service body and paint shop,<br />

bus wash and fuel island (diesel, gasoline, CNG), farebox dumping station and interior vehicle cleaning<br />

facility. This complex can house up to 155 fixed route buses, and is also home base for the larger of two<br />

dispatching facilities.<br />

<strong>Omnitrans</strong> also operates a smaller staff and approximately 60 large buses out of its West Valley Facility in<br />

Montclair. This facility was expanded by 3,000 square feet in 2003. Administrative staff, coach<br />

July 11, 2007 25


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

operators, and maintenance staff work out of this facility. In addition, a staff member from Human<br />

Resources provides support twice a week.<br />

2.2.5 FARE STRUCTURE<br />

Figure 2-5 shows <strong>Omnitrans</strong>’ fixed route fare policy as of July 1, 2007.<br />

Figure 2-5: Fixed Route and Regional Express Bus Fares (as of July 1, 2007)<br />

Cash Fares<br />

Regular $ 1.35<br />

Senior* & Disabled $ 0.55<br />

Children 46" and under<br />

(limit 2)<br />

Free<br />

Personal Care Attendant Free with ADA rider<br />

Day Passes<br />

Full Fare $ 3.50<br />

Senior & Disabled $ 1.60<br />

10-Pack Day Passes<br />

Full Fare $ 31.50<br />

Senior & Disabled $ 13.50<br />

7-Day Pass<br />

Full Fare $ 15.00<br />

Senior & Disabled $ 7.00<br />

Student $ 10.00<br />

31-Day Pass<br />

Full Fare $ 45.00<br />

Senior & Disabled $ 22.50<br />

Student Fare $ 33.00<br />

*Senior = over 62<br />

2.2.6 RIDER PROFILE<br />

Based on the 2006 <strong>Omnitrans</strong> On-Board User Intercept Survey, the typical <strong>Omnitrans</strong> fixed route rider is<br />

between the ages of 20 and 49 (66%), has an income less than $20,000 (52%), and is equally likely to be<br />

male or female. The typical user is classified as transit-dependent, meaning they do not have access to<br />

an automobile to complete the needed trip. Only 15% of those surveyed reported that an automobile was<br />

available for their trip. Only 36% of users are in possession of a driver’s license; of the remainder, 73%<br />

have at least one licensed driver in their household.<br />

The average household size was reported to be 4.2 persons per household, and less than a fifth of all<br />

respondents have a disability.<br />

2.2.7 TRAVEL CHARACTERISTICS<br />

Based on the 2006 <strong>Omnitrans</strong> On-Board User Intercept Survey, home was both the primary origin and<br />

destination for fixed route passengers (49% and 41% respectively). Travel patterns to and from the home<br />

destination then differ by the age of the user. Youth between the ages of 12 and 19 are more likely to use<br />

the bus to travel between home and school, while those users above 20 are more likely to use the service<br />

July 11, 2007 26


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

to travel between work and home. The most frequent home cities observed in the survey for fixed route<br />

were San Bernardino, Fontana, Ontario, and Rialto.<br />

2.2.8 PERFORMANCE CHARACTERISTICS AND FORECAST FOR FY <strong>2008</strong>-<br />

<strong>2013</strong><br />

Figure 2-6 provides a forecast of annual fixed route characteristics for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP<br />

timeframe. During this period:<br />

• Ridership will fluctuate slightly above and below 2007 levels.<br />

• Annual revenue hours will decrease from <strong>2008</strong> to 2011 with service cuts, and<br />

increase in 2012 with the implementation of sbX. In parallel, peak hour bus<br />

requirements will decrease from 145 in 2007 to 136 in 2009 through 2011, and<br />

increase to 148 in 2012 with sbX.<br />

• Farebox recovery will increase from 20% in 2007 to over 25% in 2012 and <strong>2013</strong>.<br />

July 11, 2007 27


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-6: Projected Characteristics for <strong>Omnitrans</strong> Fixed Route<br />

SYSTEM: OMNITRANS FIXED ROUTE (Directly Operated + Contracted) 1<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Fixed Route:<br />

Peak-Hour Fleet 145 145 145 138 136 136 136 148 148<br />

Spare Vehicles for Maintenance<br />

and Other Purposes 31 31 31 28 28 28 28 32 32<br />

Spare Ratio 21.4% 21.4% 21.4% 20.3% 20.6% 20.6% 20.6% 21.6% 21.6%<br />

Energy Contingency Reserve 7 7 7 7 7 7 7 7 7<br />

Subtotal Fixed Route Vehicles 183 183 183 173 171 171 171 187 187<br />

Demand Response:<br />

Peak-Hour Fleet 0 0 0 0 0 0 0 0 0<br />

Spare Vehicles 0 0 0 0 0 0 0 0 0<br />

Spare Ratio<br />

Total Vehicles 183 183 183 173 171 171 171 187 187<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 12 0<br />

New Replacement Vehicles Delivered 23 0 0 15 15 15 15 15 15<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $10,736.8 $11,177.3 $11,854.0 $12,535.9 $13,035.7 $13,204.9 $14,429.1 $18,116.9 $18,321.4<br />

Measure I Fare Subsidy ($000) $151.9 $147.7 $185.4 $284.6 $395.9 $415.1 $646.4 $750.6 $742.7<br />

Operating Cost ($000's) $55,152.2 $54,598.8 $60,127.7 $59,150.3 $60,248.8 $64,924.6 $67,961.7 $72,897.8 $76,102.5<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 8,581.8 8,783.3 8,704.3 8,115.1 7,869.0 7,869.0 7,869.0 8,258.0 8,258.0<br />

Total Vehicle Miles (000's) 10,039.1 10,122.9 9,512.9 8,869.0 8,600.0 8,600.0 8,600.0 9,025.1 9,025.1<br />

Revenue Vehicle Hours (000's) 676.6 679.3 676.2 634.3 611.3 611.3 611.3 641.5 641.5<br />

Total Vehicle Hours (000's) 692.4 747.6 706.6 662.8 638.8 638.8 638.8 670.4 670.4<br />

Linked Passengers (000's) 10,989.3 10,919.7 10,889.7 10,557.1 10,295.0 10,281.0 10,113.7 11,078.2 10,960.6<br />

Unlinked Passengers (000's) 15,038.2 14,975.7 14,937.9 14,481.7 14,122.1 14,102.9 13,873.4 15,196.5 15,035.2<br />

Full-Time Employee Equivalent 774 610 617 596 585 585 585 585 585<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $0.71 $0.75 $0.79 $0.87 $0.92 $0.94 $1.04 $1.19 $1.22<br />

Cost/Unlinked Passenger $3.67 $3.65 $4.03 $4.08 $4.27 $4.60 $4.90 $4.80 $5.06<br />

Subsidy/Unlinked Passenger $2.95 $2.90 $3.23 $3.22 $3.34 $3.67 $3.86 $3.60 $3.84<br />

Cost/Revenue Vehicle Hour $81.51 $80.37 $88.92 $93.26 $98.55 $106.20 $111.17 $113.63 $118.62<br />

Passengers/Revenue Vehicle Hour 22.2 22.0 22.1 22.8 23.1 23.1 22.7 23.7 23.4<br />

Operating Ratio (Fares+MI/Cost) 1 19.7% 20.7% 20.0% 21.7% 22.3% 21.0% 22.2% 25.9% 25.1%<br />

NOTES:<br />

1. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 28


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2.3 Access Service<br />

The following information on Access service is provided for background and reference. No substantive<br />

changes are contemplated to Access service in FY <strong>2008</strong>, other than adjusting the service area to match<br />

the fixed route service changes implemented in May 2007. Any changes to Access service will come in<br />

the out-years of the six-year SRTP timeframe.<br />

2.3.1 DEFINITION OF ACCESS SERVICE<br />

Access Service is the <strong>Omnitrans</strong> ADA complementary paratransit service for persons who are physically<br />

or cognitively unable to use regular fixed route transit.<br />

2.3.2 SERVICE CHARACTERISTICS<br />

The Americans with Disabilities Act (ADA) requires that fixed route transit operators provide, or ensure<br />

the provision of, “complementary” (i.e., comparable) paratransit service for those individuals who,<br />

because of their disability, cannot use the regular general public fixed route service. <strong>Omnitrans</strong> had an<br />

area-wide community transit program serving seniors, people with disabilities, and social service agencies<br />

prior to the ADA civil rights regulations enacted in 1991. With implementation of its ADA Complementary<br />

Paratransit <strong>Plan</strong>, <strong>Omnitrans</strong> continued to provide community transit through its Core Access Service, but<br />

expanded the days and hours of operation for people eligible for ADA complementary paratransit service<br />

to match the times of fixed route availability. Access is provided on a curb-to-curb basis. The current<br />

contractor is First <strong>Transit</strong>. First <strong>Transit</strong> assumed responsibility for Access operations on July 1, 2006.<br />

According to U.S. Census data, Access’ client base is growing, although perhaps not quite at the same<br />

rate as the rest of the County. While the total countywide population grew by 20.5% from 1990 to 2000,<br />

the population aged 65 and older increased by 17.3% (from 124,900 to 146,459). Seniors comprised<br />

8.8% of the total population in 1990, but only 8.6% in 2000 (compared to a statewide average of 10.6%<br />

that year). Seniors are not allowed to ride Access based solely on the fact that they are seniors, but<br />

nevertheless, a large portion of Access' ridership base is made up of seniors. Comparison of data for<br />

people with disabilities is not as readily available, due to changes in reporting definitions and categories,<br />

but a total of 302,693 individuals in San Bernardino County reported some form of disability in 2000<br />

(19.8% of the civilian non-institutionalized population aged five or older).<br />

Service Area Coverage<br />

Access service is available through the <strong>Omnitrans</strong> service area within a 3/4 mile radius either side of an<br />

existing <strong>Omnitrans</strong> regular bus route.<br />

Service Span<br />

Access provides service seven days a week. The hours of service are presented in Figure 2-7. Access<br />

does not operate on New Year’s Day, Memorial Day, the Fourth of July, Labor Day, Thanksgiving Day<br />

and Christmas Day.<br />

Figure 2-7: Access Service Days and Span of Service (as of July 1, 2007)<br />

Days<br />

Monday – Friday<br />

Saturday<br />

Sunday<br />

Hours of Service<br />

4:00 a.m. – 11:00 p.m.<br />

7:00 a.m. – 7:00 p.m.<br />

7:00 a.m. – 7:00 p.m.<br />

Effective July 1, 2007, the disability identification card (D-card) will no longer be valid on Access.<br />

Cardholders will have until January <strong>2008</strong> to complete the ADA application form.<br />

July 11, 2007 29


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Trip Booking and Scheduling<br />

Access is a pre-reservation, shared-ride service. Pick-up times are scheduled within a 40-minute<br />

scheduling window. For example, for a 9:00 a.m. pick-up, the pick-up time will be scheduled as 8:50 a.m.<br />

to 9:30 a.m. Trip requests are taken at least one day in advance and up to 14 days in advance. All call<br />

taking is done at First <strong>Transit</strong>’s I Street location. Total staff complement includes 8 reservationists /<br />

schedulers, 1 supervisor, 1 scheduling optimizer and 10 dispatchers.<br />

Reservations are taken seven days a week between the hours of 8:00 a.m. and 5:00 p.m. Dispatch is<br />

staffed between the hours of 5:00 a.m. and 10:00 p.m. Access receives 14,000 to 15,000 calls a month.<br />

For illustrative purposes, Figure 2-8 presents telephone performance for a sample month (August 2006).<br />

<strong>Omnitrans</strong> had a new phone system installed at the I Street location in mid-December 2006.<br />

Figure 2-8: Access Telephone Performance (August 2006)<br />

Calls Received 14,572<br />

Average Answer Time (Seconds) 63<br />

Average Call Time (Seconds) 242<br />

Calls Answered 10,241<br />

Answered By RAN 7,164<br />

Overflow 3,123<br />

# Abandoned 1,208<br />

Average Wait Time (Seconds) 113<br />

% Abandoned 8.29%<br />

Virtually all Access trips are booked in advance. It was reported that there were only two subscription<br />

trips. This practice contributes to an excessive number of calls having to be handled on a daily basis.<br />

Typical paratransit industry practice is that up to 50% of total trip volumes are subscription trips.<br />

First <strong>Transit</strong> officials report concerns including:<br />

• While permitted by the ADA, staff does not negotiate trip request times (i.e., up to<br />

one hour before or one hour after requested time).<br />

• Staff spends an excessive amount of time on the phone handling trip requests.<br />

• Customers have a habit of requesting to speak the supervisor to express any<br />

concerns with their trip request.<br />

These concerns speak to opportunities for additional staff training and education of the registration<br />

population.<br />

Trips are scheduled using commercially available software, provided by the Trapeze Software Group.<br />

This software has been in use since 2000. First <strong>Transit</strong> was expecting the installation of the latest version<br />

of the software before the end of December 2006. Staff is currently revising the scheduling parameters to<br />

July 11, 2007 30


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

maximize the use of the software and increase system productivity. All vehicles are equipped with<br />

Siemens Mobile Data Terminals (MDTs) and Automatic Vehicle Locating (AVL) capabilities. While driver<br />

manifests are transmitted electronically via the MDTs, drivers continue to use paper manifests as well.<br />

Most vehicles are also equipped with the DriveCam camera system.<br />

Figure 2-9 provides a sample of cancellations and no-shows for the four-month period of July to October<br />

2006 (First <strong>Transit</strong> commenced operation of Access services in July 2006). The East Valley has a 20-<br />

30% higher cancellation and no-show rate. (See Section 2.4.2 for a definition of cancellations and noshows.)<br />

Figure 2-9: Cancellations and No-Shows (July-October 2006)<br />

East Valley Access<br />

Jul Aug Sep Oct TOTAL<br />

Total Trips Booked 19325 20063 18229 20435 78052<br />

Cancels 2653 1544 1409 1476 7082 9.07%<br />

No-Shows 1441 1679 1455 1507 6082 7.79%<br />

West Valley Access<br />

Jul Aug Sep Oct TOTAL<br />

Total Trips Booked 22117 23728 21422 26915 94182<br />

Cancels 1973 1386 894 1170 5423 5.76%<br />

No-Shows 1118 1577 1313 1505 5513 5.85%<br />

Total Access<br />

Jul Aug Sep Oct TOTAL<br />

Total Trips Booked 41442 43791 39651 47350 172234<br />

Cancels 4626 2930 2303 2646 12505 7.26%<br />

No-Shows 2559 3256 2768 3012 11595 6.73%<br />

2.3.3 FLEET<br />

First <strong>Transit</strong> operates <strong>Omnitrans</strong>-owned vehicles for both the Access and OmniLink services. Currently<br />

there are 90 vehicles, with a peak pullout utilizing 82 vehicles. Forty-eight vehicles are assigned to the I<br />

Street location, and forty-two are assigned to the West Valley Paratransit Facility. Capacity ranges from<br />

16 to 20 ambulatory individuals and three or four wheelchairs or scooters. Figure 2-10 provides a fleet<br />

vehicle summary by region.<br />

July 11, 2007 31


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-10: Access Fleet (as of July 1, 2007)<br />

Route Name<br />

Peak Fleet<br />

Weekday Saturday Sunday<br />

East Valley Peak Fleet – Sub Total 42 10 8<br />

East Valley Spares 6 38 40<br />

Total East Valley Access Vehicles 48 48 48<br />

East Valley Spare Ratio 14.29% N/A N/A<br />

West Valley Peak Fleet – Sub Total 40 7 4<br />

West Valley Spares 2 35 38<br />

Total West Valley Access Vehicles 42 42 42<br />

West Valley Spare Ratio 5.00% N/A N/A<br />

Total Access Peak Fleet 82 17 12<br />

Total Access Spares 8 73 78<br />

Total Access Service Fleet 90 90 90<br />

Total Spare Ratio 9.76% N/A N/A<br />

For a list of all active Access vehicles by year, make and ambulatory/wheelchair capacity, see Appendix<br />

A.<br />

2.3.4 FACILITIES<br />

First <strong>Transit</strong> operates Access services out of two facilities: the I Street facility located at 234 South I<br />

Street in San Bernardino, and the West Valley Paratransit Facility located at 9421 Feron Blvd in Rancho<br />

Cucamonga.<br />

The I Street site encompasses some 4.7 acres and includes the vehicle maintenance garage (including<br />

10 bus bays), fueling and bus washing. The 4,500 sq. ft. office building houses the Access<br />

administration, trip reservations, scheduling, dispatch office, and training facilities.<br />

The West Valley facility sits on 1.3 acres and provides for vehicle storage and general vehicle cleaning.<br />

Current facilities are capable of accommodating present operations and have ample room for service<br />

expansion.<br />

2.3.5 FARE STRUCTURE<br />

The fare policy for Access is shown in Figure 2-11 and Figure 2-12. In September 2003, <strong>Omnitrans</strong> went<br />

from a 39-zone fare structure to a six-zone fare structure. Each current zone is approximately seven<br />

miles wide. The zone breaks align closely with the following streets: Campus, Etiwanda, Cactus,<br />

Tippecanoe, and Wabash. The six zones are illustrated in Figure 2-13. This greatly improved the fare<br />

payment system for both passengers and drivers.<br />

July 11, 2007 32


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-11: Access Bus Fares (as of July 1, 2007)<br />

Passenger<br />

1 zone $ 2.45<br />

2 zones $ 2.45<br />

3 zones $ 2.45<br />

4 zones $ 3.45<br />

5 zones $ 4.45<br />

6 zones $ 5.45<br />

Companion*<br />

1 zone $ 2.70<br />

2 zones $ 2.70<br />

3 zones $ 2.70<br />

4 zones $ 3.70<br />

5 zones $ 4.70<br />

6 zones $ 5.70<br />

Personal Care Attendant Free<br />

Children 46" and under<br />

(limit 2)<br />

Free<br />

*Disability ID card is no longer valid on Access<br />

service on a space available basis<br />

Figure 2-12: Access Subscription Passes (as of July 1, 2007)<br />

Subscription Passes<br />

1 zone $ 130.00<br />

2 zones $ 130.00<br />

3 zones $ 130.00<br />

4 zones $ 170.00<br />

5 zones $ 210.00<br />

6 zones $ 250.00<br />

July 11, 2007 33


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-13: Access Fare Zones<br />

July 11, 2007 34


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

It is important to note that consistent with the federal regulations, the actual additional “zonal” fare for both<br />

ADA riders and their companions is twice the base fixed route fare, but the direct charge to ADA<br />

passengers is subsidized $0.25 through Measure I (which provides a program of reduced fares and<br />

enhanced service for seniors and disabled transit users in the Valley region, through SANBAG in<br />

cooperation with transit service agencies). In addition, a “subscription pass” is available for riders,<br />

primarily agency clients, who have subscription trips enrolled with Access. As of July 1, 2007,<br />

subscription passes are no longer valid for non-subscription trips; the pass price was also reduced by<br />

approximately 25%.<br />

2.3.6 RIDER PROFILE<br />

Access service currently has 7,295 ADA eligible registrants, or 0.544% of the total <strong>Omnitrans</strong> service area<br />

population. 3,522 ADA registrants (or 48%) indicate they use a mobility aid (wheelchair or scooter). Fifty<br />

two percent of ADA registrants are ambulatory. Seventy six percent (or 5,572 registrants) are registered<br />

to travel with a personal care attendant (PCA).<br />

While ambulatory registrants represent 52% of the ADA registrant population, they represent 71.9% of<br />

trips taken (based on the past 13 months of Access trip data). Based on February 2007 Access trip data,<br />

2.3% of trips included a PCA.<br />

2.3.7 TRAVEL CHARACTERISTICS<br />

Trip Distance/Analysis of Trip Origins and Destinations: Systemwide, Access has an average trip<br />

length of 5.7 miles as calculated by total revenue miles divided by total ridership. It appears, however,<br />

that trips in the East Valley are consistently longer than those in the West Valley.<br />

<strong>Omnitrans</strong> staff has generated robust data plots/maps for Access trip origins and destinations. For<br />

illustrative purposes, Figure 2-14 and Figure 2-15 present an example of these maps (for April 2006). For<br />

larger versions of the two maps, see Appendix H.<br />

July 11, 2007 35


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-14: Trip Origins and Destinations – West Valley<br />

July 11, 2007 36


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-15: Trip Origins and Destinations – East Valley<br />

July 11, 2007 37


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2.3.8 PERFORMANCE CHARACTERISTICS AND FORECAST FOR FY <strong>2008</strong>-<br />

<strong>2013</strong><br />

Figure 2-16 provides a statistical synopsis of ADA paratransit services, profiling key trip and budget<br />

information.<br />

Figure 2-16: Access Paratransit Statistical Profile (2006)<br />

Trips 469,000<br />

Passenger Trips / Hour 2.87<br />

Trips / Capita 2.86<br />

Operating Expenses $8,754,000<br />

Cost / Trip $18.67<br />

Cost / Capita $6.52<br />

Access ADA paratransit provides a productive and relatively high level of service as measured by the<br />

number of trips per capita of 2.86. It also ranks very favorably in terms of cost per trip, suggesting that<br />

Access is currently delivering cost-effective and efficient services to the County’s disability community.<br />

Detailed historic and forecast data are presented in Figure 2-17 (key historical data) and Figure 2-18<br />

(detailed historic and forecast service characteristics).<br />

July 11, 2007 38


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-17: Key Historical Performance Data<br />

Access<br />

FY 1999 = Base Year<br />

120%<br />

100%<br />

80%<br />

Percent Change<br />

60%<br />

40%<br />

20%<br />

0%<br />

-20%<br />

FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005<br />

Year<br />

Total Passengers Carried Operating Cost Revenue Hours of Operation Operating Cost per Passenger Subsidy per Passenger<br />

Figure 2-18 provides a forecast of annual Access Service characteristics for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong><br />

SRTP timeframe.<br />

July 11, 2007 39


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-18: Projected Characteristics for Access Service<br />

SYSTEM: ACCESS<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Peak-Hour Fleet 81 81 82 82 82 82 82 82 82<br />

Spare Vehicles 8 8 8 8 8 8 8 8 8<br />

Spare Ratio 9.9% 9.9% 9.8% 9.8% 9.8% 9.8% 9.8% 9.8% 9.8%<br />

Total Vehicles 89 89 90 90 90 90 90 90 90<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 0 0<br />

New Replacement Vehicles Delivered 0 23 21 25 16 10 0 25 0<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $1,041.6 $1,049.4 $1,052.7 $1,256.8 $1,353.2 $1,403.3 $1,629.3 $1,863.0 $1,891.5<br />

Measure I Fare Subsidy ($000) $110.6 $108.6 $102.8 $101.6 $101.3 $103.5 $107.2 $105.1 $104.1<br />

Operating Cost ($000's) $7,864.7 $8,751.0 $9,591.5 $11,453.6 $12,033.4 $12,631.9 $13,129.0 $13,514.0 $14,008.4<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 2,627.2 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5<br />

Total Vehicle Miles (000's) 3,361.5 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3<br />

Revenue Vehicle Hours (000's) 160.1 163.5 163.5 163.5 163.5 163.5 163.5 163.5 163.5<br />

Total Vehicle Hours (000's) 207.4 214.9 214.9 214.9 214.9 214.9 214.9 214.9 214.9<br />

Linked Passengers (000's) 492.1 468.9 420.9 416.1 414.8 423.8 438.9 430.3 426.1<br />

Unlinked Passengers (000's) 492.1 468.9 420.9 416.1 414.8 423.8 438.9 430.3 426.1<br />

Full-Time Employee Equivalent 176 161 162 162 162 162 162 162 162<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $2.12 $2.24 $2.50 $3.02 $3.26 $3.31 $3.71 $4.33 $4.44<br />

Cost/Unlinked Passenger $15.98 $18.66 $22.79 $27.53 $29.01 $29.81 $29.91 $31.40 $32.87<br />

Subsidy/Unlinked Passenger $13.87 $16.42 $20.28 $24.51 $25.75 $26.50 $26.20 $27.07 $28.44<br />

Cost/Revenue Vehicle Hour $49.12 $53.53 $58.67 $70.06 $73.60 $77.26 $80.30 $82.66 $85.68<br />

Passengers/Revenue Vehicle Hour 3.1 2.9 2.6 2.5 2.5 2.6 2.7 2.6 2.6<br />

Operating Ratio (Fares+MI/Cost) 1 14.7% 13.2% 12.0% 11.9% 12.1% 11.9% 13.2% 14.6% 14.2%<br />

NOTES:<br />

1. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 40


IBI GROUP<br />

2.4 OmniLink Service<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The following information on OmniLink service is provided for background and reference. No substantive<br />

changes are contemplated to OmniLink service in FY <strong>2008</strong>. Any changes to OmniLink service will come<br />

in the out-years of the six-year SRTP timeframe.<br />

2.4.1 DEFINITION OF OMNILINK SERVICE<br />

OmniLink is a general public dial-a-ride service designed for low-density service areas.<br />

2.4.2 SERVICE CHARACTERISTICS<br />

OmniLink was introduced as a new <strong>Omnitrans</strong> program in Yucaipa in 1993 to provide coverage in lowdensity<br />

and low demand areas that are difficult to serve with fixed route transit. Service in Chino Hills was<br />

started in January 2002. Both services are described below:<br />

• Chino Hills OmniLink – Serving Chino Hills west of SR-71 to the County Line<br />

with dial-a-ride service. Chino Hills OmniLink is pulsed (formally scheduled) to<br />

meet OmniLink Route 65 at Chino Hills Marketplace. One round trip shuttle run<br />

is also operated out of the service area to and from the Chino Senior Center (City<br />

of Chino).<br />

• Yucaipa OmniLink – Serving Yucaipa and Calimesa 3 (areas served originally by<br />

the Yucaipa/Calimesa Dial-A-Ride, which started in 1993).<br />

In addition to providing policy-based service coverage in low-density areas, OmniLink service is designed<br />

to provide feeder service to/from <strong>Omnitrans</strong> fixed route bus service. To this end, only Chino Hills<br />

currently is pulsed to make connections with fixed route service.<br />

Both OmniLink services are operated under contract, currently with First <strong>Transit</strong>. The current three-year<br />

contract went into effect July 1, 2006. Under the terms of the service agreement, <strong>Omnitrans</strong> is<br />

responsible for service vehicles and the provision of facilities, scheduling hardware and software, service<br />

and policy planning, administrative oversight, customer relations and budget planning. First <strong>Transit</strong> is<br />

responsible to hire, train and supervise all scheduling/dispatch, operations and maintenance staff,<br />

process all trip requests, and to maintain and operate all service vehicles in accordance with <strong>Omnitrans</strong><br />

specifications.<br />

Service Area Coverage<br />

Chino Hills OmniLink – Chino Hills OmniLink provides demand-response service within the corporate<br />

boundaries of Chino Hills. A shuttle service is operated on weekdays between Chino Hills and the City of<br />

Chino to provide access to the Chino Senior Center. The weekday service is scheduled to depart<br />

outbound from Chino Hills at 10:00 a.m. and inbound from the Chino Senior Center at 1:00 p.m., and only<br />

operates if requested in advance.<br />

3<br />

Calimesa, bordering Yucaipa, is located in Riverside County.<br />

July 11, 2007 41


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-19: OmniLink Chino Hills Service Area<br />

July 11, 2007 42


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Yucaipa OmniLink – Yucaipa OmniLink provides demand-response service within the corporate<br />

boundaries of Yucaipa and for trips between Yucaipa and neighboring Calimesa, (see Figure 2-20).<br />

Service is provided for Calimesa trips that either originate or end in Yucaipa. Service is not provided for<br />

trips that begin and end within Calimesa.<br />

Figure 2-20: OmniLink Yucaipa Service Area<br />

Service Span<br />

In both Chino Hills and Yucaipa, service is provided Monday to Friday, 7:00 a.m. to 6:00 p.m. Service is<br />

not provided on New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and<br />

Christmas.<br />

July 11, 2007 43


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Trip Booking and Scheduling<br />

Trip bookings can be made 30 minutes before and after service start and end times.<br />

Advance reservations can be made up to three days in advance. “Repeater” subscription bookings can<br />

be made for one calendar month for trips that reoccur at least three days a week (same time between the<br />

same origin and destination). Same day bookings are accommodated a space available basis.<br />

All advance and repeater bookings are confirmed at the time of the booking and entered into Trapeze<br />

PASS as an unassigned trip (not assigned to a run). There is no route optimization using Trapeze PASS.<br />

OmniLink route optimization can be implemented in conjunction with Access operating procedures.<br />

Additional Trapeze PASS training may be required for those First <strong>Transit</strong> staff responsible for OmniLink<br />

scheduling and dispatch.<br />

A scheduler/dispatcher is assigned to each OmniLink service during the core weekday service hours. A<br />

single scheduler/dispatcher handles both areas in the early morning, over lunch and on weekends. Each<br />

scheduler/dispatcher is responsible to book, schedule and dispatch each trip in their respective service<br />

areas 4 . With Yucaipa OmniLink, all trips are assigned to a run on the day of service. With Chino Hills<br />

OmniLink, most assignments are made the day before service is required. For Chino Hills, driver<br />

manifests are posted at 5:00 p.m. the night before. Same day bookings in Chino Hills are assigned by<br />

the dispatcher on the day of service.<br />

Trip assignments are made via Mobile Data Terminals (MDTs) and cell phone voice dispatch. Trip<br />

assignments are often made one or two hours out from the pick-up time. A 40-minute pick-up window is<br />

used for trip assignment. Using Trapeze PASS software and a split screen, the schedulers/dispatchers<br />

drag individual trips from the unassigned list to a particular route. Trip assignments appear on the MDT<br />

screen. Drivers update the electronic dispatch lists via the MDTs and maintain a paper trip sheet as<br />

backup. Although vehicles are equipped with Automatic Vehicle Locator (AVL) technology, this<br />

technology is not fully used in the trip assignment process. Both service areas are rather compact and<br />

the dispatchers assign trips based on their knowledge of the service area.<br />

Eligibility<br />

OmniLink is a general public, dial-a-ride service. No pre-registration is required. Trip booking information<br />

is recorded when a passenger books the first trip.<br />

Level of Driver Assistance<br />

OmniLink is a curb-to-curb service. The OmniLink bus stops in front of the nearest accessible door at the<br />

trip origin and destination locations. Drivers will assist individuals on or off the bus if required (including<br />

wheelchair securement and lift operation). Passengers are responsible for travel beyond the bus.<br />

Cancellations/No-Shows<br />

Cancellations must be made at least two hours prior to the scheduled pick-up time. Failure to do so will<br />

result in the recording of a no-show. Three no-shows will result in denial of advance reservation or<br />

repeater service for six months. Repeated no-shows could result in the denial of all service.<br />

Monthly Productivity Standards<br />

While the goal for Yucaipa OmniLink is 4.20 passengers per revenue hour, the minimum standard is set<br />

at 3.50 passengers per hour. The Chino Hills OmniLink productivity goal is 3.00 passengers per revenue<br />

hour and the minimum standard is 2.30 passengers per hour.<br />

4<br />

Overload trip requests are handled by Access reservationists and confirmed with the dispatchers prior to being entered on the<br />

unassigned list.<br />

July 11, 2007 44


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

A schedule of liquidated damages and incentives has been established for each OmniLink service based<br />

on a combination of hourly productivity and on-time performance. Monthly penalties are assigned if<br />

productivity goes below 3.50 and 2.30 passengers per revenue hour for the Yucaipa and Chino Hills<br />

services, respectively. Monthly incentives are assigned if the productivity standards are exceeded<br />

without falling below the on-time performance standard.<br />

On-Time Performance<br />

One hundred percent on-time performance has been established as a goal for both Chino Hills and<br />

Yucaipa OmniLink services. A minimum standard of 95% has been established for both services. A<br />

schedule of monthly penalties has been established if on-time performance falls below the minimum. The<br />

schedule of incentives is tied to performance above the minimum and is contingent on meeting the<br />

productivity minimums.<br />

A series of monthly penalties is assessed for each trip picked up or no-showed 60 minutes or later than<br />

the service window. This penalty increases incrementally as the time delay per trip increases.<br />

Operating Costs and Productivity<br />

Chino Hills OmniLink annual operating costs have increased by over 70% for the period FY 2002/03 to<br />

FY 2005/06. This has been driven by a 50% and 95% increase in annual revenue hours and revenue<br />

miles, respectively, as well as an almost 9% increase in the cost per revenue hour. Chino Hills OmniLink<br />

operating costs per passenger increased by almost 11% and the subsidy cost per passenger increased<br />

by almost 12%.<br />

Yucaipa OmniLink annual operating costs have increased by almost 20% for the period FY 2001/02 to FY<br />

2005/06, while annual revenue hours and revenue miles decreased by 13% and 10%, respectively.<br />

While not service volume-driven, annual operating cost increases were impacted by a 44% increase in<br />

the operating cost per revenue hour. Yucaipa OmniLink operating costs per passenger increased by 32%<br />

and the subsidy cost per passenger increased by 44%. Annual ridership also decreased by<br />

approximately 9% during this period.<br />

Service productivity (passengers carried per revenue hour) decreased for Chino Hills OmniLink by almost<br />

2% from 2.24 passengers per revenue hour in FY 2002/03 to 2.20 in FY 2005/06. However, significant<br />

productivity gains (48%) were made between FY 2003/04 (when service productivity hit a period low of<br />

1.49 passengers per revenue hour) and FY 2005/06.<br />

Yucaipa OmniLink hourly service productivity increased by over 9% for the period, from 2.91 passengers<br />

per revenue hour in FY 2001/02 to 3.18 in FY 2005/06.<br />

While service productivity gains have been made, both the Chino Hills and Yucaipa OmniLink services<br />

have not been able to reach the current service standard minimums established for each service (2.30<br />

passengers per revenue hour for Chino Hills OmniLink and 3.50 for Yucaipa OmniLink). To reach the<br />

respective productivity standards, fewer annual service hours should have been operated. Given the<br />

annual ridership for each service in FY 2005/06:<br />

Farebox Recovery<br />

• Chino Hills OmniLink would have had to operate approximately 5,652 annual<br />

revenue hours.<br />

• Yucaipa OmniLink would have had to operate approximately 12,578 hours.<br />

Farebox recovery ratios have dropped for both OmniLink services over the evaluation timeframe.<br />

Ridership has increased by over 62% on the Chino Hills OmniLink service (between FY 2002/03 and FY<br />

July 11, 2007 45


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2005/06). The fare box revenues have increased by over 44% and the fare box revenue recovery<br />

dropped by over 16%. The drop in the Chino Hills farebox recovery ratio is due to the decrease in hourly<br />

productivity combined with the increase in the operating cost per revenue hour.<br />

The parallel decrease in the Yucaipa farebox recovery ratio was more dramatic at almost 54% for the<br />

period FY 2001/02 to FY 2005/06. The explanation for this decline is more straightforward, with declines<br />

in annual ridership (9%) and farebox revenues (over 43%), and increases in the operating cost per<br />

revenue hour (44%).<br />

By FY 2005/06, Chino Hills farebox recovery ratio dropped to 5% and Yucaipa’s dropped to 6%. Both are<br />

far below the TDA 20% requirement for urban general public demand-response services.<br />

• To achieve a 20% farebox recovery ratio in FY 2005/06 at an average fare per<br />

passenger of $1.01, Chino Hills OmniLink would have had to carry 9.41<br />

passengers per revenue hour. To achieve a 10% farebox recovery ratio, the<br />

service would have had to carry 4.70 passengers per revenue hour.<br />

• To achieve a 20% farebox recovery ratio in FY 2005/06 at an average fare per<br />

passenger of $1.01, Yucaipa OmniLink would have had to carry 9.96 passengers<br />

per revenue hour. To achieve a 10% farebox recovery ratio, the service would<br />

have had to carry 4.98 passengers per revenue hour.<br />

Although both the Chino Hills and Yucaipa OmniLink dispatchers feel that additional service capacity (an<br />

extra run) is required to effectively meet passenger demand, both services should be more productive<br />

with the current hours operated. Extra capacity would further decrease hourly productivity and revenue<br />

recovery. More effective OmniLink trip scheduling will improve service productivity within existing<br />

revenue hours. Although no further reductions in revenue hours are recommended in the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP, productivity enhancements through scheduling improvements would facilitate a further<br />

reduction in revenue hours to reduce operating costs and improve OmniLink farebox recovery.<br />

2.4.3 FLEET<br />

There are currently 11 minibuses assigned to OmniLink. Of this fleet, five are required to meet the<br />

Yucaipa maximum bus pullout and two are required to meet the Chino Hills maximum bus pullout. This<br />

leaves a 57% spare ratio (see Figure 2-21). (Spare ratio is defined as the number of spare vehicles<br />

divided by the vehicles required for peak service.) The majority of the OmniLink fleet is made up of 2000<br />

Ford Goshen cut-aways (10). Three OmniLink service vehicles are 2004 El Dorado cut-aways. All<br />

OmniLink minibuses are light duty vehicles, with an effective service life cycle of five to seven years<br />

(depending on mileage and individual vehicle maintenance history). For a list of OmniLink buses, see<br />

Appendix A.<br />

July 11, 2007 46


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-21: OmniLink Fleet (as of July 1, 2007)<br />

Yucaipa<br />

Chino Hills<br />

Total<br />

Route Name Weekday Peak Fleet Saturday Sunday<br />

Peak Fleet - Sub Total<br />

5 No Service No Service<br />

Spares<br />

3 No Service No Service<br />

Total Vehicles<br />

8 No Service No Service<br />

Spare Ratio<br />

60.00% No Service No Service<br />

Peak Fleet - Sub Total<br />

2 No Service No Service<br />

Spares<br />

1 No Service No Service<br />

Total Vehicles<br />

3 No Service No Service<br />

Spare Ratio<br />

50.00% No Service No Service<br />

Total Omnilink Peak Fleet<br />

7 No Service No Service<br />

Total Omnilink Spares<br />

4 No Service No Service<br />

Total Omnilink Service Fleet<br />

11 No Service No Service<br />

Total Spare Ratio<br />

57.14% No Service No Service<br />

2.4.4 FACILITIES<br />

Both Chino Hills and Yucaipa OmniLink are dispatched from the East Valley Paratransit Facility located at<br />

234 South I Street in San Bernardino. Yucaipa OmniLink is also operated from the East Valley<br />

Paratransit Facility; Chino Hills OmniLink is operated from the West Valley Paratransit Facility located at<br />

9421 Feron Blvd, Suite 101, Rancho Cucamonga (to reduce deadheading).<br />

2.4.5 FARE STRUCTURE<br />

Figure 2-22 provides the current OmniLink bus fares.<br />

2.4.6 RIDER PROFILE<br />

Figure 2-22: OmniLink Bus Fares (as of July 1, 2007)<br />

Cash Fares<br />

Regular $ 3.00<br />

Senior* & Disabled $ 1.50<br />

Student $ 2.00<br />

Children 46" and under (limit 2) Free<br />

10-Ticket Booklet**<br />

Regular $ 27.00<br />

Senior & Disabled $ 13.50<br />

Student $ 18.00<br />

*Senior = over 62.<br />

**Valid as free transfer or exchange for a free 1-Day<br />

Pass on fixed route service. 1-Day, 7-Day, and<br />

31-Day Passes are no longer valid as transfers.<br />

OmniLink dispatchers identified school, shopping and medical trips as the key trip purposes for both<br />

OmniLink services. The dispatchers identified students and seniors as key market segments. Figure 2-<br />

23 summarizes OmniLink ridership for June 2006 and FY 2005/06 by market segment. The June 2006<br />

and FY 2005/06 data suggest a high use by seniors (over 59% for Chino Hills and 52% for Yucaipa). A<br />

July 11, 2007 47


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

review of an OmniLink trip report produced by Trapeze Pass in November 2006 strongly suggests the<br />

under-representation of general public passengers and a possible over-representation of senior ridership.<br />

From the review of November data, 59% of Chino Hills OmniLink trips and 21% of Yucaipa OmniLink trips<br />

were made by students.<br />

Figure 2-23: OmniLink Ridership by Market Segment (FY 2005/06)<br />

Chino Hills Omnilink<br />

(June 2006)<br />

Yucaipa Omnilink<br />

(June 2006)<br />

Combined Services<br />

(June 2006)<br />

Combined Services<br />

(FY 2005/06)<br />

Total<br />

Passengers<br />

% of Total<br />

Total<br />

Passengers<br />

% of Total<br />

Total<br />

Passengers<br />

% of Total<br />

Total<br />

Passengers<br />

% of Total<br />

Total Passengers 1,212 100.00% 3,826 100.00% 5,038 100.00% 53,111 100.00%<br />

ADA Registrants 0 0.00% 529 13.83% 529 10.50% 2,540 4.78%<br />

Disabled 114 9.41% 786 20.54% 900 17.86% 9,667 18.20%<br />

Seniors 720 59.41% 1,992 52.06% 2,712 53.83% 22,397 42.17%<br />

General Public 367 30.28% 514 13.43% 881 17.49% 18,072 34.03%<br />

2.4.7 TRAVEL CHARACTERISTICS<br />

Chino Hills OmniLink Key Destinations and Peak Service Hours<br />

Chino Hills OmniLink has a relatively small set of key destinations. Figure 2-24 provides a sampling of<br />

Chino Hills OmniLink trip origin/destination pairs.<br />

Key destinations in Chino Hills include:<br />

• Canyon Hills Junior High (2500 Madrugada)<br />

• Ayala High School (14255 Peyton Drive)<br />

• Chino Market Place (4200 Chino Hills Parkway – also transfer site for Route 65)<br />

• Wal*Mart (3943 Grand Avenue)<br />

• Food 4 Less (4024 Grand Avenue)<br />

While weekday shuttle service is available to the Chino Senior Center, demand for this location does not<br />

appear to be substantial. Both Canyon Hills Junior High and Ayala High School are the most significant<br />

trip destinations for a.m. service and trip origins for p.m. service.<br />

The Chino Hills OmniLink dispatcher indicated that peak service hours were between 7:00 a.m. and 8:00<br />

a.m. (serving Canyon Hills Junior High), and between 2:00 p.m. and 4:00 p.m. (serving the Canyon Hills<br />

Junior High and Ayala High School dismissal bells). Figure 2-25 provides a summary of passenger loads<br />

and the availability of Chino Hills OmniLink buses by weekday service hour.<br />

Passenger load data were reviewed for 21 weekdays in March 2006. From these data, peak loads are in<br />

the afternoon from 1:00 p.m. to 3:00 p.m. These peak hours coincide with the afternoon Canyon Hills<br />

Junior High and Ayala High School runs. It would appear that in the mornings (before noon) and after<br />

3:00 p.m. there is a capacity surplus. During these times, one bus could handle the demand.<br />

July 11, 2007 48


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-24: Chino Hills OmniLink Origins/Destinations<br />

July 11, 2007 49


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-25: Chino Hills OmniLink Passenger Loadings and Bus Pullout by Weekday Hour<br />

Time<br />

Weekday<br />

Passenger<br />

Loadings<br />

Peak Loadings<br />

0700 to<br />

0800<br />

0800 to<br />

0900<br />

0900 to<br />

1000<br />

1000 to<br />

1100<br />

1100 to<br />

1200<br />

1200 to<br />

1300<br />

1300 to<br />

1400<br />

1400 to<br />

1500<br />

1500 to<br />

1600<br />

1600 to<br />

1700<br />

1700 to<br />

1800<br />

1 to 8 2 to 6 2 to 8 2 to 5 0 to 5 1 to 12 3 to 16 8 to 23 1 to 6 1 to 4 1 to 2<br />

Bus 1<br />

Bus 2<br />

Bus 3<br />

Bus 4<br />

indicates a bus in service<br />

July 11, 2007 50


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Yucaipa OmniLink Key Destinations and Peak Service Hours<br />

Yucaipa OmniLink has a wider range of key destinations. Figure 2-26 provides a sampling of Yucaipa<br />

OmniLink trip origin/destination pairs.<br />

Yucaipa OmniLink key destinations include:<br />

• Stater Bros Grocery (34460 Yucaipa Blvd)<br />

• Yucaipa Adult Day Center (12980 2nd Street)<br />

• Yucaipa 9th Grade Campus (12358 6th Street)<br />

• Yucaipa High School (33000 Yucaipa Blvd)<br />

• Beaver Medical Clinic (13391 California Street)<br />

• Beaver Medical Clinic (11985 4th Street)<br />

• Routes 8 and 9 westbound bus stop at 4th and Yucaipa (in front of Staters)<br />

• VONS (33644 Yucaipa Blvd)<br />

• Washington Mutual Bank (34318 Yucaipa Blvd)<br />

Many of the key destinations are along the central Yucaipa Blvd corridor.<br />

The Yucaipa OmniLink dispatcher identified an a.m. peak from 7:00 a.m. to 10:00 a.m. and a p.m. peak<br />

beginning at 2:30 p.m. and running until the end of the service day at 6:00 p.m. Figure 2-27 provides a<br />

summary of passenger loads and the availability of OmniLink buses by weekday service hour.<br />

Passenger load data were reviewed for 21 weekdays in March 2006. From these data, peak loads occur<br />

from 10:00 a.m. through 4:00 p.m. The highest p.m. loads are consistent with the 9th Grade Campus<br />

dismissal bell at 2:41 p.m. and Yucaipa High School dismissal bell at 2:47 p.m. Up to five buses are<br />

operating during the maximum bus pullout. Given the low productivity and passenger loads, Yucaipa<br />

OmniLink (like Chino Hills OmniLink) appears to have a bus capacity surplus, even during the peak<br />

service hours.<br />

July 11, 2007 51


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-26: Yucaipa OmniLink Origins/Destinations<br />

July 11, 2007 52


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-27: Yucaipa OmniLink Passenger Loadings and Bus Pullout by Weekday Hour<br />

Time<br />

Weekday Passenger<br />

Loadings<br />

0700 to<br />

0800<br />

0800 to<br />

0900<br />

0900 to<br />

1000<br />

1000 to<br />

1100<br />

1100 to<br />

1200<br />

1200 to<br />

1300<br />

1300 to<br />

1400<br />

1400 to<br />

1500<br />

1500 to<br />

1600<br />

1600 to<br />

1700<br />

1700 to<br />

1800<br />

7 to 11 6 to 15 13 to 18 16 to 27 12 to 20 10 to 20 13 to 21 17 to 33 15 to 20 7 to 11 3 to 9<br />

Peak Loadings<br />

Bus 1 (Mon - Fri)<br />

Bus 2 (Tues - Fri)<br />

Bus 3 (Mon - Fri)<br />

Bus 4 (Mon - Fri)<br />

Bus 5 (Mon, Thur, Fri)<br />

Bus 6 (Mon - Fri)<br />

Bus 7 (Tues, Wed,<br />

Fri)<br />

Operates as a split<br />

on Fridays<br />

indicates a bus in service<br />

July 11, 2007 53


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2.4.8 PERFORMANCE CHARACTERISTICS AND FORECAST FOR FY <strong>2008</strong>-<br />

<strong>2013</strong><br />

Figure 2-28 provides a forecast of annual OmniLink characteristics for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP<br />

timeframe. During this period:<br />

• Ridership decreases in response to fare increases.<br />

• Revenue hours decrease by 4,000 due to weekend service cuts and weekday<br />

capacity reductions.<br />

• Farebox recovery increases to 7.6% by <strong>2013</strong>. This is still below the 10%<br />

minimum service standard. Additional weekday capacity reductions and<br />

scheduling improvements may be required.<br />

July 11, 2007 54


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-28: Projected Characteristics for OmniLink<br />

SYSTEM: OMNILINK<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Peak-Hour Fleet 8 8 8 9 9 9 9 9 9<br />

Spare Vehicles 4 4 4 4 4 4 4 4 4<br />

Spare Ratio 50.0% 50.0% 50.0% 44.4% 44.4% 44.4% 44.4% 44.4% 44.4%<br />

Total Vehicles 12 12 12 13 13 13 13 13 13<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 0 0<br />

New Replacement Vehicles Delivered 0 2 4 4 0 2 2 2 2<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $59.5 $53.3 $56.6 $77.6 $78.2 $78.9 $88.7 $101.2 $101.3<br />

Measure I Fare Subsidy ($000) $8.7 $8.7 $9.8 $7.6 $7.6 $7.6 $7.6 $7.5 $7.5<br />

Operating Cost ($000's) $1,053.2 $936.7 $1,052.4 $1,159.0 $1,234.6 $1,294.7 $1,345.6 $1,385.3 $1,436.4<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 252.6 222.0 233.0 183.9 183.9 183.9 183.9 183.9 183.9<br />

Total Vehicle Miles (000's) 382.6 380.4 313.6 247.6 247.6 247.6 247.6 247.6 247.6<br />

Revenue Vehicle Hours (000's) 22.4 19.1 19.0 15.0 15.0 15.0 15.0 15.0 15.0<br />

Total Vehicle Hours (000's) 30.7 29.8 26.4 20.8 20.8 20.8 20.8 20.8 20.8<br />

Linked Passengers (000's) 52.9 53.1 60.0 45.9 46.2 46.6 46.4 45.6 45.6<br />

Unlinked Passengers (000's) 52.9 53.1 60.0 45.9 46.2 46.6 46.4 45.6 45.6<br />

Full-Time Employee Equivalent 42 18 17 17 17 17 17 17 17<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $1.12 $1.00 $0.94 $1.69 $1.69 $1.69 $1.91 $2.22 $2.22<br />

Cost/Unlinked Passenger $19.90 $17.64 $17.55 $25.24 $26.74 $27.80 $29.03 $30.41 $31.52<br />

Subsidy/Unlinked Passenger $18.78 $16.63 $16.61 $23.55 $25.05 $26.11 $27.12 $28.19 $29.30<br />

Cost/Revenue Vehicle Hour $47.10 $49.17 $55.39 $77.27 $82.31 $86.31 $89.71 $92.35 $95.76<br />

Passengers/Revenue Vehicle Hour 2.4 2.8 3.2 3.1 3.1 3.1 3.1 3.0 3.0<br />

Operating Ratio (Fares+MI/Cost) 1 6.5% 6.6% 6.3% 7.4% 6.9% 6.7% 7.2% 7.8% 7.6%<br />

NOTES:<br />

1. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 55


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

3. REGIONAL TRANSIT SERVICES<br />

As part of the existing conditions analysis, it is important to take into account the plans of other agencies<br />

that may have an impact on <strong>Omnitrans</strong>’ service, as well as understand the connections between these<br />

agencies and <strong>Omnitrans</strong>. Below is a brief agency-by-agency look at planned projects and service<br />

changes that are expected to have some impact on <strong>Omnitrans</strong> and its riders, as well as their interaction<br />

with <strong>Omnitrans</strong>’ routes and services. In addition, <strong>Omnitrans</strong> and its surrounding transit agencies work<br />

cooperatively to provide transit services throughout the region. To effectively accomplish this, <strong>Omnitrans</strong><br />

enters into Cooperative Service Agreements, defined below, with other agencies so that the roles and<br />

responsibilities are clearly defined.<br />

The agencies studied include Riverside <strong>Transit</strong> Agency, Foothill <strong>Transit</strong>, Orange County Transportation<br />

Authority, Los Angeles County Metropolitan Transportation Authority, Pomona Valley <strong>Transit</strong> Authority,<br />

Mountain Area Regional <strong>Transit</strong> Authority, Victor Valley <strong>Transit</strong> Authority, Southern California Regional<br />

Railroad Authority (Metrolink), Greyhound, and Amtrak.<br />

3.1 Riverside <strong>Transit</strong> Agency<br />

The Riverside <strong>Transit</strong> Agency (RTA) operates local and regional public transit in Western Riverside<br />

County, including:<br />

• Regional Route 25 on 70-minute headways (Monday through Sunday) between the<br />

Riverside Downtown Terminal and the Loma Linda Medical Center and VA Hospital<br />

where it connects with <strong>Omnitrans</strong> Routes 2, 9 and 19. Route 25 also provides some<br />

service for Grand Terrace residents (access to Loma Linda). Operating times are<br />

between 5:50 a.m. and 7:50 p.m. on weekdays, 7:50 a.m. and 6:05 p.m. on Saturday,<br />

and 7:50 a.m. and 6:11 p.m. on Sunday.<br />

• Regional Route 36 on 50-minute headways (Monday through Saturday) between<br />

Banning and Redlands Mall Transcenter where it connects with <strong>Omnitrans</strong> Routes 8,9,<br />

15, and 19. Operating times are between 7:30 a.m. and 5:21 p.m. weekdays and<br />

between 8:00 a.m. and 4:11 p.m. on Saturday.<br />

• Regional Route 204 on 30-minute headways (weekdays) between Riverside Downtown<br />

Terminal and Ontario Mills Mall and the Montclair Transcenter where it connects with<br />

<strong>Omnitrans</strong> Routes 62, 65, 66, and 68, Foothill Routes 187,190/690, 292, 294, 480 and<br />

492, as well as the Foothill <strong>Transit</strong>’s Silver Streak express service. Route 204 operates<br />

between 3:38 a.m. to 9:20 a.m., and 2:55 p.m. to 7:49 p.m.<br />

RTA is currently finalizing an SRTP. Discontinuation of Regional Route 36 and 204 are under<br />

consideration because of low ridership.<br />

3.2 Foothill <strong>Transit</strong><br />

Foothill <strong>Transit</strong> is the main service provider to Los Angeles County’s San Gabriel Valley. Foothill<br />

operates:<br />

• Route 187 on 20 minute weekday and 30-minute weekend/holiday headways<br />

between the Montclair Transcenter and Pasadena via Claremont and Glendora.<br />

Route 187 operates 4:00 a.m. to 12:54 a.m. on weekdays and 5:00 a.m. to 12:19<br />

a.m. on weekends and holidays.<br />

July 11, 2007 56


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Route 197 on 30/60-minute weekday and 60-minute weekend/holiday headways<br />

between the Montclair Transcenter and Pomona. Route 197 operates 5:31 a.m.<br />

to 8:36 p.m. on weekdays and 6:04 a.m. to 7:54 p.m. on weekends and holidays.<br />

• Route 480 on 30-minute headways on weekdays, weekends and holidays<br />

between the Montclair Transcenter and West Covina via Pomona. Route 480<br />

operates 5:00 a.m. to 10:42 p.m. on weekdays and 4:32 a.m. to 10:53 p.m. on<br />

weekends and holidays.<br />

• Route 492 on 30-minute headways on weekdays, weekends and holidays<br />

between the Montclair Transcenter and El Monte via Arcadia. Route 492<br />

operates 4:47 a.m. to 10:15 p.m. on weekdays and 6:03 a.m. to 7:42 p.m. on<br />

weekends and holidays.<br />

• Route 690 as a weekday peak express between the Montclair Transcenter and<br />

Pasadena via the I-210 Freeway. Route 690 operates seven morning trips<br />

between 4:55 a.m. and 9:30 a.m. and seven afternoon/evening trips between<br />

3:30 p.m. and 7:57 p.m.<br />

• Route 699 as a weekday peak express between the Montclair Transcenter and<br />

Downtown Los Angeles via Cal State Los Angeles and USC Medical Center.<br />

Route 699 operates 22 morning trips between 4:14 a.m. and 8:17 a.m. and 18<br />

afternoon/evening trips between 2:00 p.m. and 6:35 p.m.<br />

• Silver Streak express on 12 to 60-minute headways on weekdays and 15 to 60-<br />

minute headways on weekends and holidays between the Montclair Transcenter<br />

and Downtown Los Angeles via the Pomona Transcenter, the Plaza of West<br />

Covina, El Monte Metrolink Station, Cal State Los Angeles, USC Medical Center<br />

and Union Station. Silver Streak operates 4:04 a.m. to 5:54 p.m. on weekdays<br />

and 3:59 a.m. to 5:57 p.m. on weekends and holidays.<br />

• Route 497 as a weekday service between the Chino Transcenter and Downtown<br />

Los Angeles via Chino Park N Ride, Cal State Los Angeles and USC Medical<br />

Center. Route 497 operates 13 morning trips between 4:41 a.m. and 7:38 a.m.<br />

and 13 afternoon/evening trips between 2:15 p.m. and 6:40 p.m.<br />

Foothill services into the Montclair Transcenter facilitate connections with <strong>Omnitrans</strong> Routes 62, 65, 66,<br />

and 68, and RTA Route 204. Foothill Route 497 facilitates connections with <strong>Omnitrans</strong> Routes 62, 63, 65<br />

and 68, and OCTA Route 758.<br />

3.3 Orange County Transportation Authority<br />

The Orange County Transportation Authority (OCTA) is responsible for the operation of local and regional<br />

public transit services in Orange County. OCTA operates:<br />

• Route 758 as a weekday peak express between the Chino Transcenter and the Irvine<br />

Transportation Center via the Chino Park N Ride and Brea Mall. Two morning trips<br />

depart the Chino Transcenter at 5:32 a.m. and 6:02 a.m., and two evening trips arrive at<br />

the Chino Transcenter at 7:04 p.m. and 7:34 p.m. On March 11, 2007 routing was<br />

modified in the Irvine Spectrum area to serve a greater number of employers along Irvine<br />

Center, Sand Canyon, and Alton in Irvine.<br />

July 11, 2007 57


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

3.4 Los Angeles County Metropolitan Transportation Authority<br />

The Los Angeles County Metropolitan Transportation Authority (LACMTA) is the state chartered regional<br />

transportation planning and public transportation operating agency for the County of Los Angeles.<br />

LACMTA operates Route 684 between Pomona <strong>Transit</strong> Center and Brea mall via Cal Poly Pomona, Mt.<br />

San Antonio College and Diamond Bar. Route 684 operates on an approximate 60-minute headway from<br />

6:31 a.m. and 8:21 p.m. on weekdays and on a clockface 60-minute headway between 5:45 a.m. and<br />

5:40 p.m. on weekends and holidays. <strong>Omnitrans</strong> Route 61 connections are possible at the Pomona<br />

Transcenter. Route 684 is under review because of low ridership, and is scheduled to be canceled in<br />

September 2007. However, the route will continue under Foothill <strong>Transit</strong>’s banner as Route 193, with the<br />

same headways and similar routing.<br />

3.5 Pomona Valley Transportation Authority<br />

The Pomona Valley Transportation Authority (PVTA) is the community transit provider for the Pomona<br />

Valley communities of Claremont, La Verne, Pomona and San Dimas. PVTA operates several dial-a-ride<br />

systems which service the Montclair and Montclair Plaza Transcenters, where transfers to <strong>Omnitrans</strong><br />

services are possible. PVTA is applying for a grant to extend their service into the West Valley. No<br />

changes that would impact <strong>Omnitrans</strong> services are planned for the SRTP timeframe.<br />

3.6 Mountain Area Regional <strong>Transit</strong> Authority<br />

The Mountain Area Regional <strong>Transit</strong> Authority (MARTA) provides local and off the mountain bus service<br />

to the Big Bear Valley, Running Springs, Lake Arrowhead, Crestline and San Bernardino. MARTA<br />

currently has two off the mountain routes that run into <strong>Omnitrans</strong>’ service area: the Arrowhead/Crestline<br />

route, which has three daily runs; and the Big Bear Valley route, which has two daily runs. Two additional<br />

daily mid-day runs have been approved for the Big Bear Valley route, and are scheduled to be<br />

implemented mid-summer, 2007. MARTA connections with <strong>Omnitrans</strong> Routes 1, 2, 3, 4, 5, 7, 8, 9, 10,<br />

11, 14, 15 and 90 are facilitated at the Fourth Street <strong>Transit</strong> Mall in downtown San Bernardino.<br />

Connections with other <strong>Omnitrans</strong> routes currently using the Fourth Street <strong>Transit</strong> Mall will be enhanced<br />

when all services operate through the planned San Bernardino Transcenter.<br />

3.7 Victor Valley <strong>Transit</strong> Authority<br />

The Victor Valley <strong>Transit</strong> Authority has eliminated its service to the <strong>Omnitrans</strong> service area, and its<br />

current five-year transit plan has no plans to reintroduce said service.<br />

3.8 Southern California Regional Rail Authority (Metrolink)<br />

In 1991, the transportation commissions of Los Angeles, Orange, Riverside, San Bernardino and Ventura<br />

counties formed a Joint Powers Authority (JPA) to form the Southern California Regional Rail Authority<br />

(SCRRA) to develop a regional transit service to reduce the congestion on highways and improve mobility<br />

throughout the Southern California region. In October 1992, Metrolink was introduced. Today Metrolink<br />

operates seven rail commuter lines throughout the region.<br />

The <strong>Omnitrans</strong> service area is served directly by the Metrolink San Bernardino and Inland Empire-Orange<br />

County Lines. <strong>Omnitrans</strong> provides feeder service to the San Bernardino Line at the San Bernardino,<br />

Rialto, Fontana, Rancho Cucamonga, Upland and Montclair Metrolink Stations. <strong>Omnitrans</strong> also serves<br />

the Inland Empire-Orange County Line at the San Bernardino and Riverside Metrolink Stations.<br />

Connections with the Riverside Line are possible at the East Ontario and Pomona Metrolink Stations.<br />

Effective feeder service to Metrolink stations will become increasingly critical as station parking capacity is<br />

used up.<br />

July 11, 2007 58


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

3.9 Greyhound<br />

Greyhound Lines is the largest intercity common carrier of passengers by bus in North America, serving<br />

2,200 destinations in the United States. Greyhound’s San Bernardino station at 596 North G Street is<br />

serviced by <strong>Omnitrans</strong>’ Route 11.<br />

Greyhound does not have any transfer agreements with <strong>Omnitrans</strong>, nor does it have planned service<br />

changes that will affect <strong>Omnitrans</strong> service during this SRTP. However, <strong>Omnitrans</strong> is currently considering<br />

consolidating all regional transit services, including Greyhound, at its San Bernardino Transcenter to<br />

make it a true intermodal facility.<br />

3.10 Amtrak<br />

Amtrak is the United States' intercity passenger train system, serving 500 U.S. communities. Amtrak has<br />

one station in San Bernardino, at 1170 W. Third Street, that is directly served by <strong>Omnitrans</strong> Route 1. The<br />

Amtrak route that stops there is the Southwest Chief. Amtrak also has a stop in Ontario, at 228 South<br />

Plum Street, for their Sunset Limited route.<br />

Amtrak does not have any transfer agreements with <strong>Omnitrans</strong>, nor does it have planned service<br />

changes that will affect <strong>Omnitrans</strong> service during this SRTP.<br />

3.11 Ontario International Airport<br />

Ontario International Airport is the Inland Empire’s only major commercial airport, the West Coast air and<br />

truck hub for UPS, and a major distribution point for FedEx. <strong>Omnitrans</strong>’ Route 61 stops on Airport Drive,<br />

with transfers available to a free airport shuttle that serves the terminals.<br />

The Southern California Association of Governments (SCAG) produced a 2005 Ontario Airport-Vicinity<br />

Ground Access <strong>Plan</strong> to study projected growth in local and regional transportation demand due to the<br />

expansion of the Ontario Airport. It concluded that keeping the airport and its surroundings as accessible<br />

as possible would require significant cooperation between the public and private sectors, as well as<br />

substantial funding. <strong>Omnitrans</strong> has an important role to play in communicating the impact of land use<br />

decisions on transit services, as well as implementing transit service that will be beneficial to the Airport,<br />

all stakeholders, and <strong>Omnitrans</strong> itself.<br />

3.12 San Bernardino International Airport<br />

San Bernardino International Airport is a general aviation and cargo airport located on the former site of<br />

Norton Air Force Base. The Inland Valley Development Agency (IVDA) is a joint powers authority<br />

comprised of the County of San Bernardino and the Cities of San Bernardino, Colton and Loma Linda.<br />

Formed in 1990, the IVDA is responsible for the redevelopment of the non-aviation portion of the former<br />

Norton Air Force Base. In addition to the approximately 600 acres on the former base, the IVDA also has<br />

a redevelopment project area of approximately 13,000 acres of surrounding properties. The land use<br />

designations within the project area include: light and heavy industrial, office, commercial and residential.<br />

In 2002, the IVDA entered into a Master Disposition and Development Agreement (DDA) with<br />

Hillwood/San Bernardino LLC., a Texas-based development company, which serves as the master<br />

developer of the project commonly known as Alliance*California. As the land is developed for future<br />

residential and commercial use, transportation needs may arise that require <strong>Omnitrans</strong>’ attention.<br />

July 11, 2007 59


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

3.13 Transfer and Cooperative Service Agreements<br />

<strong>Omnitrans</strong> and its surrounding transit agencies work cooperatively to provide transit services throughout<br />

the region. To effectively accomplish this, <strong>Omnitrans</strong> enters into Cooperative Service Agreements with<br />

other agencies so that the roles and responsibilities are clearly defined.<br />

Foothill <strong>Transit</strong> – Transfers, passes, etc are good towards the passengers’ base fare within the<br />

prevailing fare zone at the point of transfer. Standard rates for passes and transfers apply. Agreement<br />

went into effect January 23, 2002.<br />

Los Angeles County Metropolitan <strong>Transit</strong> Agency (LACMTA) – Schedules are coordinated to the<br />

extent possible to ease transfer between systems. Under the Non-Financial Cooperative Service<br />

Agreement, each party will honor the other’s annual employee passes in lieu of payment. Agreement<br />

went into effect July 1, 1996. This contract was amended February 10, 2004 to include LACMTA’s EZ<br />

<strong>Transit</strong> Pass. The EZ <strong>Transit</strong> Pass is applicable as valid base fare towards the fare zone(s) at the point of<br />

transfer between intersecting Los Angeles County EZ <strong>Transit</strong> Pass participating services and <strong>Omnitrans</strong><br />

Services.<br />

Southern California Regional Railroad Authority (SCRRA) – <strong>Omnitrans</strong> passes are not honored on<br />

Metrolink. SCRRA’s Metrolink passes are good toward a single boarding within the <strong>Omnitrans</strong> base zone<br />

in the same direction of travel under the following conditions:<br />

1. One-way tickets valid for the date of travel will be honored from Metrolink stations.<br />

2. Round-trip tickets valid for the date of travel will be honored for boarding’s to and from<br />

Metrolink stations.<br />

3. Ten-trip tickets and four-trip tickers will be honored on boarding’s to and from Metrolink<br />

stations if already validated on the day of travel.<br />

4. Monthly passes will be honored for boarding’s to and from Metrolink stations.<br />

This agreement went into effect September 1, 2004.<br />

Mountain Area Regional <strong>Transit</strong> Authority (MARTA) – Transfers, passes, etc are good towards the<br />

passengers’ base fare within the prevailing fare zone at the point of transfer. Standard rates for passes<br />

and transfers apply. Agreement went into effect July 1, 1999.<br />

Orange County Transportation Authority (OCTA) – Under the Non-Monetary Cooperative Service<br />

Agreement between <strong>Omnitrans</strong> and OCTA, both parties agreed to coordinate passenger information,<br />

operations, service planning efforts, fare policies, bus stop and transfer connections in regard to OCTA’s<br />

new Route 758 operating between <strong>Omnitrans</strong>’ Chino Transcenter and OCTA’s Irvine Transportation<br />

Center. Based on the agreement, <strong>Omnitrans</strong> passengers transferring onto the Route 758 will receive a<br />

discount towards their OCTA fare. In return, <strong>Omnitrans</strong> will honor OCTA’s transfer media off the Route<br />

758. Agreement went into effect July 3, 2006.<br />

Riverside <strong>Transit</strong> Agency (RTA) – Transfer media are good towards the passengers’ base fare within<br />

the prevailing fare zone at the point of transfer. Standard rates for passes and transfers apply.<br />

Agreement went into effect October 10, 2004.<br />

July 11, 2007 60


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4. SERVICE AREA PROFILE (AS OF JULY 1, 2007)<br />

4.1 Service Area<br />

San Bernardino County can be divided into three distinct regions. The High Desert represents the<br />

majority of the County area. The Mountain region encompasses the San Bernardino National Forest and<br />

portions of the San Gabriel National Forest to the south of the desert regions. The San Bernardino Valley<br />

encompasses the valley south of the Mountain region, bordered by the Los Angeles County Line to the<br />

west and the Riverside County Line to the south. Orange County also borders San Bernardino County at<br />

the southwestern-most end of the County at Chino Hills State Park.<br />

The <strong>Omnitrans</strong> service area covers over 456 square miles and serves the urbanized area of San<br />

Bernardino Valley region of the County with a population close to 1.4 million. The service area includes<br />

the cities of Colton, Fontana, Grand Terrace, Highland, Loma Linda, Redlands, Rialto, San Bernardino,<br />

and Yucaipa in the East Valley (east of I-15), and Chino, Chino Hills, Montclair, Ontario, Rancho<br />

Cucamonga, and Upland in the West Valley (west of I-15).<br />

4.2 Demographics of the Service Area<br />

Population, housing, employment, age, household income and vehicle ownership are three critical<br />

demographic attributes in determining transit demand. These demographic attributes are incorporated<br />

into a <strong>Transit</strong> Orientation Index (TOI) as discussed in Section 4.3.<br />

4.2.1 POPULATION GROWTH<br />

Figure 4-1 shows the anticipated population growth from 2005-2030 for the communities in San<br />

Bernardino County.<br />

Figure 4-1: San Bernardino Valley Population Projections by Community (2005-2030)<br />

City<br />

2005 2010 2015 2020 2025 2030<br />

Population Population Population Population Population Population<br />

Chino 75,097 82,319 90,563 98,703 106,500 113,977<br />

Chino Hills 75,017 78,307 80,126 81,916 83,636 85,284<br />

Colton 54,733 62,086 68,087 74,004 79,676 85,117<br />

Fontana 158,590 179,426 195,373 211,105 226,186 240,650<br />

Grand Terrace 12,409 12,928 13,375 13,817 14,239 14,646<br />

Highland 48,458 50,167 54,624 59,020 63,229 67,267<br />

Loma Linda 21,848 24,632 25,858 27,067 28,225 29,338<br />

Montclair 34,459 34,709 34,808 34,904 34,997 35,087<br />

Ontario 171,154 180,059 212,734 244,977 275,873 305,509<br />

Rancho<br />

Cucamonga<br />

149,527 154,170 159,832 165,417 170,771 175,904<br />

Redlands 69,288 72,036 76,415 80,737 84,875 88,842<br />

Rialto 97,848 99,936 102,851 105,727 108,486 111,128<br />

San Bernardino 199,035 207,021 208,860 210,672 212,404 214,069<br />

Upland 74,991 80,143 82,563 84,949 87,239 89,433<br />

Yucaipa 47,042 49,689 53,361 56,984 60,456 63,786<br />

Total 1,289,496 1,367,628 1,459,430 1,549,999 1,636,792 1,720,037<br />

Source: 2000 US Census and SCAG projections<br />

July 11, 2007 61


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4.2.2 TRANSIT DEPENDENCE<br />

<strong>Transit</strong> dependence is the measure of a household’s dependence on public transportation to access<br />

employment, shopping, and housing opportunities. Age, household income, and automobile ownership<br />

are all useful indicators of transit dependence.<br />

Age<br />

An analysis of age looks at three age groups which have a higher propensity to use transit. These are<br />

seniors (age 65 and older), college-aged residents (age 18 to 24) and high school students (age 14 to<br />

17). Seniors are a large and growing market for transit systems. Seniors have a high propensity to use<br />

transit due to factors such as income and the ability to own and drive an automobile. Many college<br />

students have limited budgets and choose to use transit in order to reduce their cost of living. Limited or<br />

expensive parking at college campuses can also stimulate transit use. The 18-24 age group is used as a<br />

surrogate for the student population as this age group is where most college students are found.<br />

Similarly, the younger high school students represent a strong market for transit as they have increased<br />

mobility needs, but are too young or too poor to own and operate a private car. Figure 4-2 shows the age<br />

distribution of transit-dependent populations by city.<br />

Figure 4-2: Distribution of Ages by City<br />

Age 15-17 Age 18-24 Age 25-29 Age 65+<br />

San Bernardino Valley (Total) 5.1% 10.4% 7.3% 7.4%<br />

Chino 4.7% 12.3% 7.8% 5.9%<br />

Chino Hills 5.1% 7.4% 6.0% 4.2%<br />

Colton 4.9% 11.9% 8.8% 6.4%<br />

Fontana 5.3% 10.3% 7.7% 4.7%<br />

Grand Terrace 4.2% 9.0% 7.2% 10.7%<br />

Highland 5.2% 9.0% 6.5% 6.5%<br />

Loma Linda 3.4% 10.2% 11.4% 15.4%<br />

Montclair 5.3% 10.7% 7.8% 8.3%<br />

Ontario 5.0% 11.2% 8.5% 5.9%<br />

Rancho Cucamonga 5.2% 9.9% 6.9% 6.1%<br />

Redlands 4.7% 10.7% 6.5% 12.6%<br />

Rialto 6.0% 10.4% 6.7% 6.4%<br />

San Bernardino 5.1% 11.0% 7.3% 8.2%<br />

Upland 4.6% 9.6% 6.8% 10.8%<br />

Yucaipa 5.2% 7.6% 5.1% 15.5%<br />

Source: 2000 US Census<br />

According to the U.S. Census, the Cities of Rialto (6.0%), Fontana (5.3%), and Montclair (5.3%) have the<br />

highest percentage of high school students. Loma Linda has the smallest percentage (3.4%). The cities<br />

with the highest percentage of college students age 18 to 24 are Chino (12.3%), Colton (11.9%), and<br />

Ontario (11.2%). The lowest are Chino Hills (7.4%) and Yucaipa (7.6%). Loma Linda (11.4%), Colton<br />

(8.8%), and Ontario (8.5%) have the highest percentages of young adults age 25-29 when compared to<br />

the other cities. Yucaipa (5.1%) and Chino Hills (6.0%) have the lowest percentages of young adults.<br />

Finally, higher percentages of seniors can be found in the <strong>Omnitrans</strong> service area Cities of Yucaipa<br />

(15.5%), Loma Linda (15.4%), and Redlands (12.6%), while Chino Hills (4.2%) and Fontana (4.7%) have<br />

the lowest percentages.<br />

July 11, 2007 62


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Income<br />

Low-income persons were identified by the number of persons below the federal standard for poverty.<br />

Many of the people that fall under the poverty line do not have adequate personal transportation and thus<br />

rely on public transit for their everyday transportation. Consequently, it is important to understand where<br />

persons in poverty reside within the <strong>Omnitrans</strong> service area.<br />

Thresholds for poverty are adjusted every year to account for changes in the Consumer Price Index. The<br />

Department of Health and Human Services updates the poverty guidelines annually and releases these<br />

guidelines in the Federal Register.<br />

Poverty, as defined by the U.S. Census<br />

Poverty is determined by comparing the family’s income to a set of weighted average thresholds for a<br />

given family size. If a family’s total income is less than the threshold for the family’s size composition, the<br />

family and everyone in it is considered poor. If a person is not living with anyone related by birth,<br />

marriage, or adoption, the person’s own income is compared with his or her poverty threshold as an<br />

“unrelated individual.” It is important to note that poverty status was determined for everyone except<br />

those in institutions, military group quarters, or college dormitories, and unrelated individuals under 15<br />

years old. Figure 4-3 shows the Poverty Thresholds (Annual Dollar Amounts) by size of family and<br />

number of related children under 18 years old in 1999.<br />

July 11, 2007 63


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-3: Poverty Thresholds<br />

Size of family<br />

unit<br />

One person<br />

(unrelated<br />

individual)<br />

Weighted<br />

average<br />

threshold ($)<br />

8,501<br />

Related children under 18 years living in household ($)<br />

None One Two Three Four Five Six Seven<br />

Eight or<br />

more<br />

Under 65 years 8,667 8,667<br />

65 years and<br />

over<br />

7,990 7,990<br />

Two people 10,869<br />

Householder<br />

under 65 years<br />

Householder 65<br />

years and over<br />

11,214 11,156 11,483<br />

10,075 10,070 11,440<br />

Three people 13,290 13,032 13,410 13,423<br />

Four people 17,029 17,184 17,465 16,895 16,954<br />

Five people 20,127 20,723 21,024 20,380 19,882 19,578<br />

Six people 22,727 23,835 23,930 23,436 22,964 22,261 21,845<br />

Seven people 25,912 27,425 27,596 27,006 26,595 25,828 24,934 23,953<br />

Eight people 28,967 30,673 30,944 30,387 29,899 29,206 28,327 27,412 27,180<br />

Nine people or<br />

more<br />

Source: 2000 US Census<br />

34,417 36,897 37,076 36,583 36,169 35,489 34,554 33,708 33,499 32,208<br />

July 11, 2007 64


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-4 shows the poverty rates for areas in the San Bernardino Valley. The percentages indicated in<br />

the figure denote the percentage of persons that fall below the poverty line, as defined by the U.S.<br />

Census.<br />

Figure 4-4: Percentage of Population Living Below the Poverty Line<br />

San Bernardino Valley (Total) 15.6%<br />

San Bernardino 27.6%<br />

Highland 21.5%<br />

Colton 19.6%<br />

Montclair 17.4%<br />

Rialto 17.4%<br />

Ontario 15.5%<br />

Loma Linda 15.1%<br />

Fontana 14.7%<br />

Upland 12.0%<br />

Yucaipa 11.2%<br />

Redlands 10.5%<br />

Chino 8.3%<br />

Grand Terrace 7.4%<br />

Rancho Cucamonga 7.1%<br />

Chino Hills 5.1%<br />

Source: 2000 US Census<br />

The City of San Bernardino had the highest rate of poverty, with 27.6% of its residents falling below the<br />

poverty line. The City of Chino Hills had the lowest rate of poverty (5.1%).<br />

July 11, 2007 65


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Vehicle Availability<br />

Vehicle availability per household is also an indication of transit dependence. Limited access to a private<br />

vehicle entails that there is dependence on other modes of transportation such as carpooling, public<br />

transit, bicycle, or other method of travel. According to the U.S. Census, 31.8% of households in the San<br />

Bernardino Valley only have access to one vehicle, while 8.3% do not have access to a vehicle (Figure 4-<br />

5). Of the fifteen cities, San Bernardino has the highest rate of households without access to an<br />

automobile (15.2%), followed by Loma Linda (11.2%) and Colton (10.8%).<br />

Figure 4-5: Percentage of Household Vehicle Availability<br />

0 Vehicles 1 Vehicle 2 Vehicles 3+ Vehicles<br />

San Bernardino Valley<br />

(Total) 8.3% 31.8% 40.4% 21.9%<br />

Chino 6.0% 25.6% 49.8% 41.0%<br />

Chino Hills 1.8% 17.5% 50.2% 30.5%<br />

Colton 10.8% 39.2% 34.2% 15.8%<br />

Fontana 7.5% 26.9% 42.4% 23.2%<br />

Grand Terrace 3.5% 29.5% 45.1% 21.9%<br />

Highland 9.9% 30.7% 38.6% 20.8%<br />

Loma Linda 11.2% 40.5% 34.7% 13.6%<br />

Montclair 8.6% 32.5% 35.7% 23.2%<br />

Ontario 8.3% 31.7% 38.2% 21.9%<br />

Rancho Cucamonga 4.3% 26.7% 44.4% 24.6%<br />

Redlands 7.1% 36.6% 37.4% 18.9%<br />

Rialto 8.7% 32.7% 36.0% 22.6%<br />

San Bernardino 15.2% 38.1% 32.7% 14.0%<br />

Upland 6.4% 35.6% 37.8% 20.2%<br />

Yucaipa 8.4% 35.2% 34.6% 21.8%<br />

Source: 2000 US Census<br />

July 11, 2007 66


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Areas with a high percentage of poverty also have a high percentage of “one or zero” vehicles present<br />

per given household. Areas with lower poverty rates have higher rates of vehicle ownership (Figure 4-6).<br />

Figure 4-6: Correlation Between Poverty and Vehicle Ownership<br />

Percent in<br />

Poverty<br />

0<br />

Vehicles<br />

1<br />

Vehicle<br />

2<br />

Vehicles<br />

3+<br />

Vehicles<br />

San Bernardino 27.6% 15.2% 38.1% 32.7% 14.0%<br />

Highland 21.5% 9.9% 30.7% 38.6% 20.8%<br />

Colton 19.6% 10.8% 39.2% 34.2% 15.8%<br />

Montclair 17.4% 8.6% 32.5% 35.7% 23.2%<br />

Rialto 17.4% 8.7% 32.7% 36.0% 22.6%<br />

Ontario 15.5% 8.3% 31.7% 38.2% 21.9%<br />

Loma Linda 15.1% 11.2% 40.5% 34.7% 13.6%<br />

Fontana 14.7% 7.5% 26.9% 42.4% 23.2%<br />

Upland 12.0% 6.4% 35.6% 37.8% 20.2%<br />

Yucaipa 11.2% 8.4% 35.2% 34.6% 21.8%<br />

Redlands 10.5% 7.1% 36.6% 37.4% 18.9%<br />

Chino 8.3% 6.0% 25.6% 49.8% 41.0%<br />

Grand Terrace 7.4% 3.5% 29.5% 45.1% 21.9%<br />

Rancho Cucamonga 7.1% 4.3% 26.7% 44.4% 24.6%<br />

Chino Hills 5.1% 1.8% 17.5% 50.2% 30.5%<br />

Source: 2000 US Census<br />

The City of San Bernardino has a high percentage of persons that live below the poverty level and have<br />

limited access to private vehicles. This could explain the high dependence on public transportation for<br />

this area. On the other hand, Chino Hills has the lowest rate of poverty and a higher rate of multiple<br />

private vehicle ownership per household when compared to other areas. Yet the proportion of public<br />

transportation use is not as low (2.0%) compared to other areas in the Valley. Both Yucaipa (0.7%) and<br />

Grand Terrace (0.8%) residents tend to use public transit less and tend to drive alone to work. This is the<br />

result of numerous transportation options (e.g. commuter rail, express bus service, etc.) into job rich<br />

destinations to the west and limited transit options and job opportunities to the east.<br />

4.3 <strong>Transit</strong> Orientation Index<br />

A <strong>Transit</strong> Orientation Index (TOI) is a useful tool to provide a spatial representation of potentially strong<br />

and weak transit markets based on a series of key demographic attributes. These include:<br />

• Population density (persons or households per square mile).<br />

• Employment density (jobs per square mile).<br />

• Proportion of the population age 65 and over (elderly per square mile).<br />

July 11, 2007 67


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Proportion of the population under age 16 (youth per square mile).<br />

• Proportion of population below the poverty level per square mile.<br />

• Proportion of households with no vehicle per square mile.<br />

The higher the population or job density and the higher the proportion of elderly, youth, households with<br />

incomes below the poverty level or without a private vehicle, the higher the TOI. The higher the TOI, the<br />

greater the potential transit market as reflected in a higher per capita transit ridership. Higher transit<br />

productivity generally results when service is provided along corridors or between nodes with higher TOI.<br />

Figure 4-7 and Figure 4-8 provide illustrations of the <strong>Omnitrans</strong> fixed route system (2006) in relation to a<br />

Residential TOI and high concentrations of residential and job density. For a larger version of these<br />

maps, see Appendix H.<br />

July 11, 2007 68


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-7: <strong>Omnitrans</strong> East Valley Fixed Route Weekday Coverage (6:00 a.m.) and Residential and Job Concentrations (2006)<br />

July 11, 2007 69


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-8: <strong>Omnitrans</strong> West Valley Fixed Route Weekday Coverage (6:00 a.m.) and Residential and Job Concentrations (2006)<br />

July 11, 2007 70


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4.4 General <strong>Plan</strong> Summaries<br />

General plans are comprehensive development and land use plans developed and approved by<br />

municipal legislative bodies to establish policies concerning the future of development. California state<br />

law requires that general plans have the following seven elements: circulation, conservation, housing,<br />

land use, noise, open space, and safety, as defined in the California Government Code (Title 7, Division<br />

1, Chapter 3, Article 5, Section 65302). <strong>Transit</strong> planning should be an element in most general plans in<br />

order to ensure transit plays an effective role in the community’s land use policies and vision. General<br />

plans can effectively establish a direction for short and long term transit planning and service design.<br />

A summary of current General <strong>Plan</strong>s in effect in the <strong>Omnitrans</strong> service areas is included in Appendix D.<br />

The summary includes an overview of the general plans for the Cities of Chino, Chino Hills, Colton,<br />

Fontana, Grand Terrace, Highland, Loma Linda, Montclair, Ontario, Rancho Cucamonga, Redlands,<br />

Rialto, San Bernardino, Upland, and Yucaipa, as well as the County of San Bernardino.<br />

4.5 City Profiles<br />

<strong>Omnitrans</strong> member cities include Chino, Chino Hills, Colton, Fontana, Grand Terrace, Highland, Loma<br />

Linda, Montclair, Ontario, Rancho Cucamonga, Redlands, Rialto, San Bernardino, Upland, and Yucaipa.<br />

Each city is unique with respect to actual physical size, topography, street layout, population size,<br />

demographic characteristics, and general plan vision. Demographic characteristics by community have<br />

been provided in Section 4.2. For detailed community profiles by individual city, please see Appendix F.<br />

Figure 4-9 provides a general comparison of community attributes to illustrate the diversity amongst the<br />

communities served by <strong>Omnitrans</strong>.<br />

July 11, 2007 71


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-9: <strong>Omnitrans</strong> Member City Overview<br />

City Size of City 2006 Population<br />

Density<br />

Population per<br />

Square Mile<br />

% Population<br />

Increase by 2015<br />

% of population<br />

over 65<br />

Median<br />

Household<br />

Income<br />

Median Home<br />

Price (Existing)<br />

% households<br />

With No Vehicles<br />

Chino 18.59 sq. miles 73,343 3,945 8.80% 5.40% $68,705 $500,000 4.80%<br />

Chino Hills* 44.88 sq. miles 71,849 1,600 6.81% 6.30% $93,133 $590,000 1.40%<br />

Colton 15.90 sq. miles 51,045 3,210 11.01% 6.40% $42,362 $350,000 10.80%<br />

Fontana 35.78 sq. miles 160,015 4,472 16.20% 3.00% $58,481 $431,806 3.00%<br />

Grand Terrace 3.60 sq. miles 12,227 3,396 10.60% 10.70% $64,552 $383,500 3.50%<br />

Highland 13.62 sq. miles 50,236 3,688 6.10% 6.50% $48,050 $365,000 9.90%<br />

Loma Linda 7.80 sq. miles 21,592 2,767 20.40% 15.40% $43,856 $440,000 11.20%<br />

Montclair* 5.20 sq. miles 34,679 6,669 1.02% 8.30% $47,026 $440,000 8.60%<br />

Ontario 36.76 sq. miles 170,373 4,635 22.21% 7.50% $46,344 $434,073 5.00%<br />

Rancho Cucamonga* 37.70 sq. miles 141,586 3,755 6.90% 7.10% $71,967 $537,041 4.90%<br />

Redlands* 35.98 sq. miles 70,324 1,954 10.28% 9.90% $52,111 $423,867 4.90%<br />

Rialto 21.80 sq. miles 97,524 4,473 4.81% 4.50% $50,446 $384,955 5.80%<br />

San Bernardino 59.85 sq. miles 198,322 3,313 4.70% 6.90% $33,915 $326,457 10.50%<br />

Upland 15.01 sq. miles 73,697 4,909 13.88% 11.10% $57,194 $566,149 4.70%<br />

Yucaipa 27.50 sq. miles 49,388 1,796 5.30% 15.50% $45,044 $377,000 8.40%<br />

* 2005 population estimates were used.<br />

Source: SCAG projections<br />

July 11, 2007 72


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4.6 Community-Specific Effects of Economic Change on Population,<br />

Employment Growth and <strong>Transit</strong> Use<br />

The communities in San Bernardino have experienced different growth patterns over the last decade.<br />

Communities in the western portion of the County have grown faster than eastern communities. The City<br />

of San Bernardino, the traditional economic center, has maintained its primacy, but other communities<br />

(such as Ontario) have grown significantly over the past years. The following section provides<br />

information on the two most populous cities in the San Bernardino County, the Cities of San Bernardino<br />

and Ontario. For each city, population and employment growth trends will be examined.<br />

City of San Bernardino<br />

Even with faster growth rates in other cities and some local economic downturns, population and<br />

employment growth within San Bernardino are expected to continue at a steady pace. As Figure 4-10<br />

illustrates, the population is projected to grow by nearly 5% during the ten-year period between 2005<br />

(199,035) and 2015 (208,860) and by another 2.5% in following fifteen years to 2030. San Bernardino’s<br />

dominance in terms of residential and employment population will not change significantly over the<br />

period, but Ontario’s population – growing at a much faster rate – will surpass that of San Bernardino.<br />

Figure 4-10: City of San Bernardino Projected Population and Employment<br />

250,000<br />

200,000<br />

199,035<br />

207,021 208,860 210,672 212,404 214,069<br />

150,000<br />

100,000<br />

88,791<br />

99,337<br />

110,056<br />

120,965<br />

131,943<br />

143,045<br />

50,000<br />

0<br />

2005 2010 2015 2020 2025 2030<br />

Year<br />

Employment<br />

Population<br />

Source: SCAG projections<br />

July 11, 2007 73


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Employment Growth in San Bernardino<br />

Employment is anticipated to increase more rapidly than population in San Bernardino between 2005 and<br />

2030. By 2015, the number of jobs in San Bernardino is anticipated to grow to more than 110,000, an<br />

increase of almost 24% from 2005. During this same period, population is expected to grow by only 5%.<br />

Growth in different industries is not identified as part of the projections provided through SCAG, and it is<br />

difficult to determine which industries will grow faster than others. Changes in the economy, shifts in land<br />

use patterns, and technological advances can all play a role in which industries will grow in the following<br />

years. Nonetheless, SCAG predicts that areas east of I-215 will have the highest concentration of<br />

population and jobs within the city.<br />

City of Ontario<br />

Ontario shows a more rapid growth in population rather than employment during the period between 2005<br />

and 2030. Ontario is expected to surpass San Bernardino as the most populous city in the County by<br />

2015. As Figure 4-11 illustrates, Ontario will have a population of more than 212,000 people in 2015 and<br />

over 305,000 in 2030. This represents an increase in population of 24% in 2015 and 78% in 2030.<br />

Possible reasons for this growth are the amount of land available for development and the city’s<br />

aggressive development efforts.<br />

Figure 4-11: City of Ontario Projected Population and Employment<br />

350,000<br />

300,000<br />

305,509<br />

250,000<br />

244,977<br />

275,873<br />

200,000<br />

212,734<br />

150,000<br />

100,000<br />

171,154<br />

85,536<br />

180,059<br />

97,366<br />

109,637<br />

122,204<br />

134,897<br />

147,785<br />

50,000<br />

0<br />

2005 2010 2015 2020 2025 2030<br />

Year<br />

Employment<br />

Population<br />

Source: SCAG projections<br />

July 11, 2007 74


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Employment Growth in Ontario<br />

By 2015, the number of jobs in Ontario will grow to more than 109,000, a 29% increase. Growth in<br />

different industries is not identified as part of the projections provided through SCAG. Unlike San<br />

Bernardino, some areas of Ontario remain undeveloped and have the potential to be developed into<br />

commercial or industrial land uses. This presents a unique opportunity for the city to pursue development<br />

that will yield the most benefits. Both commercial and industrial opportunities along the eastern end of<br />

the city are possible, while residential development in the New Model Colony is currently planned.<br />

Should the city decide to alter any of these land uses, jobs within industries would fluctuate but would<br />

continue to provide employment opportunities.<br />

4.7 Hot Spots<br />

<strong>Omnitrans</strong> has developed a generally sound route structure and service strategy that provides transit<br />

coverage where it is most needed within the service area. From the analysis of regional demographic<br />

characteristics and the review of city and county general plans, a number of growth nodes, developments<br />

and elderly concentrations are relevant to transit service design in the <strong>Omnitrans</strong> service area. If<br />

potential ridership warrants increased service or the extension of service coverage, existing resources<br />

may have to reprioritized, or new services considered to service population growth or new developments.<br />

If <strong>Omnitrans</strong> is able to follow the fiscally responsible recommendations outlined in this SRTP, it may be<br />

able to shift resources to capture these emerging markets, growing ridership even while controlling costs.<br />

4.7.1 POPULATION GROWTH<br />

Within the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe, the Cities of Fontana, Loma Linda, Ontario, and<br />

Upland will experience the highest increases in population. This is especially true for Ontario, with a<br />

projected population increase of over 22% above its 2006 population of 170,373.<br />

4.7.2 HIGH DENSITY<br />

An analysis of population, employment, and job density was conducted for 2005 conditions. It identified a<br />

number of Traffic Analysis Zones (TAZs) where population density is above 7,500 people per square mile<br />

and employment is above 5,000 jobs per square mile. These areas include:<br />

• Southeast Upland, south of SR-66 and north of I-10<br />

• Southern Montclair, along Holt<br />

• Central Rialto, south of SR-66 along Riverside Avenue<br />

In 2015, these three areas will be joined by four other areas with high population and job densities earlier<br />

specified. These additional areas include:<br />

• San Bernardino, east of I-215 along Highland and Baseline<br />

• Colton, North of I-10 along Mt. Vernon<br />

• Chino, between SR-60 and Riverside Drive, east of Monte Vista and west of<br />

Mountain<br />

• Ontario, along SR-83 near Holt<br />

July 11, 2007 75


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4.7.3 SENIOR CONCENTRATIONS<br />

The proportion of the San Bernardino Valley population age 65 and over is 7.4%. This is below the<br />

proportion of the California population age 65 and over (10.6%). The majority of the cities served by<br />

<strong>Omnitrans</strong> have elderly population proportions lower than the State average. The exceptions are Grand<br />

Terrace (10.7%), Loma Linda (15.4%), Upland (11.1%) and Yucaipa (15.5%).<br />

4.7.4 POVERTY AND VEHICLE OWNERSHIP<br />

The proportion of households in the San Bernardino Valley living below the poverty line is 15.6%. This is<br />

higher than the proportion of California households living below the poverty line (10.6%). Cities with high<br />

concentrations of households below the poverty line include Colton (19.6%), Fontana (14.7%), Highland<br />

(21.5%), Loma Linda (15.1%), Rialto (17.4%), San Bernardino (27.6%), and Muscoy (36.5%). A number<br />

of these communities also have high proportions of households without a vehicle. Almost 11% of<br />

households in Colton do not own a vehicle, while the proportions in Loma Linda and San Bernardino are<br />

11.2% and 10.5% respectively.<br />

4.7.5 NEW DEVELOPMENT<br />

Numerous new developments were identified in the general plans of cities served by <strong>Omnitrans</strong>. These<br />

include:<br />

Chino<br />

The City of Chino has designated few specific areas for development opportunities. Bounded by Chino<br />

Hills parkway, Ramona Avenue and State Highway 71, the triangle-shaped 13 acre property is zoned for<br />

commercial and office uses. Lands adjacent to Central Avenue are also planned for commercial<br />

development with a mix of office and retail.<br />

Other prominent corridor-adjacent areas that are zoned for commercial uses are North Central Avenue<br />

and Pomona Freeway at Benson Avenue.<br />

Chino Hills<br />

Prime retail sites have been identified at:<br />

Colton<br />

• Chino Hills Parkway & Pipeline Center<br />

• Chino Hills Promenade<br />

• Rolling Ridge Plaza<br />

• Woodview Plaza<br />

A significant area of the northwestern part of the city has been redesignated from medium- and highdensity<br />

residential to low-density zones. This area is north of San Bernardino Avenue and west of<br />

Meridian Avenue.<br />

Large vacant pieces of land that lie north of Valley Boulevard and that are bisected by Meridian Avenue<br />

have been eliminated as medium-density residential zones to provide more industrial development<br />

opportunities. Some areas east of Cooley Drive have been redesignated from medium-density to lowdensity<br />

residential.<br />

July 11, 2007 76


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Areas north of Valley Boulevard and intersected by La Cadena Drive have been designated high-density<br />

residential to meet housing needs in the central city area. <strong>Plan</strong>ned community development is<br />

designated in areas north of I-215 fronting the Santa Ana River. High-density residential zoning is also<br />

designated in areas east of Mount Vernon near Fairway Drive. The largest concentration of high-density<br />

residential zoning is in the area bounded by Rancho Avenue, Olive Street, Valley Boulevard, and Mount<br />

Vernon. High-density residential is also planned in these areas:<br />

• East and west of La Cadena Drive and C Street<br />

• North and south of Washington Street (which pivots at Barton Road)<br />

• North and south of Fairway Drive east of Mount Vernon Avenue<br />

Currently, the Colton Redevelopment Agency has three areas for future redevelopment:<br />

Fontana<br />

• Santa Ana River industrial area west of Hunts Lane<br />

• West end of industrial project west of Hermosa Avenue and south of San<br />

Bernardino Avenue<br />

• Mount Vernon corridor extending eastward along Fairway Drive to the I-215<br />

Freeway<br />

Over 30% of the City’s land is vacant as of the year 2001, especially in the northern portion of the city.<br />

The City plans to create and adopt policies to improve development on scattered infill opportunities<br />

located in the central core of the city, and provide significant opportunity areas south of Slover Avenue<br />

and east of Sierra Avenue, and south of Jurupa Avenue in the southeast corner of the city. The physical<br />

connections between Downtown, Metrolink station, <strong>Transit</strong> Plaza, and surrounding community are<br />

planned for improvement.<br />

Major intersection improvements and traffic control installation systems are taking place along Alder<br />

Avenue, Randall Avenue, Baseline Avenue, Foothill Avenue, Maple Avenue, Ceres Avenue, and Walnut<br />

Avenue.<br />

The Land Use <strong>Plan</strong> provides the following acreage with a final build-out that could generate 105,992 jobs:<br />

Grand Terrace<br />

• 2,440 acres of community and general commercial development<br />

• 8,150 acres of light and general industrial uses<br />

• 1,086 acres of mixed-use development<br />

There are 138 acres of commercial property within the city. Strip commercial uses are located on Barton<br />

Road, with the highest concentration between Mount Vernon and Michigan Avenues. A neighborhood<br />

shopping center is located at the intersection of Mount Vernon Avenue and Barton Road. It is the intent<br />

of the General <strong>Plan</strong> to carefully monitor new commercial uses along Barton Road.<br />

The Barton Road Specific <strong>Plan</strong> is being amended to permit low- and moderate-income housing for senior<br />

citizens. The City plans to study High Grove as a possible commuter rail station, and also as a hub for<br />

July 11, 2007 77


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

public transit to serve Barton corridor, parks and other activity centers. One of the implementing actions<br />

is to work with <strong>Omnitrans</strong> and SANBAG to improve internal circulation and regional connectivity.<br />

To accommodate future traffic volume, some of the major transportation routes that are designated for<br />

significant improvements are:<br />

• Barton Road corridor<br />

• Michigan Street from Commerce Way to Barton Road<br />

• Barton Road/I-215 interchange<br />

• La Cadena Drive<br />

• Mt. Vernon Avenue and Commerce Way proposed to be improved to secondary<br />

highway standards<br />

• Main Street, west of Michigan<br />

The City plans to study High Grove as a possible commuter rail station that would serve as a bus transit<br />

hub serving activity centers including the Barton Road corridor, parks, and schools.<br />

Highland<br />

The Land Use <strong>Plan</strong> has designated enough land to accommodate 21,000 units and 72,000 residents by<br />

2030. 60% of the city’s 11,948 acres are designated for residential uses and more than 20% are for open<br />

spaces. East Highlands Ranch <strong>Plan</strong>ned unit development to the east of SR-30 has been the prime<br />

shaper of the development in the city. The city plans to promote mixed-use development of the Town<br />

Center and Golden Triangle to foster social interaction.<br />

Out of the four quadrants formed by the intersection of Baseline and Palm Avenue, significant vacant land<br />

exists on the northwest quadrant and this will be the focus of totally new development. Many of the midblock<br />

commercial uses along Baseline, which is the principal east-west corridor through the city, are<br />

redesignated to medium-density residential uses.<br />

Golden Triangle, formed by two creeks and Boulder Avenue, is a collection of vacant and agricultural<br />

lands. The few constraints for a successful master-planning effort are congestion on 5 th Street and the<br />

elimination of excellent visual resources. The General <strong>Plan</strong> aims to mitigate these constraints and<br />

facilitate a master-planned, mixed-use development. New uses will be oriented along City Creek and a<br />

new specific plan is going to be planned.<br />

To encourage the flow of industrial workers from San Bernardino International Airport (SBIA), the General<br />

<strong>Plan</strong> has designated the 5 th Street corridor to be a major employment center that includes Business Parks<br />

and other industrial land uses.<br />

Victoria Avenue, the prime entry point to the airport from I-210, is going to expand and have a<br />

concentration of commercial uses specifically at Baseline, Pacific Street, and Highland Avenue. This<br />

avenue is also seen as a potential new interchange for the I-210 Freeway.<br />

Another prime residential area known as Seven Oaks area is envisaged in the General <strong>Plan</strong> to have good<br />

access points, trail connections, open spaces, and preservation of existing natural resources. Strong<br />

connection to the Historic Village District is being emphasized.<br />

July 11, 2007 78


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The circulation element of the City’s General <strong>Plan</strong> mentions the connection of I-210 with SR-30 by 2007<br />

and proposed expansion of SR-30 to six lanes near Highland. The City plans to provide Park-N-Ride<br />

regional bus and carpool facilities. Other goals are:<br />

• Work with <strong>Omnitrans</strong> to provide more service to the eastern side of the city<br />

• Ensure accessibility of disabled to public transportation<br />

• Coordinate to provide “safe, clean and attractive” bus shelters<br />

Finally, the City plans to study the feasibility of implementing Variable Parking District Overlays along the<br />

Base Line Historic District to improve the existing condition of parking-deficient development.<br />

Loma Linda<br />

There is a “Special <strong>Plan</strong>ning Area D” that consists of dispersed residential uses especially along Mission<br />

Road and Redlands Boulevard. The area is bounded by Redlands Boulevard on the north, California<br />

Street on the east, the new alignment of Mission Road on the south, and the Edison transmission towers<br />

to the west. The General <strong>Plan</strong> intends the area to have a mixed-use character. The public also envisions<br />

a heritage park within the planning area for recreational uses.<br />

“Special <strong>Plan</strong>ning Area E”: This area located south of new Mission Road is intended to promote a livework<br />

studio environment. “Special <strong>Plan</strong>ning Area F,” between Barton Road and San Timoteo Creek and<br />

west of California Avenue, is also being planned for mixed-use on certain portion of the existing orange<br />

groves. Similarly, “Special <strong>Plan</strong>ning Area H,” located east of California Street and south of Barton Street,<br />

has vacant lands and orange groves that are being planned for mixed-use development. Providing<br />

access to and improving circulation patterns on Barton Street are primary goals. Finally, “Special<br />

<strong>Plan</strong>ning Area I” is zoned in the future for mixed-use development at the intersection of Mountain View<br />

Avenue and Barton Road, bounded on the east by the Edison easement.<br />

<strong>Omnitrans</strong> is the primary public transportation provider, operating five routes in the city; Riverside <strong>Transit</strong><br />

Agency also operates one route.<br />

The Capital Improvement Program and the Final 2002 Regional Transportation Improvement Program<br />

(RTIP) identify the following improvements:<br />

• Provide traffic signal coordination and timing interconnect at seven traffic signals<br />

and install emergency preemption of traffic signal operation; Anderson<br />

Street/Tippecanoe Avenue from University Court to Hospitality Lane<br />

• Widen existing bridge from three lanes to four lanes, add pedestrian walkway to<br />

outside of bridge; Mountain View Avenue from Van Leuven to Prospect<br />

• Widen intersection and install traffic signals and drainage; Redlands Boulevard at<br />

California Street<br />

• Widen from four lanes to six lanes; Redlands Boulevard from east city limits to<br />

west city limits<br />

• Widen from two to six lanes; California Street from Barton Road to Redlands<br />

Boulevard<br />

Widening roadway and extending Evans Street interchange are noted in the <strong>Plan</strong>. Key intersections<br />

marked for improvements are:<br />

July 11, 2007 79


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Additional lanes at the intersection of California Street and Redlands Boulevard<br />

• Additional lanes at the intersection of Benton Street and Barton Road<br />

• Additional lanes at Anderson Street and Redlands Boulevard<br />

• Two-way center left turn lane at the intersection of the proposed Evans Street<br />

• Realignment of Mission Road intersection to coincide with Orange Avenue<br />

intersection<br />

For transit policies, the City of Loma Linda plans to achieve the following:<br />

Montclair<br />

• Ensure that the site design of new developments provides for pedestrian access<br />

to existing and future transit routes and transit centers through specific review<br />

during the development review process.<br />

• Preserve options for future transit use when designing roadway and highway<br />

improvements.<br />

• When applicable, include <strong>Omnitrans</strong> in the review of new development projects,<br />

and require new development to provide transit improvements in proportion to<br />

traffic demands created by the project. <strong>Transit</strong> improvements may include direct<br />

and paved access to transit stops; provision of bus turnout areas and bus<br />

shelters; and roadway geometric designs to accommodate bus traffic.<br />

• Encourage ridership on public transit through use of city information sources<br />

(e.g., City website and mail-outs) to provide information on transit services.<br />

• Require community care facilities and large age-restricted developments (50<br />

units or more, but excluding facilities designed for “active” adults) to provide<br />

transportation services for the convenience of residents as a condition of<br />

development.<br />

New development plans are proposed at the Montclair Transcenter and along Fremont Avenue for<br />

pedestrian-friendly access and shuttle services to provide good linkage. 55% of Montclair’s land use is<br />

classified as residential and only 9% is commercially zoned.<br />

The existing commercial and industrial land uses north of I-10 and between Holt Boulevard and Mission<br />

Boulevard attract many people. Residential neighborhoods are predominant in the southern portion of<br />

the I-10 Freeway up to Holt Boulevard.<br />

The City is planning to continue commercial plans typically along the following arterials:<br />

• Mission Boulevard<br />

• Holt Boulevard<br />

• Large portion of Central Avenue<br />

• Monte Vista Avenue<br />

July 11, 2007 80


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

New developments:<br />

Ontario<br />

• Arrow Highway<br />

• Moreno Street<br />

• Between Mills and Amherst Avenues, on the north side of Holt Boulevard, 106<br />

residences of 3-storiess are being built.<br />

• 19 one- and two-story homes are going to be constructed on the south side of<br />

Mission Boulevard between Ramona and Monte Vista Avenues.<br />

• 5,800 square feet, multi-tenant commercial development was approved by the<br />

<strong>Plan</strong>ning Commission at the southwest corner of Mission Boulevard and Ramona<br />

Avenue.<br />

• North Montclair Downtown Specific <strong>Plan</strong> – proposes a mixed-use, transit-oriented<br />

development between the Montclair Gold Line/Metrolink station and the Montclair<br />

Plaza. Mixed-use development is intended to create a transit village with a range<br />

of medium to high-density housing, retail, commercial, and office development.<br />

This development will reinforce the significance of the Montclair Transcenter as<br />

an <strong>Omnitrans</strong> service focal point.<br />

Major commercial developments in Eastern Ontario include:<br />

• Ontario center: 8 million square feet of office, commercial, residential, and<br />

industrial uses.<br />

• CA Commerce center: 1420 acres of development.<br />

• Centerlake: 1.3 million square feet of commercial and business uses.<br />

• Village industrial park: Large-scale warehousing and distribution uses for<br />

Hyundai, Honda and Inland Container.<br />

Growth and Travel Patterns:<br />

• Ontario airport continues to be a dominant economic force for the city but the<br />

potential for growth is small. Construction of United Parcel Service’s new freight<br />

facility is expected to increase freight volume and traffic.<br />

• The airport has a location advantage, spurring more commercial and industrial<br />

development.<br />

• Construction of more single-family residences plus closer multi-family<br />

development regulation is to be accomplished without affecting housing choices.<br />

• A major concern is a good connection between residents of Creekside and<br />

others south of Pomona Freeway and those who live in established<br />

neighborhoods (CPA’s 1, 3, 4, 10, and 11) within downtown Ontario.<br />

July 11, 2007 81


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• In addition to restoration projects within Downtown and East Holt Special Study<br />

area, most of the City’s future development is likely to involve build-out of<br />

industrial and commercial uses that will take place in CPA’s 5, 6, and 8.<br />

Unique areas that have special attention for development are:<br />

Rancho Cucamonga<br />

• Grove Avenue Corridor Business Park<br />

• Town Center Study Area<br />

• East Holt Boulevard Study Area<br />

The Land Use <strong>Plan</strong> aims to achieve two objectives. One is to increase mixed-use development along<br />

Foothill Boulevard and the Empire Lakes area. The other is consolidation of open space preserves.<br />

The following Specific <strong>Plan</strong>s and <strong>Plan</strong>ned Communities have been approved:<br />

• Industrial Area Specific <strong>Plan</strong>: The purpose of the plan is to make guidelines for<br />

industrial development and three zones have been identified in the southern<br />

portion of the city.<br />

o<br />

o<br />

o<br />

Zone A is bordered on the north by Arrow Route and North Town area, by Haven<br />

Avenue to the east, 4th Street to the south, and to the west by Cucamonga Creek<br />

and the City of Ontario.<br />

Zone B is bounded on the north by Foothill Boulevard, Devore Freeway (I-15) to the<br />

east, 4th Street to the south, and by Haven Avenue to the west.<br />

Zone C is bounded on the north by Foothill Boulevard, on Etiwanda and East<br />

Avenues, 4th Street and the City of Ontario to the south, and by I-15 to the west.<br />

• Sub-Area 18 Specific <strong>Plan</strong>: The purpose of this plan according to the General<br />

<strong>Plan</strong> is to provide a “broader mix of land uses than was originally permitted within<br />

the Industrial Area Specific <strong>Plan</strong>.” On the south of the <strong>Plan</strong> area is Fourth Street,<br />

on the east is Milliken Avenue, on the north is Atchison Topeka and Santa Fe<br />

(AT&SF) Railroad, and on the west is Cleveland Avenue and Utica Street.<br />

• Foothill Boulevard Specific <strong>Plan</strong>: The plan proposes a series of activity centers<br />

and gateways, linked through a unifying suburban parkway design.<br />

• Etiwanda Specific <strong>Plan</strong>: This rural area is located in the northeast corner of the<br />

city and the purpose of the <strong>Plan</strong> is to ensure long-term rural character.<br />

• Etiwanda North Specific <strong>Plan</strong>: The General <strong>Plan</strong> aims to make open space a<br />

prominent feature in these 6,840 acres of land, located just above the Etiwanda<br />

Specific <strong>Plan</strong> area.<br />

• Victoria Community <strong>Plan</strong>: With Victoria Park lane as the central corridor, the City<br />

plans to build residential villages and related uses in the 2,150 acres of land<br />

bounded on the north by Highland Avenue, the east by Etiwanda Avenue, and<br />

the south and west by the I-15, Arrow Route, Base Line Road, Milliken, Southern<br />

Pacific Railroad tracks and Deer Creek.<br />

July 11, 2007 82


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Terra Vista Community <strong>Plan</strong>: This central core area is planned for a mixed-use<br />

development along Foothill Boulevard and Haven Avenue.<br />

The most visible change from the General <strong>Plan</strong> is the approval of more than 700 acres of mixed-use<br />

development in the city.<br />

Redlands<br />

Some of the aims of the General <strong>Plan</strong> are to:<br />

• Maintain the predominant single-family residential character of the city.<br />

• Locate low, medium and high-density uses near regional access routes and<br />

employment centers.<br />

• Continue mobile home parks.<br />

• Encourage residential units in downtown area.<br />

• Consider approval of medium-density houses in the East Valley Corridor special<br />

development district.<br />

• Encourage <strong>Plan</strong>ned Residential Developments and Specific <strong>Plan</strong>s in San<br />

Timoteo and Live Oak Canyon areas.<br />

• Focus development in the “Southeast Area <strong>Plan</strong>” bounded by Sunset Drive on<br />

the north, Alessandro Drive on the west, Live Oak Canyon Road on the south,<br />

and South Lane on the east.<br />

The Downtown Redlands Specific <strong>Plan</strong> makes specific proposals for the development of the downtown<br />

area between Redlands Boulevard and the I-10 Freeway. This includes two- and three-story mixed-use<br />

development in the Town Center District and industrial buildings in the Service Commercial District.<br />

In the East Valley Corridor (EVC) Specific <strong>Plan</strong>, 4,000 acres are planned for commercial and industrial<br />

establishments that total 37 million square feet and provide up to 90,000 jobs.<br />

The City plans to improve commercial strip development at four places:<br />

• Redlands Boulevard west of Texas Street<br />

• Colton Avenue west of Orange Street<br />

• Orange Street between Colton Avenue and Brockton Street<br />

• Mentone Boulevard between Wabash Avenue and Crafton Avenue<br />

No expansion on the University of Redlands campus is being planned currently. In the overall traffic<br />

scenario, the General <strong>Plan</strong> mentions need for comprehensive study to reduce congestion issues on the<br />

following road network:<br />

• Alessandro Boulevard<br />

• Sunset Drive<br />

July 11, 2007 83


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Timoteo Canyon Road<br />

• Live Oak Canyon Road<br />

Rialto<br />

In the residential category, high-density housing, except that for senior citizens, has brought problems to<br />

the city; therefore, extending high-density residential land use is considered undesirable. Yet as more<br />

land is available, affordable housing is looked at as an important design element.<br />

The City has proposed a new industrial land use zoning category of varying intensity on large portions of<br />

vacant land. The City plans to focus redevelopment plans on several vacant in-fill sites along Foothill<br />

Boulevard and provide commercial business opportunities in the Central Business District. The document<br />

identifies in-fill sites for development along Foothill Boulevard within radii of 1, 3, and 5 miles. The<br />

downtown revitalization for $2.8 million is currently underway, and will bring more mixed-use commercial<br />

and residential development.<br />

After the completion of the I-210 Freeway extension to North Rialto, with four on- and off-ramps, retail and<br />

commercial growth is seen as an added advantage on vacant adjacent lands. Currently a moratorium<br />

has been ordered on many development proposals along the I-210 corridor; the City planned to lift this<br />

action on December 20, 2006, when the Land Use Element was scheduled to be updated. The<br />

properties most affected are located east of Alder Avenue, north of Baseline Road, and west of Ayala<br />

Avenue; also included are those properties that have frontage on Casmalia or Easton Avenue. Around<br />

1500 acres of land along the I-210 Freeway extensions are marked for development, including the area<br />

around Rialto Municipal airport.<br />

A new Gateway Center is planned in the East Central sector, between Foothill Boulevard and I-10<br />

Freeway, east of Cactus Avenue. This is a diverse area with some of the city’s oldest development.<br />

Caltrans has proposed a Route 30 extension parallel to the Highland Avenue, but due to the lack of a<br />

precise planning timeline, an update of the Land Use Element is deferred along this section of the<br />

corridor.<br />

Bloomington Avenue is one of the city’s most attractive streetscapes but its north-south grid creates a five<br />

point intersection with Riverside Avenue, creating confusion and danger for drivers. Its other terminus on<br />

Cedar Avenue is congested by traffic coming from and to Valley Boulevard and the I-10 Freeway. The<br />

City has the goal of improving this corridor and limiting traffic by measures such as speed limits,<br />

crosswalks, signals, and stop signs.<br />

San Bernardino<br />

The City has approved preparation of Strategic Area <strong>Plan</strong>s to oversee the growth regulation and guidance<br />

in certain areas. These Specific <strong>Plan</strong>s are:<br />

• San Bernardino Valley College Strategic Area: Bounded by the City of Colton to<br />

the west and south, Mill Street to the south and K Street to the north, this<br />

strategic area was marked for expansion to accommodate more college students<br />

and to explore opportunities for off-campus parking.<br />

• Santa Fe Depot Strategic Area: Bounded on the south by Rialto Avenue, I-215<br />

to the east, Viaduct Avenue to the west and BNSF to the north, this land is being<br />

planned to integrate historic Santa Fe depot with surrounding neighborhoods and<br />

improve aesthetics.<br />

July 11, 2007 84


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Redlands Boulevard Strategic Area: The <strong>Plan</strong> plans a mixture of commercial,<br />

industrial and office uses to enhance economic viability.<br />

• Tippecanoe Strategic Area: This area west of San Bernardino International<br />

Airport (SBIA) is targeted for more economic linkage to the airport and better<br />

usage of the Santa Ana River. The <strong>Plan</strong> proposes signal synchronization and<br />

extension of Tippecanoe Avenue from the southern part of the city to Baseline<br />

Avenue. More cooperation with the Cities of Loma Linda and Redlands is also<br />

expected to extend Mountain View Avenue north of the river and intersection<br />

improvements at the I-10 Freeway.<br />

• Eastern Recreation Village Strategic Area: This area is being developed as a<br />

recreational and commercial area while enhancing the existing sports complex<br />

and bike trails.<br />

• Residential Conversion Strategic Area: The area is bound by 19th Street on the<br />

north, 18th Street on the south, Guthrie Street on the east, and Sterling Avenue<br />

on the west. There are plans to improve the current residential apartments and<br />

develop on vacant lots.<br />

• Southeast Industrial Strategic Area: Protection of existing industrial base and<br />

continuous redevelopment options are being considered for this area just south<br />

of the San Bernardino International Airport Strategic Area and north of the<br />

Southeast Strategic Area.<br />

• SBIA and Downtown Strategic Area: Many improvement plans for street lighting,<br />

parking, mixed-use development, and pedestrian-friendly street walks are<br />

underway for all areas surrounding SBIA and the historic core of the Downtown.<br />

• Corridor Strategic Area: Lot consolidations, density bonuses, and public<br />

amenities construction are the major plans on adjacent portions of land along a<br />

few corridors that include Mount Vernon Avenue, E Street, Baseline Street and<br />

Highland Avenue.<br />

Upland<br />

Changes recommended in the Circulation Element of Upland’s General <strong>Plan</strong> include:<br />

Yucaipa<br />

• Construct Campus Avenue between 20th and 23rd streets as a four-lane<br />

roadway<br />

• Widen 8th street between San Antonio Avenue to the east city limit<br />

• Redesign Foothill Boulevard between San Antonio and Redding Way, and at<br />

Memorial Park on the south side east of Eleventh Avenue, to provide on-street<br />

parking for commercial establishments and to increase the right-of-way<br />

Compared to the average 4 dwellings per acre, the level of development in the city is only 1.3 homes per<br />

acre, suggesting a significantly low-intensity development.<br />

The Land Use <strong>Plan</strong> designates greater importance to rural living in the Wildwood canyon and North<br />

Bench areas, and a few portions in the Dunlap acres. Multi-family residential uses are allocated mainly to<br />

July 11, 2007 85


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

the central core, and commercial nodes are for specific nodes such as Oak Glen and Bryant, Yucaipa and<br />

5 th , Sand Canyon and Yucaipa, and Oak Glen and Yucaipa.<br />

The City zoned the land south of the I-10 freeway and east of the Live Oak Canyon Road as a master<br />

<strong>Plan</strong>ned Development with a mix of residential and commercial uses. In the Crafton Hills area, adjacent<br />

to the City of Redlands, the City of Yucaipa approved a 59-lot <strong>Plan</strong>ned Development that fronts onto<br />

Bryant Street and Mill Creek Road. The City is proposing to connect to the City of Redlands by Crafton<br />

Hills Drive, which is a limited access collector.<br />

July 11, 2007 86


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5. REGIONAL PLANNING ACTIVITIES<br />

5.1 <strong>Omnitrans</strong> sbX (BRT) Systemwide <strong>Plan</strong><br />

The Systemwide <strong>Transit</strong> Corridor <strong>Plan</strong> for the San Bernardino Valley – The plan identified seven key<br />

transit corridors (Figure 5-1) for the introduction of higher quality transit service (higher frequency,<br />

express or BRT services) to attract choice riders and effect a positive transit mode shift. Major transit<br />

corridors include Corridor 1 (E Street), Corridor 2 (Foothill East), Corridor 3 (Foothill West), Corridor 4<br />

(Mountain & Euclid), Corridor 5 (San Bernardino Avenue), Corridor 6 (Holt & Fourth Street), and Corridor<br />

7 (Grand & Edison). Corridor 1 was identified as the highest priority corridor with the planned<br />

implementation of the E Street sbX in FY 2010/11. The remaining corridors form the framework for the<br />

establishment of a base 5 fixed route network, with the possible introduction of limited stop or full express<br />

services as a precursor to sbX network expansion.<br />

5<br />

Base routes are the core routes in the transit system, operating in a straight-line route structure on the main arterial roads<br />

throughout the service area. They are oriented as much as possible to the main travel destinations and corridors, and form a grid<br />

route network that can provide a basic level of mobility to residents.<br />

July 11, 2007 87


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-1: <strong>Omnitrans</strong>' Major Systemwide <strong>Transit</strong> Corridors<br />

July 11, 2007 88


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.2 <strong>Omnitrans</strong> sbX E Street Corridor Project<br />

The E Street <strong>Transit</strong> Corridor Project – Phase I Final Alternatives Analysis Report (12/07/05)<br />

recommended the implementation of sbX BRT service to the E Street corridor in FY 2011/12 (Figure 5-2).<br />

The 16 mile Bus Rapid <strong>Transit</strong> (BRT) Locally Preferred Alternative (LPA) for the E Street Corridor in the<br />

Cities of San Bernardino and Loma Linda has been adopted by the <strong>Omnitrans</strong> Board of Directors and the<br />

San Bernardino Associated Governments (SANBAG) Board (both on December 7, 2005). Both the San<br />

Bernardino and Loma Linda City Councils have approved it as well. <strong>Omnitrans</strong> submitted a request to the<br />

Southern California Association of Governments (SCAG), the Metropolitan <strong>Plan</strong>ning Organization (MPO)<br />

for the Los Angeles Region, to have the existing financially constrained Regional Transportation <strong>Plan</strong><br />

(RTP) and the RTIP for the SCAG Region amended to include the LPA. SCAG took action to amend the<br />

RTP during July 2006. With the submittal of this New Starts/Small Starts Report to FTA, <strong>Omnitrans</strong> is<br />

prepared to submit a request to FTA for permission to enter the Project Development Process for the<br />

adopted LPA.<br />

The LPA was selected with broad local support in the corridor, both from key stakeholders and the<br />

general public. Several public workshops were held during 2005 to present corridor alternatives and to<br />

receive input on the selection of the LPA. Stakeholders and the public felt that the LPA will provide more<br />

reliability, higher frequencies of service and faster speeds than the Baseline Alternative. They perceived<br />

that it will increase transit usage by choice rider groups and reduce traffic congestion, save energy, help<br />

improve the local economy and improve air quality in the fast growing E Street Corridor.<br />

Compared to the TSM Baseline Alternative, <strong>Omnitrans</strong> can “Make the Case” for high-quality BRT service<br />

(which is branded as “San Bernardino Express” or “sbX”) that will:<br />

• Have speeds and travel times that are superior to the limited stop bus service<br />

that was tested as part of the TSM Baseline because of the implementation of<br />

exclusive lanes in congested areas. (40.2 minutes end-to-end travel time for the<br />

LPA versus 55.9 minutes (TSM Route 2 – Limited Stop Service) versus 69<br />

minutes (Route 2 – Local Service));<br />

• Have in-vehicle travel times competitive with autos in the corridor during peak<br />

commute hours (40.2 minutes versus 39.5 minutes);<br />

• Have better reliability because BRT travels in dedicated lanes or has preferential<br />

treatment;<br />

• Have better fleet utilization and will be able to meet the five-minute headway<br />

threshold for the Horizon Year 2030 with fewer vehicles (23 versus 31 for the<br />

TSM Limited Stop Service);<br />

• Attract 13,200 daily riders versus 9,860 on the TSM Limited for Horizon Year<br />

2030 6 ;<br />

• Attract 9,010 daily riders versus 6,650 on the TSM Limited for Opening Year<br />

2011 7 ;<br />

6<br />

Horizon Year 2030 ridership forecasts are based on a complete model run of the San Bernardino Valley Focus Model using Year<br />

2030 socioeconomic data and Year 2030 networks. Both transit alternatives assume five-minute headways on premium service in<br />

the E Street Corridor (Route 2 – Limited for TSM Alternative, BRT route for LPA).<br />

7<br />

Since Year 2011 socioeconomic data and Year 2011 networks are not available, Opening Year 2011 ridership forecasts are based<br />

on an interpolation of data from two model runs of the San Bernardino Valley Focus Model using Year 2000 and Year 2030<br />

socioeconomic data and networks. Both transit alternatives (TSM Baseline and LPA) for both years (2000 and 2030) assume tenminute<br />

headways on premium service in the E Street Corridor.<br />

July 11, 2007 89


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Achieve a very high corridor rider benefits and an excellent cost-effectiveness<br />

ratio of $3.79 cents per hour of benefit in the Horizon Year, and a costeffectiveness<br />

ratio of $12.94 in the Opening Year;<br />

• Have attractive, well-designed vehicles and stations/stops that will enhance<br />

adjacent land uses and help stimulate the development of TODs;<br />

• Will help stimulate economic development in the E Street <strong>Transit</strong> Corridor’s five<br />

redevelopment areas; and<br />

• Be affordable at $138,802,000 (Base Year Capital Costs), an average of less<br />

than $10 million per mile, and cheaper to operate at five-minute headways than<br />

the TSM Limited ($9,759,000 in annual operating costs versus $12,530,000 for<br />

the TSM Limited). At Opening Year 2011 headway of ten minutes, BRT O & M<br />

Costs are under $4,000,000 per year, which is less than 5% of <strong>Omnitrans</strong>’<br />

projected systemwide operating budget of $80,400,000 for 2011. This makes the<br />

E Street Project eligible for a “medium” financial rating from FTA.<br />

In terms of choice of modes, from early on in the corridor planning process the development of BRT was<br />

broadly supported by key stakeholders and the general public. It was felt that BRT was more suitable to<br />

the corridor than Light Rail <strong>Transit</strong> (LRT) and would be cheaper to construct and operate.<br />

The introduction of a limited stop express as a Route 2 overlay has been considered in the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP Scenario 2 and 3 service plans to develop a market for higher speed transit along the E<br />

Street corridor. sbX bus storage and maintenance needs have been considered in the Capital/Facilities<br />

<strong>Plan</strong> and Financial <strong>Plan</strong>. Implementation of sbX will require some East Valley route restructuring to<br />

accommodate east-west transfers to sbX. A Route 2 limited stop express (proposed Route 302) is<br />

recommended as a precursor to the E Street sbX in the Partially Constrained Scenario (Scenario 2,<br />

discussed in Chapter 12). Although Route 302 is not included in the recommended Scenario 1<br />

(Financially Constrained Scenario, discussed in Chapter 10), it could be considered for implementation in<br />

the later years of the SRTP timeframe if overall systemwide ridership and farebox revenue recovery<br />

improve. If implemented, Route 302 would be discontinued with the implementation of the E Street sbX.<br />

In addition, the reduction of Route 2 Local frequency to 30 minutes should be considered.<br />

July 11, 2007 90


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-2: Locally Preferred E Street sbX Alternative<br />

July 11, 2007 91


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.3 SCAG 2004 Regional Transportation <strong>Plan</strong> (RTP)<br />

The RTP, a 20-year transportation blueprint adopted by the Southern California Association of<br />

Governments (SCAG), outlines a long-range strategy to meet mobility, financial, and air quality<br />

requirements. This plan must show how the region will meet federal air quality standards and other<br />

needs based on realistic estimates of transportation funding. Only programs and projects outlined in the<br />

final document are eligible for state and federal funding. The Regional Transportation <strong>Plan</strong> establishes<br />

transportation priorities and identifies projects that support its goals.<br />

The RTP is updated every three years. The 2004 RTP, referred to as Destination 2030, was adopted in<br />

April 2004. SANBAG staff, working with all 24 cities in San Bernardino County, provided extensive input<br />

to this regional plan and submitted future county transportation projects for inclusion. This document<br />

reflects population, housing, employment, environmental, land use forecasts, and technology changes for<br />

the Southern California region.<br />

Decision 2030 goals include:<br />

• Maximize mobility and accessibility.<br />

• Ensure safety and reliability.<br />

• Preserve transportation system.<br />

• Maximize transportation system productivity.<br />

• Protect the environment.<br />

• Encourage land use and growth patterns that complement the transportation<br />

system.<br />

Public transit priorities include:<br />

• BRT: Designed to provide fast, high-quality bus service to attract choice riders<br />

and effect a mode shift to reduce congestion.<br />

• Metrolink Commuter Rail: Provide the backbone of a mass transit regional<br />

commute service.<br />

• Land Use – <strong>Transit</strong> Coordination: The regional transit program calls for<br />

increased and better coordination between transit and land use planning.<br />

• <strong>Transit</strong>-Oriented Development (TOD): Local and regional planning agencies<br />

are encouraged to promote TOD initiatives cooperatively along major transit<br />

corridors.<br />

• <strong>Transit</strong> Centers: Develop a network of transit-based centers and corridors,<br />

supported by in-fill development that maximizes use of existing infrastructure,<br />

supports increased ridership, reduces air pollution, and preserves green space<br />

and undeveloped areas.<br />

The <strong>Omnitrans</strong> sbX Systemwide <strong>Plan</strong>, <strong>Omnitrans</strong> sbX E Street Corridor Project, SANBAG Redlands<br />

Passenger Rail <strong>Plan</strong> and SCAG Compass 2% are strategies that clearly reflect the goals of Decision<br />

2030.<br />

July 11, 2007 92


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.4 SANBAG Redlands Passenger Rail Station Area <strong>Plan</strong><br />

On April 4, 2007, the SANBAG Board of Directors approved the Redlands Passenger Rail Station Area<br />

<strong>Plan</strong>. Redlands Passenger Rail is a planned passenger rail service between the planned San Bernardino<br />

Transcenter and the City of Redlands along the Redlands Subdivision. The Redlands Passenger Rail<br />

Station Area <strong>Plan</strong> identifies nine possible Redlands Passenger Rail stations with TOD along the BNSF<br />

Redlands Subdivision right-of-way (Figure 5-3). Possible station sites include the proposed San<br />

Bernardino Transcenter, Mill Street, Orange Show Road, Tippecanoe Avenue, Mountain View Avenue,<br />

California Street, Alabama Street, Downtown Redlands (three possible alternatives), and Grove Street.<br />

The introduction of this rail commuter service will impact east-west <strong>Omnitrans</strong> ridership in the East Valley<br />

and also require East Valley service restructuring as feeders around the final Redlands Passenger Rail<br />

stations. TOD development proposed around each station will concentrate densities and activities,<br />

potentially generating increased local transit demand. Shuttle service between specific stations and San<br />

Bernardino International Airport, Loma Linda Medical University and Medical Center, Loma Linda VA<br />

Hospital, University of Redlands, Crafton Hills College and the planned Yucaipa Transcenter may be<br />

warranted. With the exception of the initial San Bernardino Transcenter development, Redlands<br />

Passenger Rail <strong>Plan</strong> impacts are anticipated to occur beyond the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe.<br />

July 11, 2007 93


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-3: Redlands Passenger Rail Alignment and Stations<br />

July 11, 2007 94


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.5 SANBAG Public <strong>Transit</strong>-Human Services Transportation<br />

Coordination <strong>Plan</strong> for San Bernardino County<br />

SANBAG is currently developing a Public <strong>Transit</strong>-Human Services Transportation Coordination <strong>Plan</strong> for<br />

San Bernardino County.<br />

With the reauthorization in 2005 of the federal transportation bill, titled SAFETEA-LU, new regulations<br />

specify that it is desirable for federal monies to be coordinated and consolidated in “a process through<br />

which representatives of different agencies and client groups work together to achieve any one or all of<br />

the following goals: more cost-effective service delivery; increased capacity to serve unmet needs;<br />

improved quality of service; and services which are more easily understood and accessed by riders.”<br />

Moreover, FTA mandates that projects receiving FTA 5310, JARC or New Freedom funds be part of the<br />

plan adopted by SANBAG – addressing ways to improve service through coordination and/or<br />

consolidation. This plan will look at effectiveness and efficiency of governance, administration,<br />

maintenance and operations. It will explore options for increased service levels, increased mobility for all<br />

consumers, better quality of service to riders, cost savings (especially on a unit cost basis), upgraded<br />

maintenance programs, better reporting and record keeping, more equitable cost sharing between<br />

participating agencies and individuals, more professional delivery of transportation services, and safer<br />

transportation services.<br />

SAFETEA-LU regulations will also affect the plan. Several key factors to consider are:<br />

• There will be more money for transit.<br />

• There is a new program (“New Freedom”) that will fund new services for elderly<br />

and disabled riders as well as ADA services that go beyond ADA requirements.<br />

• The rules for the plan do not specify a lead organization.<br />

San Bernardino County and the project partners face many new challenges in the preparation of a<br />

strategic plan, including:<br />

• Competition for local public transportation funds;<br />

• Legislative constraints; and<br />

• A lack of transportation continuity and availability among the service agencies<br />

utilizing existing transportation providers.<br />

The further coordination of transportation services will enable the multitude of agencies and organizations<br />

to:<br />

• Maximize the use of existing resources;<br />

• Increase the efficiency in delivering services;<br />

• Improve access to users; and<br />

• Reduce or eliminate duplication and redundancy.<br />

<strong>Transit</strong>, and more specifically mobility, has played an important role in the daily living requirements of<br />

older adults and the disability community. To date, for the most part, only those affiliated with a specific<br />

agency, organization or program have been able to access transportation services, with only limited<br />

July 11, 2007 95


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

services available to the general public. One may assume that many of the more discretionary trip needs<br />

of these populations have not been met.<br />

<strong>Transit</strong> providers and human service agencies have often worked to coordinate services, but barriers<br />

sometimes limit the success of these efforts. These barriers include regulatory restrictions, funding<br />

requirements and differing perceptions. For example, both Medicaid and ADA have scheduling<br />

requirements that may make it difficult to coordinate use.<br />

New directions in state and national policy on a variety of fronts show an increasing role and heightened<br />

expectations for public transit. Project partners face many challenges in fulfilling that role:<br />

• Revenue and funding constraints, including greater dependence on subsidies;<br />

• Escalating operating costs;<br />

• Changing demographic and settlement patterns that make providing transit<br />

difficult and potentially inefficient if not appropriately coordinated or consolidated;<br />

and<br />

• Rising expectations for transit's social mandate, e.g.,<br />

o<br />

o<br />

Increase the accessibility of persons with economical and transportation<br />

disadvantages 8 ; and<br />

Satisfying the needs of the population centers within fiscal and fleet size<br />

constraints.<br />

SANBAG’s Public <strong>Transit</strong> – Human Services Transportation Coordination <strong>Plan</strong> being conducted for San<br />

Bernardino County has the following objectives:<br />

1. Conduct best practices review (other jurisdictions with operating characteristics similar to<br />

those of the SANBAG/regional paratransit services service area);<br />

2. Expand stakeholder participation through a comprehensive approach to outreach and<br />

consultation;<br />

3. Identify opportunities to maximize the use of existing resources;<br />

4. Identify alternate models for governance, service delivery and operations;<br />

5. Increase the efficiency in delivering services in response to management/institutional<br />

issues; and<br />

6. Improve access (and mobility) for customers.<br />

This Coordination <strong>Plan</strong> is scheduled to be completed in the Fall of 2007.<br />

The implications of Coordination <strong>Plan</strong> outcomes for <strong>Omnitrans</strong> include:<br />

• From an administrative perspective, a possible opportunity to assume a greater<br />

mobility manager role; and,<br />

8<br />

The Americans with Disabilities Act (ADA) creates strategic planning challenges and financial pressures that are unprecedented<br />

within the transit and paratransit industry.<br />

July 11, 2007 96


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• From an operations/service delivery perspective, a need to ensure that the<br />

Access shared-ride ADA public paratransit services not inherit the transportation<br />

requirements (including the administrative and financial burden) for programspecific<br />

travel requirements.<br />

<strong>Omnitrans</strong> has recently embarked upon a marketing/communication strategy to educate program<br />

providers, organizations, and agencies as to the effective use of subscription trip bookings to ensure the<br />

consistent and reliable transportation of program participants. These efforts will require ongoing dialogue<br />

with County officials to ensure the coordination of Public <strong>Transit</strong> – Human Services Transportation<br />

Coordination <strong>Plan</strong> outcomes.<br />

5.6 SANBAG Comprehensive Transportation <strong>Plan</strong> (CTP)<br />

SANBAG is currently updating San Bernardino County’s CTP to the year 2030. Goals, objectives,<br />

performance indicators and alternative transportation scenarios are being defined and analyzed to create<br />

a preferred plan alternative. In cooperation with local agencies, this work has involved updating the<br />

socioeconomic forecasts to the year 2030 and the base year streets and highway network for the CTP<br />

traffic model.<br />

The updated CTP will:<br />

• Identify transportation improvements and strategies to enhance system<br />

performance and achieve emission reductions to meet air quality requirements;<br />

and<br />

• Integrate goods movement strategies currently under development and serve as<br />

a basis for action programs to be implemented through the Congestion<br />

Management Program.<br />

Public transit plays a significant role in the development of CTP goals and objectives. Initiatives such as<br />

the <strong>Omnitrans</strong> sbX Systemwide <strong>Plan</strong>, the <strong>Omnitrans</strong> sbX E Street Corridor Project and the SANBAG<br />

Redlands Passenger Rail Station Area <strong>Plan</strong> play a critical role in the development of transportation<br />

scenarios and congestion management strategies.<br />

5.7 SCAG Compass Blueprint 2% Strategy<br />

Growth in Southern California is expected to result in the addition of another six million people (another<br />

two “Chicago’s”) over the next 30 years. In 2001, the Southern California Association of Governments<br />

(SCAG) began an ambitious study to examine how the region should grow. In 2004, the results indicated<br />

that if growth were concentrated in only 2% of the land area of Southern California, the region could<br />

accommodate the growth while still maintaining the single family neighborhoods that make up Southern<br />

California cities. But in that 2% area, largely in built up areas and along existing and proposed transit<br />

corridors, densities would have to increase and efforts would have to be made to integrate land uses so<br />

as to improve the jobs-housing balance. Since 2004, SCAG has been undertaking a series of studies,<br />

entitled The Compass Blueprint 2% Strategy, which is a guide for how and where to implement SCAG’s<br />

Growth Vision for Southern California. While recognizing valuable quality of life goals, the Compass<br />

Strategy provides a guide to local decision-makers, demonstrating how minor changes in land use and<br />

transportation decision-making can reap unexpected economic, mobility, and environmental benefits<br />

locally, sub-regionally and regionally.<br />

The Strategy proposes increasing the region’s mobility by encouraging transportation development and<br />

transit-oriented development focusing on in-fill development and redevelopment opportunities. SCAG<br />

and the Compass Blueprint team of consultants are offering free planning services to assist local<br />

July 11, 2007 97


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

governments (including SANBAG and the City of San Bernardino) with projects that support the Compass<br />

Blueprint Growth Vision.<br />

The SCAG findings as they relate to SANBAG are shown below. Initial opportunity areas were identified<br />

as part of the process. Currently, The Compass Blueprint 2% Strategy, concentrating on implementation<br />

tools, is ongoing throughout the region.<br />

The Compass Blueprint 2% Strategy – Implications for San Bernardino Valley<br />

In 2006, as part of SCAG’s Compass Blueprint 2% Strategy, SANBAG began to examine in more detail<br />

how anticipated growth in San Bernardino County could be accommodated. Building on the initial SCAG<br />

efforts, the first phase of the study involves identifying “opportunity” areas in the eastern portion of the<br />

San Bernardino Valley where growth would likely occur as shown in Figure 5-4. These opportunity areas<br />

include city centers, transit hubs or Transcenters, and other high-density growth areas.<br />

In addition to the SCAG/SANBAG 2% initiative, SANBAG is also examining the transit-oriented<br />

development of the proposed extension of the Metrolink service to Redlands. SANBAG is planning a 9.1<br />

mile extension connecting the Santa Fe Depot to proposed station locations in eastern San Bernardino<br />

County. The plan calls for a station at a proposed Transcenter at E Street and Rialto Avenue and six<br />

other stations along the alignment, ending at the University of Redlands.<br />

The plan was released in November 2006 and has been presented to the three involved cities.<br />

Recommendations for transit-oriented zoning changes are set out for the proposed stations. Some<br />

aspects of the extension remain to be worked out, including the location of a station in downtown<br />

Redlands.<br />

At the April 4, 2007 SANBAG Board meeting, the Board decided to continue studying the extension.<br />

While the extension is still several years away, approval was given for more in-depth studies, and for<br />

SANBAG to prepare an application for $75 million in federal funding. The agency has $75 million set<br />

aside from the County’s Measure I sales tax to pay for the $150 million project. With approval of the plan,<br />

the Cities of San Bernardino, Loma Linda, and Redlands will be asked to start considering land use<br />

changes around the proposed stations, such as denser housing, commercial development, pedestrian<br />

and bicycle paths and other amenities.<br />

July 11, 2007 98


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-4: Compass Strategic Opportunity Areas (in blue)<br />

Source: http://www.compassblueprint.org/files/pdf/SANBAG.pdf<br />

July 11, 2007 99


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.8 Gold Line Extension<br />

The Metro Gold Line Authority is proposing to extend the current Gold Line Light Rapid <strong>Transit</strong> system 16<br />

miles east from Pasadena, where it currently ends, to Montclair (Figure 5-5).<br />

Preliminary Engineering Studies are underway and federal funding for construction is expected, even<br />

though the alignment faces stiff competition in the City of Los Angeles from other proposed transit<br />

alignments. The first phase of the Gold Line extension, from Arcadia to Azusa, is scheduled for<br />

completion in 2010. The second phase, to Montclair’s existing Transcenter, would be completed by 2015.<br />

As part of its efforts to look at ways to increase ridership, the Metro Gold Line Authority is currently<br />

undertaking an extensive transit-oriented development (TOD) study, evaluating stations along the<br />

proposed 16 mile extension. Each city along the corridor is at different development stages in regards to<br />

TOD readiness and acceptance.<br />

The TOD analysis is particularly relevant to <strong>Omnitrans</strong> as the alignment currently is proposed to end at<br />

the Montclair Transcenter, part of <strong>Omnitrans</strong>’ service area, and there is now discussion underway about<br />

extending the alignment further east to Ontario Airport. Montclair has recently completed the North<br />

Montclair Specific <strong>Plan</strong>, which significantly increases the range of uses and proposed densities in and<br />

around the Transcenter into the area in order to build on the existing commercial center and support<br />

transit initiatives, such as the Gold Line extension and <strong>Omnitrans</strong> efforts to enhance transit connections to<br />

other parts of the San Bernardino Valley. The Gold Line TOD Study will build upon the City’s efforts and<br />

provide additional tools for implementing Montclair’s vision for a vibrant Montclair LRT station area and<br />

Transcenter. The Study is underway and is expected to be completed in December, 2007.<br />

July 11, 2007 100


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-5: Proposed Gold Line Extension<br />

July 11, 2007 101


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.9 SCRRA Strategic Assessment (Metrolink)<br />

SCRRA’s Strategic Assessment is a conceptual plan for the development of the Metrolink commuter rail<br />

system through 2030. While the potential for increasing demand is clearly recognized, the plan prioritizes<br />

demand-driven service expansion with operational and fiscal realities.<br />

Six Service Scenarios were developed for the SCRRA Strategic Assessment. Under each scenario,<br />

service levels, ridership and costs/benefits were projected for 2010, 2015, 2020 and 2030. Possible<br />

service levels were determined for each line. For the lines serving the <strong>Omnitrans</strong> service area:<br />

• San Bernardino Line service levels would remain constant at 34 trains/weekday<br />

through 2015 and be increased to 48 in 2015.<br />

• Inland Empire-Orange County Line service levels will rise from the current 12<br />

trains/weekday to 20 in 2010 and 22 in 2015.<br />

• Riverside Line service levels will rise from the current 12 trains/weekday to 22 by<br />

2015.<br />

If the increased service levels on the Inland Empire-Orange County Line are implemented, demand may<br />

increase for enhanced <strong>Omnitrans</strong> feeder service to the San Bernardino Metrolink Station within the <strong>2008</strong>-<br />

<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe. Similar demand for <strong>Omnitrans</strong> feeder services to stations along the<br />

San Bernardino Line may not materialize until the next SRTP cycle. <strong>Omnitrans</strong> planners will work closely<br />

with SCRRA planners to monitor parking capacity at Metrolink stations within the <strong>Omnitrans</strong> service area<br />

to determine if enhanced feeder services are required to offset limited station parking capacity.<br />

5.10 Intelligent Transportation Systems (ITS)/Traffic Management <strong>Plan</strong>s<br />

Travel in the San Bernardino Valley will increase as new development comes on line and as the<br />

population grows. SANBAG, SCAG, and a number of San Bernardino Valley communities are actively<br />

involved in a range of ITS/Traffic Management initiatives to better manage traffic congestion and increase<br />

roadway capacity without increasing the number of traffic lanes.<br />

5.10.1 INLAND ITS STRATEGIC PLAN<br />

SANBAG has joined with a wide range of regional stakeholder agencies to develop a Regional ITS<br />

Strategic <strong>Plan</strong>. <strong>Omnitrans</strong>, along with other neighboring transit providers, is a Regional ITS Strategic<br />

<strong>Plan</strong> stakeholder. Regional ITS Strategic <strong>Plan</strong> objectives are to apply ITS techniques and approaches to<br />

make highways, roadways, and transit systems operate more safely and efficiently. San Bernardino<br />

County already has a number of working ITS applications, including:<br />

• 1-800-COMMMUTE telephone line, which provides information on roadways,<br />

transit, rideshare, and many other commute alternatives;<br />

• Closed-circuit TV cameras to help identify and respond to accidents more<br />

quickly;<br />

• Electronic sensors in freeways, which transmit vehicle counts to a traffic<br />

management center and provide up-to-the-minute traffic conditions;<br />

• Computerized traffic signal control systems to better monitor and respond to local<br />

traffic congestion;<br />

July 11, 2007 102


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Smart call boxes, which gather traffic count data and transmit that information to<br />

traffic management centers and the California Highway Patrol;<br />

• Changeable message signs on the freeways to alert motorists to accidents or<br />

route changes; and<br />

• Traffic signals at freeway entrance ramps to help traffic merge more safely and<br />

attempt to keep the freeways moving.<br />

5.10.2 SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL SYSTEM<br />

PLAN<br />

In 1999, the SANBAG Board of Directors approved the development of a strategic plan for the crossjurisdictional<br />

interconnection and coordination of traffic signals in the San Bernardino Valley. Corridors<br />

and intersections were prioritized in a Tier 1 and Tier 2 implementation program. Tier 1 locations<br />

included 299 signals along major east-west streets along I-10 and Highway 60 and north-south streets<br />

that link or are adjacent to these freeways. Tier 2 locations include 294 signals along other major San<br />

Bernardino Valley corridors such as Foothill Blvd, Highland Street (east), the Mt.<br />

Vernon/Washington/Barton corridor, Euclid Avenue and Central Avenue. Funding was approved in<br />

August 2006. The project is estimated to be completed in 2007. Although there are no specific transit<br />

priority signal strategies, anticipated improvements in traffic circulation should benefit <strong>Omnitrans</strong> schedule<br />

adherence.<br />

5.10.3 SAN BERNARDINO COUNTY CARPOOL LANES<br />

There are over 43 miles of carpool lanes in San Bernardino County. The construction of an additional 18<br />

miles is planned in the near future. Current carpool lanes include:<br />

• A 9.9-mile segment of I-10 in Ontario and Montclair that opened in January 2000.<br />

• 8.5-miles of SR-71, the Chino Valley Freeway that opened in 1997.<br />

• A 10-mile segment of SR-60 in Chino, Ontario, and the unincorporated area of<br />

San Bernardino County that opened in 1997.<br />

• A 6-mile segment of SR-210 in Rancho Cucamonga and Fontana that opened in<br />

2001.<br />

• A 9-mile segment of SR-210 in Rancho Cucamonga and Upland that opened in<br />

the fall of 2002. (An additional five miles to the west through Claremont and La<br />

Verne in Los Angeles County opened at the same time).<br />

SANBAG is currently working with Caltrans to fund and construct an additional 18 miles of carpool lanes<br />

along the following corridors:<br />

• An 8-mile segment of SR-210 in Rialto and San Bernardino was scheduled to<br />

open in 2006.<br />

• A 6-mile segment on I-215 is under development through downtown<br />

San Bernardino and is scheduled for completion in 2007.<br />

• A 4-mile segment on I-215 from the Riverside County line north to I-10 through<br />

Grand Terrace and Colton. Project development for the preparation of an<br />

July 11, 2007 103


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Environmental Impact Report/Statement is underway. This phase of the project<br />

likely will extend through 2009.<br />

Carpool lanes serve as HOV lanes and are of strategic importance to the operation of commuter express<br />

bus services. <strong>Omnitrans</strong> will continue to work with SANBAG to plan for transit service using HOV lanes.<br />

Direct access ramps would be desirable to facilitate consistent travel times and enable more efficient<br />

operation of Route 90 in Riverside County.<br />

5.10.4 PARK AND RIDE LOTS<br />

Managed park and ride lots are located at Montclair Transcenter, Rancho Cucamonga (Highland east of<br />

Archibald), Rancho Cucamonga (Baseline west of I-15), Chino (Chino Avenue east of Highway 71),<br />

Bloomington (Cedar north of I-10) and Yucaipa (Hampton Road east of Yucaipa Blvd).<br />

Although managed park and ride lots in the San Bernardino Valley are associated with Metrolink service<br />

and carpool initiatives, they can play a strategic role in the development of regional express bus services.<br />

5.10.5 511 MOTORIST ASSISTANCE TRAVELER INFORMATION SYSTEM<br />

(MATIS)<br />

Los Angeles SAFE/MTA are the lead agencies in the development of an interactive website to provide<br />

regional traffic and transit information. SANBAG is a participant in this project. Similar to the 511 system<br />

in the San Francisco Bay area, this Southern California initiative can evolve to include transit trip planning<br />

capabilities. The project should be operational in <strong>2008</strong>/09.<br />

5.10.6 CITY OF ONTARIO TRANSPORTATION SYSTEMS COMMUNICATIONS<br />

MASTER PLAN<br />

The City of Ontario has initiated a Master <strong>Plan</strong> to maximize the efficiency of its existing ITS infrastructure<br />

and to design and implement advanced ITS to better manage traffic circulation. <strong>Omnitrans</strong> is a<br />

stakeholder in the Master <strong>Plan</strong> process. The City is currently creating a draft plan to help secure funding.<br />

At this stage the plan does not include any transit signal priorities, but the City has expressed a<br />

willingness to improve transit circulation by the real time management of signal timing through its<br />

communication control center.<br />

5.10.7 E STREET TRANSIT CORRIDOR PROJECT<br />

The City of San Bernardino has expressed a willingness to work closely with <strong>Omnitrans</strong> on the planning<br />

and implementation of the E Street sbX. Queue jump lanes, transit only lanes, transit signal prioritization<br />

and signal coordination are under consideration to improve sbX and local route circulation along the E<br />

Street corridor. <strong>Omnitrans</strong>’ Siemens Automatic Vehicle Location and Control (AVLC) system incorporates<br />

a transit signal priority transponder capability for the eventual integration with a transit signal priority<br />

application along the E Street corridor.<br />

5.11 Federal and State Compliance Information<br />

5.11.1 ENVIRONMENTAL JUSTICE<br />

Environmental justice has become a significant issue for transit properties and the communities they<br />

serve. A 1994 Presidential Executive Order required every federal agency to “make achieving<br />

environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately<br />

high and adverse human health or environmental effects of its programs policies and activities on minority<br />

populations and low-income populations.” In the context of transit, this means that <strong>Omnitrans</strong> must<br />

ensure that its services are provided without discrimination towards minority or low-income populations.<br />

As a recipient of federal funding, <strong>Omnitrans</strong> is obligated to ensure that no one is denied the benefit of<br />

July 11, 2007 104


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

transit service on the basis of race, color, national origin or economic status. In order to evaluate the<br />

current situation the 2000 Census data were analyzed using GIS techniques.<br />

San Bernardino has a large minority population (here defined as all non-whites and Hispanic whites) that<br />

is widely dispersed throughout the <strong>Omnitrans</strong> service area. Minority populations are evenly distributed<br />

throughout the service area but are generally higher in the East Valley than the West Valley. However,<br />

the East Valley areas of Redlands, Yucaipa and Highland generally have a lower proportion of minority<br />

residents.<br />

In order to assess the degree to which <strong>Omnitrans</strong> meets Title VI of the federal regulations, a spatial<br />

analysis was conducted comparing populations of low-income groups and minorities (LIM) with the<br />

presence of transit services and facilities. The spatial distribution of the LIM population is shown in Figure<br />

5-6 and Figure 5-7. These population maps were then evaluated against four sets of route maps based<br />

on service coverage and frequency to determine if the LIM populations received better or worse service<br />

than non-LIM populations.<br />

July 11, 2007 105


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-6: Low-Income and Minority Population Beyond 15-Minute Service Area (West Valley)<br />

July 11, 2007 106


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-7: Low-Income and Minority Population Beyond 15-Minute Service Area (East Valley)<br />

July 11, 2007 107


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-8: Low-Income and Minority Population Beyond 30-Minute Service Area (West Valley)<br />

July 11, 2007 108


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-9: Low-Income and Minority Population Beyond 30-Minute Service Area (East Valley)<br />

July 11, 2007 109


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-10: Low-Income and Minority Population Beyond 60-Minute Service Area (West Valley)<br />

July 11, 2007 110


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-11: Low-Income and Minority Population Beyond 60-Minute Service Area (East Valley)<br />

July 11, 2007 111


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

SERVICE<br />

The three sets of service maps were based on a half-mile walking distance to a bus route, which<br />

represents the current <strong>Omnitrans</strong> standard. The first map was limited to the network of services that<br />

operate every 15 minutes or better (Figure 5-6 and Figure 5-7). The second map was based on services<br />

that operate every 30 minutes or better (Figure 5-8 and Figure 5-9), while the final map was based on all<br />

services that operate every 60 minutes or better (Figure 5-10 and Figure 5-11).<br />

In the next step of the analysis the populations living within a half-mile of each level of service (15-minute,<br />

30-minute, or all headways) were determined. The data drawn from the maps in Figure 5-6 through<br />

Figure 5-11 were then used to calculate the total populations, LIM and non-LIM populations within a halfmile<br />

walking distance of the service. The results consistently found that the populations within the<br />

walking distance zone had a higher proportion of LIM residents to non-LIM residents. For example, the<br />

proportion of LIM residents within a half-mile of any bus service was 55.3%, compared to the total service<br />

area proportion of 52.4% LIM residents. This population of LIMs also represents 89.1% of all LIMs living<br />

in the service area (Figure 5-12).<br />

Figure 5-12: LIM and Non-LIM Populations Served by <strong>Omnitrans</strong><br />

Total<br />

POP<br />

Total<br />

Non-<br />

LIM<br />

Total<br />

LIM<br />

%<br />

Non-LIM<br />

% LIM<br />

% of<br />

Total<br />

Non-LIM<br />

% of Total<br />

LIM<br />

Service Area 1,278,077 608,448 669,629 47.6% 52.4%<br />

Half-mile of Any (60-Minute and less) Service<br />

Within 1,078,367 481,927 596,440 44.7% 55.3% 79.2% 89.1%<br />

Not Within 199,710 126,521 73,189 63.4% 36.6% 20.8% 10.9%<br />

30-Minute Service<br />

Within 824,994 338,191 486,803 41.0% 59.0% 55.6% 72.7%<br />

Not Within 453,083 270,257 182,826 59.6% 40.4% 44.4% 27.3%<br />

15-Minute Service<br />

Within 328,384 104,286 224,098 31.8% 68.2% 17.1% 33.5%<br />

Not Within 949,693 504,162 445,531 53.1% 46.9% 82.9% 66.5%<br />

FACILITIES<br />

The table in Figure 5-13 shows that at stops with benches or shelters, the proportion of LIM population<br />

exceeds that of the LIM in the general population. For example, 63.7% of the population within a halfmile<br />

of a shelter is LIM, compared to the overall system where 52.4% of the population within a half-mile<br />

of any stop is LIM. Overall 54.0% of the population within a half-mile of a stop with a shelter is LIM,<br />

compared to 33.9% that is not LIM.<br />

The maps in Figure 5-14 and Figure 5-15 illustrate the distribution of passenger facilities or amenities in<br />

the <strong>Omnitrans</strong> service area. The maps specifically identify bus stops with or without benches and<br />

shelters. An analysis was conducted to determine if <strong>Omnitrans</strong> was meeting its Title VI obligations by<br />

ensuring that the distribution of passenger amenities does not discriminate against LIM populations.<br />

July 11, 2007 112


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-13: Percentage of LIM and Non-LIM Populations Near <strong>Omnitrans</strong> Bus Stop Amenities<br />

Total<br />

POP<br />

Total<br />

Non-<br />

LIM<br />

Total<br />

LIM<br />

%<br />

Non-LIM<br />

% LIM<br />

% of Total<br />

Non-LIM<br />

% of<br />

Total LIM<br />

Service<br />

Area 1,278,077 608,448 669,629 47.6% 52.4% 0.0% 0.0%<br />

Half-mile walk of any Stop<br />

Within 1,093,288 491,846 601,442 45.0% 55.0% 80.8% 89.8%<br />

Not Within 184,789 116,602 68,187 63.1% 36.9% 19.2% 10.2%<br />

Half-mile walk of any Stop with bench<br />

Within 765,014 316,488 448,526 41.4% 58.6% 52.0% 67.0%<br />

Not Within 513,063 291,960 221,103 56.9% 43.1% 48.0% 33.0%<br />

Half-mile walk of any Stop with shelter<br />

Within 567,466 205,964 361,502 36.3% 63.7% 33.9% 54.0%<br />

Not Within 710,611 402,484 308,127 56.6% 43.4% 66.1% 46.0%<br />

July 11, 2007 113


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-14: Bus Stop, Benches, and Shelters (East Valley)<br />

July 11, 2007 114


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 5-15: Bus Stops, Benches, and Shelters (West Valley)<br />

July 11, 2007 115


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

5.11.2 CONTINGENCY FLEET<br />

<strong>Omnitrans</strong> has developed an Emergency Preparedness <strong>Plan</strong> and an Energy Contingency <strong>Plan</strong> to<br />

undertake appropriate corrective measures in case of emergencies relative to natural or human-caused<br />

disasters. Both plans are designed to provide “transparent” transportation services in the event of an<br />

emergency. The Energy Contingency <strong>Plan</strong> was updated in 2002 and renamed the Contingency Fleet<br />

<strong>Plan</strong>. To be in compliance with FTA requirements, the plan required this renaming. Otherwise, a new<br />

Contingency <strong>Plan</strong> would have had to be developed. The Contingency Fleet <strong>Plan</strong> more accurately<br />

describes the need for contingency buses and the purpose of a contingency fleet. The Contingency Fleet<br />

<strong>Plan</strong> not only includes issues pertaining to energy-related emergencies, but applies to all emergencies<br />

that require additional buses beyond <strong>Omnitrans</strong>’ normal complement.<br />

The FTA compliant Contingency Fleet <strong>Plan</strong> established the framework by which the contingency buses<br />

would be utilized by <strong>Omnitrans</strong> in response to an emergency.<br />

The Contingency Fleet at <strong>Omnitrans</strong> will consist of seven retired buses. The specific bus numbers will<br />

change as “better” or “newer” buses are retired. <strong>Omnitrans</strong>’ objective is to have about 5% of the fleet in a<br />

contingency status in preparation for emergencies. The reason for this is that in recent years increasing<br />

emphasis has been placed on inter-agency coordination and cooperation among emergency services.<br />

<strong>Omnitrans</strong> is an essential transportation provider. As such, <strong>Omnitrans</strong> needs to maintain a fleet of buses<br />

in a level of readiness to fill gaps in the regional transportation system. This contingency fleet of<br />

<strong>Omnitrans</strong> buses is ready for purposes of evacuation, emergency medical need, fire, or capacity needs.<br />

These needs are directly linked to <strong>Omnitrans</strong>’ Emergency Preparedness <strong>Plan</strong>. This fleet is also<br />

authorized for use as replacement vehicles for other vehicles being repaired in a long-term campaign.<br />

In cases of emergencies, <strong>Omnitrans</strong> will first utilize all of the existing fleet of service ready buses and<br />

operational spares. Once all of these buses have been placed into service, if there is an ongoing need<br />

for additional buses based on the emergency, <strong>Omnitrans</strong> will activate the contingency fleet. The Director<br />

of Maintenance, after consultation with the Director of Operations, will provide Operations buses from the<br />

contingency fleet to address the emergency. Once the emergency has expired, the contingency buses<br />

will be removed from service and returned to contingency status.<br />

In conjunction with <strong>Omnitrans</strong>’ Contingency Fleet <strong>Plan</strong> and <strong>Omnitrans</strong>’ Emergency Preparedness <strong>Plan</strong>,<br />

<strong>Omnitrans</strong> undertakes additional efforts directly related to emergency contingency planning. These<br />

efforts include actions to increase system passenger capacity, re-pricing services to meet short-term<br />

contingencies, and redesigning services to economize on fuel and equipment requirements.<br />

More detailed information can be obtained in <strong>Omnitrans</strong>’ 2002 Contingency Fleet <strong>Plan</strong> and in <strong>Omnitrans</strong>’<br />

Emergency Preparedness <strong>Plan</strong>.<br />

5.11.3 ADA COMPLIANCE<br />

Originally submitted in 1992, <strong>Omnitrans</strong>’ Americans with Disabilities Act (ADA) <strong>Plan</strong> was updated annually<br />

through 1998. In 1998, the Federal <strong>Transit</strong> Administration modified the annual ADA reporting<br />

requirements so that public fixed route transit operators were no longer required to file updates to their<br />

plans, so long as they had attained and continue to provide paratransit services to all persons who are<br />

unable to use the fixed route service because of limitations imposed by their disabilities, and if this<br />

paratransit service meets all of their required service criteria. As <strong>Omnitrans</strong> services did and currently<br />

continue to meet this standard, <strong>Omnitrans</strong> is no longer required to submit an annual update.<br />

However, this does not discount the other areas of ADA compliance that <strong>Omnitrans</strong> works to meet every<br />

day. These include:<br />

• Bus Stop Announcements/Passenger Assistance<br />

• Bus Stop Design Guidelines<br />

July 11, 2007 116


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Accessibility between Bus Stops and Facilities/Developments<br />

• Bus Stop Survey<br />

• Fare Requirements and Premium Service<br />

In addition to these elements, <strong>Omnitrans</strong> works closely with city staff, developers and social service<br />

organizations to encourage transit-friendly design and accessibility improvements when sites are<br />

relocated or built.<br />

5.11.4 BUS STOP ANNOUNCEMENTS/PASSENGER ASSISTANCE<br />

One of the main concerns of passengers is the feeling of security that is lost when riding a bus; people<br />

may lose track of where they are, or where they need to get off to reach their destination. This is no<br />

different for people with disabilities. It is a requirement under the ADA that all major destinations, major<br />

intersections and at transfer locations are announced on-board the bus. To ensure that this requirement<br />

is met, <strong>Omnitrans</strong> has been installing an automatic annunciator system. With this system, all major stop<br />

locations will be announced, and passengers can request a particular stop along a route be called out, no<br />

matter what the location. As of July 1, 2007, 100% of buses in service have this new technology<br />

installed.<br />

5.11.5 BUS STOP DESIGN GUIDELINES<br />

In October 2006, the Board of Directors approved <strong>Omnitrans</strong>’ Bus Stop Design Guidelines. These<br />

guidelines were developed with the assistance of member agencies and Caltrans. The document<br />

provides a set of guidelines that focus on the design aspects of bus stops including dimensions,<br />

accessibility, amenities, and procedural practices related to bus stop placement and construction.<br />

<strong>Omnitrans</strong> is currently working with staff members from local jurisdictions to ensure that the document is<br />

recognized as the document for bus stop design within the <strong>Omnitrans</strong> service area.<br />

5.11.6 ACCESSIBILITY BETWEEN BUS STOPS AND<br />

FACILITIES/DEVELOPMENTS<br />

An element critical to ADA compliance is one that is often beyond the control of <strong>Omnitrans</strong>: the path of<br />

travel between a bus stop and a particular facility’s or development’s entrance. As cities permit new<br />

construction, this is often considered and necessary steps are taken to assure accessibility, but in some<br />

instances, critical elements may be overlooked. When <strong>Omnitrans</strong> becomes aware of bus stops that are<br />

not accessible due to path of travel issues, staff is responsible to contact the city or county to make them<br />

aware of the problem as well. With this coordination, it is possible to slowly improve path of travel<br />

accessibility.<br />

5.11.7 BUS STOP SURVEY<br />

<strong>Omnitrans</strong>’ Marketing and <strong>Plan</strong>ning Departments will begin surveying each stop in the service area<br />

beginning mid-2007. The intention of the survey is to examine different characteristics of the stop<br />

including existing amenities, accessibility, path of travel to adjacent buildings, and overall stop conditions.<br />

The survey will help <strong>Omnitrans</strong> identify stops that are not compliant with the current Bus Stop Design<br />

Guidelines and methods for improving problematic stops.<br />

5.11.8 FARE REQUIREMENTS AND PREMIUM SERVICE<br />

As a Federal <strong>Transit</strong> Administration Grant Recipient, <strong>Omnitrans</strong> must allow individuals 65 years of age<br />

and over, persons with disabilities, and Medicare cardholders to ride fixed route services during the offpeak<br />

period for a fare that is not more than one-half the base fare charged other persons during the peak<br />

period. <strong>Omnitrans</strong> offers this half-fare all day long, and it is eligible to individuals 62 years of age and<br />

over, persons with disabilities, and Medicare cardholders.<br />

July 11, 2007 117


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

This requirement is for fixed route service only. It is not applicable to demand-response services, such as<br />

OmniLink, which are open to the general public, and which have their own fare structure. Under its fare<br />

structure, seniors, students, and persons with disabilities ride for half of the OmniLink regular fare.<br />

Access Service, <strong>Omnitrans</strong>’ paratransit service, also has a different fare structure. The fare for a trip<br />

charged to an Access rider cannot be more than twice the fare that would be charged to an individual<br />

paying full fare (i.e., without regard to discounts) for a trip of similar length, at a similar time of day, on<br />

<strong>Omnitrans</strong>’ fixed route system. This calculation includes transfer and premium charges applicable to a<br />

trip of similar length, at a similar time of day, on the fixed route system. A personal care attendant can<br />

ride free of charge.<br />

If a paratransit trip exceeds the minimum requirements for complementary paratransit provided under the<br />

ADA, <strong>Omnitrans</strong> is permitted, and does, charge a premium fare for the trip.<br />

July 11, 2007 118


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

6. SERVICE GOALS AND POLICIES<br />

Service goals define <strong>Omnitrans</strong>’ vision for the provision of public transit service. Service polices establish<br />

the standards and processes for achieving the service goals. Service policies, design standards and<br />

performance standards (Chapter 7) are interrelated and should clearly reflect the means to achieve an<br />

approved service goal.<br />

6.1 <strong>Omnitrans</strong> Service Goals and Objectives<br />

6.1.1 OMNITRANS SERVICE GOAL<br />

A goal is a generalized statement of what is to be achieved. The <strong>Omnitrans</strong> Mission Statement clearly<br />

defines the <strong>Omnitrans</strong> service delivery goal:<br />

“To provide the San Bernardino Valley with comprehensive mass<br />

transportation services which maximize customer use, comfort, safety,<br />

and satisfaction while efficiently using financial and other resources in<br />

an environmentally sensitive manner.”<br />

6.1.2 OMNITRANS SERVICE OBJECTIVES<br />

An objective is a more clearly defined target. Given high operating costs and a current farebox recovery<br />

ratio that fluctuates above and below the TDA 20% farebox recovery ratio minimum, “the primary<br />

<strong>Omnitrans</strong> operating objective is to achieve and maintain a combined fixed route and OmniLink<br />

farebox recovery ratio of 25%.”<br />

6.2 Service Principles<br />

Service principles define the purpose and direction for service policies and design standards. The<br />

principles are:<br />

Support County & Municipal Transportation and Land Use Goals. The service design guidelines<br />

should be supportive of the strategic transportation and land use goals of SCAG, SANBAG, and local<br />

jurisdictions.<br />

Support National, State and Regional Air Quality and Energy Goals. The service design guidelines<br />

should be supportive of air quality and energy goals.<br />

Customer Focus. The service design guidelines should address aspects of transit service that are of the<br />

highest importance to current and potential customers.<br />

Equal Application in All Municipalities. Guidelines should be defined and measured in a way that does<br />

not unfairly bias the allocation of service in favor of particular municipalities. The same guidelines should<br />

be applied equally across the region.<br />

Equity to All Residents. The guidelines should promote the availability of a basic level of transit mobility<br />

to all residents of the <strong>Omnitrans</strong> service area, particularly those without access to other modes of<br />

transportation. This principle also includes the provision of appropriate municipal infrastructure to support<br />

this basic level of service in all communities (e.g. streets designated for use by transit vehicles, accessible<br />

bus stops and bus shelters, and appropriate use of transit priority measures). This principle also ensures<br />

compliance with Federal Title VI requirements.<br />

Clarity. Service design guidelines, and their supporting reasons, should be clear and easy to understand<br />

by customers and other stakeholders.<br />

July 11, 2007 119


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Measurability. Each service design guideline should be measurable using reliable data that are currently<br />

available, or using data that are planned to be collected in the future.<br />

Quantify All Service Design Guidelines. Guidelines should be quantifiable and objective. Guidelines<br />

should not be open to subjective interpretation.<br />

Ease of Implementation and Monitoring. The service design guidelines should be straightforward for<br />

<strong>Omnitrans</strong> to implement and monitor on a continuous basis.<br />

Provide Guidelines that are Practical and Easy to Implement. The guidelines should lend themselves<br />

to consistent and continuous application by <strong>Omnitrans</strong> to identify transit services needing further<br />

investigation for possible adjustments.<br />

Cost-Effectiveness. The service design guidelines should ensure that all transit services in the region<br />

are as cost-effective as possible.<br />

Responsiveness to Changes in Urban Form. The service design guidelines should reflect the<br />

changing needs of communities for transit services as they reach various levels of urban development.<br />

Provide Guidelines for the Provision of <strong>Transit</strong> Coverage in New Developments. The guidelines<br />

should include evaluation criteria for requests to introduce transit service in new development areas.<br />

6.3 Productivity/Coverage Tradeoff<br />

Public transit is a means to an end. That end is the safe transport of people to places where they need or<br />

want to go. This fundamental role for transit cannot be lost in the operation, administration and planning<br />

of public transit services. Public transit not only provides an alternative for those with mobility choices,<br />

but often serves as the sole source of mobility for the transit-dependent.<br />

Publicly subsidized transit must balance efficiency with equity. That balance is reflected in competing<br />

productivity and coverage goals. The productivity goal maximizes the number of passengers carried per<br />

revenue hour, while the coverage goal maximizes equitable access to all parts of the community. A<br />

transit service that emphasizes productivity concentrates the majority of revenue hours along high-density<br />

corridors and/or during peak hours when the majority of the public travels. A transit service that<br />

maximizes coverage ensures equitable coverage in both high- and low-density areas and during peak<br />

and off-peak hours. The subsidy cost per passenger is lower and farebox recovery is higher with a<br />

productivity-oriented system than with a coverage-oriented system.<br />

At one time, the establishment of a balance between productivity and coverage goals was a value<br />

judgment. In the FY 2006-2011 <strong>Omnitrans</strong> SRTP, the <strong>Omnitrans</strong> Board approved a 65%<br />

productivity/35% coverage goal for the allocation of annual <strong>Omnitrans</strong> revenue hours. With high<br />

operating costs, a farebox recovery ratio fluctuating above and below the minimum TDA 20% farebox<br />

recovery ratio, and the establishment of a 25% systemwide farebox recovery goal, a<br />

productivity/coverage goal is no longer appropriate for <strong>Omnitrans</strong>. Although a 25% farebox recovery ratio<br />

has been established for <strong>Omnitrans</strong> fixed route and OmniLink services, a range of farebox recovery ratios<br />

has been recommended for various service categories by time period (refer to Sections 6.6.1 and 6.6.2)<br />

to facilitate the operation of less productive “coverage” routes.<br />

6.4 Service Deployment Standards<br />

New Service Warrants provide a tool for judging when new services or service extensions are<br />

appropriate. A new fixed route or route extension and/or OmniLink Service could be introduced when<br />

ridership forecasts based on population, school enrollment, or job density are sufficient to achieve<br />

minimum revenue recovery ratios by service type. New services should be introduced on a trial basis and<br />

July 11, 2007 120


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

given a minimum of nine months to achieve the required minimum farebox recovery ratio (refer to Section<br />

6.12).<br />

As new residential areas or business developments build out, there may initially be only sufficient<br />

potential ridership to support peak-only service. With eventual build-out, there may be sufficient potential<br />

ridership to support midday, evening and weekend service.<br />

6.4.1 FIXED ROUTE SERVICE DEPLOYMENT STANDARDS<br />

General guidelines for the introduction of new or increased fixed route service are summarized in Figure<br />

6-1.<br />

Figure 6-1: New Fixed Route Service Warrants<br />

Description Measure Proposed Target<br />

Coverage Gap Distance from nearest existing service<br />

Within ¼ mile weekdays and<br />

Saturdays, within ½ mile evenings,<br />

Sundays & Holidays<br />

Residential Market (to<br />

establish service)<br />

Minimum residential density – dwelling<br />

units/acre<br />

Express Bus: 4 du’s/acre in 20-mile<br />

catchment area<br />

Fixed Route Bus, hourly: 4<br />

du’s/acre<br />

Fixed Route Bus, 30-min: 7<br />

du’s/acre<br />

Employment Market<br />

(to establish service)<br />

Employment Market<br />

(to establish service)<br />

Performance (to<br />

continue service)<br />

Route Deviations<br />

Limited Stop Service<br />

Minimum commercial retail, office density –<br />

million square feet<br />

Minimum industrial/business park density –<br />

million square feet<br />

Farebox recovery and passengers per hour<br />

The ratio of through-passenger added time<br />

(in person-minutes) divided by the amount<br />

of time (in person-minutes) saved by<br />

passengers using the new deviation<br />

section, less the amount of added walk time<br />

for people in the section of the original<br />

route that is abandoned<br />

Minimum usage and frequency to consider<br />

Express Bus: 5 MSF in 20-mile<br />

catchment area<br />

Fixed Route Bus, hourly: 5 MSF<br />

Fixed Route Bus, 30-min: 8 MSF<br />

Express Bus: 11 MSF in 20-mile<br />

catchment area<br />

Fixed Route Bus, hourly: 11 MSF<br />

Fixed Route Bus, 30-min: 18 MSF<br />

Must show continued growth in first<br />

12 months of service, and achieve<br />

targets by the end of the twelfth<br />

month; subject to New Route<br />

Monitoring/Correction Procedure<br />

Less than 1 (i.e. a net saving in<br />

passenger time)<br />

Minimum 50 passengers/hour and<br />

10-20 minute frequency.<br />

limited stop service<br />

Sources: Transportation <strong>Plan</strong>ning Handbook, Institute of Transportation Engineers, 1992 / San<br />

Diego Municipal Code, Land Development Code, Trip Generation Manual, May 2003 / IBI Group /<br />

<strong>Omnitrans</strong><br />

Farebox Recovery and Passenger per Hour Needed: New service expansion and/or service frequency<br />

increases should always be assessed in terms of potential ridership. Prior to the recommendation of new<br />

services, an analysis of ridership potential is required. A Go/No Go decision should be based on<br />

probability of attracting sufficient ridership to meet the approved minimum farebox recovery ratio.<br />

July 11, 2007 121


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The formula for calculating the minimum number of passengers needed per revenue hour to meet<br />

minimum farebox recovery is:<br />

Passengers per service hour = (Operating cost per service hour X 0.25 * )/fare<br />

collected per passenger<br />

*Represents approved farebox recovery ratio<br />

The formula for calculating the potential ridership in a service area is:<br />

Potential passengers per service hour* = Population within ¼ mile of the<br />

proposed new transit service<br />

X per capita hourly transit trip rate<br />

*Benchmark is minimum hourly ridership needed to meet minimum<br />

farebox recovery<br />

In some cases, new services may only be warranted during weekday peaks when hourly productivity is<br />

sufficient to support farebox recovery requirements. In other cases, service requests to new business<br />

parks or new residential subdivisions could be considered through a joint partnership with major<br />

employers or developers to offset farebox recovery shortfalls when initial ridership during the early<br />

phases of development is too low to support the approved farebox recovery minimum.<br />

6.4.2 OMNILINK SERVICE DEPLOYMENT STANDARDS<br />

New OmniLink service should only be considered in cases where there is sufficient potential ridership to<br />

support approved OmniLink farebox recovery minimums, but insufficient ridership to support fixed route<br />

service. OmniLink service can also be considered in service areas with street patterns and widths that<br />

will not accommodate the safe and effective operation of fixed route transit service.<br />

6.4.3 ACCESS SERVICE DEPLOYMENT STANDARDS<br />

In accordance with ADA regulations, Access Service coverage will be adjusted with the expansion or<br />

decrease of fixed route service coverage.<br />

6.5 Service Monitoring/Evaluation Process<br />

Service performance standards are recommended in Chapter 7. A service monitoring and evaluation<br />

program is established to ensure that service is performing in accordance with approved efficiency and<br />

service quality standards.<br />

The proposed service monitoring and evaluation strategy is to facilitate a real time and proactive<br />

management of service efficiency and effectiveness. Service monitoring and evaluation will be conducted<br />

primarily by <strong>Omnitrans</strong> <strong>Plan</strong>ning, Operations, Finance, and Marketing staff. It will involve the monitoring<br />

of daily dispatch reports by road supervisors, the evaluation of monthly ridership and performance reports<br />

by <strong>Plan</strong>ning and Operations staff, field research and observations by <strong>Plan</strong>ning and Marketing staff, the<br />

July 11, 2007 122


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

review of budget variance by Finance staff and the monitoring of customer service commendation and<br />

complaint trends by Marketing staff. It will also include a formal schedule of management and Board<br />

reports. Performance reports to the senior management team and the Board will include a clear<br />

statement of trends, emerging issues and proposed actions to address issues.<br />

6.5.1 SYSTEMWIDE SERVICE MONITORING AND EVALUATION<br />

This will essentially include the monthly budget variance analysis and the review of commendations and<br />

complaint trends by Finance and Marketing staff, respectively.<br />

Budget Control<br />

Finance staff will review monthly budget variance reports and identify cost centers that are experiencing<br />

negative budget variance (expenditures exceed budgeted funds for the cost center). Monthly variance<br />

reports will be prepared for each cost center and the Director responsible will be required to explain the<br />

variance. Finance and the senior management team will develop strategies to correct unfavorable<br />

budgets through cost cutting strategies or the reassignment of funds from cost centers that are underspending.<br />

While monitoring and variance reporting should be conducted and minor adjustments should occur on a<br />

monthly basis, major corrections may have to more effectively dealt with through the bid cycle or on an<br />

annual basis.<br />

A monthly systemwide summary report will be presented to senior management and the Board’s Finance<br />

Committee, while a quarterly report will be made to the Board.<br />

Customer Service Trends<br />

Marketing staff will prepare and review monthly commendation and complaint reports to identify servicerelated<br />

trends, including service characteristics that are working well, service improvement requests and<br />

service quality or safety issues. Monthly reports will be presented to the senior management team and<br />

the responsible Directors will be required to take appropriate action. Quarterly reports will be made to the<br />

Board <strong>Plan</strong>ning and Productivity Committee (PPC).<br />

6.5.2 FIXED ROUTE SERVICE MONITORING AND EVALUATION<br />

Fixed route monitoring and evaluation will be primarily conducted by Operations and <strong>Plan</strong>ning staff.<br />

Day-to-Day Monitoring and Problem Solving<br />

Dispatchers and road supervisors will monitor dispatch “incident” reports on a daily basis to ensure quick<br />

response to operational issues. Problems that can not be resolved immediately in the field will be<br />

referred to an active Operations and <strong>Plan</strong>ning Committee for resolution.<br />

Operations and <strong>Plan</strong>ning Committee<br />

This is a critical action-oriented problem solving committee to correct operational problems that cannot be<br />

easily resolved in the field without impacting other aspects of service. These issues could include running<br />

time problems, passenger overloads, turning or bus stop access problems, or equipment problems.<br />

Membership on the Operations and <strong>Plan</strong>ning Committee should include operators (one from each<br />

division), road supervisors (again one from each division), union representation, a planner, a<br />

Maintenance representative and a Marketing staff representative. To effectively address emergent<br />

operating issues, the committee should meet on a two-week cycle, alternating meeting locations between<br />

the San Bernardino Facility and the West Valley Facility in Montclair.<br />

July 11, 2007 123


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Items brought for discussion and resolution at the committee should be kept active on the committee<br />

agenda until they are addressed. While it is possible that some can be resolved quickly, some may have<br />

to wait until the next bid or budget year. In any case, this forum enables an explanation to the Operations<br />

staff of what is required to correct the problem. An active Operations and <strong>Plan</strong>ning Committee improves<br />

communications and morale, and can speed up the solving of operating problems.<br />

“Adopt A Route” Program<br />

Essentially, an “adopt a route” program formalizes and structures field work for <strong>Plan</strong>ning and Marketing<br />

staff. Field work and time spent riding buses is important to service planning and marketing processes. It<br />

fosters a greater understanding of how the service operates. <strong>Plan</strong>ners and Marketing staff develop a<br />

better understanding of what might work and what might not work. It also affords an opportunity to talk to<br />

bus operators and their customers and gain valuable insight into planning better services.<br />

An “adopt a route” program can be established for selected <strong>Plan</strong>ning and Marketing staff. Each staff<br />

member can be assigned to a specific set of routes. Over time they become familiar with key<br />

destinations, bus stops and markets using the route. They become familiar with when and where a route<br />

is busy. Field logs should be kept for future reference. Field work can be identified in the objectives of<br />

those staff involved.<br />

Monthly Ridership and Performance Monitoring<br />

<strong>Plan</strong>ning staff will actively monitor and evaluate both systemwide and route-specific performance data on<br />

a monthly basis. Figure 6-2 provides an overview of measures and a reporting schedule.<br />

July 11, 2007 124


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 6-2: Fixed Route Ridership and Performance Monitoring and Evaluation<br />

Scope Performance Measure Review Cycle<br />

Senior<br />

Management<br />

Report Cycle<br />

Board PPC<br />

Reporting Cycle<br />

Board Reporting<br />

Cycle<br />

Revenue/Unlinked<br />

Passenger<br />

Monthly Quarterly Quarterly Annually<br />

Cost/Revenue Vehicle Hour Monthly Monthly Quarterly Annually<br />

Passengers/Revenue<br />

Vehicle Hour<br />

Monthly Monthly Monthly Monthly<br />

Annual Passengers/Capita Monthly Quarterly Annually Annually<br />

Farebox Recovery Ratio Monthly Monthly Monthly Monthly<br />

Systemwide<br />

On-Time Performance Monthly Monthly Monthly Monthly<br />

Preventable Collisions Monthly Monthly Annually Annually<br />

Passenger Complaints Daily Monthly Quarterly Annually<br />

Road Calls Monthly Monthly Annually Annually<br />

Cancelled Trips (No<br />

Vehicles or Operators<br />

Available)<br />

Monthly Monthly Quarterly Annually<br />

Farebox Recovery Ratio<br />

Monthly<br />

Monthly (Identify<br />

Poor Performers)<br />

Quarterly<br />

Annually<br />

Route by Route<br />

Passengers/Revenue<br />

Vehicle Hour<br />

Monthly<br />

Monthly<br />

(Identify Poor<br />

Performers)<br />

Quarterly<br />

(Identify Poor<br />

Performers)<br />

Quarterly<br />

(Identify Poor<br />

Performers)<br />

On-Time Performance<br />

Monthly<br />

Monthly<br />

(Identify Poor<br />

Performers)<br />

Quarterly<br />

(Identify Poor<br />

Performers)<br />

Quarterly<br />

(Identify Poor<br />

Performers)<br />

6.5.3 OMNILINK SERVICE MONITORING AND EVALUATION<br />

OmniLink service monitoring and evaluation will be primarily conducted by Operations and <strong>Plan</strong>ning staff.<br />

Operations will be responsible for contract oversight and monitoring contract compliance on a daily basis<br />

and through the review of monthly performance measures. <strong>Plan</strong>ning staff will be responsible for<br />

performance monitoring on a monthly basis. The calculation of passengers per revenue hour should be<br />

based on the number of passenger trips actually completed (net cancellations and no-shows) and not the<br />

total trips initially scheduled. The former gives a true picture of service productivity while the latter gives<br />

an inflated picture. Figure 6-3 provides an overview of measures and a reporting schedule.<br />

July 11, 2007 125


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 6-3: OmniLink Performance Monitoring and Evaluation<br />

Performance Measure<br />

Review Cycle<br />

Senior<br />

Management<br />

Report Cycle<br />

Board PPC<br />

Reporting Cycle<br />

Board Reporting<br />

Cycle<br />

Cost/Passenger Carried Monthly Monthly Quarterly Annually<br />

Cost/Revenue Vehicle Hour Monthly Monthly Quarterly Annually<br />

Farebox Recovery Ratio Monthly Monthly Monthly Monthly<br />

Passengers/Revenue<br />

Vehicle Hour<br />

Monthly Monthly Monthly Monthly<br />

On-Time Performance Monthly Monthly Monthly Monthly<br />

Average Travel Time Monthly Monthly Quarterly Annually<br />

Passenger Complaints Daily Monthly Quarterly Annually<br />

Passenger Trips<br />

Cancellations and No<br />

Shows<br />

Telephone Reponse<br />

Performance (max. wait<br />

times)<br />

Revenue/Unlinked<br />

Passenger<br />

Daily Quarterly Quarterly Annually<br />

Daily Monthly Quarterly Annually<br />

Monthly Quarterly Quarterly Annually<br />

Preventable Collisions Monthly Monthly Annually Annually<br />

Road Calls Monthly Monthly Annually Annually<br />

Cancelled Trips (No<br />

Vehicles or Operators<br />

Available)<br />

Monthly Monthly Quarterly Annually<br />

July 11, 2007 126


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

6.5.4 ACCESS SERVICE MONITORING AND EVALUATION<br />

Access Service monitoring and evaluation process is similar to the OmniLink process. There will be an<br />

additional contract oversight requirement to ensure ADA compliance. Service monitoring and evaluation<br />

will be primarily conducted by Operations and <strong>Plan</strong>ning staff. Operations will be responsible for contract<br />

oversight and monitoring contract compliance on a daily basis and through the review of monthly<br />

performance measures. <strong>Plan</strong>ning staff will be responsible for performance monitoring on a monthly<br />

basis. The calculation of passengers per revenue hour should be based on the number of passenger<br />

trips actually completed (net cancellations and no-shows) and not the total trips initially scheduled. The<br />

former gives a true picture of service productivity while the latter gives an inflated picture. Figure 6-4<br />

provides an overview of measures and a reporting schedule.<br />

July 11, 2007 127


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 6-4: Access Service Performance Monitoring and Evaluation<br />

Performance Measure<br />

Review Cycle<br />

Senior<br />

Management<br />

Report Cycle<br />

Board PPC<br />

Reporting Cycle<br />

Board Reporting<br />

Cycle<br />

Cost/Registrant Carried Monthly Monthly Quarterly Annually<br />

Cost/Revenue Vehicle Hour Monthly Monthly Quarterly Annually<br />

Farebox Recovery Ratio Monthly Monthly Monthly Monthly<br />

Passengers/Revenue Vehicle<br />

Hour<br />

Monthly Monthly Monthly Monthly<br />

On-Time Performance Monthly Monthly Monthly Monthly<br />

Average Travel Time Monthly Monthly Quarterly Annually<br />

Passenger Complaints Daily Monthly Quarterly Annually<br />

Passenger Trips Cancellations<br />

and No Shows<br />

Daily Monthly Quarterly Annually<br />

Telephone Reponse<br />

Performance (max. wait times)<br />

Daily Monthly Quarterly Annually<br />

Preventable Collisions Monthly Monthly Annually Annually<br />

Road Calls Monthly Monthly Annually Annually<br />

Cancelled Trips (No Vehicles or<br />

Operators Available)<br />

Monthly Monthly Quarterly Annually<br />

July 11, 2007 128


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

6.6 Service Design Guidelines<br />

6.6.1 FIXED ROUTE SERVICE DESIGN<br />

Once a decision has been made to expand or enhance existing service, design guidelines provide a<br />

blueprint for the actual design and implementation of safe, operational and effective services. Figure 6-5<br />

summarizes proposed fixed route service design guidelines intended to guide the implementation of new<br />

or enhanced services.<br />

July 11, 2007 129


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Route Coverage<br />

Figure 6-5: Fixed Route Service Design Guidelines<br />

Description Measure Proposed Target<br />

Bus stop distance from all consumer destinations<br />

(residences, places of work, schools, shopping<br />

centers, etc.)<br />

Route Structure<br />

Bus Stop Spacing<br />

(non-express routes)<br />

Span of Service<br />

Frequencies<br />

Vehicle Loadings<br />

Route Structure – the route coverage standard should<br />

be achieved by a grid system of base, express & local<br />

routes<br />

Distance between bus stops<br />

All trips can be begun and ended between the<br />

following points:<br />

-East Valley and Downtown San Bernardino<br />

-West Valley and Ontario and Montclair<br />

Minimum service frequencies<br />

Maximum percentage of passenger loads per bus on<br />

average over 30 minutes<br />

85% within ¼ mile of bus stop weekdays & Saturdays; within<br />

½ mile evenings, Sundays & Holidays (in future)<br />

Base and express routes should operate in a straight-line<br />

structure on the main arterial roads and freeways oriented to<br />

the main activity centers. Local routes should circulate the<br />

various cities and neighborhoods connecting to the base and<br />

express routes including Metrolink where available.<br />

Stops no closer than 750 feet from each other and no further<br />

than 1000 feet – exceptions for pedestrian safety, geographic<br />

barriers, significant generators<br />

6:00 am-9:00 pm on weekdays, 7:00 am-9:00 pm on<br />

Saturdays, 7:00 am-7:00 pm on Sundays and Holidays (in<br />

future)<br />

- 30 minutes or less: Monday-Saturday to 6:30 pm<br />

- 60 minutes or less: Evenings, All day Sundays/Holidays (in<br />

future)<br />

Peak Periods:<br />

120% of seating capacity<br />

Off-Peak Periods:<br />

100% of seating capacity<br />

Monday-Saturday<br />

Base Routes: 30 Boardings/Hour<br />

Local Routes: 20 Boardings/Hour<br />

Ridership Levels<br />

Boardings per revenue hour<br />

Sundays/Holidays (All Routes)<br />

10 Boardings/Hour @ 60-minute service<br />

15 Boardings/Hour @ 30-minute service<br />

Overall Average<br />

25 Boardings/Hour<br />

July 11, 2007 130


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Description Measure Proposed Target<br />

Weekdays:<br />

30% on base routes<br />

20% on other routes<br />

Cost Recovery<br />

% of operating costs recovered from fares and<br />

Measure I fare subsidies<br />

Weekends<br />

20% on all routes – Saturday<br />

15% on all routes – Sunday<br />

Recovery Time<br />

Route Selection<br />

The time between when a bus arrives at the end of the<br />

line to when it begins the next trip schedules as a<br />

cushion to ensure schedule adherence, timed transfers<br />

and bus operations within posted speed limits<br />

Roads and streets that routes will operate along<br />

Overall Average<br />

25 %<br />

Depending on route-specific operating conditions, sufficient<br />

additional time should be built into the schedules as a cushion<br />

to ensure schedule adherence, timed transfers and bus<br />

operations within posted speed limits. A minimum of 10%<br />

recovery time should be incorporated into route schedules.<br />

Buses will only operate along streets engineered to facilitate<br />

safe and effective bus operations. Turning radii, street<br />

widths, bus size and overhead clearances must be<br />

considered in this assessment.<br />

July 11, 2007 131


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

6.6.2 OMNILINK SERVICE DESIGN<br />

Service Structure: OmniLink will operate as a full demand-response or route deviation service providing<br />

coverage in low-density areas and be designed to provide local service to/from <strong>Omnitrans</strong> fixed route bus<br />

service.<br />

Span of Service: OmniLink should only operate during hours when average farebox recovery does not<br />

drop below 10%.<br />

Maximum Vehicle Loadings: 100% of seating capacity<br />

6.6.3 ACCESS SERVICE DESIGN<br />

Access must operate in accordance with ADA regulations and be provided in conjunction with fixed route<br />

service coverage.<br />

Service Coverage: Access will provide ADA complementary paratransit throughout the <strong>Omnitrans</strong><br />

service area within a ¾ mile radius on either side of an existing, scheduled <strong>Omnitrans</strong> regular bus route.<br />

6.7 Bus Stop Placement Standard<br />

<strong>Omnitrans</strong> prepared the report, Bus Stop Design Guidelines (2006), for use by city planners, traffic<br />

engineers, developers and other public officials for the design and placement of bus stops to facilitate<br />

safe and effective bus operations. While a wide range of guidelines are presented in the document, the<br />

key elements for consideration in the placement of bus stops are:<br />

• Spacing along the route<br />

• Location of the expected passenger traffic generator, either based on population<br />

density and/or specific use (i.e. major employment centers, regional shopping<br />

centers, hospitals, etc.) for the stop<br />

• Traffic safety<br />

• Pedestrian safety and access to stop: pathways leading to and from bus stop<br />

areas should be level, have a firm surface, and be free of obstacles<br />

• Availability of adequate right-of-way to ensure that the bus stop meets the ADA<br />

accessibility standards<br />

• Curb clearance – adequate space for buses to stop, and return to the traffic flow<br />

• Operational effectiveness issues (including relation to the nearest intersection,<br />

bus turning requirements, and re-entering the travel lane)<br />

6.8 Public Involvement/Outreach <strong>Plan</strong><br />

The involvement and education of the public in <strong>Omnitrans</strong> programs and processes are critical to<br />

successful transit service planning. As a public transit agency, <strong>Omnitrans</strong> has public accountability for its<br />

services and programs. As such, <strong>Omnitrans</strong> should establish an ongoing protocol for communication with<br />

its customers. A Public Outreach <strong>Plan</strong> is intended to provide <strong>Omnitrans</strong> staff with a standard set of<br />

communications protocol and outreach tools that can be employed in a programmatic fashion depending<br />

upon the program or activity of <strong>Omnitrans</strong>. Given past and current transit operations, <strong>Omnitrans</strong> is likely<br />

July 11, 2007 132


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

to engage in nine different types of programs or activities that will result in the need for public outreach<br />

activities. These include:<br />

• Major Investment Study (MIS)<br />

• Environmental Impact Statement/Environmental Impact Report (EIS/EIR)<br />

• Fare Change<br />

• Route Change, Service Change or Notice of New Service<br />

• <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong><br />

• Grants<br />

• Emergency and Temporary Event Service Changes<br />

• Special <strong>Plan</strong>ning Studies<br />

• Route Information Gathering and Other Outreach Methods<br />

The types of public outreach activities that <strong>Omnitrans</strong> will likely undertake are addressed with the<br />

appropriate corresponding legal requirements and outreach opportunities identified (see Figure 6-6). In<br />

some cases, there are legal requirements that will shape the public outreach process; in cases where no<br />

specific requirement exists, <strong>Omnitrans</strong> should employ proven public outreach strategies.<br />

July 11, 2007 133


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 6-6: Types of Agency Actions and Programs<br />

Public Outreach<br />

Activity<br />

Major<br />

Investment<br />

Study<br />

Environmental<br />

Impact<br />

Statement and<br />

Environmental<br />

Impact Report<br />

Description of Activity Legal Requirements Outreach Opportunities<br />

Study that examines transportation improvements for<br />

a corridor or site and determines feasible alternatives.<br />

Consideration of the social, economic and<br />

environmental consequences and benefits of<br />

proposed project and activities; a detailed written<br />

statement on the environmental impacts of proposed<br />

project and the alternatives to reduce the harm.<br />

Educate the public and<br />

encourage participation in the<br />

planning process in accordance<br />

with 23 CFR Part 450.212. The<br />

key required processes include:<br />

1. Early and continuing public<br />

involvement opportunities<br />

throughout the transportation<br />

planning and programming<br />

process;<br />

2. Timely information about<br />

transportation issues and<br />

processes (including technical<br />

information) to citizens, etc.;<br />

3. Adequate public notice of<br />

public involvement activities<br />

and time for public review and<br />

comment at key decision points<br />

and demonstration of<br />

consideration of comments;<br />

4. Include outreach to lowincome<br />

and minority<br />

households.<br />

Public hearing notice, public<br />

hearing, hearing transcripts and<br />

a summary of the issues;<br />

additionally there are legal<br />

requirements with regard to<br />

timing, identified in 23 CFR Part<br />

771.<br />

Community workshops supplemented by a<br />

project database, meeting notices, customer<br />

newsletters, electronic newsletters, press<br />

releases, workshop comment forms and project<br />

fact sheets.<br />

Scoping meeting open house, community<br />

meetings, public hearing, project database,<br />

meeting notice, press releases, comment forms,<br />

project fact sheets, project newsletters and<br />

other supporting materials.<br />

July 11, 2007 134


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Public Outreach<br />

Activity<br />

Fare Change<br />

Route Change,<br />

Service Change<br />

or Notice of New<br />

Service<br />

Description of Activity Legal Requirements Outreach Opportunities<br />

Recommendation for change in fares typically<br />

associated with a change in the farebox recovery<br />

ratio.<br />

Any physical change to the street route, schedule,<br />

access, type of service or addition of new service.<br />

In accordance with 49 CFR Part<br />

635.7, any change in fare (one<br />

day reduced fare or free fare<br />

promotion excluded) will result<br />

in the need for a public hearing;<br />

hearing notice must be<br />

published at least 30 days prior;<br />

meeting notice must contain<br />

description of proposed fare<br />

change, time and place of<br />

public hearing; an opportunity<br />

for the public to comment on<br />

the proposed change is<br />

required at the public hearing.<br />

In accordance with 49 CFR Part<br />

635.7, a public hearing is<br />

required if there is any change<br />

in service which directly affects:<br />

1) 25% or more of the number<br />

of transit route miles of a route,<br />

2) 25% or more of the number<br />

of transit revenue vehicle miles<br />

of a route computed on a daily<br />

basis for the day of the week for<br />

which the change is made, or 3)<br />

25% or more of the ridership of<br />

a route computed on a daily<br />

basis for the day of the week for<br />

which the change is made, 4) a<br />

new route is established, or 5)<br />

significant changes on a route.<br />

An opportunity for the public to<br />

comment on the proposed<br />

change is required.<br />

Community workshops, supplemented by<br />

meeting notices, “Take One” cards, customer<br />

newsletters, electronic newsletters, bus book<br />

advertisements, bus cards, press releases,<br />

advertisements, workshop comment forms and<br />

project fact sheets.<br />

Community workshops, supplemented by<br />

meeting notices, “Take One” cards, fliers,<br />

shelter advertisements, press releases,<br />

advertisements, workshop comment forms and<br />

project fact sheets.<br />

July 11, 2007 135


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Public Outreach<br />

Activity<br />

<strong>Short</strong> <strong>Range</strong><br />

<strong>Transit</strong> <strong>Plan</strong><br />

Grants<br />

Emergency and<br />

Temporary<br />

Event Service<br />

Changes<br />

Special <strong>Plan</strong>ning<br />

Studies<br />

Description of Activity Legal Requirements Outreach Opportunities<br />

The <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong> (SRTP) provides a plan<br />

to guide the development of <strong>Omnitrans</strong> and includes<br />

the evaluation of existing service and designing new<br />

services. The SRTP is a tool to assist in the daily<br />

operation, planning, financing and management of<br />

<strong>Omnitrans</strong>.<br />

<strong>Omnitrans</strong> applies for project grants throughout the<br />

year from the Federal <strong>Transit</strong> Administration. The<br />

majority of grants fall into one of the following<br />

categories: Urbanized Area Formula Grants (Section<br />

5307) which provide capital and operating assistance<br />

to transit agencies in urban areas and Discretionary<br />

Capital Program (Section 5309) which provides<br />

discretionary capital assistance for construction of<br />

new fixed guideway systems, extensions to fixed<br />

guideway systems, buses, and bus-related facilities.<br />

Service changes that result in temporary road detours<br />

due to road maintenance, road construction, natural<br />

disasters, manmade disasters or events or activities<br />

requiring road closure. An earthquake damaging a<br />

road, a terrorist act resulting in the destruction of a<br />

highway, or a street festival that closes off a road are<br />

all examples of emergency or temporary events that<br />

require a change in service. Changes in service could<br />

include a route change or time change.<br />

Special <strong>Plan</strong>ning Studies cover a broad range of<br />

activities and planning, including purchasing land,<br />

replacing or purchasing new vehicles, and adding<br />

transit hubs to studying the feasibility of adding<br />

service to a new area. Special <strong>Plan</strong>ning Studies<br />

provide an opportunity to study a project in further<br />

detail.<br />

Legal requirements are related<br />

to the content of the plan.<br />

Section 5307 and 5309 grants<br />

require adherence to public<br />

involvement procedures<br />

identified in 23 CFR Part<br />

450.212.<br />

In accordance with 49 CFR Part<br />

635.7, in an emergency<br />

situation, a service change may<br />

be implemented without a<br />

public hearing. The “Regional<br />

Director” must be notified<br />

concerning the change within<br />

five working days of its<br />

implementation. A public<br />

hearing must be held on the<br />

changes within 60 days of the<br />

implementation, unless the<br />

change is to be in effect for 90<br />

days or less.<br />

No specific legal requirements.<br />

Stakeholder open houses, community open<br />

houses, project website, telephone hotline,<br />

meeting notices, press releases, workshop<br />

comment forms and project newsletter.<br />

Community workshops supplemented by a<br />

project database, meeting notices, customer<br />

newsletters, electronic newsletters, press<br />

releases, workshop comment forms and project<br />

fact sheets.<br />

Timely distribution of information is critical.<br />

Most activities or events leading up to<br />

emergency or temporary service changes often<br />

have little if any advance warning.<br />

Dissemination of information needs to be<br />

comprehensive and rapid. Utilization of the<br />

follow methods is recommended: <strong>Omnitrans</strong><br />

website for noticing; email blasts; bus stop flyers<br />

and newspaper advertisements.<br />

Depending on study and the scope of outreach<br />

possibilities, the following activities could be<br />

considered: community workshops<br />

supplemented by a project database, meeting<br />

notices, customer newsletters, electronic<br />

newsletters, press releases, workshop comment<br />

forms and project fact sheets.<br />

July 11, 2007 136


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Public Outreach<br />

Activity<br />

Route<br />

Information<br />

Gathering and<br />

Other Outreach<br />

Methods<br />

Description of Activity Legal Requirements Outreach Opportunities<br />

Other outreach methods that may be utilized by<br />

<strong>Omnitrans</strong> include:<br />

• Public Surveying<br />

• Market Research<br />

• Focus Groups<br />

• Survey Intercepts<br />

• One-on-One Interviews<br />

• Charettes<br />

• Task Force<br />

• Board and Committee Meetings<br />

No specific legal requirements<br />

aside from requirements<br />

associated with <strong>Omnitrans</strong><br />

Board meetings (Brown Act<br />

meeting requirements).<br />

Outreach methods and activities described can<br />

be used in conjunction with one another and<br />

supplemented with collateral materials and<br />

outreach support activities including:<br />

• Public noticing<br />

• Hotlines and call centers<br />

• Advertising<br />

• Behind driver flyers<br />

• Bus cards<br />

• Legal newspaper noticing<br />

• Meeting signage<br />

• Media relations<br />

• Email Newsletters<br />

• Customer Newsletters<br />

July 11, 2007 137


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Special Public Outreach Considerations<br />

While the preceding set of actions and programs are expected scenarios upon which <strong>Omnitrans</strong> will<br />

implement some level of public outreach, <strong>Omnitrans</strong> must also give special consideration to other factors<br />

which may influence the expansiveness and/or nature of the outreach effort it selects to implement.<br />

These include, but are not limited, to:<br />

• Service area<br />

o<br />

Higher levels of public outreach will be necessary when potential impacts affect<br />

large portions of the service area.<br />

• Intensity of usage<br />

o<br />

Usage levels should be considered in determining the scope and level of<br />

outreach; cities with high usage levels require more outreach.<br />

• Ethnicity<br />

o<br />

Outreach needs to address the needs of non-English speaking population<br />

groups. Additionally, outreach considerations should also be given to individuals<br />

in situations such as transit-dependent, work schedules, and single head-ofhousehold<br />

families – situations that may impact their ability to be involved in<br />

public participation activities.<br />

• Accessibility for persons with disabilities<br />

o<br />

While accessibility for persons with disabilities is often thought of as applying<br />

mainly to those who utilize wheelchairs, consideration needs to be given to those<br />

who have hearing or vision impairments.<br />

• Application of available technology<br />

o<br />

Use of internet-related technologies, including website and other related<br />

technologies, as well as the use of Tele-Town Hall© technology (which allows for<br />

“town hall” style meetings by telephone) should be considered when appropriate.<br />

6.9 Title VI<br />

Title VI of the Civil Rights Act requires public transit agencies receiving federal funding to ensure that that<br />

service is provided without regard to race or the economic status of the residents. Application of service<br />

design guidelines provides a tool for designing and evaluating service that does not discriminate on race<br />

or economic status. In keeping with the intent of Title VI, <strong>Omnitrans</strong> has developed a grid service network<br />

with routes spaced at one mile intervals. This has resulted in equitable transit service coverage, with<br />

most areas of the built up San Bernardino Valley within ½ mile of a transit route. <strong>Omnitrans</strong> focuses on<br />

high ridership corridors that coincidently have high concentrations of economically disadvantaged<br />

persons. ADA complementary paratransit service is provided within ¾ mile of a scheduled regular transit<br />

route in accordance with Federal regulations. Care has been taken in the Scenario 1: Financially<br />

Constrained Service <strong>Plan</strong> to maintain transit service in low-income and minority neighborhoods.<br />

6.10 Accessibility Improvement <strong>Plan</strong><br />

The Accessibility Improvement <strong>Plan</strong> provides guidance to <strong>Omnitrans</strong> staff concerning which stops are<br />

ADA accessible throughout <strong>Omnitrans</strong>’ service area. The plan directs staff to survey its bus stop<br />

July 11, 2007 138


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

inventory annually for compliance issues and to forward such issues to cities or the County for<br />

improvement.<br />

<strong>Omnitrans</strong> does not improve the accessibility of stops as they exist along public right-of-way. There are<br />

exceptions, however, at those stops that require amenities due to the high volume of use, number of<br />

routes, and other characteristics that necessitate such treatments.<br />

Several cities do improve bus stops through a number of means. One method is through development<br />

agreements between the local jurisdiction and developer. Through development agreements, the<br />

responsibility of providing an area for a bus stop or amenities lies with the developer. Another method to<br />

improve accessibility is through street improvement programs. Street improvement programs include:<br />

curb cuts, beautification programs, and other methods that present the opportunity to include bus stop<br />

improvements as part of these projects. Both <strong>Omnitrans</strong> and local jurisdictions should make every effort<br />

to mutually identify these opportunities.<br />

Stops should conform to all applicable federal, state, and local codes and policies that ensure an<br />

accessible path for persons using mobility devices. <strong>Omnitrans</strong> has a set of guidelines (titled Bus Stop<br />

Design Guidelines) which was approved by the <strong>Omnitrans</strong> Board of Directors in October, 2006. These<br />

guidelines reference the ADA Accessibility Guidelines (ADAAG), and were developed with the assistance<br />

of member agencies and Caltrans. They focus on the design aspects of bus stops including dimensions,<br />

accessibility, amenities, and procedural practices related to bus stop placement and construction.<br />

<strong>Omnitrans</strong> is currently working with staff members from local jurisdictions to ensure that the document is<br />

recognized as the document for bus stop design within the <strong>Omnitrans</strong> service area.<br />

Funding sources are available specifically for access improvements to bus stops. Every two years, the<br />

San Bernardino Associated Governments (SANBAG) releases a call for projects which are funded<br />

through the Transportation Development Act Article 3 funds. Projects eligible for these funds include:<br />

sidewalk retrofits, construction of bus boarding areas at new or existing bus stop locations, and the<br />

construction of sidewalks to new or existing bus stop locations. These funds cannot be used to purchase<br />

or install shelters or amenities. <strong>Omnitrans</strong> has made a policy decision not to apply for these funds<br />

directly. However, <strong>Omnitrans</strong> staff can provide the necessary information needed by city/county staff<br />

during the application process.<br />

<strong>Omnitrans</strong> also receives funding from the Federal <strong>Transit</strong> Administration (FTA) Section 5307 program,<br />

known as the Urbanized Area Formula Assistance Program. FTA regulations require that a minimum of<br />

1% of an urbanized area’s annual Section 5307 Program allocation be spent on <strong>Transit</strong> Enhancement<br />

Projects, such as bus passenger shelters, bicycle racks on transit vehicles, transit connections to parks,<br />

and preservation of historic transit facilities. <strong>Omnitrans</strong> uses the <strong>Transit</strong> Enhancement funds for the<br />

planning, design, and construction of new Transcenters or renovation of existing Transcenters.<br />

<strong>Omnitrans</strong> prepared the report, Bus Stop Design Guidelines (2006), for use by city planners, traffic<br />

engineers, developers and other public officials for the design and placement of bus stops to facilitate<br />

safe and effective bus operations. An overview of the key elements for consideration in the placement of<br />

bus stops can be found in Section 6.7.<br />

6.11 <strong>Transit</strong> Infrastructure Development Policy<br />

<strong>Transit</strong> infrastructure pertains to the basic facilities, equipment, and installations needed to allow for the<br />

safe operation of the transit system. Infrastructure in this sense can refer to a number of items including<br />

bus pads (the part of the street where the bus stops), bus stop waiting areas and loading zones, bus<br />

turnouts, and transit centers. Moreover, improvements in ITS applications and traffic control, controllers<br />

and signals will fall under transit infrastructure in the near future.<br />

Because <strong>Omnitrans</strong> does not have control over public right-of-way, the agency can only provide guidance<br />

and, depending on the scope of improvement, funding for developing transit infrastructure. The local<br />

July 11, 2007 139


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

jurisdiction has final approval authority as well as the responsibility for constructing and maintaining<br />

transit infrastructure on public right-of-way.<br />

A partnership between <strong>Omnitrans</strong> and the local jurisdiction is required in order to develop transit<br />

infrastructure. Section 1 of <strong>Omnitrans</strong>’ Bus Stop Design Guidelines refers to policies that establish a<br />

systematic process for developing transit infrastructure within the local jurisdiction. The following excerpt<br />

from <strong>Omnitrans</strong>’ Bus Stop Design Guidelines pertains to the development of transit infrastructure.<br />

Bus Stop Design Guidelines Section 1.4: General, Community and Specific <strong>Plan</strong>s<br />

As the member agencies create or update their General <strong>Plan</strong>s, Community <strong>Plan</strong>s, or Specific Area <strong>Plan</strong>s,<br />

there is an opportunity to review development patterns and incorporate transit planning into the planning<br />

process. OMNITRANS should be included early in the planning process and a transit element should be<br />

included in the plan. The transit element should include proposed bus routes, transit centers, and special<br />

services such as bus rapid transit (BRT).<br />

<strong>Plan</strong> Initiation: Once the local jurisdiction begins the process of revising an existing (or create a new)<br />

plan, OMNITRANS should be informed. OMNITRANS staff should be invited to meetings regarding<br />

transportation infrastructure and access to communities, neighborhoods or developments. Initial drafts<br />

and scoping letters should be coordinated with OMNITRANS to ensure that transit needs are considered<br />

prior to the formal public review process.<br />

Review: OMNITRANS shall be provided the opportunity to review and respond to all proposed plan<br />

changes before and during the public review process.<br />

Implementation: Local jurisdictions will be responsible for implementing General, Community, and<br />

Specific <strong>Plan</strong>s as approved by their councils and commissions. Any amendments to these plans that will<br />

have a direct impact on the location of stops should be forwarded to OMNITRANS for review and<br />

comment.<br />

Bus Stop Design Guidelines Section 1.5: Development <strong>Plan</strong> Review<br />

Development plans are processed by the member cities and county on a regular basis. These plans may<br />

directly impact bus stops and bus routes. In addition, jurisdictions also use their Capital Improvement<br />

Programs (CIP) to build or improve streets that may affect transit. The intent of this process is to<br />

determine which plans are likely to affect transit service now or in the future so they can be reviewed, and<br />

necessary space and amenities can be provided for needed bus stops and routes. It is also the intent of<br />

this process to avoid reviewing plans which will not have effects on transit, to avoid wasted effort and<br />

unnecessary delays to projects.<br />

Intake: Development and roadway improvement plans received from jurisdictions will be evaluated for<br />

potential impacts on current or future transit operations using the following criteria. <strong>Plan</strong>s which meet one<br />

or more of the following criteria should be sent to OMNITRANS for review.<br />

• Identified transit streets in General, Community or Specific <strong>Plan</strong>s<br />

• Existing streets with transit routes<br />

• Major streets<br />

• Projects that affect streets serving high-density residential, commercial, industrial<br />

areas or educational or medical institutions<br />

• Streets that would logically connect existing or planned transit routes or<br />

connecting areas which have or are planned to have transit service<br />

July 11, 2007 140


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Any other project that in the jurisdiction’s opinion should be assessed for current<br />

or future transit needs<br />

Review: The jurisdiction should send one (1) set of development plans to OMNITRANS with a letter or<br />

checklist that indicates why the plans were selected for review. The plans or letter should also include<br />

basic project information such as proposed usage, the name of the contact person at the jurisdiction, and<br />

the name and contact information of the contact person of the developer (or project manager for CIP<br />

projects). OMNITRANS will review the plans and consult with the jurisdiction or others as necessary to<br />

properly comment on the plans. OMNITRANS will provide comments on the plans to the jurisdiction by<br />

marking on the proposed plans and/or by separate letter. Revised plans should be returned to<br />

OMNITRANS along with prior comments for subsequent reviews. OMNITRANS approval will be<br />

documented by a signature on the check plans, or on a separate document.<br />

6.12 Service Implementation Policy<br />

New fixed route and OmniLink service will be implemented in accordance with new service warrants<br />

described in Section 6.4. By doing so, it has been assumed that there is sufficient potential ridership to<br />

achieve the minimum farebox recovery ratio established for the service.<br />

Trial Period of Operation<br />

• New or changed routes would be operated on a trial basis for a period of nine<br />

months and evaluated.<br />

Warrants for Continuance<br />

• A new or changed route would be continued after the nine month trial period if<br />

the performance of the route reaches 75% of the minimum passengers per hour<br />

standard established for its route type.<br />

• If the 75% performance level is not reached, the route would be subjected to<br />

additional marketing and/or corrective actions such as further changes to the<br />

route structure, spans and headways.<br />

• New or changed routes would be expected to reach or exceed the minimum<br />

passengers per hour standard after twelve months of operation.<br />

Warrants for Discontinuance<br />

• If a new or changed route remains below the minimum passengers per hour<br />

standard for six months following the implementation of marketing and corrective<br />

actions, the route would be discontinued or redesigned as appropriate.<br />

• Normally discontinuance would occur if a route cannot achieve 50% of the<br />

minimum passengers per hour standard established for the route.<br />

• If the new or changed route reaches or exceeds the minimum passengers per<br />

hour standard after twelve months of operation, it would become a normal part of<br />

the transit system and subject to the same adjustment and review procedures as<br />

existing routes.<br />

The hours from new or existing services that are discontinued can be either reassigned to other service<br />

extensions or enhancements, or if necessary, be used to offset annual budget cut requirements.<br />

July 11, 2007 141


IBI GROUP<br />

7. PERFORMANCE STANDARDS<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Service design guidelines, or performance measurement guidelines, provide an objective rationale for the<br />

allocation of transit resources. Service design guidelines provide the tools for making decisions regarding<br />

the provision of transit services, the design of routes and schedules, and the evaluation of services.<br />

Service design guidelines serve five major functions:<br />

• Service Development – Guidelines form a consistent basis for service planning,<br />

and, in particular, for establishing minimum levels of service. Judgment and<br />

flexibility remain, but the guidelines assist in the development of new services<br />

and the refinement of existing services.<br />

• Evaluation – Service design guidelines provide targets in the form of indicators<br />

and standards that enable individual route performance to be evaluated and<br />

monitored by management decision-makers.<br />

• Budgeting – The preparation of annual budgets should reflect the goal of<br />

providing service to the policy levels established in the service design guidelines.<br />

This should enable the Board of Directors to focus on policy level decisions and<br />

the service impacts of budget adjustments.<br />

• Public Accountability – Political decision-makers, transit customers, voters and<br />

taxpayers should be able to readily identify the minimum levels of service and<br />

performance that are to be provided. The allocation of the resources of the<br />

transit system must be seen to be based on equitable and rational criteria that<br />

are explicit and available for public scrutiny.<br />

• Title VI – Title VI of the Civil Rights Act requires public transit agencies receiving<br />

federal funding to ensure that their service is provided without regard to race or<br />

the economic status of the residents. Application of service design guidelines<br />

provides a tool for design and evaluating service that does not discriminate on<br />

race or economic status.<br />

The service design guidelines are intended both to be flexible in interpretation and application and to be<br />

continuously refined. As new types of services or data sources are introduced, revisions to the guidelines<br />

may become appropriate. Flexibility in application and interpretation must be maintained, as the<br />

environment in which these guidelines will be applied is not static and will continue to change as the<br />

region grows and transportation demand increases.<br />

The guidelines have been designed to enable <strong>Omnitrans</strong> to establish targets consistent with actual<br />

financial resources. If, after following the fiscally conservative Constrained Scenario plan, the situation<br />

turns around and resources start to improve, the targets could be enhanced; if resources grow more<br />

limited, the targets could be relaxed. The guidelines will be applied to identify transit services that should<br />

be improved or added, or may be falling below acceptable performance levels. If a service fails to meet<br />

the identified performance level, further investigations and analysis will be undertaken to confirm whether<br />

the guidelines are being achieved, and a broad range of potential corrective actions may be considered.<br />

The action taken, if any, will need to be appropriate given the specific circumstances of the service in<br />

question.<br />

Service performance standards provide targets in the form of indicators and standards that enable<br />

systemwide, individual route performance or service specific monitoring and evaluation by management<br />

decision-makers. Performance standards are the benchmarks critical to the service monitoring and<br />

evaluation program outlined in Section 6.5. In the case of contracted services such as OmniLink and<br />

July 11, 2007 142


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Access Service, selected performance standards are included as performance expectations in the<br />

respective service contracts and provide benchmarks for the evaluation of contractual compliance.<br />

7.1 Fixed Route Performance Standards<br />

Proposed fixed route performance standards are organized into service standards, and effectiveness,<br />

efficiency, and labor productivity indicator categories. The proposed standards are summarized in Figure<br />

7-1 through Figure 7-4. Included are a definition of the measure, the proposed target and (where data<br />

are available) an indication of actual performance in FY 2006.<br />

July 11, 2007 143


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-1: Proposed Fixed Route Service Standards<br />

Description Measure Proposed Target FY 2006 Actual<br />

Route Coverage<br />

Route Structure<br />

Bus Stop Spacing<br />

(non-express routes)<br />

Span of Service<br />

Frequency of<br />

Service<br />

Vehicle Loadings<br />

Bus stop distance from all consumer<br />

destinations (residences, places of work,<br />

schools, shopping centers, etc.)<br />

Route Structure – the route coverage<br />

standard should be achieved by a grid<br />

system of base, express & local routes.<br />

Distance between bus stops<br />

All trips can be begun and ended between<br />

the following points:<br />

-East Valley and Downtown San Bernardino<br />

-West Valley and Ontario and Montclair<br />

Minimum service frequencies<br />

Maximum percentage of passenger loads<br />

per bus on average over 30 minutes.<br />

85% within ¼ mile of bus stop<br />

weekday & Saturday; within ½ mile<br />

evenings, Sundays & Holidays (in<br />

future)<br />

Base and express routes should<br />

operate in a straight-line structure<br />

on the main arterial roads and<br />

freeways oriented to the main<br />

activity centers. Local routes<br />

should circulate the various cities<br />

and neighborhoods connecting to<br />

the base and express routes<br />

including Metrolink where available.<br />

Stops no closer than 750 feet from<br />

each other and no further than 1000<br />

feet – exceptions for pedestrian<br />

safety, geographic barriers,<br />

significant generators<br />

6:00 am-9:00 pm on weekdays,<br />

7:00 am-9:00 pm on Saturdays,<br />

7:00 am-7:00 pm on Sundays and<br />

Holidays (in future)<br />

- 30 minutes or less: Monday-<br />

Saturday to 6:30 pm<br />

- 60 minutes or less; Evenings, All<br />

day Sundays/Holidays (in future)<br />

Peak Periods:<br />

120% of seating capacity<br />

Off-Peak Periods:<br />

100% of seating capacity<br />

82%<br />

NA<br />

Standard is 0.2 miles or greater<br />

Some routes not meeting<br />

Minimum frequency is 60 minutes<br />

Peak Periods:<br />

120% of seating capacity<br />

Off-Peak Periods:<br />

110% of seating capacity<br />

July 11, 2007 144


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Description Measure Proposed Target FY 2006 Actual<br />

Monday-Saturday<br />

Base Routes: 30 Boardings/Hour<br />

Local Routes: 20 Boardings/Hour<br />

All routes: 20 Boardings/Hour<br />

Ridership Levels<br />

Boardings per revenue hour<br />

Sundays/Holidays (All Routes)<br />

15 Boardings/Hr @ 30-min service<br />

10 Boardings/Hr @ 60-min service<br />

Overall Average<br />

25 Boardings/Hour<br />

Weekdays:<br />

30% on base routes<br />

20% on other routes<br />

Overall Average<br />

22 Boardings/Hour<br />

20% all routes<br />

Farebox Recovery<br />

% of operating costs recovered from fares<br />

and Measure I fare subsidies<br />

Weekends<br />

20% on all routes – Saturday<br />

15% on all routes – Sunday<br />

Overall Average<br />

25 %<br />

Overall Average<br />

20.9 %<br />

Average Fare Fare revenue per boarding passenger $0.87 (FY <strong>2008</strong>) $0.75<br />

July 11, 2007 145


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-2: Fixed Route Operating Effectiveness Indicators<br />

Description Measure Proposed Target FY 2006 Actual<br />

On-Time Performance<br />

For all timepoints and terminals,<br />

percentage of buses that:<br />

-leave 1.5 minutes early<br />

-are "on-time" within 5.5 minutes late<br />

-None should leave early<br />

-95% or more should be “on-time”<br />

at timed transfer (A) points<br />

-90% or more should be "on-time"<br />

for entire route<br />

-95% “on-time” at timed transfer (A)<br />

points<br />

-81% weekday average "on- time"<br />

(within 1.5 minutes early and 5.5<br />

minutes late) for entire route<br />

Service Reliability % scheduled pullouts 100% 95%<br />

Passenger Safety Preventable collisions per million miles 6 7<br />

Figure 7-3: Fixed Route Vehicle Efficiency Indicators<br />

Description Measure Proposed Target FY 2006 Actual<br />

Vehicle Failure Rate<br />

Vehicle miles between valid mechanical<br />

failures per NTD guidelines<br />

5,000 5,000<br />

Farebox Failure Rate Total miles between valid farebox failures 70,000 86,000<br />

July 11, 2007 146


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-4: Labor Productivity Indicators<br />

Description Measure Proposed Target FY 2006 Actual<br />

Systemwide Total operating hours/revenue hours 1.04 1.04<br />

Transportation<br />

Operator<br />

Transportation<br />

Supervision Efficiency<br />

Vehicle Maintenance<br />

Efficiency<br />

Administrative<br />

Efficiency<br />

Annual operating hours/FTE operator 1,570 1,524<br />

Annual revenue miles per employee<br />

controlling the operation (dispatch and field<br />

supervision)<br />

Annual vehicle miles/maintenance<br />

employee (including clerical staff in vehicle<br />

maintenance administration; does not<br />

include plant and facility maintenance staff)<br />

Annual revenue hours/non-line<br />

administrative employee (defined as<br />

Administration [Executive Director,<br />

Administrative Secretaries], IT Services,<br />

Marketing, <strong>Plan</strong>ning, Human Resources,<br />

Safety and Security, and Finance)<br />

25,000 30,700<br />

80,000 88,000<br />

10,000 7,000<br />

July 11, 2007 147


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

7.1.1 FIXED ROUTE PERFORMANCE AGAINST STANDARDS<br />

Key performance measures for fixed route transit service include farebox recovery, on-time performance<br />

and the percentage of buses that actually make their pullout times. The current systemwide farebox<br />

recovery ratio is 20.9%. Current farebox recovery is under the proposed 25% farebox recovery ratio for<br />

the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP. While on-time performance for the timed transfer A timepoints is<br />

meeting the 95% standard, weekday on-time performance for entire routes at 81% is below the existing<br />

and proposed 90% on-time performance standard. Also of concern is the percentage of buses that<br />

actually make pullout. In a reliable transit system, no trips are cancelled or late to start because of the<br />

lack of roadworthy equipment or because operators do not show on time. Currently, 95% of buses<br />

actually make their pullout, whereas the proposed standard is 100%. If <strong>Omnitrans</strong> can increase its<br />

pullout, the public will respond to the higher level of service reliability. This is an important way to<br />

increase ridership, even in a financially constrained scenario.<br />

Farebox Recovery: Monitoring and evaluation of farebox recovery should be at the individual route level<br />

and by timeframe (peak, midday, evening and weekend). Routes that fall below the minimum farebox<br />

recovery established for the route category and time period should be identified for service changes that<br />

could correct a shortfall, whereas routes that consistently fall below the minimum standard should be<br />

placed on a probationary list for possible service cutback.<br />

On-Time Performance: Monitoring and evaluation of on-time performance should also be conducted at<br />

the individual route level. Routes that consistently run late need to either add additional running time to<br />

their schedules, or adjust their schedules to reallocate time to route segments where the route runs late.<br />

In some cases, short turns or interlines may have to be considered for all or some trips to maintain ontime<br />

performance. Equipment breakdowns can also significantly impact on-time performance.<br />

Pullouts: The problem of buses not making pullout should be examined at the facility level (West Valley<br />

and East Valley) to determine what is causing the shortfall. It could be operators not making their shift or<br />

buses not cycled out of maintenance quickly enough. In the case of the former, there may be a<br />

requirement for a larger extra board. In the case of the latter, it could be the adjustment of maintenance<br />

shifts to ensure sufficient night resources or an increase in the spare bus ratio. Not meeting bus pullout<br />

has a significant impact on on-time performance and service reliability.<br />

7.1.2 ROUTES ON PROBATION<br />

Routes that consistently do not meet farebox recovery minimums should be placed on a probation list.<br />

Poor performing routes should be identified through monthly monitoring. Poorly performing routes should<br />

be reported to the <strong>Omnitrans</strong> Management Team monthly for the consideration of corrective measures or<br />

for possible cancellation. Management should review the probationary list with the PPC on a monthly<br />

basis and recommend either continued efforts to improve performance, or cancellation of the route at all<br />

or selected time periods. Route performance recommendations should be brought to the full Board on a<br />

quarterly basis.<br />

7.2 OmniLink Performance Standards<br />

Proposed OmniLink performance standards are organized into financial, cost effectiveness, cost<br />

efficiency, coverage, service utilization, amount of service, labor productivity, service quality and service<br />

reliability categories. The proposed standards are summarized in Figure 7-5 through Figure 7-12.<br />

Included are a definition of the measure, the proposed target and (where data are available) an indication<br />

of actual performance in FY 2006.<br />

July 11, 2007 148


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-5: OmniLink Financial Performance<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Expenditures per Capita*<br />

Farebox Recovery*<br />

Total operating cost / service<br />

area population<br />

Passenger fares as a % of<br />

operating costs<br />

$10.13 $9.11<br />

10% 5.6%<br />

Average Fare<br />

Fare revenue / one-way<br />

passenger trip<br />

$1.69 $1.00<br />

*Based on immediate service area population (Chino Hills and Yucaipa) and reallocated operating cost<br />

Figure 7-6: OmniLink Cost Effectiveness<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Operating Cost per Passenger<br />

Trip*<br />

*Based on reallocated operating cost<br />

Operating cost / completed<br />

one-way passenger trip for<br />

OmniLink<br />

$26.94 $20.93<br />

Figure 7-7: OmniLink Cost Efficiency<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

$82.44<br />

Operating Cost per Hour*<br />

Operating cost / revenue hour<br />

To be determined annually as part<br />

of budget process (& contract<br />

$58.34<br />

provisions/negotiations)<br />

Operating Cost per Mile*<br />

Operating cost / revenue mile<br />

$6.72<br />

To be determined annually as part<br />

$5.01<br />

of budget process<br />

*Based on reallocated operating cost<br />

July 11, 2007 149


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-8: OmniLink Service Coverage<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Service Area Coverage<br />

Area in which service is<br />

operated<br />

OmniLink will operate as a full<br />

demand-response or route<br />

deviation service providing<br />

coverage in low-density areas and<br />

be designed to provide local<br />

service to/from <strong>Omnitrans</strong> fixed<br />

route bus service.<br />

OmniLink operates within the Cities<br />

of Chino Hills and Yucaipa<br />

Monday – Friday<br />

7:00 am to 6:00 pm<br />

Span of Service<br />

Hours of day and days of<br />

week service provided<br />

OmniLink should only operate<br />

during hours when average farebox<br />

recovery does not drop below 10%.<br />

Saturday<br />

7:30 am to 5:30 pm<br />

Sunday<br />

8:00 am to 2:00 pm<br />

Frequency of Service<br />

Length of time between<br />

scheduled vehicle trips<br />

When operating in a flex or route<br />

deviation mode, OmniLink should<br />

operate a 60-minute frequency<br />

Currently operated as a dial-a-ride<br />

service<br />

July 11, 2007 150


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-9: OmniLink Service Utilization<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Trips per Capita*<br />

Total unlinked passenger trips<br />

/ service area population<br />

0.38 0.45<br />

Passengers / Revenue Hour<br />

Completed one-way<br />

passenger trips / scheduled<br />

revenue vehicle hour (limited<br />

to trips by registrants)<br />

4.57<br />

(to meet 10% farebox recovery)<br />

Chino Hills – 2.20<br />

Yucaipa – 3.15<br />

Vehicle Loadings<br />

Maximum passenger loads per<br />

bus<br />

Loads not to exceed 100% of<br />

seated capacity. No standees.<br />

No current standard<br />

*Based on Chino Hills and Yucaipa service area population<br />

Figure 7-10: Amount of OmniLink Service Provided<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Revenue Hours / Capita*<br />

Total annual revenue hours /<br />

service area population<br />

0.12 0.16<br />

*Based on Chino Hills and Yucaipa service area population<br />

July 11, 2007 151


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-11: OmniLink Service Quality<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

On-time Performance/Schedule<br />

Adherence<br />

Actual departure time<br />

compared to scheduled<br />

departure time<br />

At established timepoints (e.g.,<br />

Chino Marketplace and the future<br />

Yucaipa Transcenter), no bus<br />

should leave early and no bus<br />

should leave later than 3 minutes<br />

from the timepoint, 90% of the time.<br />

No current standard<br />

On-time Performance/Scheduled<br />

Pickups<br />

% of pick-ups within plus or<br />

minus 10 minutes<br />

90% of all pick-ups will be within<br />

plus or minus 10 minutes of the<br />

scheduled time<br />

No current standard<br />

Complaints<br />

Number of complaints per<br />

1,000 one-way passenger trips<br />

1 No current standard<br />

Customer Cancellation & No-show<br />

Rates<br />

% of total scheduled trips<br />

cancelled<br />

% of total scheduled trips as<br />

no-shows<br />

5% customer cancellations<br />

3% customer no-shows<br />

No current standard<br />

Telephone Performance:<br />

Maximum Hold Time<br />

Number of seconds a<br />

passenger is placed on hold<br />

waiting to book a trip<br />

120 seconds No current standard<br />

July 11, 2007 152


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-12: OmniLink Service Reliability<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Passenger Safety<br />

Number of preventable<br />

collisions / million revenue<br />

miles<br />

5.0<br />

Chino Hills – 0 (0 / 114,666 miles)<br />

Yucaipa – 10.0 (1 / 99,604 miles)<br />

Vehicle Breakdowns<br />

Number of revenue miles<br />

between road calls (resulting<br />

in service delays)<br />

10,000<br />

Chino Hills – 10,063<br />

Yucaipa – 49,802<br />

Bus Trips Cancelled<br />

The number of actual runs<br />

cancelled because either a<br />

bus or operator was not<br />

available to start a run<br />

Zero tolerance<br />

No current standard<br />

Transfer Wait Times<br />

The time a bus is scheduled to<br />

wait at transfer points for a<br />

designed connection<br />

OmniLink buses will wait no longer<br />

than 3 minutes at a designated<br />

transfer point for arriving <strong>Omnitrans</strong><br />

buses or regional transit services.<br />

No current standard<br />

July 11, 2007 153


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

7.2.1 OMNILINK PERFORMANCE AGAINST STANDARDS<br />

Minimum farebox recovery is the most critical efficiency standard for the provision of OmniLink service. A<br />

10% farebox recovery ratio has been approved for OmniLink service for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP<br />

timeframe. Minimum farebox recovery determines the minimum passengers/revenue hour performance<br />

standard. Currently, the combined Chino Hills and Yucaipa OmniLink services are recovering 5.6% of<br />

operating costs through farebox revenues and carrying 2.8 passengers per revenue hour. With the<br />

discontinuation of less productive weekend hours, farebox recovery in FY <strong>2008</strong> is projected to be 7.4%<br />

and hourly productivity is projected to be 3.1 passengers per revenue hour. To achieve a 10% farebox<br />

recovery ratio in FY <strong>2008</strong>, a minimum hourly productivity of 4.57 is required.<br />

During the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe, other performance measures will be monitored and<br />

evaluated to ensure a broader assessment of service performance.<br />

7.2.2 ROUTES ON PROBATION<br />

Under the current Financial <strong>Plan</strong> combined OmniLink services are not projected to achieve 10% farebox<br />

recovery. OmniLink farebox recovery is blended with fixed route farebox recovery. Assuming the<br />

majority of fixed routes are productive and can achieve farebox recovery above the 25% minimum<br />

requirement, less productive OmniLink services can be supported. If either OmniLink service cannot<br />

achieve a minimum 10% farebox ratio, they should be candidates for cancellation like other unproductive<br />

fixed route services in order to improve overall fixed route farebox recovery.<br />

OmniLink productivity is driven by ridership and revenue hours. If ridership is not sufficient to reach<br />

minimum farebox recovery, demand-response revenue hours can be reduced to improve productivity.<br />

Improvements can be made without canceling OmniLink service through more productive scheduling and<br />

dispatch.<br />

7.3 Access Performance Standards<br />

Performance standards are organized into financial, cost effectiveness, cost efficiency, coverage, service<br />

utilization, amount of service, labor productivity, service quality and service reliability categories. The<br />

proposed standards are summarized in Figure 7-13 through Figure 7-18. Included are a definition of the<br />

measure, the proposed target and (where data are available) an indication of actual performance in FY<br />

2006. The FY <strong>2008</strong> figures have been adjusted for cost allocation. Performance standards reflect a<br />

blend of advance booked and subscription trip services.<br />

July 11, 2007 154


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Expenditures per Capita*<br />

Farebox Recovery<br />

Figure 7-13: Access Financial Performance<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Total operating cost per <strong>Omnitrans</strong> Access<br />

service area population (use for budgetary<br />

purposes/track trends over time)<br />

Passenger fares as a % of operating costs<br />

(10% is the minimum State requirement)<br />

$8.61 $7.73<br />

12.0% 11.2%<br />

Average Fare Fare revenue / one-way passenger trip $3.02 $2.24<br />

*Based on <strong>Omnitrans</strong> Access service area population and reallocated operating cost<br />

Figure 7-14: Access Cost Effectiveness<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Operating Cost / Passenger Trip*<br />

Operating cost / completed one-way<br />

passenger trip for Access<br />

$27.74 $22.08<br />

*Based on reallocated operating cost<br />

July 11, 2007 155


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Operating Cost per Hour*<br />

Operating Cost per Mile*<br />

Figure 7-15: Access Cost Efficiency<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

*Based on reallocated operating cost<br />

Operating cost / revenue hour<br />

Operating cost / revenue mile<br />

$70.59<br />

To be determined annually as<br />

part of budget process (&<br />

contract provisions /<br />

negotiations)<br />

$4.28<br />

To be determined annually as<br />

part of budget process<br />

$63.34<br />

$3.84<br />

Figure 7-16: Access Service Utilization<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Trips per Capita*<br />

Total ADA passenger trips (registrants) /<br />

population of the entire <strong>Omnitrans</strong> Access<br />

service area (use for budgetary<br />

2.8 2.9<br />

purposes/track trends over time)<br />

Ridership<br />

Completed one-way passenger trips /<br />

revenue hour (limited to trips by registrants).<br />

Combined advance booked & subscription<br />

2.5 2.9<br />

trips.<br />

*Combined figures for East and West Valley<br />

July 11, 2007 156


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

On-time Performance<br />

Average Travel Time<br />

Complaints<br />

Figure 7-17: Access Service Quality<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

% of pick-ups within plus or minus 10<br />

minutes of the scheduled pickup time<br />

% of passenger onboard travel time below<br />

maximum time<br />

Number of complaints per 1,000 one-way<br />

passenger trips<br />

90% of all scheduled pick-ups<br />

will be within plus or minus 10<br />

minutes of scheduled pickup<br />

time<br />

Per ADA requirement: not to<br />

exceed 2 times the equivalent<br />

trip taken by fixed route transit<br />

90+ %<br />

No current standard<br />

3 No current standard<br />

Trip Denial Rate<br />

% of total passenger trips denied<br />

Per ADA requirement: zero<br />

denials (within prescribed<br />

guidelines / scheduling<br />

parameters)<br />

No current standard<br />

Customer Cancellation & No-show<br />

Rates*<br />

% of total scheduled trips cancelled<br />

% of total scheduled trips as no shows<br />

5% customer cancellations<br />

3% customer no-shows<br />

7.3% customer cancellations<br />

6.7% customer no-shows<br />

Telephone Performance: Maximum Hold<br />

Time<br />

*Combined figures for East and West Valley<br />

Number of seconds a registrant is placed on<br />

hold waiting to book a trip<br />

120 seconds (maximum) Average: 113 seconds<br />

Figure 7-18: Access Service Reliability<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Passenger Safety<br />

Number of preventable collisions / million<br />

revenue miles<br />

5.0 9.3<br />

Vehicle Breakdowns<br />

Number of revenue miles between road<br />

calls (resulting in service delays)<br />

14,000 14,421<br />

July 11, 2007 157


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

7.3.1 ACCESS PERFORMANCE AGAINST STANDARDS<br />

Minimum farebox recovery is an important efficiency standard for the provision of Access service. A 12%<br />

farebox recovery ratio has been identified as the target for Access service for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong><br />

SRTP timeframe. Minimum farebox recovery determines the minimum passengers/revenue hour<br />

performance standard. In FY 2006, Access service recovered 13.2% of operating costs through farebox<br />

revenues and carried 2.9 passengers per revenue hour. FY 2006 exceeded the performance target. The<br />

target has been adjusted to reflect fare increases during the <strong>2008</strong>-<strong>2013</strong> timeframe.<br />

Similarly, the fare increases will result in a decline (adjustment to reflect fare elasticity) of ridership.<br />

However, service hours and miles will remain constant to reflect:<br />

• The need to address <strong>Omnitrans</strong>’ current initiative of marketing subscription<br />

service/premium fares for agency/program participants. In so doing there is a<br />

need to ensure service availability and guaranteed on-time performance for<br />

monthly subscribers. One key component of marketing subscription<br />

service/premium fares is service reliability and consistency. This will initially<br />

require flexibility (including service capacity) for Access schedulers in the<br />

development of subscription runs (or templates).<br />

• The need to maintain conservative estimates of the level of Access service to<br />

accommodate the demand for service which may decline at a lesser rate than<br />

assumed. The latter may be as a result of fare increases having less of an<br />

impact, a potential growth in program participation in subscription services over<br />

the 2007 to 2009 period, unanticipated outcomes of the County’s Public <strong>Transit</strong>-<br />

Human Services Transportation Coordination <strong>Plan</strong> (which again may result in an<br />

increase in program participation in subscription services, and changing/growing<br />

community demographics).<br />

Access productivity is driven by ridership and revenue hours. With an anticipated decline in ridership,<br />

productivity will decline. Under the current Financial <strong>Plan</strong>, which includes fare increases, the farebox<br />

recovery for Access service is expected to range between 11.9% and 14.6%.<br />

Current Access performance is favorable in terms of its productivity and on-time performance, the latter<br />

being an indicator of service quality. However, the current rate of cancellations and no-shows (7.3% and<br />

6.7% respectively) exceeds the standard and speaks to an excessive amount of revenue service going<br />

unused.<br />

Current Access financial, cost effectiveness and cost efficiency performance is favorable relative to<br />

performance standards. However, the standards have been adjusted to reflect cost allocation, making<br />

direct comparisons in current dollars difficult.<br />

In terms of service reliability, Access is currently experiencing an excessive number of preventable<br />

collisions per miles operated. However, the number of road calls per 10,000 miles operated is some 40%<br />

below the standard.<br />

7.3.2 ROUTES ON PROBATION<br />

The delivery of Access (paratransit) services, including level of service, service area, advance booking<br />

requirements and scheduling parameters, is driven by federally mandated requirements under the<br />

Americans with Disabilities Act (ADA). Any reductions would require corresponding adjustments to the<br />

fixed route services in order to ensure <strong>Omnitrans</strong>’ ongoing compliance with ADA.<br />

July 11, 2007 158


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Ongoing Access service improvements, including service utilization enhancements, will result as a<br />

consequence of recommended interventions including demand management measures (i.e., enhanced<br />

scheduling parameters, fare policy, etc.).<br />

July 11, 2007 159


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

8. FARE POLICY FY <strong>2008</strong>-<strong>2013</strong><br />

Recommended <strong>Omnitrans</strong> fare policy is based on the requirement of achieving minimum farebox<br />

recovery ratio objectives set for fixed route, OmniLink and Access Service. <strong>Omnitrans</strong> is required by the<br />

Transportation Development Act (TDA) to maintain a farebox recovery ratio of at least 20% for its general<br />

public services. In FY 2006, the farebox recovery ratio was 20.63%. In order to provide a farebox<br />

recovery ratio buffer and ensure that its TDA obligations were met, at a Board <strong>Plan</strong>ning and Productivity<br />

meeting on September 13, 2006, <strong>Omnitrans</strong> fixed route fare structure was established to achieve a<br />

minimum 25% farebox recovery ratio. OmniLink fare structure was established to achieve a minimum<br />

10% farebox recovery ratio. Access Service fare structure was established to achieve a 10% farebox<br />

recovery ratio.<br />

In order to meet its farebox recovery ratio goals, <strong>Omnitrans</strong> decided to raise the fares charged to<br />

passengers. In August 2006, <strong>Omnitrans</strong>’ Board of Directors approved an increase in the fixed route base<br />

fare from $1.15 to $1.25, and in the Day Pass from $2.75 to $3.00. These changes took effect on<br />

Tuesday, September 5, 2006. One of the staff recommendations when the fare increase was considered<br />

by the <strong>Omnitrans</strong> Board was to develop a long term plan as part of the Comprehensive Operations<br />

Analysis (COA) for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP.<br />

Fare Policy FY <strong>2008</strong>-<strong>2013</strong><br />

The fare policy for FY <strong>2008</strong>-<strong>2013</strong> was developed after considering the fare policy goals and objectives set<br />

out in the March 2003 FY 2004-<strong>2008</strong> Fare Policy and Implementation <strong>Plan</strong> prepared by Booz-Allen<br />

Hamilton and conducting historical analysis of rider and revenue trends for <strong>Omnitrans</strong> fixed route,<br />

OmniLink, and Access services. The report set out the fare policy goals, developed in conjunction with<br />

stakeholder input and the Fare Policy Committee, as follows:<br />

• Optimize fare revenues and other financial resources to ensure that <strong>Omnitrans</strong><br />

can successfully meet its ridership goals and service delivery objectives.<br />

• Develop a market-driven fare policy that attracts people to transit as the region<br />

grows by promoting the benefits and worth of transit.<br />

The following systemwide objectives were proposed to support the overall goals, and provide guidance<br />

for the fare study and a basis for evaluating alternatives:<br />

• Build ridership while maximizing revenue.<br />

• Price fares so that passengers pay a reasonable amount and <strong>Omnitrans</strong><br />

achieves systemwide farebox recovery targets.<br />

• Maintain ease of understanding, use, enforcement, and customer convenience of<br />

the fare structure and ensure fare media are recognizable and durable.<br />

• Provide fare media options that meet rider needs.<br />

• Promote regional fare integration and common fare media with connecting transit<br />

services and build intercounty ridership.<br />

• Minimize boarding times through fare technology and media options.<br />

• Provide for regular fare structure reviews and adjustments.<br />

July 11, 2007 160


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Leverage opportunities to effectively and efficiently leverage fare technology to<br />

implement fare policies.<br />

As the Comprehensive Operational Analysis was underway, it became clear that it would be necessary to<br />

raise fares in 2007 in order to sustain the mandated 20% farebox recovery. Based on the goals and<br />

objectives set out in the March 2003 report and the <strong>Omnitrans</strong> Board’s goal of meeting the 25% farebox<br />

recovery ratio, the Board approved a new fare structure on March 7, 2007, to take effect on July 1, 2007.<br />

Four fare increases are planned for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe. Fare changes will go<br />

into effect July 1, 2007, September 1, <strong>2008</strong>, September 1, 2010, and September 1, 2011. Increases in<br />

discounted senior and disability fares for fixed route and OmniLink services and regular fares for Access<br />

Service will be offset through gradual increases in Measure I fund allocations to fare revenues.<br />

8.1 Fixed Route<br />

The fixed route fare policy recommendations for the balance of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP were<br />

based on the following strategies:<br />

• Aggressively raise largest and most profitable fare categories (cash fare and Day<br />

Pass) to meet farebox recovery ratio target of 25%.<br />

• Raise longer duration fare categories (7-Day Pass and 31-Day Pass) at slower<br />

rates to encourage their usage and retain riders.<br />

• Sell 7-Day Passes through on-board Trim unit to ease usage.<br />

• Use prepaid discounts (10-20%) on Day Pass bought in multiples to mitigate<br />

ridership loss by rewarding repeat business.<br />

• Increases in discounted senior and disability fares will be offset through gradual<br />

increases in Measure I fund allocations to fare revenues.<br />

• No change in free fare policy.<br />

Figure 8-1 summarizes recommended annual fares for <strong>Omnitrans</strong> fixed route service for the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP timeframe.<br />

July 11, 2007 161


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 8-1: Proposed Fixed Route Fare Structure and Policies<br />

Service<br />

Fixed Route<br />

Current, effective since Sept<br />

5, 2006<br />

Adopted, effective July 1,<br />

2007<br />

Proposed, effective<br />

September 1, <strong>2008</strong><br />

Proposed, effective<br />

September 1, 2009<br />

Proposed, effective<br />

September 1, 2010<br />

Proposed, effective<br />

September 1, 2011<br />

Proposed, effective<br />

September 1, 2012<br />

Fare Type<br />

Fare Category<br />

FY 2007 FY <strong>2008</strong> FY 2009 FY 2010 FY 2011 FY 2012 FY <strong>2013</strong><br />

Cash<br />

Full Fare $1.25 $1.35 $1.50 $1.50 $1.75 $2.00 $2.00<br />

Senior/Disability* $0.50 (+$0.10 MI = $0.60) $0.55 (+$0.10 MI = $0.65) $0.60 (+$0.15 MI = $0.75) $0.60 (+$0.15 MI = $0.75) $0.60 (+$0.25 MI = $0.85) $0.75 (+$0.25 MI = $1.00) $0.75 (+$0.25 MI = $1.00)<br />

Full Fare $41.00 $45.00 $47.00 $47.00 $51.00 $56.00 $56.00<br />

31-Day Passes Senior/Disability* $20.50 (+$2.65 MI = $23.15) $22.50 (+$5.30 MI = $27.80) $23.50 (+$7.95 MI = $31.45) $23.50 (+$7.95 MI = $31.45) $25.50 (+$13.25 MI = $38.75) $28.00 (+$13.25 MI = $41.25) $28.00 (+$13.25 MI = $41.25)<br />

Student $29.50 $33.00 $35.00 $35.00 $39.00 $44.00 $44.00<br />

Special<br />

Summer Youth Pass (Age


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

8.2 OmniLink<br />

The OmniLink fare policy recommendations for the balance of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP were<br />

based on the following strategies:<br />

• Aggressively increase fares to meet target farebox recovery ratio of at least 7%<br />

over the life of the SRTP, and ultimately 10%.<br />

• Price at roughly twice the fixed route cash fare.<br />

• Eliminate free ride for passengers with fixed route Pass to combat declining<br />

revenue.<br />

• Introduce student fare priced between regular and senior/disabled fares.<br />

• Introduce 10-trip discounted ticket books for regular fare, senior/disability and<br />

student customers to offset the fare increase for regular riders.<br />

• Increases in discounted senior and disability fares will be offset through gradual<br />

increases in Measure I fund allocations to fare revenues.<br />

Figure 8-2 summarizes recommended annual fares for <strong>Omnitrans</strong> OmniLink service for the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP timeframe.<br />

July 11, 2007 163


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 8-2: Proposed OmniLink Fare Structure and Policies<br />

Current, effective since Sept<br />

5, 2006<br />

Adopted, effective July 1,<br />

2007<br />

Proposed, effective<br />

September 1, <strong>2008</strong><br />

Proposed, effective<br />

September 1, 2009<br />

Proposed, effective<br />

September 1, 2010<br />

Proposed, effective<br />

September 1, 2011<br />

Proposed, effective<br />

September 1, 2012<br />

Service Fare Type Fare Category<br />

FY 2007 FY <strong>2008</strong> FY 2009 FY 2010 FY 2011 FY 2012 FY <strong>2013</strong><br />

Full Fare $2.50 $3.00 $3.00 $3.00 $3.50 $4.00 $4.00<br />

Cash Senior/Disability* $1.25 (+$0.25 MI = $1.50) $1.50 (+$0.25 MI = $1.75) $1.50 (+$0.25 MI = $1.75) $1.50 (+$0.25 MI = $1.75) $1.75 (+$0.25 MI = $2.00) $2.00 (+$0.25 MI = $2.25) $2.00 (+$0.25 MI = $2.25)<br />

Student $1.25 $2.00 $2.00 $2.00 $2.25 $2.50 $2.50<br />

FR 1-Day/7-<br />

Day/31-Day<br />

Full Fare<br />

Acceptable since January 2004<br />

Not Accepted Not Accepted Not Accepted Not Accepted Not Accepted Not Accepted<br />

Passes Senior/Disability/Student* Not Accepted Not Accepted Not Accepted Not Accepted Not Accepted Not Accepted<br />

Full Fare Not available $27.00 $27.00 $27.00 $31.50 $36.00 $36.00<br />

10-Ticket Booklet Senior/Disability* Not available $13.50 (+$2.50 MI = $16.00) $13.50 (+$2.50 MI = $16.00) $13.50 (+$2.50 MI = $16.00) $15.75 (+$2.50 MI = $18.25) $18.00 (+$2.50 MI = $20.50) $18.00 (+$2.50 MI = $20.50)<br />

Student Not available $18.00 $18.00 $18.00 $20.25 $22.50 $22.50<br />

OmniLink<br />

* <strong>Omnitrans</strong> receives Measure I subsidy for Senior and Disability trips; Access & OmniLink: $0.25/trip, Fixed Route: $0.10/trip in FY <strong>2008</strong>, $0.15/trip in FY 2009-<br />

FY 2010, $0.20/trip in FY2011-FY 2012, $0.25/trip in FY <strong>2013</strong>.<br />

July 11, 2007 164


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

8.3 Combined General Public Service<br />

Figure 8-3 summarizes recommended annual fares for <strong>Omnitrans</strong> fixed route and OmniLink general<br />

public transit services for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe. Details of fare policy changes are<br />

documented in Sections 8.1 and 8.2.<br />

July 11, 2007 165


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 8-3: Proposed General Public Fare Structure and Policies<br />

Current, effective since Sept<br />

5, 2006<br />

Adopted, effective July 1,<br />

2007<br />

Proposed, effective<br />

September 1, <strong>2008</strong><br />

Proposed, effective<br />

September 1, 2009<br />

Proposed, effective<br />

September 1, 2010<br />

Proposed, effective<br />

September 1, 2011<br />

Proposed, effective<br />

September 1, 2012<br />

Service Fare Type<br />

Fare Category<br />

FY 2007 FY <strong>2008</strong> FY 2009 FY 2010 FY 2011 FY 2012 FY <strong>2013</strong><br />

Cash<br />

Full Fare $1.25 $1.35 $1.50 $1.50 $1.75 $2.00 $2.00<br />

Senior/Disability* $0.50 (+$0.10 MI = $0.60) $0.55 (+$0.10 MI = $0.65) $0.60 (+$0.15 MI = $0.75) $0.60 (+$0.15 MI = $0.75) $0.60 (+$0.25 MI = $0.85) $0.75 (+$0.25 MI = $1.00) $0.75 (+$0.25 MI = $1.00)<br />

Full Fare $41.00 $45.00 $47.00 $47.00 $51.00 $56.00 $56.00<br />

31-Day Passes Senior/Disability* $20.50 (+$2.65 MI = $23.15) $22.50 (+$5.30 MI = $27.80) $23.50 (+$7.95 MI = $31.45) $23.50 (+$7.95 MI = $31.45) $25.50 (+$13.25 MI = $38.75) $28.00 (+$13.25 MI = $41.25) $28.00 (+$13.25 MI = $41.25)<br />

Student $29.50 $33.00 $35.00 $35.00 $39.00 $44.00 $44.00<br />

Special<br />

Summer Youth Pass (Age


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

8.4 Access<br />

The Access fare policy recommendations for the balance of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP were based<br />

on the following strategies:<br />

• Increase cash and ticket fares to maintain farebox recovery ratio of at least 12%.<br />

• Price 1-3 zone fare at roughly twice the fixed route cash fare.<br />

• Reduce the cost of monthly subscriptions and designate as applicable only to<br />

trips classified as “subscription.”<br />

• In accordance with ADA regulations, there will be no change to the Personal<br />

Care Attendant (PCA) free fare policy.<br />

Figure 8-4 summarizes recommended annual fares for <strong>Omnitrans</strong> Access service for the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP timeframe. All Access Service fare increases will be offset through gradual increases in<br />

Measure I fund allocations to fare revenues.<br />

July 11, 2007 167


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 8-4: Proposed Access Fare Structure and Policies<br />

Current, effective since Sept<br />

5, 2006<br />

Adopted, effective July 1,<br />

2007<br />

Proposed, effective<br />

September 1, <strong>2008</strong><br />

Proposed, effective<br />

September 1, 2009<br />

Proposed, effective<br />

September 1, 2010<br />

Proposed, effective<br />

September 1, 2011<br />

Proposed, effective September<br />

1, 2012<br />

Service Fare Type Fare Category<br />

FY 2007 FY <strong>2008</strong> FY 2009 FY 2010 FY 2011 FY 2012 FY <strong>2013</strong><br />

1-3 zone $2.05 (+$0.25 MI = $2.30) $2.45 (+$0.25 MI = $2.70) $2.75 (+$0.25 MI = $3.00) $2.75 (+$0.25 MI = $3.00) $3.25 (+$0.25 MI = $3.50) $3.75 (+$0.25 MI = $4.00) $3.75 (+$0.25 MI = $4.00)<br />

Cash<br />

4 zone $2.80 (+$0.25 MI = $3.05) $3.45 (+$0.25 MI = $3.70) $3.75 (+$0.25 MI = $4.00) $3.75 (+$0.25 MI = $4.00) $4.25 (+$0.25 MI = $4.50) $5.00 (+$0.25 MI = $5.25) $5.00 (+$0.25 MI = $5.25)<br />

5 zone $3.55 (+$0.25 MI = $3.80) $4.45 (+$0.25 MI = $4.70) $4.75 (+$0.25 MI = $5.00) $4.75 (+$0.25 MI = $5.00) $5.25 (+$0.25 MI = $5.50) $6.25 (+$0.25 MI = $6.50) $6.25 (+$0.25 MI = $6.50)<br />

6 zone $4.30 (+$0.25 MI = $4.55) $5.45 (+$0.25 MI = $5.70) $5.75 (+$0.25 MI = $6.00) $5.75 (+$0.25 MI = $6.00) 6.25 (+$0.25 MI = $6.50) $7.50 (+$0.25 MI = $7.75) $7.50 (+$0.25 MI = $7.75)<br />

1-3 zone $172.50 (+$13.25 MI = $185.75)$130.00 (+$13.25 MI = $143.25)$145.00 (+$13.25 MI = $158.25)$145.00 (+$13.25 MI = $158.25)$170.00 (+$13.25 MI = $183.25)$200.00 (+$13.25 MI = $213.25) $200.00 (+$13.25 MI = $213.25)<br />

Subscription<br />

4 zone $228.50 (+$13.25 MI = $241.75)$170.00 (+$13.25 MI = $183.25)$185.00 (+$13.25 MI = $198.25)$185.00 (+$13.25 MI = $198.25)$210.00 (+$13.25 MI = $223.25)$245.00 (+$13.25 MI = $258.25) $245.00 (+$13.25 MI = $258.25)<br />

5 zone $285.00 (+$13.25 MI = $298.25)$210.00 (+$13.25 MI = $223.25)$225.00 (+$13.25 MI = $238.25)$225.00 (+$13.25 MI = $238.25)$250.00 (+$13.25 MI = $263.25$290.00 (+$13.25 MI = $303.25 $290.00 (+$13.25 MI = $303.25)<br />

6 zone $341.00 (+$13.25 MI = $354.25)$250.00 (+$13.25 MI = $263.25)$265.00 (+$13.25 MI = $278.25)$265.00 (+$13.25 MI = $278.25)$290.00 (+$13.25 MI = $303.25)$335.00 (+$13.25 MI = $348.25) $335.00 (+$13.25 MI = $348.25)<br />

Access*<br />

* <strong>Omnitrans</strong> receives Measure I subsidy for Senior and Disability trips; Access & OmniLink: $0.25/trip, Fixed Route: $0.10/trip in FY <strong>2008</strong>, $0.15/trip in FY 2009-<br />

FY 2010, $0.20/trip in FY2011-FY 2012, $0.25/trip in FY <strong>2013</strong>.<br />

July 11, 2007 168


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Associated with the fare policy are the following recommendations related to the farebox recovery ratio:<br />

• For Access, seriously curtail operating cost increases in order to control large<br />

decline in farebox recovery ratio.<br />

• For OmniLink, consider major restructuring, service deletion, etc. to address<br />

ineffective cost performance that dampens fixed Access farebox recovery ratio.<br />

• For Access, combine creative fare classes and purchase incentives with<br />

aggressive marketing to soften the ridership loss and public perception that<br />

comes with major fare increases.<br />

• For Access, consider either restructuring subscription fares to be competitive or<br />

eliminate fare class altogether.<br />

July 11, 2007 169


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

9. NEEDS ASSESSMENT/COA FINDINGS<br />

The following needs assessment was based on a detailed line-by-line analysis conducted in the Summer<br />

and Fall 2006 on the 30 bus routes that were in place at that time. As a result of the assessment, several<br />

deficiencies were corrected in the May 2007 service adjustment including the elimination of one route.<br />

The needs assessment below reports on the 2006 findings and notes instances where corrective actions<br />

were taken in May 2007.<br />

In May 2006, <strong>Omnitrans</strong> provided 30 fixed bus routes including 18 routes in the East Valley, 11 routes in<br />

the West Valley and 1 regional express route. The fixed routes include 15 base routes in the main travel<br />

corridors, 14 local routes in the various cities, and 1 regional express route. In May 2007, <strong>Omnitrans</strong><br />

discontinued one local route and now has 29 fixed routes.<br />

Passenger on/off counts, a passenger survey, stakeholder consultation and the historical performance of<br />

the bus routes were used to identify deficiencies in each route and route section. These on/off counts<br />

were taken on typical weekdays on all vehicles in May 2006; they provided boardings, alightings and<br />

loadings by stop by route, which enabled the current ridership performance (as measured by passengers<br />

per revenue hour) to be determined for each route and route section. The passenger survey was taken in<br />

April 2006 and provided demographic and travel information on the passengers riding each bus.<br />

Stakeholder consultation occurred over the July-October 2006 period and involved city officials, transit<br />

policy makers, <strong>Omnitrans</strong> management and operating staff, and the operators of the 30 routes. The<br />

consultation provided information on the strengths and weaknesses of each route and advice on the<br />

improvements that should be considered to improve the efficiency and effectiveness of the transit<br />

system’s routes and services.<br />

The transit system’s fixed routes are reviewed in this chapter based on the route and service standards<br />

that were in place in May 2006. The operating characteristics and performance of each route are shown<br />

in Figure 9-1 through Figure 9-4. Appendix G provides profile maps for each fixed route.<br />

9.1 Route Assessment (Fixed Route)<br />

9.1.1 EAST VALLEY ROUTES<br />

The East Valley (east of I-15) has nine base routes, nine local routes and one express route, covering the<br />

cities of Colton, Fontana, Grand Terrace, Highland, Loma Linda, Redlands, Rialto, San Bernardino, and<br />

Yucaipa. The routes use 89 buses and have an average overall weekday performance of 29 passengers<br />

per hour as compared to the weekday standard of 25 passengers per hour.<br />

Base Route 1: ARMC-San Bernardino-Del Rosa – This East Valley base route serves Colton and San<br />

Bernardino. It provides 15-30 minute daytime and 30-minute evening service on weekdays, 45-minute<br />

daytime service on Saturdays, and 30-minute daytime service on Sundays. On weekdays, the south<br />

section in Colton provides 15-minute service all day in the Valley/Mt. Vernon corridor between the<br />

Arrowhead Regional Medical Center and the Fourth Street <strong>Transit</strong> Mall in downtown San Bernardino; it<br />

has an above standard performance of 35 passengers per hour. The north section in San Bernardino<br />

provides 30-minute service in the Waterman corridor between the <strong>Transit</strong> Mall and Del Rosa; it has a<br />

significantly above standard performance of 36 passengers per hour. When considering Route 5 in the<br />

Waterman corridor, the corridor receives a combined 10-20 minute service on weekdays and 20-minute<br />

service on weekends. The route has a declining ridership, with monthly average passengers per revenue<br />

hour of 32 on weekdays, 23 on Saturdays, and 29 on Sundays, which are above standard for a base<br />

route.<br />

July 11, 2007 170


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-1: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route East Valley Routes (May 2006 Weekday) – (a)<br />

HEADWAY<br />

TRIP TIME (min)<br />

PK RUN SCH/ BUSES REVENUE VEHICLE HOURS BOARDING PASSENGERS PASSENGERS/ REVHR Peak<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED ACT AM Mid PM AM Mid PM AM Mid PM AM Mid PM Max<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph RnTm Pk Day Pk Eve Pk Day Pk Eve Total Pk Day Pk Eve Total Pk Day Pk Eve Total Load<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&C nb 6.3 15 15 15 15 27 3 27 3 27 3 27 3 14.0 90% 2.0 2.0 2.0 2.0 5.0 11.5 6.0 9.1 31.6 169 757 345 181 1,452 34 66 58 20 46 31am<br />

sb 6.9 15 15 15 15 30 11 30 11 30 11 30 11 13.8 92% 2.7 2.7 2.7 2.7 10.9 15.7 8.2 12.3 47.2 264 576 249 130 1,219 22 30 30 11 26 15pm<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date Placnb 6.3 30 30 30 30 28 10 28 10 28 10 28 10 13.4 88% 1.3 1.3 1.3 1.3 3.2 7.3 3.8 4.5 18.7 97 322 131 67 617 31 44 34 15 33 26pm<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 106% 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7 173 403 142 55 773 45 73 49 16 49 31am<br />

Total Route 1 24.5 112 26 112 26 112 26 112 26 13.1 109% 8.0 8.0 7.0 7.0 24.0 43.6 20.9 29.3 117.7 703 2,058 867 433 4,061 29 47 41 15 35<br />

2: Cal State-E Street-Loma Lindsb 4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb 5:20am-9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 15 15 15 30 24 24 24 24 15.7 85% 1.6 1.6 1.6 0.8 4.8 9.6 4.6 3.4 22.5 320 658 326 121 1,425 67 65 53 35 63 46am<br />

Tripper 0.5 0.5 0.5 1.5 2.0<br />

nb 6.3 15 15 15 30 26 10 26 10 26 10 22 5 14.5 100% 2.4 2.4 2.4 0.9 8.6 14.4 6.7 3.4 33.1 182 530 246 137 1,095 21 36 30 41 33 25am<br />

Tripper 0.5 0.5 0.5 1.5 2.0<br />

E St.&Court - VA Hospital sb 6.8 15 15 15 30 34 7 34 7 34 7 34 7 11.9 105% 2.7 2.7 2.7 1.4 8.2 16.4 7.9 5.9 38.4 194 551 232 76 1,053 24 34 29 13 27 24pm<br />

nb 6.8 15 15 15 30 34 34 34 28 11.9 98% 2.3 2.3 2.3 0.9 6.0 13.6 6.3 3.5 29.5 93 593 388 160 1,234 15 44 61 46 42 33pm<br />

Total Route 2 26.1 118 17 118 17 118 17 108 12 13.3 104% 9.0 10.0 10.0 4.0 27.6 55.0 28.6 16.2 127.5 789 2,332 1,192 494 4,807 29 42 42 31 38<br />

3/4: Highland-San Bernardino eb 5:05am-10:05pm 4 6.0 3.0 3.0 16.0<br />

wb 4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline (4eb 12.2 20 20 20 30 51 5 51 5 51 5 51 5 14.3 99% 2.8 2.8 2.8 1.9 11.2 16.8 8.4 5.6 42.0 336 1,020 539 285 2,180 30 61 64 51 52 30pm<br />

Boulder&Baseline-4thSt&E St. (3) wb 12.2 20 20 20 30 51 15 51 15 51 15 51 5 14.3 109% 3.3 3.3 3.3 1.9 14.7 19.8 9.9 6.5 50.9 354 943 452 257 2,006 24 48 46 39 39 20pm<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4) wb 6.4 20 20 20 30 25 19 25 19 25 19 25 9 15.3 124% 2.2 2.2 2.2 1.1 8.8 13.2 6.6 3.4 32.0 194 427 193 119 933 22 32 29 35 29 24am<br />

4thSt&ESt - Boulder&Baseline (3) eb 6.4 20 20 20 30 29 5 29 5 29 5 29 5 13.2 98% 1.7 1.7 1.7 1.1 7.6 10.2 5.1 4.0 26.8 138 482 301 235 1,156 18 47 59 59 43 22pm<br />

Total Route 3/4 37.0 156 44 156 44 156 44 156 24 14.2 102% 10.0 10.0 10.0 6.0 42.3 60.0 30.0 19.5 151.8 1,022 2,872 1,485 896 6,275 24 48 50 46 41<br />

5: San Bndo-Del Rosa-Cal Statenb 5:50am-9:50pm 3.8 6.0 3.0 3.5 16.3<br />

sb 4:58am-9:28pm 3.7 6.0 3.0 3.5 16.2<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 116% 0.8 0.8 0.8 0.8 3.1 5.0 2.5 2.9 13.5 123 271 164 123 681 39 54 66 42 50 23am<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 132% 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.1 78 173 83 27 361 22 31 30 8 24<br />

Del Rosa&Highland - Cal State Unnb 7.3 30 30 30 30 25 18 25 18 25 18 25 18 17.5 100% 1.4 1.4 1.4 1.4 5.4 8.6 4.3 5.0 23.3 54 113 61 39 267 10 13 14 8 11<br />

sb 7.3 30 30 30 30 24 24 24 24 18.3 85% 0.8 0.8 0.8 0.8 3.0 4.8 2.4 2.8 13.0 238 223 138 76 675 80 46 58 27 52 49am<br />

Total Route 5 24.6 97 23 97 23 97 23 97 23 15.2 105% 4.0 4.0 4.0 4.0 15.0 24.0 12.0 14.0 65.0 493 780 446 265 1,984 33 33 37 19 31<br />

7: San Bdno-Sierra Way-Cal Stanb 6:05am-7:05pm 3.0 6.0 3.0 1.0 13.0<br />

sb 5:06am-6:06pm 4.3 6.0 3.0 0.7 14.0<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 95% 0.7 0.7 0.7 0.7 2.1 4.2 2.1 0.7 9.1 63 192 137 39 431 30 46 65 56 47 20pm<br />

sb 5.8 30 30 30 30 25 10 25 10 25 10 25 10 13.8 108% 1.2 1.2 1.2 1.2 5.0 7.0 3.5 0.8 16.3 70 158 113 16 357 14 23 32 20 22<br />

SierraWay&40th - Cal State nb 3.4 60 60 60 60 15 2 15 2 15 2 15 2 13.7 106% 0.3 0.3 0.3 0.3 0.9 1.7 0.9 0.3 3.7 11 40 14 15 80 13 24 16 53 22<br />

sb 3.2 60 60 60 60 11 11 11 11 17.5 141% 0.2 0.2 0.2 0.2 0.8 1.1 0.6 0.1 2.6 49 55 29 15 148 62 50 53 117 58 18am<br />

Cal State - Kendall&Palm nb 4.2 60 60 60 60 13 11 13 11 13 11 13 11 19.2 100% 0.4 0.4 0.4 0.4 1.2 2.4 1.2 0.4 5.2 11 19 11 6 47 9 8 9 15 9<br />

sb 2.3 60 60 60 60 8 5 8 5 8 5 8 5 17.3 95% 0.2 0.2 0.2 0.2 0.9 1.3 0.7 0.2 3.0 29 26 10 1 66 31 20 15 7 22<br />

Total Route 7 23.4 93 28 93 28 93 28 93 28 15.1 112% 3.0 3.0 3.0 3.0 10.9 17.7 8.9 2.5 39.9 233 490 314 92 1,129 21 28 35 37 28<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-7:30pm 3.0 6.0 3.0 3.2 15.2<br />

wb 5:02am-7:02pm 4.0 6.0 3.0 2.2 15.2<br />

4th&E St-Redlands&Mountain Vie eb 7.1 60 60 60 60 21 21 21 21 20.1 93% 0.4 0.4 0.4 0.4 1.1 2.1 1.1 1.1 5.3 52 119 51 26 248 50 57 49 23 47 23am<br />

wb 7.8 60 60 60 60 24 10 24 10 24 10 24 10 19.5 84% 0.6 0.6 0.6 0.6 2.3 3.4 1.7 1.2 8.6 49 94 37 12 192 22 28 22 10 22 27pm<br />

Redlands&MtnView-Redlands Ma eb 4.8 60 60 60 60 26 26 26 26 11.1 91% 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.4 6.6 10 19 27 7 63 8 7 21 5 10<br />

wb 4.8 60 60 60 60 26 26 26 26 11.1 106% 0.4 0.4 0.4 0.4 1.7 2.6 1.3 1.0 6.6 13 42 23 8 86 8 16 18 8 13<br />

Redlands Mall- 4th&Yucaipa eb 11.8 60 60 60 60 35 5 35 5 35 5 35 5 20.3 88% 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.1 10.1 30 68 39 16 153 15 17 20 8 15<br />

wb 11.0 60 60 60 60 33 33 33 33 20.0 82% 0.6 0.6 0.6 0.6 2.2 3.3 1.7 1.2 8.4 40 79 49 8 176 18 24 30 7 21<br />

Total Route 8 47.3 165 15 165 15 165 15 165 15 17.2 101% 3.0 3.0 3.0 3.0 10.6 18.0 9.0 8.1 45.6 194 421 226 77 918 18 23 25 10 20<br />

9: San Bdno-Redlands-Yucaipa eb 6:10am-9:05pm 3.0 6.0 3.0 3.6 15.6<br />

wb 4:33m-8:33pm 4.0 6.0 3.0 4.0 17.0<br />

4th&E St. - Barton&Benton eb 7.7 60 60 60 60 31 31 31 31 14.9 100% 0.5 0.5 0.5 0.5 1.6 3.1 1.6 1.8 8.0 88 137 70 21 316 57 44 45 11 39 31am<br />

wb 8.5 60 60 60 60 34 15 34 15 34 15 34 15 14.9 95% 0.8 0.8 0.8 0.8 3.3 4.9 2.5 3.3 13.9 38 87 57 45 227 12 18 23 14 16<br />

Barton&Benton-Redlands Mall eb 4.4 60 60 60 60 14 14 14 14 18.8 108% 0.2 0.2 0.2 0.2 0.7 1.4 0.7 0.8 3.6 21 23 12 13 69 30 16 17 16 19<br />

wb 4.4 60 60 60 60 14 14 14 14 18.8 108% 0.2 0.2 0.2 0.2 0.9 1.4 0.7 0.9 4.0 10 43 24 5 82 11 31 34 5 21<br />

Redlands Mall - California&D St. eb 10.4 60 60 60 60 33 5 33 5 33 5 33 5 18.9 102% 0.6 0.6 0.6 0.6 1.9 3.8 1.9 2.2 9.8 24 71 35 24 154 13 19 18 11 16<br />

wb 10.5 60 60 60 60 34 34 34 34 18.6 107% 0.6 0.6 0.6 0.6 2.3 3.4 1.7 2.3 9.6 72 111 48 24 255 32 33 28 11 26 20pm<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 105% 3.0 3.0 3.0 3.0 10.6 18.0 9.0 11.4 49.0 253 472 246 132 1,103 24 26 27 12 23<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 171


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-2: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route East Valley Routes (May 2006 Weekday) – (b)<br />

HEADWAY TRIP TIME (min) PK RUN SCH/ BUSES<br />

REVENUE VEHICLE HOURS BOARDING PASSENGERS PASSENGERS/ REVHR Peak<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED ACT AM Mid PM AM Mid PM AM Mid PM AM Mid PM Max<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph RnTm Pk Day Pk Eve Pk Day Pk Eve Total Pk Day Pk Eve Total Pk Day Pk Eve Total Load<br />

10: Fontana-Baseline-San Bdnowb 5:35am-6:35pm 3.0 6.5 2.5 1.0 13.0 *<br />

eb 5:30am-7:30pm 3.3 6.0 3.0 1.5 13.8 *<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 41 38 38 38 38 17.6 86% 1.3 1.3 1.3 0.9 3.8 8.2 3.2 0.9 16.1 139 319 124 55 637 37 39 39 59 39 25am<br />

eb 11.1 30 30 30 45 38 15 38 15 38 15 38 15 17.6 102% 1.8 1.8 1.8 1.2 5.8 10.6 5.3 1.8 23.5 130 249 78 21 478 22 23 15 12 20<br />

Baseline&Citrus - Fontana Metroli wb 2.6 30 30 30 30 12 5 12 5 12 5 12 5 13.0 114% 0.6 0.6 0.6 0.6 1.7 3.7 1.4 0.6 7.4 19 47 10 5 81 11 13 7 9 11<br />

eb 3.1 30 30 30 41 12 12 12 12 15.3 95% 0.4 0.4 0.4 0.3 1.3 2.4 1.2 0.4 5.4 117 147 105 46 415 89 61 88 105 77 34am<br />

Total Route 10 27.9 100 20 100 20 100 20 100 20 16.7 98% 4.0 4.0 4.0 3.0 12.7 24.9 11.1 3.7 52.3 405 762 317 127 1,611 32 31 29 34 31<br />

11: San Bdno-Muscoy-Cal Statenb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 3.9 16.6<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 107% 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0 53 110 66 34 263 22 28 33 13 24 27pm<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 109% 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.0 16.5 44 79 106 71 300 14 13 34 18 18 19am<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 123% 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0 46 173 138 107 464 9 21 33 20 20<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 105% 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.5 15.5 127 199 31 18 375 33 37 11 5 24<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 101% 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.4 66.0 270 561 341 230 1,402 18 23 28 15 21<br />

14/14L: Fontana-Foothill-SanB wb 3:46am-10:02pm 4.3 6.0 3.0 4.0 17.3<br />

eb 4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana ML (14) wb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 109% 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.7 51.0 560 1,018 519 285 2,382 32 51 52 43 47 34am<br />

4th&Arrowhead-Fontana ML (14L wb 9.8 60 25 5 23.5 0.5 2.0 2.0<br />

Tripper 1.0 1.0 1.0<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 107% 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7 437 896 557 366 2,256 29 41 51 62 44 28pm<br />

Fontana ML-4th&Arrowhead (14L eb 9.8 60 25 5 23.5 0.5 2.0 2.0<br />

Total Route 14 39.2 140 25 90 15 90 15 82 8 16.8 108% 9.0 7.0 7.0 3.0 32.2 42.0 21.0 12.5 107.7 997 1,914 1,076 651 4,638 31 46 51 52 43<br />

15: Fontana-SanB/Highland-Redeb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.5 6.0 3.0 3.8 15.3<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 101% 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5 102 314 163 47 626 24 30 31 7 24<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 104% 2.1 2.1 2.1 2.1 5.3 12.8 6.4 8.1 32.6 148 307 144 104 703 28 24 23 13 22 21am<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 89% 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0 119 271 191 122 703 24 23 32 24 25 21pm<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 114% 2.1 2.1 2.1 2.1 5.3 12.8 6.4 5.3 29.9 135 244 148 113 640 25 19 23 21 21<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 112% 8.0 8.0 8.0 8.0 20.0 48.0 24.0 25.0 117.0 504 1,136 646 386 2,672 25 24 27 15 23<br />

19: Redlands-Colton-Fontana wb 4:50am-8:20pm 2.5 6.0 3.0 2.3 13.8<br />

eb 5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 129% 2.2 2.2 2.2 2.2 5.4 13.0 6.5 4.9 29.8 152 525 241 188 1,106 28 40 37 39 37 19pm<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 96% 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1 144 373 107 98 722 23 25 14 10 19<br />

Arrowhead RMC - Fontana MLink wb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 100% 1.2 1.2 1.2 1.2 2.9 7.0 3.5 2.6 16.0 63 130 87 38 318 22 19 25 14 20<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 112% 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8 66 215 125 88 494 23 31 36 20 28 19am<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 112% 7.0 7.0 7.0 7.0 17.5 42.0 21.0 21.3 101.8 425 1,243 560 412 2,640 24 30 27 19 26<br />

20: FontanaML-Hemlock-Kaisersb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.0 6.0 3.0 3.0 15.0<br />

Fontana Metrolink - Randall&Hemsb 3.2 30 30 30 30 9 9 9 9 21.4 70% 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.8 4.4 70 134 71 47 322 78 74 79 56 73 14am<br />

nb 2.9 30 30 30 30 14 15 14 15 14 15 14 15 12.5 128% 1.0 1.0 1.0 1.0 2.9 5.8 2.9 2.9 14.5 40 64 21 6 131 14 11 7 2 9<br />

Randall&Hemlock - Marygold&Siesb 3.0 30 30 30 30 13 13 13 13 14.0 123% 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4 17 36 17 4 74 13 14 13 3 12<br />

nb 3.0 30 30 30 30 9 9 9 9 20.3 67% 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.9 4.5 44 120 58 31 253 49 67 64 34 56 11am<br />

Total Route 20 12.2 45 15 45 15 45 15 45 15 16.3 94% 2.0 2.0 2.0 2.0 6.0 12.0 6.0 5.9 29.9 171 354 167 88 780 29 30 28 15 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.6 16.7<br />

sb 5:05am-9:50pm 4.0 6.3 3.0 4.0 17.3<br />

Arrowhead RMC-Live Oak&Rvrsd nb 11.3 20 20 20 26 47 8 47 8 47 8 47 8 14.5 90% 2.8 2.8 2.8 2.1 11.3 16.5 8.3 7.6 43.6 204 493 229 97 1,023 18 30 28 13 23 18pm<br />

sb 11.7 20 20 20 26 50 15 50 15 50 15 50 14.1 141% 3.3 3.3 3.3 1.9 13.0 20.6 9.8 7.7 51.0 177 463 301 189 1,130 14 23 31 25 22 23am<br />

Total Route 22 23.1 97 23 97 23 97 23 97 8 14.3 111% 6.0 6.0 6.0 4.0 24.3 37.1 18.0 15.3 94.7 381 956 530 286 2,153 16 26 29 19 23<br />

28: Southridge-Slover Av-Kaise wb 6:02am-6:02pm 3.0 6.0 3.8 12.8<br />

eb 6:31am-6:31pm 3.0 6.0 3.8 12.8<br />

Marygold&Sierra-Slover&Mulberrywb 4.8 60 60 60 20 20 20 14.4 84% 0.3 0.3 0.3 1.0 2.0 1.3 4.3 10 7 6 23 10 4 5 5 7am<br />

eb 5.4 60 60 60 21 6 21 6 21 6 15.5 97% 0.5 0.5 0.5 1.4 2.7 1.7 5.8 4 5 8 17 3 2 5 3 7pm<br />

Slover&Mulberry-Slover&Marley cw 3.2 60 60 60 13 13 13 14.5 115% 0.2 0.2 0.2 0.7 1.3 0.8 2.8 28 39 37 104 43 30 45 38<br />

Total Route 28 13.4 54 6 54 6 54 6 14.9 105% 1.0 1.0 1.0 3.0 6.0 3.8 12.8 42 51 51 - 144 14 9 13 11<br />

29: Bloomington-Valley-Kaiser eb 6:45am-5:54pm 2.0 6.0 3.7 11.7<br />

wb 7:10am-6:10pm 2.0 6.0 3.9 11.9<br />

Marygold&Sierra-11th&Cedar eb 5.8 60 60 60 25 25 25 13.8 99% 0.4 0.4 0.4 0.8 2.5 1.5 4.9 18 86 31 135 22 34 20 28 8pm<br />

wb 5.7 60 60 60 25 10 25 10 25 10 13.7 106% 0.6 0.6 0.6 1.2 3.5 2.3 6.9 19 76 15 110 16 22 7 16 5am<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 102% 1.0 1.0 1.0 2.0 6.0 3.8 11.8 37 162 46 245 19 27 12 21<br />

31: Redlands Trolley Blue Line 7:00am-7:00pm -<br />

Total Route 30 13.6 60 60 60 50 10 50 10 50 10 16.3 119% 1.0 1.0 1.0 2.2 6.0 4.6 12.8 12 45 23 81 6 8 5 6<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.1 17.1<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.5 17.5<br />

4th St <strong>Transit</strong> Mall-Montclair TC wb 32.9 45 40 40 45 90 10 81 30 80 17 80 7 21.9 93% 2.2 2.8 2.4 1.9 8.9 14.4 7.3 8.0 38.5 138 110 85 29 362 16 8 12 4 9<br />

eb 32.7 50 45 45 45 75 75 73 75 26.2 130% 1.5 1.7 1.6 1.7 6.0 9.3 4.9 6.9 27.1 94 102 189 41 426 16 11 39 6 16 22pm<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 14.7 45 45 45 45 26 5 26 9 28 22 26 5 33.8 99% 0.7 0.8 1.1 0.7 2.8 4.4 3.3 3.1 13.5 80 107 53 31 271 29 25 16 10 20<br />

nb 14.7 50 45 45 45 29 34 38 32 30.3 113% 0.6 0.8 0.8 0.7 2.3 3.9 2.5 3.2 12.0 47 178 67 82 374 20 46 26 26 31 24pm<br />

Total Route 90 94.9 220 15 216 39 219 39 213 12 25.9 112% 5.0 6.0 6.0 5.0 20.0 32.0 18.0 21.1 91.1 359 497 394 183 1,433 18 16 22 9 16<br />

East Valley Total 16.3 88 88 87 66 295 516 262 221 1294 7,290 17,106 8,927 4,752 38076 25 33 34 21 29<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 172


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-3: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route West Valley Routes (May 2006 Weekday) – (a)<br />

HEADWAY TRIP TIME (min)<br />

PK RUN SCH/ BUSES REVENUE VEHICLE HOURS BOARDING PASSENGERS ASSENGERS PER REVHPeak<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED ACT AM Mid PM AM Mid PM AM Mid PM AM Mid PM Max<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph RnTm Pk Day Pk Eve Pk Day Pk Eve Total Pk Day Pk Eve Total Pk Day Pk Eve Total Load<br />

60:OntCC-ChaffeyColl-OntMills eb 5:10am-9:10pm 4.0 6.0 3.0 3.4 16.4 *<br />

wb 4:40am-8:40pm 4.5 6.0 3.0 2.5 16.0 *<br />

Holt&Vineyard-Chaffey College eb 9.0 60 60 60 60 33 20 33 20 33 20 33 20 16.4 87% 0.9 0.9 0.9 0.9 3.5 5.3 2.7 3.0 14.5 85 97 53 28 263 24 18 20 9 18 32am<br />

wb 8.8 60 60 60 60 30 20 30 20 30 20 30 20 17.6 121% 0.8 0.8 0.8 0.8 3.7 5.0 2.5 2.1 13.3 37 109 31 10 187 10 22 12 5 14<br />

Chaffey College - Ontario Mills sb 9.9 60 60 60 60 37 37 37 37 16.1 152% 0.6 0.6 0.6 0.6 2.5 3.7 1.9 2.1 10.1 20 41 23 8 92 8 11 12 4 9<br />

nb 9.9 60 60 60 60 40 40 40 40 14.9 114% 0.7 0.7 0.7 0.7 3.0 4.0 2.0 1.7 10.6 30 95 40 25 190 10 24 20 15 18 12pm<br />

Total Route 60 37.6 140 40 140 40 140 40 140 40 16.1 108% 3.0 3.0 3.0 3.0 12.7 18.0 9.0 8.9 48.5 172 342 147 71 732 14 19 16 8 15<br />

61:Fontana-OntarioMills-Pomoneb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb 4:20am-10:20pm 4.0 5.8 3.3 4.0 17.0<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 103% 1.8 2.1 2.1 1.1 6.6 12.3 6.9 3.7 29.4 365 224 403 191 1,183 56 18 58 52 40 28pm<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 113% 2.5 2.9 2.9 1.5 10.1 16.9 9.5 3.7 40.1 246 460 279 107 1,092 24 27 29 29 27<br />

Ontario Transfer Center - Airport Deb 3.2 16 15 15 30 15 17 17 17 12.8 101% 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.7 119 194 98 37 448 34 30 27 19 29<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 91% 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.0 13.9 78 166 98 30 372 17 31 32 30 27<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 100% 4.0 3.9 3.9 1.9 14.8 22.2 12.6 6.7 56.2 147 788 284 90 1,309 10 35 23 13 23<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 89% 2.7 3.0 3.0 1.5 10.6 17.3 9.8 6.0 43.6 290 502 366 167 1,325 27 29 38 28 30 36am<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 108% 13.0 14.0 14.0 7.0 50.0 80.5 45.5 23.0 199.0 1,245 2,334 1,528 622 5,729 25 29 34 27 29<br />

62: Montclair-Ontario-Chino nb 5:48am-9:18pm 3.0 6.0 3.0 3.5 15.5<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

Chino <strong>Transit</strong> Ctr-Ontario TC nb 6.7 30 30 30 30 22 22 22 22 18.2 89% 0.7 0.7 0.7 0.7 2.2 4.4 2.2 2.6 11.4 79 171 100 52 402 36 39 45 20 35 26pm<br />

sb 6.4 30 30 30 30 22 19 22 19 22 19 22 19 17.6 95% 1.4 1.4 1.4 1.4 4.1 8.2 4.1 4.0 20.4 50 132 90 55 327 12 ## ## 14 16<br />

Ontario <strong>Transit</strong> Ctr-Montclair TC nb 5.4 30 30 30 30 20 20 20 20 16.2 105% 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.3 10.3 86 120 63 39 308 43 ## ## 17 30<br />

sb 5.2 30 30 30 30 20 20 20 20 15.5 101% 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.0 10.0 56 90 59 23 228 28 23 30 12 23 16pm<br />

Montclair Transcenter-19th&Euclidnb 6.4 30 30 30 30 23 23 23 23 16.7 0.8 0.8 0.8 0.8 2.3 4.6 2.3 2.7 11.9 40 90 35 23 188 17 20 15 9 16<br />

sb 6.4 30 30 30 30 24 24 24 24 16.0 0.8 0.8 0.8 0.8 2.4 4.8 2.4 2.4 12.0 26 67 42 20 155 11 14 18 8 13<br />

Total Route 62 36.5 131 19 131 19 131 19 131 19 16.7 97% 5.0 5.0 5.0 5.0 15.0 30.0 15.0 15.9 75.9 337 670 389 212 1,608 22 22 26 13 21<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 83% 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5 73 150 111 48 382 32 33 48 38 37 24pm<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 109% 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7 43 87 67 32 229 10 10 15 15 12<br />

Sultana&D St - San Antonio Hosp nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 113% 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5 48 177 108 43 376 15 28 34 25 26<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 103% 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8 74 164 51 28 317 35 39 24 21 32 17am<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 104% 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 238 578 337 151 1,304 20 24 28 23 24<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair Transcenter- ChinoTsb 6.6 30 30 30 30 24 24 24 24 16.6 93% 0.8 0.8 0.8 0.8 3.2 4.8 2.4 3.4 13.8 127 230 90 112 559 40 48 38 33 41 22pm<br />

nb 6.6 30 30 30 30 21 15 21 15 21 15 21 15 19.0 106% 1.2 1.2 1.2 1.2 4.8 7.2 3.6 5.0 20.6 109 195 87 55 446 23 27 24 11 22 25pm<br />

A: ChinoTC-ChinoHillsMPvia Chinsb 3.6 60 60 60 60 14 14 14 14 15.5 110% 0.2 0.2 0.2 0.2 0.9 1.4 0.7 1.0 4.0 14 26 7 8 55 15 19 10 8 14<br />

nb 3.6 60 60 60 60 15 15 15 15 14.5 120% 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3 18 53 20 13 104 18 35 27 13 24<br />

B: ChinoTC-ChinoHillsMPvia Edissb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.1 4.3 10 22 10 5 47 10 15 13 5 11<br />

nb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3 24 49 56 17 146 24 33 75 16 34<br />

A/B: ChinoHillsMP- ChinoHillsLooccw 5.6 30 30 30 30 19 12 19 12 19 12 19 12 17.7 94% 1.0 1.0 1.0 1.0 4.1 6.2 3.1 4.3 17.8 22 34 9 4 69 5 5 3 1 4<br />

Total Route 65 34.0 123 27 123 27 123 27 123 27 16.6 99% 4.0 4.0 4.0 4.0 16.1 24.1 12.1 16.8 69.0 324 609 279 214 1,426 20 25 23 13 21<br />

66: Fontana-Foothill-Montclair wb 4;19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb 5:00am-9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TC wb 16.4 15 15 15 15-30 66 15 66 15 66 15 66 15 14.9 113% 5.4 5.4 5.4 3.0 18.8 32.4 16.2 10.5 77.9 396 696 354 189 1,635 21 21 22 18 21 24am<br />

eb 16.7 15 15 15 15-30 75 9 75 9 75 9 75 9 13.3 106% 5.6 5.6 5.6 3.0 19.2 33.6 16.8 7.8 77.4 251 652 460 240 1,603 13 19 27 31 21 23pm<br />

Total Route 68 33.1 141 24 141 24 141 24 141 24 14.1 109% 11.0 11.0 11.0 6.0 38.0 66.0 33.0 18.3 155.3 647 1,348 814 429 3,238 17 20 25 23 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-6:35pm 4.0 6.0 3.8 13.8<br />

sb 6:05am-7:05pm 4.0 6.0 3.9 13.9<br />

D St& Sultana - Euclid&Baseline nb 4.5 60 60 60 16 16 16 16.8 112% 0.3 0.3 0.3 1.1 1.6 1.0 3.7 55 67 48 170 52 42 47 46 19am<br />

sb 3.9 60 60 60 15 8 15 8 15 8 15.5 121% 0.4 0.4 0.4 1.5 2.3 1.5 5.3 14 42 17 73 9 18 12 14<br />

Euclid&Baseline - Fontana Metrol eb 14.2 60 60 60 63 11 63 11 63 11 13.5 112% 1.2 1.2 1.2 4.9 7.4 4.7 17.0 47 95 49 191 10 13 10 11<br />

wb 14.2 60 60 60 67 67 67 12.7 82% 1.1 1.1 1.1 4.5 6.7 4.3 15.5 56 105 81 242 13 16 19 16 14pm<br />

Total Route 67 36.7 161 19 161 19 161 19 13.7 125% 3.0 3.0 3.0 - 12.0 18.0 11.5 0.0 41.5 172 309 195 676 14 17 17 16<br />

68: Chino-Montclair-Ch.College nb 5:03am-9:07pm 3.5 6.0 3.0 4.0 16.5<br />

sb 4:49am-9:19pm 3.7 6.0 2.5 4.2 16.4<br />

Chino <strong>Transit</strong> Center- Montclair T nb 7.9 30 30 30 30-6 35 3 35 3 35 3 35 3 13.5 118% 1.3 1.3 1.3 0.5 4.4 7.6 3.8 3.2 19.1 85 129 177 38 429 19 17 47 12 23 26am<br />

sb 7.9 30 30 30 30-6 30 22 30 22 30 22 30 22 15.7 97% 1.7 1.7 1.7 0.7 6.4 10.4 4.3 4.0 25.1 62 85 42 34 223 10 8 10 9 9<br />

Montclair Transcenter- ChaffeyCo eb 12.4 30 30 30 30-6 51 15 51 15 51 15 51 15 14.6 115% 2.2 2.2 2.2 0.9 7.7 13.2 6.6 5.7 33.2 151 238 80 42 511 20 18 12 7 15<br />

wb 12.4 30 30 30 30-6 54 54 54 54 13.8 85% 1.8 1.8 1.8 0.9 6.7 10.8 4.5 4.7 26.6 121 286 130 70 607 18 26 29 15 23 15pm<br />

Total Route 68 40.5 170 40 170 40 170 40 170 40 14.3 112% 7.0 7.0 7.0 3.0 25.2 42.0 19.2 17.6 104.0 419 738 429 184 1,770 17 18 22 10 17<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 173


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-4: Operating Characteristics of <strong>Omnitrans</strong> Fixed Route West Valley Routes (May 2006 Weekday) – (b)<br />

HEADWAY TRIP TIME (min) PK RUN SCH/ BUSES REVENUE VEHICLE HOURS BOARDING PASSENGERS ASSENGERS PER REVHPeak<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED ACT AM Mid PM AM Mid PM AM Mid PM AM Mid PM Max<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph RnTm Pk Day Pk Eve Pk Day Pk Eve Total Pk Day Pk Eve Total Pk Day Pk Eve Total Load<br />

70:Ontario-via Riverside-Ont M eb 6:34am-7:20pm 3.5 6.0 3.6 1.3 14.4 *<br />

wb 6:44am-8:24pm 3.5 6.0 3.6 2.5 15.6 *<br />

D St& Sultana -Ontario Mills eb 13.0 60 60 60 60 39 4 39 32 39 7 39 32 19.9 94% 0.7 1.2 0.8 1.2 2.5 7.1 2.8 1.5 13.8 64 108 63 235 26 15 23 17 11am<br />

wb 12.0 60 60 60 60 41 8 41 8 41 41 8 17.6 92% 0.8 0.8 0.7 0.8 2.9 4.9 2.5 2.0 12.3 57 110 74 241 20 22 30 20 12am<br />

Total Route 70 25.0 80 12 80 40 80 7 80 40 18.7 93% 1.5 2.0 1.5 2.0 5.4 12.0 5.2 3.5 26.1 121 218 137 476 23 18 26 18<br />

75:Ontario-via Francis-Ont Millseb 6:05am-6:24pm 3.5 3.6 7.1<br />

wb 6:24am-6:24pm 3.5 3.6 7.1<br />

D St& Sultana -Ontario Mills eb 13.1 60 60 35 12 34 12 22.4 95% 0.8 0.8 2.7 2.7 5.5 42 39 81 15 14 15 27am<br />

wb 11.6 60 60 38 3 36 5 18.3 98% 0.7 0.7 2.4 2.4 4.8 33 44 77 14 18 16 32pm<br />

Total Route 75 24.7 73 15 70 17 20.3 96% 1.5 1.5 5.1 5.1 10.3 75 83 158 15 16 15<br />

71:Kaiser-S.Ridge-R.Cucamongeb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.5 15.5<br />

Foothill&Haven-Etiwanda&Philadeeb 8.3 60 60 60 60 23 23 23 23 21.8 96% 0.4 0.4 0.4 0.4 1.5 2.3 1.2 1.2 6.1 65 103 70 39 277 42 45 61 34 45 21pm<br />

wb 7.8 60 60 60 60 18 18 19 17 17 19 17 19 26.0 100% 0.6 0.6 0.6 0.6 2.4 3.6 1.8 1.5 9.3 33 57 32 15 137 14 16 18 10 15<br />

Etwnda&Phila-Mulberry &Philadel eb 3.6 60 60 60 60 15 15 15 15 14.3 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.8 4.0 8 14 9 2 33 8 9 12 3 8<br />

wb 3.6 60 60 60 60 15 15 15 15 14.3 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.6 3.9 12 11 5 2 30 12 7 7 3 8<br />

Mulberry&Philadelphia-Jurupa&Cheb 2.1 60 60 60 60 12 12 12 12 10.5 101% 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.6 3.2 28 39 15 4 86 35 33 25 7 27<br />

wb 2.1 60 60 60 60 12 12 12 12 10.5 93% 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.5 3.1 15 14 6 1 36 19 12 10 2 12<br />

Jurupa&Cherry- Fontana Metrolin eb 8.2 60 60 60 60 25 15 25 15 25 15 25 15 19.8 93% 0.7 0.7 0.7 0.7 2.7 4.0 2.0 2.0 10.7 33 68 28 13 142 12 17 14 7 13<br />

wb 8.2 60 60 60 60 27 27 27 27 18.3 95% 0.5 0.5 0.5 0.5 1.8 2.7 1.4 1.1 7.0 94 140 66 34 334 52 52 49 30 48 32am<br />

Total Route 71 44.0 147 33 148 32 146 34 146 34 17.9 97% 3.0 3.0 3.0 3.0 12.0 18.0 9.0 8.3 47.3 288 446 231 110 1,075 24 25 26 13 23<br />

West Valley Total 15.9 56 56 57 35 203 333 177 119 831 4038 7592 4569 1993 18192 20 23 26 17 22<br />

Total System 16.2 144 144 144 101 499 849 438 340 2125 11328 24698 13496 6745 56268 23 29 31 20 26<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 174


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Base Route 2: Cal State-E Street-Loma Linda – This East Valley base route serves Loma Linda and<br />

San Bernardino. It provides 15-minute daytime service and 30-minute evening service on weekdays, and<br />

20-minute weekend daytime service. On weekdays, the south section in the Hospitality Ln/Arrowhead<br />

corridor between downtown Loma Linda and the Fourth Street <strong>Transit</strong> Mall has an above standard<br />

performance of 38 passengers per hour. The north section between the <strong>Transit</strong> Mall and Cal State in the<br />

Arrowhead/Kendall corridor performs significantly above standard with an average of 48 passengers per<br />

hour. The loadings on the north section suggest that 10 rather than 15-minute service may be required<br />

during peak periods, and 15 rather than 30-minute service may be required in the evening on the north<br />

section of this route. The route has a declining ridership, with monthly average passengers per revenue<br />

hour of 35 on weekdays, 30 on Saturdays, and 26 on Sundays, which are above standard for a base<br />

route. The route gets overloaded and is a good candidate for limited stop/sbX service.<br />

Base Routes 3/4: Baseline-Highland-San Bernardino – These East Valley base routes serve the<br />

Baseline East and Highland East corridors out of the Fourth Street <strong>Transit</strong> Mall in downtown San<br />

Bernardino. The routes provide 20-minute daytime and 30-minute evening service on weekdays and 20-<br />

minute daytime service on weekends. On weekdays, the Baseline East corridor performs significantly<br />

above standard with an average of 36 passengers per hour, and the Highland East corridor performs<br />

significantly above standard with an average of 45 passengers per hour. The loadings in both corridors<br />

suggest that 15 rather than 20-minute service may be required during the daytime on weekdays, which<br />

would make the frequencies compatible with Routes 1 and 2 for transferring purposes. The routes have a<br />

stable ridership, with monthly average passengers per revenue hour of 36 on weekdays, 30 on<br />

Saturdays, and 22 on Sundays, which are above standard for a base route. Ridership seems to be slowly<br />

declining on these routes, possibly because of the frequencies and loadings.<br />

Local Route 5: San Bernardino-Del Rosa-Cal State – This East Valley local route provides Northeast<br />

San Bernardino with 30-minute daytime and evening service on weekdays, 30-minute daytime service on<br />

Saturdays, and 60-minute daytime service on Sundays. On weekdays, the south section in the<br />

Waterman/Del Rosa corridor has a significantly above standard performance of 36 passengers per hour.<br />

The north section in the 40th Street corridor to Cal State University has a marginally above standard<br />

performance of 26 passengers per hour, which is close to the system average. The route has a slowly<br />

declining ridership, with monthly average passengers per revenue hour of 28 on weekdays, 18 on<br />

Saturdays and 17 on Sundays, which are above standard for a local route.<br />

Local Route 7: North San Bernardino-Sierra Way-San Bernardino – This East Valley local route<br />

serves the Sierra Way/Northpark/Kendall corridor between downtown San Bernardino and North San<br />

Bernardino and Cal State. It provides 30-60 minute daytime service on weekdays and 60-minute daytime<br />

service on weekends. On weekdays, the Kendall section north of the University has below standard 60-<br />

minute service and a below standard performance of 14 passengers per hour. The Northpark section<br />

serving the University has below standard 60-minute service and an above standard performance of 36<br />

passengers per hour. The Sierra Way section has 30-minute service and an above standard<br />

performance of 40 passengers per hour. A consistent 30-minute service needs to be provided on this<br />

route Monday-Saturday, and the spans need to be extended to 9:00 p.m. on weekdays. The route has a<br />

declining ridership, with monthly average passengers per revenue hour of 25 on weekdays (which is<br />

standard for base routes), and 17 on Saturdays and 12 on Sundays, which are below standard, possibly<br />

because of the low frequencies on weekends.<br />

Local Route 8: San Bernardino-Mentone-Yucaipa – This East Valley local route operates out of the<br />

Fourth Street <strong>Transit</strong> Mall and serves the Tippecanoe corridor in San Bernardino, the Redlands corridor in<br />

Loma Linda, the Mentone corridor in Redlands and the Yucaipa corridor in Yucaipa. It provides 60-<br />

minute daytime service on weekdays and Saturdays, and 120-minute headways on Sundays. On<br />

weekdays, the Tippecanoe section has an above standard performance of 34 passengers per hour; the<br />

frequency should be increased to 30-minutes and the span improved as it functions as a base route in<br />

this section. The Redlands section had a significantly below standard performance of 11 passengers per<br />

hour because of the diversion to Orange Tree and the Citrus Plaza, which was eliminated in the May<br />

2007 service adjustment. The Mentone/Yucaipa section has a below standard performance of 18<br />

passengers per hour, primarily because of the 60-minute frequencies, short span and duplication of the<br />

July 11, 2007 175


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

service area in Yucaipa by Route 9. The route has a low and declining ridership, with monthly average<br />

passengers per revenue hour of 18 on weekdays, 12 on Saturdays and 19 on Sundays, which are<br />

standard for a local route.<br />

Local Route 9: San Bernardino-Redlands-Yucaipa – This East Valley local route operates out of the<br />

Fourth Street <strong>Transit</strong> Mall and serves the Waterman corridor in San Bernardino, the Barton corridor in<br />

Loma Linda, the Citrus corridor in Redlands, and the Yucaipa corridor in Yucaipa. It provides 60-minute<br />

daytime and evening service on weekdays, 60-minute daytime service on Saturdays and 120-minute<br />

daytime service on Sundays. On weekdays, the Waterman corridor has a standard performance of 27<br />

passengers per hour, and the Barton and Citrus corridors have marginally below standard performances<br />

of 20 passengers per hour. Consideration should be given to increasing the frequency of the route from<br />

60 to 30-minutes on weekdays and from 120 to 60-minutes on Sundays (no changes to Saturday<br />

service). The route has a low and slowly declining ridership, with monthly average passengers per<br />

revenue hour of 18 on weekdays, 12 on Saturdays and 19 on Sundays, which are standard for a local<br />

route.<br />

Base Route 10: Fontana-Baseline-San Bernardino – This East Valley base route serves the Baseline<br />

East/Citrus corridor between downtown San Bernardino and the Fontana Metrolink Station. It provides<br />

30-60 minute daytime service on weekdays and 60-minute daytime service on weekends. On weekdays,<br />

the Baseline East section has a significantly above standard performance of 39 passengers per hour,<br />

primarily because of the students going to and from the high schools on the route. The Citrus section<br />

between the Baseline and Metrolink Station has a standard performance of 28 passengers per hour. The<br />

spans on the route need to be extended as they are currently below standard, operating only to 7:30 p.m.<br />

The route has a stable ridership, with monthly average passengers per revenue hour of 28 on weekdays,<br />

28 on Saturdays and 18 on Sundays. Ridership is slowly declining on this route, possibly because of the<br />

spans.<br />

Local Route 11: San Bernardino-Muscoy-Cal State – This East Valley local route serves Muscoy and<br />

Cal State from the Fourth Street <strong>Transit</strong> Mall. It provides 30-minute daytime and evening service on<br />

weekdays, 30-minute daytime service on Saturdays and 60-minute daytime service on Sundays. On<br />

weekdays, the route has a marginally below standard performance of 21 passengers per hour. While the<br />

performance would be improved if the route provided better penetration of the Muscoy area, the street<br />

layout makes it difficult to restructure the route. The route has a stable ridership since it was changed in<br />

2004. Overall, it has monthly average passengers per revenue hour of 17 on weekdays, 14 on Saturdays<br />

and 18 on Sundays, which are below standard for a local route.<br />

Base Route 14: Fontana-Foothill-San Bernardino – This East Valley base route serves the Foothill<br />

East corridor between the Fourth Street <strong>Transit</strong> Mall and the Fontana Metrolink Station. It provides 15-<br />

minute daytime and 30-60 minute evening service Monday-Sunday. On weekdays, between 5:00 a.m.<br />

and 9:00 a.m., the route was supplemented by a limited stop service (14L) stopping at the Fourth Street<br />

<strong>Transit</strong> Mall, Foothill & Riverside, Foothill & Cedar and the Fontana Metrolink Station; it provided 60-<br />

minute frequencies and was eliminated in the May 2007 service adjustment. Route 14 has an overall<br />

performance of 43 passengers per hour on weekdays, which is significantly above standard and the<br />

highest in the system. The loads justify higher frequencies than the present 15-minute service. As a<br />

result, more frequent and extended limited stop services (beyond the dropped Route 14L) may be<br />

appropriate in this corridor to increase the frequencies to 10-minutes or better. The route has a declining<br />

ridership with monthly average passengers per revenue hour of 36 on weekdays, 32 on Saturdays, and<br />

22 on Sundays, which are above standard for a base route. The route gets overloaded and is a good<br />

candidate for limited stop/sbX service.<br />

Base Route 15: Fontana-San Bernardino/Highland-Redlands – This East Valley base route serves<br />

the Merrill, Baseline and Orange corridors between the Fontana Metrolink Station and Redlands Mall<br />

Transcenter. It provides 30-minute daytime and evening service on weekdays and 30-minute daytime<br />

service on weekends. On weekdays, the route has a standard performance of 23 passengers per hour.<br />

The route has a stable ridership since it was changed in 2004. Overall, it has monthly average<br />

passengers per revenue hour of 21 on weekdays, 16 on Saturdays and 11 on Sundays, which are below<br />

July 11, 2007 176


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

standard for a base route. Because of this performance, Sunday frequencies were reduced from 30 to<br />

60-minutes in the May 2007 service adjustments.<br />

Base Route 19: Redlands-Colton-Fontana – This East Valley base route serves the San Bernardino<br />

corridor in Fontana between the South Fontana Transcenter and the Arrowhead Medical Center, and<br />

through Colton and Loma Linda to the Redlands Mall via Barton/Redlands Blvd. It provides 30-minute<br />

daytime and evening service on weekdays, 30-minute daytime service on Saturdays, and 60-minute<br />

daytime service on Sundays. On weekdays, the Fontana section has a standard performance of 24<br />

passengers per hour and the Colton/Loma Linda section has an above standard performance of 27<br />

passengers per hour. The route has a slowly declining ridership, with monthly average passengers per<br />

revenue hour of 23 on weekdays, 18 on Saturdays and 15 on Sundays. Because of this performance,<br />

Saturday frequencies were reduced from 30 to 60-minutes in the May 2007 service adjustments.<br />

Local Route 20: Fontana Metrolink-Hemlock-Kaiser – This East Valley local route serves the Merrill<br />

and Randall corridors between the Fontana Metrolink Station and the South Fontana Transcenter. It<br />

provides 30-minute daytime and evening service on weekdays and 30-minute daytime service on<br />

weekends. On weekdays, the Merrill section has a standard performance of 24 passengers per hour, and<br />

the Randall section has an above standard performance of 30 passengers per hour. The route has a low<br />

and slowly declining ridership, with monthly average passengers per revenue hour of 20 on weekdays, 18<br />

on Saturdays and 14 on Sundays. Because of this performance, Sunday frequencies were reduced from<br />

30 to 60-minutes in the May 2007 service adjustments.<br />

Base Route 22: North Rialto-Riverside-ARMC – This East Valley base route serves the Riverside<br />

corridor between North Rialto and the Arrowhead Medical Center in Colton. It provides 20-minute<br />

daytime and evening service on weekdays, 30-minute daytime service on Saturdays, and 60-minute<br />

daytime service on Sundays. On weekdays, it has a standard performance of 23 passengers per hour,<br />

suggesting that the 20-minute service may not be needed at all times. The route has a stable ridership,<br />

with monthly average passengers per revenue hour of 22 on weekdays, 22 on Saturdays and 21 on<br />

Sundays, which are standard for a base route. Because of the weekday performance, weekday<br />

frequencies were reduced from 15 to 20-minutes in the May 2007 service adjustments.<br />

Local Route 28: South Ridge-Slover Ave-Kaiser – This East Valley local route serves the South Ridge<br />

community and the Slover corridor between Banana & Mulberry and the South Fontana Transcenter. It<br />

provides 60-minute daytime service on weekdays and no service on weekends. On weekdays, it has a<br />

significantly below standard performance of 4 passengers per hour in the Slover corridor, and an above<br />

standard performance of 38 passengers per hour in the South Ridge community. Route 71, which serves<br />

the South Ridge community from the South Fontana Transcenter, needs to be restructured so that Route<br />

28 can be dropped. The route has a low and growing ridership, with monthly average passengers per<br />

revenue hour of 12 on weekdays, which is below standard for a local route.<br />

Local Route 29: Bloomington-Valley Blvd-Kaiser – This East Valley local route circulates through<br />

Bloomington and connects to the South Fontana Transcenter at the Kaiser Hospital. It provides 60-<br />

minute daytime service on weekdays and Saturdays, and no service on Sundays. On weekdays, it has a<br />

marginally below standard performance of 21 passengers per hour and below standard frequencies and<br />

spans. Thirty-minute service and lower recovery times might be justified for this route. The route has a<br />

low and growing ridership, with monthly average passengers per revenue hour of 15 on weekdays and 19<br />

on Saturdays, which are close to standard for a local route.<br />

Local Route 31: Redlands Trolley Blue Line – In May 2006, this East Valley local route circulated<br />

through the central area of Redlands and served the Redlands Mall Transcenter. It provided 60-minute<br />

daytime service on weekdays and weekends. On weekdays, it operated significantly below standard at 6<br />

passengers per hour because of the frequency, span and coverage. The route had a declining ridership,<br />

with monthly average passengers per revenue hour of 6 on weekdays, 5 on Saturdays, and 3 on<br />

Sundays, which are significantly below standard for a local route. Because of the poor performance of<br />

this route, it was discontinued in May 2007.<br />

July 11, 2007 177


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Express Route 90: Inland Empire Connection – In May 2006, this East Valley express route provided<br />

45- to 60- minute daytime and evening service Monday-Saturday and 60-minute daytime service on<br />

Sundays between the Fourth Street <strong>Transit</strong> Mall and RTA Downtown Terminal via I-215 and the Montclair<br />

Transcenter via I-10. On weekdays, the Riverside connection had an above standard performance of 25<br />

passengers per hour, and the Montclair connection had a significantly below standard performance of 13<br />

passengers per hour and was discontinued in May 2007. A possibly better alternative to the I-10 express<br />

would be a limited stop express service in the Foothill corridor between the Fourth Street <strong>Transit</strong> Mall and<br />

the Montclair Transcenter. It would supplement Routes 14 and 66 in this corridor and would provide fast<br />

no-transfer service between the East and West Valleys. In May 2007, the frequencies on the Riverside<br />

Connection section of the route were improved to a consistent 30-minutes all day.<br />

9.1.2 WEST VALLEY ROUTES<br />

The West Valley (west of I-15) has six base routes and five local routes covering the cities of Chino,<br />

Chino Hills, Montclair, Ontario, Rancho Cucamonga, and Upland. The routes use 57 buses and have an<br />

average overall weekday performance of 22 passengers per hour as compared to the weekday standard<br />

of 25 passengers per hour.<br />

Local Route 60: Ontario Convention Center-Chaffey College-Ontario Mills – This West Valley local<br />

route serves the Vineyard and Milliken/Day Creek corridors in Rancho Cucamonga between the Ontario<br />

Convention Center, Chaffey College and Ontario Mills. The route provides 60-minute service all day and<br />

performs below standard in terms of the frequency and ridership. The Vineyard section performs below<br />

standard at 16 passengers per hour; consideration might be given to restructuring this section to increase<br />

its ridership, improving the frequency to 30-minutes, and extending the section to the Ontario Transcenter<br />

in the south. The Day Creek/Milliken section performs significantly below standard at 9 passengers per<br />

hour and needs to be restructured; consideration might be given to operating this section as a separate<br />

route from Chaffey College and having it serve the Haven corridor and Ontario Mills with higher<br />

frequencies. By extending the route and improving the frequencies and breaking the route into two<br />

routes, it should be possible to reduce the route’s excessive recovery times, which are adversely affecting<br />

the performance of the route. The route has a slowly declining ridership, with monthly average<br />

passengers per revenue hour of 13 on weekdays, 6 on Saturdays and 4 on Sundays, which are<br />

significantly below standard for a local route, indicating that the route needs to be restructured.<br />

Base Route 61: Fontana-Ontario Mills-Pomona – This West Valley base route serves the Holt/San<br />

Bernardino corridor through Ontario and the Airport, and South Rancho Cucamonga between the<br />

Pomona Transcenter, the Ontario Transcenter and South Fontana Transcenter. It provides 15-minute<br />

daytime and 30-minute evening service on weekdays and Saturdays, and 15-minute daytime service on<br />

Sundays. On weekdays, it has the best performance in the West Valley with 29 passengers per hour<br />

overall. The route has a stable ridership with monthly average passengers per revenue hour of 29 on<br />

weekdays, 24 on Saturdays, and 19 on Sundays, which are above standard for a base route.<br />

Base Route 62: Montclair-Ontario-Chino – This West Valley base route serves the Chino/Euclid<br />

corridor between the Chino Transcenter and the Ontario Transcenter, the Mountain/5th corridor between<br />

the Ontario Transcenter and Montclair Transcenter, and the Mountain corridor between the Montclair<br />

Transcenter and 19th in North Upland. It provides 30-minute daytime and evening service on weekdays<br />

and 60-minute daytime service on weekends. On weekdays, the Chino/Euclid section has a standard<br />

performance of 23 passengers per hour, which would be higher if the route was extended up Euclid into<br />

North Upland. The Mountain/5th section between the Ontario Transcenter and Montclair Transcenter has<br />

standard performance of 26 passengers per hour and would be a new route if Route 62 is extended up<br />

Euclid. The Mountain section in Upland has a below standard performance of 14 passengers per hour,<br />

and should be dropped in favor of restructuring Route 67 to cover its service area. The route has a stable<br />

ridership, with monthly average passengers per revenue hour of 17 on weekdays (which is below<br />

standard, possibly because of the route structure), and 24 on Saturdays and 18 on Sundays, which are<br />

above standard for a base route.<br />

July 11, 2007 178


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Local Route 63: Chino-Ontario-Upland – This West Valley local route serves the Campus corridor in<br />

Upland between the San Antonio Hospital and the Ontario Transcenter, and the Mountain/Riverside<br />

corridor in Ontario and Chino between the Ontario Transcenter and the Chino Transcenter. Both sections<br />

of the route have 30-minute service all day and perform to standard at 24 passengers per hour overall.<br />

The route has a stable ridership with monthly average passengers per revenue hour of 20 on weekdays,<br />

18 on Saturdays and 17 on Sundays, which are standard for a local route.<br />

Base Route 65A/B: Montclair-Chino Hills – This West Valley base route serves the Central corridor in<br />

Montclair between the Montclair Transcenter and the Chino Transcenter, the Chino and Edison corridors<br />

south of the Chino Transcenter, and Chino Hills by means of a one-way loop through Los Serranos east<br />

of Pipe Line. The combined A and B branches in the Central corridor and Chino Hills provide an average<br />

30-minute daytime and evening service on weekdays, and an average 60-minute service on weekends.<br />

On weekdays, the Central corridor section has 30-minute service on average and an above standard<br />

performance of 29 passengers per hour. The Chino Avenue section served by 65A and the Edison<br />

Avenue section served by 65B each have 60-minute service and a marginally below standard<br />

performance of 20 passengers per hour. The east Los Serranos loop has 30-minute service on average<br />

and a significantly below standard performance of four passengers per hour. The high level of service in<br />

east Los Serranos is not justified by the demand. One of the branches needs to taken out of east Los<br />

Serranos and restructured to serve west Los Serranos and west Chino Hills, areas which are not covered<br />

by transit and represent a deficiency in the present route system. The route has a growing ridership, with<br />

monthly average passengers per revenue hour of 17 on weekdays (which is below standard; possibly the<br />

high frequencies are not yet justified by the demand), 23 on Saturdays and 15 on Sundays, which are<br />

above standard for a base route.<br />

Base Route 66: Fontana-Foothill-Montclair – This West Valley base route serves the Foothill corridor<br />

between the Fontana Metrolink Station and Montclair Transcenter. On weekdays, the route provides 15-<br />

minute service to 6:00 p.m. in both directions, and 30-minute service to 10:00 p.m. westbound and to 9:00<br />

p.m. eastbound. On Saturdays, the route provides 30-minute service to 6:00 p.m., and 60-minute service<br />

to 9:00 p.m. On Sundays, the route provides 30-minute service to 6:00 p.m. On weekdays, the route has<br />

a marginally below standard performance of 21 passengers per hour. Consideration should be given to<br />

connecting Routes 14 and 66 at the Fontana Metrolink Station or operating a limited stop service in the<br />

corridor served by Routes 14 and 66 between the Montclair Transcenter and the Fourth Street <strong>Transit</strong><br />

Mall in San Bernardino. This should increase ridership, justifying the 15-minute frequencies. The route<br />

has a growing ridership, with monthly average passengers per revenue hour of 18 on weekdays (which is<br />

below standard, possibly because the 15-minute frequencies are not yet as yet justified by the demand),<br />

21 on Saturdays and 18 on Sundays, which are above standard for a base route.<br />

Base Route 67: Ontario-Baseline-Fontana – This West Valley base route serves the Baseline corridor<br />

between the Fontana Metrolink Station and Euclid in Fontana, and the Euclid corridor in Ontario between<br />

Baseline and the Ontario Transcenter. It provides 60-minute service during the daytime seven days a<br />

week, and its frequency and spans are below standard. The Baseline section has a significantly below<br />

standard performance of 13 passengers per hour, while the Euclid section has an above standard<br />

performance of 27 passengers per hour, suggesting that the route needs to be restructured.<br />

Consideration should be given to extending the Baseline section to Mountain and the Montclair<br />

Transcenter, with 30-minute service and extended spans. The Euclid section could be dropped in favor<br />

of extending Route 62 to serve the Euclid section. The route should have 30-minute service and<br />

extended spans. The route has a growing ridership, with monthly average passengers per revenue hour<br />

of 16 on weekdays, 12 on Saturdays and 7 on Sundays, which are significantly below standard for a base<br />

route, indicating that the route needs to be restructured.<br />

Base Route 68: Chino-Montclair-Chaffey College – This base route in the West Valley serves the<br />

Chino Transcenter and the Ramona corridor to the Montclair Transcenter, and the Arrow/Haven corridor<br />

in Upland to Chaffey College. On weekdays, the route provides 30-minute service to 9:00 p.m.<br />

northbound and to 7:00 p.m. southbound, and 60-minute service to 9:00 p.m. southbound. On weekends,<br />

it provides 60-minute service. On weekdays, the Ramona section of the route has a below standard<br />

performance of 15 passengers per hour, possibly because of the low-density development in this corridor<br />

July 11, 2007 179


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

and the excessive recovery times at the Chino Transcenter; consideration should be given to extending<br />

the service down Central to utilize the some of the recovery times and possibly increase ridership. The<br />

Arrow/Haven section of the route has a marginally below standard performance of 19 passengers per<br />

hour, because of the high recovery time at Chaffey College; consideration should be given to extending<br />

this section north of the College to utilize some of the recovery time. The route has a slowly declining<br />

ridership, with monthly average passengers per revenue hour of 16 on weekdays, 11 on Saturdays and 8<br />

on Sundays, which are significantly below standard for a base route, indicating that the route needs to be<br />

restructured. In May 2007, the first steps to restructuring the route were taken by eliminating the Sunday<br />

service.<br />

Local Route 70: Ontario-Creekside-Ontario Mills – This West Valley local route serves the<br />

Walnut/Riverside corridor in Ontario between the Ontario Transcenter and Ontario Mills Mall. It provides<br />

below standard frequencies of 60-minutes all day. As a result, it has a marginally below standard<br />

performance of 19 passengers per hour. The route has a stable ridership, with monthly average<br />

passengers per revenue hour of 17 on weekdays, 10 on Saturdays and 9 on Sundays, which are below<br />

standard for a local route.<br />

Local Route 71: Kaiser-South Ridge-Rancho Cucamonga – This West Valley local route serves the<br />

Haven/Milliken corridor in Ontario and San Sevaine in Riverside, and the Jurupa/Sierra corridor in<br />

Fontana to the Fontana Metrolink Station. The route provides below standard 60-minute service all day.<br />

The Ontario section has a standard performance of 27 passengers per hour. The San Sevaine section<br />

has a significantly below standard performance of 8 passengers per hour, and the Fontana section has a<br />

standard performance of 19 passengers per hour. The route also has excessive recovery times, which<br />

could be reduced if 30-minute frequencies are provided and the route is shortened in Riverside and<br />

restructured in South Ridge so that Route 28 can be dropped. The route has a stable ridership, with<br />

monthly average passengers per revenue hour of 21 on weekdays, 13 on Saturdays and 10 on Sundays,<br />

which are standard for a local route.<br />

Local Route 75: Ontario-Via Francis-Ontario Mills – This West Valley local route serves the<br />

Philadelphia/Francis corridor in Ontario between the Ontario Transcenter and Ontario Mills Mall during<br />

peak periods only. It provides below standard frequencies of 60-minutes during the peak period. As a<br />

result, it has a below standard performance of 14 passengers per hour, suggesting that the route needs<br />

to be restructured or dropped. The route has a stable ridership, with monthly average passengers per<br />

revenue hour of 13 on weekdays, 10 on Saturdays and 9 on Sundays, which are below standard for a<br />

local route.<br />

9.2 Route Deficiencies (Fixed Route)<br />

Generally, the <strong>Omnitrans</strong> routes in the East and West Valleys have the following deficiencies:<br />

Route Coverage – 90% of all urban residences, places of work, secondary and post secondary schools,<br />

shopping centers, and public facilities in the urban area should be within a ½ mile of a bus stop. The<br />

following urban areas are beyond this coverage standard; about 150,000 people are affected by this<br />

deficiency:<br />

• The relatively high-density California/Bryant corridors in Yucaipa, which are<br />

inaccessible to large buses (about 20,000 people).<br />

• The high-income, low-density foothill communities in South Redlands, East<br />

Highland, Mentone, North of the 210 in Fontana, Ranch Cucamonga, Upland,<br />

and Chino Hills (about 90,000 people). Most of these areas do not want transit.<br />

• The City of Grand Terrace, served by RTA (13,000 people).<br />

July 11, 2007 180


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• The Beech corridor in Fontana (about 8,000 people).<br />

• The area around the San Bernardino Airport, including San Bernardino Avenue<br />

and the Sterling corridor (about 15,000 people).<br />

Base Route Structure – Base routes should be operated in a straight-line structure on the main arterial<br />

roads in the urban transit service area. They should be oriented as much as possible to the main travel<br />

destinations and timed-transfer centers. In the existing system, Routes 2, 3/4, 5, 10, 14, 19 and 22 in the<br />

East Valley, and Routes 61, 62, 65, 66, and 67 in the West Valley are classified as base routes<br />

connecting major destinations and operating in the major transit corridors. Four of base routes have<br />

deficiencies in their structure:<br />

• Route 19 should be restructured to operate in the Lugonia corridor (when the<br />

road is improved) so that the duplication with Route 8 in the Redlands corridor is<br />

reduced and the Route 15 diversion into the Lugonia corridor can be can be<br />

eliminated.<br />

• Route 62 (south section) should be extended to cover the full Euclid corridor into<br />

North Upland.<br />

• Route 65 south of the Chino Transcenter needs to be extended to the unserved<br />

areas of South Chino west of Pipe Line.<br />

• Route 67 should drop the Euclid section and extend the route to the Montclair<br />

Transcenter.<br />

Local Route Structure – Local routes need to support the base routes by circulating the various cities<br />

and corridors in the service area. In the existing system, Routes 1, 7, 8, 9, 11, 15, 20, 28, 29, 31 and 90<br />

(which is an express route but provides local service to the East Valley) in the East Valley, and Routes<br />

60, 63, 68, 70, 71 and 75 in the West Valley are classified as local routes. The following local routes<br />

have deficiencies in their structure:<br />

• Route 8 needs to be restructured to reduce the diversions and the duplication<br />

with Route 19.<br />

• Route 15 should be straightened, particularly in the Orange corridor.<br />

• Route 28 needs to be changed or dropped, possibly by restructuring Route 71 to<br />

serve the Route 28 service area.<br />

• Route 60 needs to be restructured by extending the west section to the Ontario<br />

Transcenter in the south, and dropping the east section and extending Route 70<br />

to serve the east section’s service area.<br />

• Route 68 should be extended to serve South Chino and the new Chaffey College<br />

campus.<br />

• Route 70 needs to be restructured so that Route 75 can be replaced, and the<br />

route needs to be extended into the Haven corridor and to Chaffey College so<br />

that the east section of Route 60 can be replaced.<br />

• Route 71 needs to be restructured in South Ridge so that Route 28 can be<br />

replaced, and extended up Sierra to Sierra Lakes Parkway.<br />

July 11, 2007 181


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Span of Service – The span of service of service should between 6:00 a.m. – 9:00 p.m. on weekdays on<br />

all routes. Routes 7, 8, 10, 28, 29, 67, 70 and 71 do not meet this standard and need to have their spans<br />

extended.<br />

Frequency of Service – The service on all routes should be at least 30 minutes during the daytime<br />

according to industry standards. Routes 7, 8, 9, 29, 60, 67, 70, and 71 have 60-minute service and do<br />

not meet this standard.<br />

Vehicle Loadings – The maximum passenger loads per bus over the maximum 30-minutes period<br />

should not exceed 120% of the seating capacity. Routes 2, 3/4 and 14 may not be meeting this standard<br />

and may require higher frequencies during peak periods.<br />

On-Time Performance – While not measured for this study, the operators advise that the on-time<br />

performance is poor on the following routes:<br />

• Route 1 (because of the train crossings)<br />

• Routes 3/4 and 14 (because of the heavy loads)<br />

• Routes 8, 19, and 71 (because of the traffic)<br />

• Route 62 (because of the tight running times)<br />

Ridership Levels – Based on the on-off counts, several routes and route sections perform significantly<br />

below the weekday standard of 20 passengers per hour:<br />

• Local Routes 28, 31, 60 and 75 (because of the structure, below standard<br />

frequencies and spans)<br />

• Base Route 62 Mountain section (because of the low demand in this section)<br />

• Local Route 65 East Los Serranos section (because of the low demand in this<br />

section)<br />

• Base Route 67 Baseline section (because of the structure and frequencies in this<br />

section)<br />

• Base Route 68 Ramona section (because of the high recovery times)<br />

• Local Route 71 Country Village section (because of the low demand)<br />

These routes and route sections need to be restructured to bring their performance to standard.<br />

9.3 Unmet Needs<br />

<strong>Omnitrans</strong> routes serve an estimated 1.44 million or 90% of West San Bernardino County’s 1.6 million<br />

people; according to the standards, the routes should be serving 1.45 million people or 90% of the<br />

population. The routes carry 56,300 unlinked passenger trips on a typical weekday, which translates to<br />

23,000 people or 1.5% of the population. Most peer systems carry 2-3% of the population on a typical<br />

weekday.<br />

It is evident that there are needs that are not being met by the transit system due in part to deficiencies in<br />

the route structures and service levels, and in part to the lack of service in several areas of the East and<br />

July 11, 2007 182


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

West Valleys. The market and line segment analysis and the stakeholder surveys have identified the<br />

strengths and weaknesses in the transit system and the needs that should be met.<br />

Market Penetration – Ridership on the <strong>Omnitrans</strong> routes consists of 25% students attending the<br />

universities, colleges and high schools in the service area, 64% adults using the routes for work purposes<br />

(44%) and for shopping, social, and other purposes (20%), and 11% seniors using the routes primarily for<br />

shopping, social, medical and other purposes. Students, seniors, and adults with limited car access are<br />

transit’s main markets.<br />

• 4,600 students (12-24 years of age) use the transit system on school days, which<br />

is about 4% of the students enrolled in the high schools, colleges and universities<br />

in the service area. This represents 14,000 unlinked weekday passenger trips or<br />

25% of the daily ridership. When compared to the peer systems with colleges<br />

and universities, student ridership could be higher, suggesting that this market<br />

could be better served by the transit system, particularly the college market.<br />

• 16,000 adults (25 to 65 years of age) use the transit system on weekdays, which<br />

is about 5% of the adult population with limited access to an automobile and<br />

comparable to most other transit properties. This represents 39,500 unlinked<br />

weekday passenger trips or 64% of the daily ridership. Considering that 85% of<br />

the ridership is captive to transit, it is clear that <strong>Omnitrans</strong> needs to improve its<br />

services to attract more choice riders, particularly workers commuting to<br />

destinations outside the County.<br />

• 32% of all work trips are made to destinations outside the County, primarily to<br />

Los Angeles County (17%), Riverside County (8%), and Orange County (4%).<br />

This represents about 400,000 daily trips as compared to an estimated 3,000<br />

daily passenger trips carried on the transit system to/from the Transcenters<br />

connecting with Metrolink and Foothill <strong>Transit</strong> services, and to/from Riverside on<br />

Route 90. This is a small market share with significant potential for improvement.<br />

• 1,400 seniors use the fixed routes on weekdays, which is 6% of <strong>Omnitrans</strong> fixed<br />

route ridership and consistent with the market share experienced by most of<br />

<strong>Omnitrans</strong>’ peer systems with fixed route and dial-a-ride services.<br />

Market Demands – It is clear that transit needs to keep pace with the changing and growing demands of<br />

the student and adult markets in order to grow the ridership base cost-effectively. Currently, there are<br />

several deficiencies that are creating unmet demands in the transit markets. <strong>Omnitrans</strong> will not be able to<br />

meet the long-term growth and development goals of the County without addressing the unmet needs of<br />

these markets. The main needs are related to deficiencies in the structures, frequencies and spans of the<br />

routes. Firstly, 60-minute service and 12-hour spans are not appropriate for an urban transit system<br />

serving students and adult commuters; the Route 7, 8, 9, 10, 28, 29, 60, 67, 70, 71 and 75 service areas<br />

are affected by this serious deficiency. Secondly, the structure of several routes need to be changed and<br />

extended to better serve the student and adult markets; Routes 8, 9, 14, 15, 29, 60, 62, 66, 68, 70, and<br />

71 are in this category. In total, there is an estimated unmet demand of 12,000 daily passenger trips.<br />

Service Performance – In order to be cost-effective, transit needs to provide services that can operate<br />

on-time and can carry at least 20 passengers per hour Monday to Saturday and 10 passengers per hour<br />

on Sundays and holidays. Routes 8, 11, 28, 31, 60, 67, 68, 70, 75 and 90 do not meet these standards<br />

and need to be restructured or dropped to reduce revenue hours and costs. In total, the services on<br />

these routes need to be reduced by an estimated 200 daily revenue hours, which will affect some 1,500<br />

daily passenger trips.<br />

July 11, 2007 183


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Priority Needs – The following is a brief listing of the unmet needs in order of priority:<br />

Base Route Structures, Frequencies and Spans – The first priority need is to improve the base routes as<br />

they serve the major corridors and markets and are the foundation of the grid system in the East and<br />

West Valleys. Consideration needs to be given to: restructuring several base routes to improve their<br />

coverage and travel time; connecting Routes 14 and 66 with a limited stop service to have uninterrupted<br />

and faster service in the Foothill corridor; extending Route 62 north into North Upland to have<br />

uninterrupted service in the Euclid corridor and south into South Chino to serve the new Chaffey College<br />

campus and Chino Hills; and extending Route 67 west in the Baseline corridor to serve Montclair. Routes<br />

2, 14, 22, 61 and 66 provide 15-minute service which should be the target headway for all base routes;<br />

Routes 3/4 provide 20-minute service, which needs to be upgraded to 15-minutes for consistency<br />

purposes. Route 10 has the demand to justify 15-minute peak service. Routes 2 and 14 have the loads<br />

to justify better than 15-minute service, which would be achieved by operating limited stop or sbX-type<br />

services in the E Street (Route 2) and Foothill (Routes 14 and 66) corridors. Consideration needs to be<br />

given to improving the spans on Route 10 and 67, which are below standard. Improving the base route<br />

structures, frequencies and spans will increase the daily revenue hours by about 250 revenue hours. The<br />

estimated unmet demand for these improvements is 6,000 daily passenger trips.<br />

Local Route Structures, Frequencies and Spans – There is a need to improve the structure of some of the<br />

local routes to improve their performance, reduce the wait and travel times to the main destinations in the<br />

local areas, and provide service into unserved areas. In the East Valley, it would include straightening<br />

and extending Routes 8 and 9 into north and south Yucaipa, straightening and extending Route 15 into<br />

central Redlands to replace Route 31, adding new routes in the San Bernardino Ave East and Sterling<br />

corridors, and extending Route 29 into the Merrill and Cherry/Beech corridors. In the West Valley, it<br />

would include extending the section of Route 60 west of Chaffey College to the Ontario Transcenter in the<br />

south and replacing the section of Route 60 east of the College with an extended Route 70, extending<br />

Route 68 to South Chino to serve the new Chaffey College campus, restructuring Route 70 in the south<br />

and extending to Chaffey College in the north to replace the east section of Route 60, restructuring Route<br />

71 in the south and extending up Sierra to the new developments in the north. The restructuring will<br />

cover the Route 20, 28, 31 and 75 service areas, enabling them to be dropped. The improvements and<br />

extensions will add about 250 daily revenue hours to the service. The estimated unmet demand for these<br />

improvements is 5,000 daily passenger trips.<br />

Commuter Express Services – There is a need to improve the commuter express services into Orange<br />

County from the West Valley. From the East Valley, commuters are well served by Routes 1, 10, 14, 15,<br />

19, 20, and 22 which connect to the Metrolink Stations on the San Bernardino Line into Los Angeles, by<br />

Route 1 which connects to the Metrolink San Bernardino Station on the San Bernardino and Orange<br />

County Lines. From the West Valley, commuters are served by Routes 60, 61, 63, 66, 67 and 68, which<br />

connect to the Metrolink Stations on the San Bernardino Line into Los Angeles, and by Routes 61 and 75<br />

which connect to the Metrolink Stations on the Riverside Line into Los Angeles. As there is only a<br />

limited commuter service into Orange County from the West Valley (OCTA peak period Route 758<br />

between the Chino Transcenter and the Irvine Transportation Center), consideration needs to be given to<br />

providing a more extensive commuter express route between the Ontario and Chino Transcenters in the<br />

West Valley and key attractors in Fullerton and Anaheim (the University, College and Metrolink Station in<br />

Fullerton, the Disneyland Resort). This will add about 100 daily revenue hours to the service. The<br />

estimated unmet demand for these improvements is 1,000 daily passenger trips.<br />

The priority need is to serve a total unmet demand of about 12,000 daily passenger trips, which could<br />

increase the daily service by 600 revenue hours or 30% more than the present system.<br />

9.4 Fixed Route Improvement Strategies<br />

The current routes carry 56,000 unlinked passenger trips on a typical weekday. There is an estimated<br />

unmet demand of 12,000 unlinked passenger trips, which if met would increase ridership to 68,000<br />

unlinked passenger trips on a typical weekday or a market share close to 3% as compared to 2% now.<br />

July 11, 2007 184


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The daily revenue hours that would be needed to meet this demand could be up to 2,600, or 30% more<br />

than the present system on weekdays, depending on how the system is to be restructured.<br />

The extent of the restructuring depends on <strong>Omnitrans</strong>’ financial capability. There are three restructuring<br />

strategies that can be considered.<br />

1. Constrained <strong>Plan</strong> – The objective of this plan is to reduce costs while keeping ridership at present<br />

levels. The plan recognizes that improvements will be constrained by funding limitations, and that only<br />

the highest priority needs can be satisfied in the short term. The highest priority needs are related to<br />

reducing revenue hours and costs by restructuring or cutting poor performing routes and route sections,<br />

and using part of the savings to improve the base routes and start improving the local routes along the<br />

lines suggested in the Priority Needs above. To reduce the costs, most unproductive routes and route<br />

sections would be dropped in the Constrained <strong>Plan</strong>. In most cases, the unproductive routes are in areas<br />

where people are within walking distance of other routes that would be restructured. sbX service for the<br />

E Street-Kendall corridor would be implemented in the Constrained <strong>Plan</strong>, as this is a priority need. Figure<br />

9-5 through Figure 9-7 show the operating characteristics of the plan. The expected impacts on<br />

<strong>Omnitrans</strong> resources are as follows:<br />

• Daily ridership would be expected to remain close to its present level of 56,000<br />

unlinked passenger trips, as most of the unmet demands would not be met by<br />

this plan. Annual ridership could remain close to its present level of 15,500,000<br />

unlinked passenger trips.<br />

• Daily revenue hours could remain at its present level of 2,000 revenue hours<br />

under this plan. Annual revenue hours would remain at its present level of<br />

634,000.<br />

• About 430 operators would be required for the Constrained <strong>Plan</strong>, which is similar<br />

to the present contingent.<br />

• The bus fleet may need to be increased by five buses under this plan.<br />

July 11, 2007 185


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-5: Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Ct nb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date Place nb 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Linda sb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 20 20 20 30 24 24 24 24 15.7 1.2 1.2 1.2 0.8 4.1 7.2 3.5 3.4 18.2<br />

nb 6.3 20 20 20 30 24 2 24 2 24 2 22 5 15.7 1.3 1.3 1.3 0.9 4.7 7.8 3.6 3.4 19.5<br />

E St.&Court - VA Hospital sb 6.8 20 20 20 30 34 2 34 2 34 2 34 7 11.9 1.8 1.8 1.8 1.4 6.5 10.8 5.2 5.9 28.4<br />

nb 6.8 20 20 20 30 34 34 34 28 11.9 1.7 1.7 1.7 0.9 4.9 10.2 4.8 3.5 23.4<br />

Total Route 2 26.1 116 4 116 4 116 4 108 12 13.5 6.0 6.0 6.0 4.0 20.2 36.0 17.1 16.2 89.5 4000 45<br />

302: Kendall-ESt-Loma Linda sbXsb 4:20am-6:20pm 2.5 6.0 3.2 12.0<br />

nb 5:20am-6:25pm 2.5 6.0 3.2 12.0<br />

Kendall@Palm - Cal State Univ sb 2.2 10 10 10 8 5 8 5 8 5 16.5 1.3 1.3 1.3 3.3 7.8 4.2 15.2<br />

nb 4.2 10 10 10 16 16 16 15.8 1.6 1.6 1.6 4.0 9.6 5.1 18.7<br />

Cal State Univ. - E St.&Court sb 6.3 10 10 10 18 18 18 21.0 1.8 1.8 1.8 4.5 10.8 5.8 21.1<br />

nb 6.3 10 10 10 19 5 19 5 19 5 19.9 2.4 2.4 2.4 6.0 14.4 7.7 28.1<br />

E St.&Court - Barton&Prospect sb 6.8 10 10 10 22 22 22 18.5 2.2 2.2 2.2 5.5 13.2 7.0 25.7<br />

nb 6.8 10 10 10 22 5 22 5 22 5 18.5 2.7 2.7 2.7 6.8 16.2 8.6 31.6<br />

Total Route 302 32.6 105 15 105 15 105 15 18.6 12.0 12.0 12.0 - 30.0 72.0 38.4 140.4 2200 16<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline (4) eb 12.2 20 20 20 30 51 51 51 51 14.3 2.6 2.6 2.6 1.7 10.2 15.3 7.7 5.1 38.3<br />

Boulder&Baseline-4thSt&E St. (3) wb 12.2 20 20 20 30 51 10 51 10 51 10 51 10 14.3 3.1 3.1 3.1 2.0 13.6 18.3 9.2 7.1 48.1<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4) wb 6.4 20 20 20 30 27 12 27 12 27 12 27 12 14.2 2.0 2.0 2.0 1.3 7.8 11.7 5.9 3.9 29.3<br />

4thSt&ESt - Boulder&Baseline (3) eb 6.4 20 20 20 30 29 29 29 29 13.2 1.5 1.5 1.5 1.0 6.5 8.7 4.4 3.4 22.9<br />

Total Route 3/4 37.0 158 22 158 22 158 22 158 22 14.1 9.0 9.0 9.0 6.0 38.0 54.0 27.0 19.5 138.5 6275 45<br />

5: San Bndo-Del Rosa-Cal State nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Univ nb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal State nb 6:05am-7:05pm 3.0 6.0 3.0 0.9 12.9<br />

sb 5:06am-6:06pm 3.9 6.0 3.0 0.7 13.6<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 0.6 9.0<br />

sb 5.8 30 30 30 30 24 3 24 3 24 3 24 3 14.4 0.9 0.9 0.9 0.9 3.5 5.4 2.7 0.6 12.2<br />

SierraWay&40th - Cal State nb 3.4 60 60 60 60 12 1 12 1 12 1 12 1 17.1 0.2 0.2 0.2 0.2 0.7 1.3 0.7 0.2 2.8<br />

sb 3.2 60 60 60 60 11 11 11 11 17.5 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.1 2.5<br />

Total Route 7 17.0 68 4 68 4 68 4 68 4 15.0 2.0 2.0 2.0 2.0 7.0 12.0 6.0 1.6 26.6 1000 38<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain View eb 7.1 60 60 60 60 21 21 21 21 20.1 0.4 0.4 0.4 0.4 1.2 2.1 1.1 1.1 5.4<br />

wb 7.8 60 60 60 60 24 10 24 10 24 10 24 10 19.5 0.6 0.6 0.6 0.6 2.3 3.4 1.7 1.6 9.0<br />

Redlands&MtnView-Redlands Mall eb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

wb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.1 6.3<br />

Redlands Mall- 4th&Yucaipa eb 11.8 60 60 60 60 35 9 35 9 35 9 35 9 20.3 0.7 0.7 0.7 0.7 2.6 4.4 2.2 2.2 11.4<br />

wb 11.0 60 60 60 60 33 33 33 33 20.0 0.6 0.6 0.6 0.6 2.2 3.3 1.7 1.5 8.7<br />

Total Route 8 47.3 161 19 161 19 161 19 161 19 17.6 3.0 3.0 3.0 3.0 11.3 18.0 9.0 8.7 47.0 900 19<br />

9: San Bdno-Redlands-Yucaipa eb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. -- Barton&Benton eb 7.7 60 60 60 60 31 31 31 31 14.9 0.5 0.5 0.5 0.5 1.6 3.1 1.6 2.1 8.3<br />

wb 8.5 60 60 60 60 34 15 34 15 34 15 34 15 14.9 0.8 0.8 0.8 0.8 4.0 4.9 2.5 3.3 14.6<br />

Barton&Benton-Redlands Mall eb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 0.7 1.4 0.7 0.9 3.7<br />

wb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 1.1 1.4 0.7 0.9 4.2<br />

Redlands Mall- California&D St. eb 10.4 60 60 60 60 33 5 33 5 33 5 33 5 18.9 0.6 0.6 0.6 0.6 1.9 3.8 1.9 2.5 10.1<br />

wb 10.5 60 60 60 60 34 34 34 34 18.6 0.6 0.6 0.6 0.6 2.7 3.4 1.7 2.3 10.1<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.0 51.0 1177 23<br />

10: Fontana-Baseline-San Bdno wb 5:35am-6:35pm 3.3 6.5 2.5 1.0 13.3<br />

eb 5:30am-7:30pm 3.3 6.0 3.0 1.5 13.8<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 41 38 38 38 38 17.6 1.3 1.3 1.3 0.9 4.1 8.2 3.2 0.9 16.4<br />

eb 11.1 30 30 30 45 38 15 38 15 38 15 38 15 17.6 1.8 1.8 1.8 1.2 5.8 10.6 5.3 1.8 23.5<br />

Baseline&Citrus - FontanaMetrolink wb 2.6 30 30 30 30 12 5 12 5 12 5 12 6 13.0 0.6 0.6 0.6 0.6 1.8 3.7 1.4 0.6 7.5<br />

eb 3.1 30 30 30 41 12 12 12 12 15.3 0.4 0.4 0.4 0.3 1.3 2.4 1.2 0.4 5.4<br />

Total Route 10 27.9 100 20 100 20 100 20 100 21 16.7 4.0 4.0 4.0 3.0 13.1 24.9 11.1 3.7 52.8 1611 30<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance not corrected in this strategy<br />

July 11, 2007 186


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-6: Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

11: San Bdno-Muscoy-Cal State nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5 *<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7 *<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.1 17.4<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana Metrolink wb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.8 51.1<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 7.0 7.0 7.0 3.0 27.2 42.0 21.0 12.6 102.8 4518 44<br />

15: Fontana-SanB/Highland-Red. eb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLink wb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaiser sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemlk sb 3.2 30 30 30 30 9 9 9 9 21.4 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.8 4.4<br />

nb 2.9 30 30 30 30 14 15 14 15 14 15 14 15 12.5 1.0 1.0 1.0 1.0 3.4 5.8 2.9 2.9 15.0<br />

Randall&Hemlock - Marygold&Sierrasb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 9 9 9 9 20.3 0.3 0.3 0.3 0.3 1.1 1.8 0.9 0.9 4.7<br />

Total Route 20 12.2 45 15 45 15 45 15 45 15 16.3 2.0 2.0 2.0 2.0 6.7 12.0 6.0 5.9 30.6 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsde nb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 6:45am-5:54pm 2.0 6.0 3.8 11.8<br />

wb 7:10am-6:10pm 2.0 6.0 3.9 11.9<br />

Marygold&Sierra-11th&Cedar eb 5.8 60 60 60 25 25 25 13.8 0.4 0.4 0.4 0.8 2.5 1.6 4.9<br />

wb 5.7 60 60 60 25 10 25 10 25 10 13.7 0.6 0.6 0.6 1.2 3.5 2.3 6.9<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 1.0 1.0 1.0 2.0 6.0 3.9 11.9 245 21<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 645 18<br />

East Valley Total 16.3 86 86 85 59 287 513 256 194 1,250 37925 30<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance not corrected in this strategy<br />

July 11, 2007 187


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-7: Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMills eb 5:10am-9:10pm 4.0 6.0 3.0 3.3 16.3 *<br />

wb 4:40am-8:40pm 4.0 6.0 3.0 3.0 16.0 *<br />

Montclair TC-Holt&Vineyard sb 7.2 30 30 30 30 28 5 28 5 28 5 28 5 15.4 1.1 1.1 1.1 1.1 4.4 6.6 3.3 3.6 17.9<br />

nb 7.2 30 30 30 30 27 27 27 27 16.0 0.9 0.9 0.9 0.9 3.6 5.4 2.7 2.7 14.4<br />

Holt&Vineyard-Chaffey College eb 9.0 60 60 60 60 28 2 28 2 28 2 28 2 19.4 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.7 8.2<br />

wb 8.8 60 60 60 60 30 30 30 30 17.6 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.5 8.0<br />

Total Route 60 32.2 113 7 113 7 113 7 113 7 17.1 3.0 3.0 3.0 3.0 12.0 18.0 9.0 9.5 48.5 980 20<br />

61:Fontana-OntarioMills-Pomona eb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport Dr. eb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTC via Chaffeynb 9.5 30 30 30 30 32 34 32 34 17.8 1.1 1.1 1.1 1.1 3.2 6.8 3.2 3.7 16.9<br />

sb 9.5 30 30 30 30 32 7 34 5 32 7 34 5 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.8 19.4<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 60 30 60 22 18 22 18 16.9 0.7 0.3 0.7 0.3 2.2 1.8 2.2 1.0 7.2<br />

sb 6.0 30 60 30 60 22 5 18 22 5 18 16.4 0.9 0.3 0.9 0.3 2.7 1.8 2.7 0.9 8.1<br />

Total Route 62 31.2 108 12 104 5 108 12 104 5 17.3 4.0 3.0 4.0 3.0 12.0 18.2 12.0 9.5 51.7 1130 22<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hospita nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair TC- ChinoTC sb 6.6 30 30 30 30 22 22 22 22 18.1 0.7 0.7 0.7 0.7 2.9 4.4 2.2 3.1 12.6<br />

nb 6.6 30 30 30 30 21 5 21 5 21 5 21 5 19.0 0.9 0.9 0.9 0.9 3.5 5.2 2.6 3.6 14.9<br />

A ChinoTC-ChinoHillsMPviaChino sb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B ChinoTC-ChinoHillsMPviaEdison sb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.1 4.3<br />

nb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

A/B ChinoHillsMP- Valla Vista Loop cw 2.7 30 60 30 60 15 15 15 15 15 15 10.8 0.5 0.5 0.5 0.5 2.0 3.0 1.5 2.1 8.6<br />

Total Route 65 31.1 112 5 112 20 112 5 112 20 16.7 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.5 51.5 1300 25<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TC wb 16.4 15 30 15 30 66 15 66 20 66 15 66 20 14.9 5.4 2.9 5.4 2.9 18.8 17.2 16.2 10.5 62.7<br />

eb 16.7 15 30 15 30 75 9 75 19 75 9 75 19 13.3 5.6 3.1 5.6 3.1 19.2 18.8 16.8 7.8 62.6<br />

Total Route 68 33.1 141 24 141 39 141 24 141 39 14.1 11.0 6.0 11.0 6.0 38.0 36.0 33.0 18.3 125.3 2673 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 60 30 60 22 22 22 22 17.5 0.7 0.4 0.7 0.4 2.6 2.2 2.9 1.1 8.7<br />

sb 6.4 30 60 30 60 23 5 23 5 23 5 23 5 16.7 0.9 0.5 0.9 0.5 2.8 2.8 3.6 1.4 10.6<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 60 30 60 60 10 60 10 60 10 60 10 15.0 2.3 1.2 2.3 1.2 8.2 7.0 9.1 3.5 27.8<br />

wb 15.0 30 60 30 60 60 60 60 60 15.0 2.0 1.0 2.0 1.0 6.0 6.0 7.8 3.0 22.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 3.0 6.0 3.0 19.5 18.0 23.4 9.0 69.9 1207 17<br />

68: Chino-Montclair-Ch.College nb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

Chino <strong>Transit</strong> Center- Montclair TC nb 7.9 30 30 30 60 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 0.5 3.2 7.6 3.8 1.5 16.1<br />

sb 7.9 30 30 30 60 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 0.7 4.3 10.4 5.2 2.1 22.0<br />

Montclair Transcenter- ChaffeyCol. eb 12.4 30 30 30 60 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1569 18<br />

70:Ontario-via Riverside-Ont Millseb 6:34am-7:20pm 2.5 6.0 3.0 1.5 13.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.0 13.5<br />

D St& Sultana -Ontario Mills eb 13.0 60 60 60 60 45 45 45 45 17.3 0.8 0.8 0.8 0.8 1.9 4.5 2.3 1.1 9.8<br />

wb 12.0 60 60 60 60 41 8 41 8 41 8 41 8 17.6 0.8 0.8 0.8 0.8 2.0 4.9 2.5 1.6 11.0<br />

Ontario Mills - Foothill&Haven nb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.3 2.8<br />

sb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.4 2.9<br />

Foothill&Haven - Chaffey College nb 7.4 60 60 60 60 25 10 25 10 25 10 25 10 17.8 0.6 0.6 0.6 0.6 1.5 3.5 1.8 0.9 7.6<br />

sb 7.4 60 60 60 60 25 25 25 25 17.8 0.4 0.4 0.4 0.4 1.0 2.5 1.3 0.8 5.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 3.0 3.0 3.0 3.0 7.5 18.0 9.0 5.2 39.7 800 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamonga eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 60 60 60 60 23 23 23 23 14.1 0.4 0.4 0.4 0.4 1.5 2.3 1.2 1.2 6.1<br />

wb 4.0 60 60 60 60 18 10 18 10 18 10 18 10 13.3 0.5 0.5 0.5 0.5 1.9 2.8 1.4 1.2 7.3<br />

Etiwanda&Jurupa-Jurupa&Cherry eb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.5 2.7<br />

wb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.4 2.6<br />

Jurupa&Cherry- Fontana Metrolink eb 8.2 60 60 60 60 30 10 30 10 30 10 30 10 16.5 0.7 0.7 0.7 0.7 2.7 4.0 2.0 2.0 10.7<br />

wb 8.2 60 60 60 60 30 30 30 30 16.5 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.3 7.8<br />

Fontana ML - Sierra&Sierra LakePkyeb 4.1 60 60 60 60 15 15 15 15 16.4 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.8 4.0<br />

wb 4.1 60 60 60 60 15 9 15 9 15 9 15 9 16.4 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.0 6.2<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 3.0 3.0 3.0 3.0 12.0 18.0 9.0 8.4 47.4 1075 23<br />

West Valley Total 15.9 57 49 58 36 192 291 183 112 778 17677 23<br />

Total Constrained Strategy 16.2 143 135 143 95 479 803 439 306 2,028 55602 27<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance not corrected in this strategy<br />

July 11, 2007 188


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

2. Partially Constrained <strong>Plan</strong> – The objective of this plan is to improve the structure of the base routes<br />

and the frequencies and spans of all routes so that they can meet the established standards. The plan<br />

would include the changes suggested for the Constrained <strong>Plan</strong> plus further changes to ensure that there<br />

is consistency in the headways and hours of service on the routes. In this plan, all routes would offer 30-<br />

minute or better headways and 15-hour spans. Figure 9-8 through Figure 9-10 show the operating<br />

characteristics of the plan. The expected impacts on <strong>Omnitrans</strong> resources are as follows:<br />

• Daily ridership would be expected to increase to 60,000 unlinked passenger trips,<br />

which would cover one-half of the unmet demands. This is a 9% increase over<br />

the present system. Annual ridership could increase to about 16,900,000 from<br />

the expected 15,500,000 unlinked passenger trips in FY 2007.<br />

• Daily revenue service hours could increase to 2,300 under this plan, which is a<br />

15% increase over the present system. Annual revenue hours could increase to<br />

about 730,000 revenue hours from the present level of 634,000.<br />

• About 472 operators would be required for the plan or 57 more than for the<br />

present system.<br />

• About 163 peak buses, or 20 more than the present system, would be required<br />

for the Partially Constrained <strong>Plan</strong>.<br />

July 11, 2007 189


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-8: Partially Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Ct nb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date Place nb 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Linda sb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 20 20 20 30 24 24 24 24 15.7 1.2 1.2 1.2 0.8 4.1 7.2 3.5 3.4 18.2<br />

nb 6.3 20 20 20 30 26 12 26 12 26 12 22 5 14.5 1.9 1.9 1.9 0.9 6.8 11.4 5.3 3.4 26.9<br />

E St.&Court - VA Hospital sb 6.8 20 20 20 30 34 10 34 10 34 10 34 7 11.9 2.2 2.2 2.2 1.4 7.2 13.2 6.4 5.9 32.7<br />

nb 6.8 20 20 20 30 34 34 34 28 11.9 1.7 1.7 1.7 0.9 4.9 10.2 4.8 3.5 23.4<br />

Total Route 2 26.1 118 22 118 22 118 22 108 12 13.3 7.0 7.0 7.0 4.0 23.1 42.0 19.9 16.2 101.2 4807 48<br />

302: Kendall-ESt-Loma Linda sbXsb 4:20am-6:20pm 2.5 6.0 3.2 12.0<br />

nb 5:20am-6:25pm 2.5 6.0 3.2 12.0<br />

Kendall@Palm - Cal State Univ sb 2.2 10 10 10 8 5 8 5 8 5 16.5 1.3 1.3 1.3 3.3 7.8 4.2 15.2<br />

nb 4.2 10 10 10 16 16 16 15.8 1.6 1.6 1.6 4.0 9.6 5.1 18.7<br />

Cal State Univ. - E St.&Court sb 6.3 10 10 10 18 18 18 21.0 1.8 1.8 1.8 4.5 10.8 5.8 21.1<br />

nb 6.3 10 10 10 19 5 19 5 19 5 19.9 2.4 2.4 2.4 6.0 14.4 7.7 28.1<br />

E St.&Court - Barton&Prospect sb 6.8 10 10 10 22 22 22 18.5 2.2 2.2 2.2 5.5 13.2 7.0 25.7<br />

nb 6.8 10 10 10 22 5 22 5 22 5 18.5 2.7 2.7 2.7 6.8 16.2 8.6 31.6<br />

Total Route 302 32.6 105 15 105 15 105 15 18.6 12.0 12.0 12.0 - 30.0 72.0 38.4 140.4 2200 16<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline (4) eb 12.2 20 20 20 30 51 51 51 51 14.3 2.6 2.6 2.6 1.7 10.2 15.3 7.7 5.1 38.3<br />

Boulder&Baseline-4thSt&E St. (3) wb 12.2 20 20 20 30 51 10 51 10 51 10 51 10 14.3 3.1 3.1 3.1 2.0 13.6 18.3 9.2 7.1 48.1<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4) wb 6.4 20 20 20 30 27 12 27 12 27 12 27 12 14.2 2.0 2.0 2.0 1.3 7.8 11.7 5.9 3.9 29.3<br />

4thSt&ESt - Boulder&Baseline (3) eb 6.4 20 20 20 30 29 29 29 29 13.2 1.5 1.5 1.5 1.0 6.5 8.7 4.4 3.4 22.9<br />

Total Route 3/4 37.0 158 22 158 22 158 22 158 22 14.1 9.0 9.0 9.0 6.0 38.0 54.0 27.0 19.5 138.5 6275 45<br />

5: San Bndo-Del Rosa-Cal State nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Univ nb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal State nb 6:05am-9:05pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:06am-9:06pm 3.9 6.0 3.0 3.0 15.9<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 2.1 10.5<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 3.6 19.1<br />

SierraWay&40th - Cal State nb 3.4 30 30 30 30 15 5 15 5 15 5 15 5 13.7 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.0 10.0<br />

sb 3.2 30 30 30 30 13 13 13 13 14.8 0.4 0.4 0.4 0.4 1.7 2.6 1.3 1.3 6.9<br />

Total Route 7 17.0 74 16 74 16 74 16 74 16 13.8 3.0 3.0 3.0 3.0 10.5 18.0 9.0 9.0 46.5 1129 24<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain View eb 7.1 30 30 30 60 27 27 27 27 15.7 0.9 0.9 0.9 0.5 3.2 5.4 2.7 1.4 12.6<br />

wb 7.8 30 30 30 60 31 5 31 5 31 5 31 5 15.1 1.2 1.2 1.2 0.6 4.8 7.2 3.6 1.7 17.3<br />

Redlands&MtnView-Redlands Mall eb 4.8 30 30 30 60 20 20 20 20 14.4 0.7 0.7 0.7 0.3 2.3 4.0 2.0 1.0 9.3<br />

wb 4.8 30 30 30 60 20 20 20 20 14.4 0.7 0.7 0.7 0.3 2.7 4.0 2.0 0.9 9.6<br />

Redlands Mall- 4th&Yucaipa eb 11.8 30 30 30 60 37 5 37 5 37 5 37 5 19.2 1.4 1.4 1.4 0.7 4.9 8.4 4.2 2.1 19.6<br />

wb 11.0 30 30 30 60 35 35 35 35 18.9 1.2 1.2 1.2 0.6 4.7 7.0 3.5 1.6 16.8<br />

Total Route 8 47.3 170 10 170 10 170 10 170 10 16.7 6.0 6.0 6.0 3.0 22.5 36.0 18.0 8.7 85.2 1300 15<br />

9: San Bdno-Redlands-Yucaipa eb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. -- Barton&Benton eb 7.7 30 30 30 60 31 31 31 31 14.9 1.0 1.0 1.0 0.5 3.1 6.2 3.1 2.1 14.5<br />

wb 8.5 30 30 30 60 34 15 34 15 34 15 34 15 14.9 1.6 1.6 1.6 0.8 7.9 9.8 4.9 3.3 25.9<br />

Baron&Benton-Redlands Mall eb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 1.4 2.8 1.4 0.9 6.5<br />

wb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 2.3 2.8 1.4 0.9 7.4<br />

Redlands Mall- California&D St. eb 10.4 30 30 30 60 33 5 33 5 33 5 33 5 18.9 1.3 1.3 1.3 0.6 3.8 7.6 3.8 2.5 17.7<br />

wb 10.5 30 30 30 60 34 34 34 34 18.6 1.1 1.1 1.1 0.6 5.5 6.8 3.4 2.3 18.0<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 6.0 6.0 6.0 3.0 24.0 36.0 18.0 12.0 90.0 1400 16<br />

10: Fontana-Baseline-San Bdno wb 5:35am-8:35pm 3.3 6.5 2.5 3.0 15.3<br />

eb 5:30am-8:30pm 3.3 6.0 3.0 3.0 15.3<br />

4th&E St.- Baseline&Citrus wb 11.1 15 30 15 41 40 40 40 40 16.7 2.7 1.3 2.7 1.0 8.7 8.7 6.7 2.9 26.9<br />

eb 11.1 15 30 15 45 40 11 40 11 40 11 40 11 16.7 3.4 1.7 3.4 1.1 11.2 10.2 10.2 3.4 35.0<br />

Baseline&Citrus - FontanaMetrolink wb 2.6 15 30 15 30 12 5 12 5 12 5 12 5 13.0 1.1 0.6 1.1 0.6 3.7 3.7 2.8 1.7 11.9<br />

eb 3.1 15 30 15 41 12 12 12 12 15.3 0.8 0.4 0.8 0.3 2.6 2.4 2.4 0.9 8.3<br />

Total Route 10 27.9 104 16 104 16 104 16 104 16 16.1 8.0 4.0 8.0 3.0 26.2 25.0 22.1 8.9 82.2 1611 20<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

July 11, 2007 190


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-9: Partially Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

11: San Bdno-Muscoy-Cal State nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5 *<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7 *<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.1 17.4<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana Metrolink wb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.8 51.1<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 7.0 7.0 7.0 3.0 27.2 42.0 21.0 12.6 102.8 4518 44<br />

314: Foothill Limited Stop<br />

15: Fontana-SanB/Highland-Red. eb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLink wb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaiser sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemlk sb 3.2 30 30 30 30 12 12 12 12 16.1 0.4 0.4 0.4 0.4 1.2 2.4 1.2 1.1 5.9<br />

nb 2.9 30 30 30 30 14 9 14 9 14 9 14 9 12.5 0.8 0.8 0.8 0.8 2.7 4.6 2.3 2.3 11.9<br />

Randall&Hemlock - Marygold&Sierrasb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 12 12 12 12 15.2 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

Total Route 20 12.2 51 9 51 9 51 9 51 9 14.4 2.0 2.0 2.0 2.0 6.6 12.0 6.0 5.8 30.5 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsde nb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 5:45am-8:54pm 3.0 6.0 3.0 3.0 15.0<br />

wb 6:10am-9:10pm 3.0 6.0 3.0 3.0 15.0<br />

Marygold&Sierra-11th&Cedar eb 5.8 30 30 30 60 25 25 25 25 13.8 0.8 0.8 0.8 0.4 2.5 5.0 2.5 1.3 11.3<br />

wb 5.7 30 30 30 60 25 10 25 10 25 10 25 10 13.7 1.2 1.2 1.2 0.6 3.5 7.0 3.5 1.8 15.8<br />

Total Route 29 11.5 50 10 50 10 50 10 50 10 13.7 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0 300 11<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 800 23<br />

East Valley Total 16.3 99 95 98 61 334 567 293 210 1,404 39694 28<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

July 11, 2007 191


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-10: Partially Constrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMills eb 5:10am-9:10pm 4.0 6.0 3.0 3.3 16.3 *<br />

wb 4:40am-8:40pm 4.0 6.0 3.0 3.0 16.0 *<br />

Montclair TC-Holt&Vineyard sb 7.2 30 30 30 30 28 5 28 5 28 5 28 5 15.4 1.1 1.1 1.1 1.1 4.4 6.6 3.3 3.6 17.9<br />

nb 7.2 30 30 30 30 27 27 27 27 16.0 0.9 0.9 0.9 0.9 3.6 5.4 2.7 2.7 14.4<br />

Holt&Vineyard-Chaffey College eb 9.0 30 30 30 30 28 2 28 2 28 2 28 2 19.4 1.0 1.0 1.0 1.0 4.0 6.0 3.0 3.3 16.3<br />

wb 8.8 30 30 30 30 30 30 30 30 17.6 1.0 1.0 1.0 1.0 4.0 6.0 3.0 3.0 16.0<br />

Total Route 60 32.2 113 7 113 7 113 7 113 7 17.1 4.0 4.0 4.0 4.0 16.0 24.0 12.0 12.6 64.6 1500 23<br />

61:Fontana-OntarioMills-Pomona eb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport Dr. eb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTC via Chaffeynb 9.5 30 30 30 30 32 32 32 32 17.8 1.1 1.1 1.1 1.1 3.2 6.4 3.2 3.5 16.3<br />

sb 9.5 30 30 30 30 32 7 32 7 32 7 32 7 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.8 19.4<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 30 30 30 22 22 22 22 16.9 0.7 0.7 0.7 0.7 2.2 4.4 2.2 2.4 11.2<br />

sb 6.0 30 30 30 30 22 5 22 5 22 5 22 5 16.4 0.9 0.9 0.9 0.9 2.7 5.4 2.7 2.7 13.5<br />

Total Route 62 31.2 108 12 108 12 108 12 108 12 17.3 4.0 4.0 4.0 4.0 12.0 24.0 12.0 12.4 60.4 1500 25<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hospita nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair Transcenter- ChinoTCsb 6.6 30 30 30 30 24 24 24 24 16.6 0.8 0.8 0.8 0.8 3.2 4.8 2.4 3.4 13.8<br />

nb 6.6 30 30 30 30 21 15 21 15 21 15 21 15 19.0 1.2 1.2 1.2 1.2 4.8 7.2 3.6 5.0 20.6<br />

A: ChinoTC-ChinoHillsMPvia Chino sb 3.6 60 60 60 60 14 14 14 14 15.5 0.2 0.2 0.2 0.2 0.9 1.4 0.7 1.0 4.0<br />

nb 3.6 60 60 60 60 15 15 15 15 14.5 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

B: ChinoTC-ChinoHillsMPvia Edisonsb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B: ChinoHillsMP- Valla Vista Loop cw 2.7 60 60 60 60 8 8 8 8 20.3 0.1 0.1 0.1 0.1 0.5 0.8 0.4 0.6 2.3<br />

Total Route 65 31.1 106 15 106 15 106 15 106 15 17.6 3.0 3.0 3.0 3.0 12.1 18.1 9.1 12.6 51.8 1300 25<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TC wb 16.4 15 30 15 30 66 15 66 20 66 15 66 20 14.9 5.4 2.9 5.4 2.9 18.8 17.2 16.2 10.5 62.7<br />

eb 16.7 15 30 15 30 75 9 75 19 75 9 75 19 13.3 5.6 3.1 5.6 3.1 19.2 18.8 16.8 7.8 62.6<br />

Total Route 68 33.1 141 24 141 39 141 24 141 39 14.1 11.0 6.0 11.0 6.0 38.0 36.0 33.0 18.3 125.3 2673 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 30 30 30 22 22 22 22 17.5 0.7 0.7 0.7 0.7 2.6 4.4 2.9 2.2 12.0<br />

sb 6.4 30 30 30 30 23 5 23 5 23 5 23 5 16.7 0.9 0.9 0.9 0.9 2.8 5.6 3.6 2.8 14.8<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 30 30 30 60 10 60 10 60 10 60 10 15.0 2.3 2.3 2.3 2.3 8.2 14.0 9.1 7.0 38.3<br />

wb 15.0 30 30 30 30 60 60 60 60 15.0 2.0 2.0 2.0 2.0 6.0 12.0 7.8 6.0 31.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 6.0 6.0 6.0 19.5 36.0 23.4 18.0 96.9 1900 20<br />

68: Chino-Montclair-Ch.College nb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

Chino <strong>Transit</strong> Center- Montclair TC nb 7.9 30 30 30 60 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 0.5 3.2 7.6 3.8 1.5 16.1<br />

sb 7.9 30 30 30 60 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 0.7 4.3 10.4 5.2 2.1 22.0<br />

Montclair Transcenter- ChaffeyCol. eb 12.4 30 30 30 60 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1569 18<br />

70:Ontario-via Riverside-Ont Millseb 6:34am-8:20pm 2.5 6.0 3.0 2.5 14.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.5 14.0<br />

D St& Sultana -Ontario Mills eb 13.0 30 30 30 60 45 45 45 45 17.3 1.5 1.5 1.5 0.8 3.8 9.0 4.5 1.9 19.1<br />

wb 12.0 30 30 30 60 41 8 41 8 41 8 41 8 17.6 1.6 1.6 1.6 0.8 4.1 9.8 4.9 2.0 20.8<br />

Ontario Mills - Foothill&Haven nb 3.7 30 30 30 60 13 13 13 13 17.1 0.4 0.4 0.4 0.2 1.1 2.6 1.3 0.5 5.5<br />

sb 3.7 30 30 30 60 13 13 13 13 17.1 0.4 0.4 0.4 0.2 1.1 2.6 1.3 0.5 5.5<br />

Foothill&Haven - Chaffey College nb 7.4 30 30 30 60 25 10 25 10 25 10 25 10 17.8 1.2 1.2 1.2 0.6 2.9 7.0 3.5 1.5 14.9<br />

sb 7.4 30 30 30 60 25 25 25 25 17.8 0.8 0.8 0.8 0.4 2.1 5.0 2.5 1.0 10.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 6.0 6.0 6.0 3.0 15.0 36.0 18.0 7.5 76.5 1500 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamonga eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 30 30 30 60 23 23 23 23 14.1 0.8 0.8 0.8 0.4 3.1 4.6 2.3 1.2 11.1<br />

wb 4.0 30 30 30 60 18 10 18 10 18 10 18 10 13.3 0.9 0.9 0.9 0.5 3.7 5.6 2.8 1.2 13.3<br />

Etiwanda&Jurupa-Jurupa&Cherry eb 2.4 30 30 30 60 10 10 10 10 14.4 0.3 0.3 0.3 0.2 1.3 2.0 1.0 0.5 4.8<br />

wb 2.4 30 30 30 60 10 10 10 10 14.4 0.3 0.3 0.3 0.2 1.3 2.0 1.0 0.4 4.8<br />

Jurupa&Cherry- Fontana Metrolink eb 8.2 30 30 30 60 30 10 30 10 30 10 30 10 16.5 1.3 1.3 1.3 0.7 5.3 8.0 4.0 2.0 19.3<br />

wb 8.2 30 30 30 60 30 30 30 30 16.5 1.0 1.0 1.0 0.5 4.0 6.0 3.0 1.3 14.3<br />

Fontana ML - Sierra&Sierra LakePkyeb 4.1 30 30 30 60 15 15 15 15 16.4 0.5 0.5 0.5 0.3 2.0 3.0 1.5 0.8 7.3<br />

wb 4.1 30 30 30 60 15 9 15 9 15 9 15 9 16.4 0.8 0.8 0.8 0.4 3.2 4.8 2.4 1.0 11.4<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 6.0 6.0 6.0 3.0 24.0 36.0 18.0 8.4 86.4 1800 21<br />

below standard performance West Valley Total 15.9 64 60 65 41 216 357 204 130 906 20685 23<br />

not corrected in this strategy Total Partially Constrained Strategy 16.2 163 155 163 102 549 923 497 339 2,309 60379 26<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

July 11, 2007 192


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

3. Unconstrained <strong>Plan</strong> – The objective of this plan is to improve the structures, frequencies and spans<br />

of the fixed routes so that the all areas of the East and West Valleys are properly served by transit. The<br />

plan would include the changes suggested for the Constrained and Partially Constrained <strong>Plan</strong>s plus<br />

further changes to cover all of the improvements suggested in the needs assessment. It would improve<br />

the structure, frequency and spans of the base and local routes, extend and add routes into the<br />

developing unserved areas and corridors in the East and West Valleys, and provide commuter express<br />

services into Orange County. Figure 9-11 through Figure 9-14 show the operating characteristics of the<br />

plan. The expected impacts on <strong>Omnitrans</strong> resources are as follows:<br />

• Daily revenue hours could increase to 2,600 under this plan, which is a 30%<br />

increase over the present system. Annual revenue service hours could increase<br />

to about 800,000 revenue hours from the present system of 634,000.<br />

• Daily ridership would be expected to increase to 68,000 unlinked passenger trips,<br />

which would cover most of the unmet demands. This is a 20% increase over the<br />

present system. Annual ridership could increase to about 19,000,000 from the<br />

expected 15,500,000 unlinked passenger trips in FY 2007.<br />

• About 522 operators would be required for the Unconstrained <strong>Plan</strong>, or 107 more<br />

the present system.<br />

• About 183 peak buses would be required for the Unconstrained <strong>Plan</strong>, or 40 more<br />

than the present system.<br />

Because of the financial constraints, the Constrained <strong>Plan</strong> is the recommended plan in the short term<br />

over the <strong>2008</strong>-2011 period.<br />

July 11, 2007 193


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-11: Unconstrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Ct nb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date Place nb 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Linda sb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 20 20 20 30 24 24 24 24 15.7 1.2 1.2 1.2 0.8 4.1 7.2 3.5 3.4 18.2<br />

nb 6.3 20 20 20 30 26 12 26 12 26 12 22 5 14.5 1.9 1.9 1.9 0.9 6.8 11.4 5.3 3.4 26.9<br />

E St.&Court - VA Hospital sb 6.8 20 20 20 30 34 10 34 10 34 10 34 7 11.9 2.2 2.2 2.2 1.4 7.2 13.2 6.4 5.9 32.7<br />

nb 6.8 20 20 20 30 34 34 34 28 11.9 1.7 1.7 1.7 0.9 4.9 10.2 4.8 3.5 23.4<br />

Total Route 2 26.1 118 22 118 22 118 22 108 12 13.3 7.0 7.0 7.0 4.0 23.1 42.0 19.9 16.2 101.2 4807 48<br />

302: Kendall-ESt-Loma Linda sbX sb 4:20am-6:20pm 2.5 6.0 3.2 12.0<br />

nb 5:20am-6:25pm 2.5 6.0 3.2 12.0<br />

Kendall@Palm - Cal State Univ sb 2.2 10 10 10 8 5 8 5 8 5 16.5 1.3 1.3 1.3 3.3 7.8 4.2 15.2<br />

nb 4.2 10 10 10 16 16 16 15.8 1.6 1.6 1.6 4.0 9.6 5.1 18.7<br />

Cal State Univ. - E St.&Court sb 6.3 10 10 10 18 18 18 21.0 1.8 1.8 1.8 4.5 10.8 5.8 21.1<br />

nb 6.3 10 10 10 19 5 19 5 19 5 19.9 2.4 2.4 2.4 6.0 14.4 7.7 28.1<br />

E St.&Court - Barton&Prospect sb 6.8 10 10 10 22 22 22 18.5 2.2 2.2 2.2 5.5 13.2 7.0 25.7<br />

nb 6.8 10 10 10 22 5 22 5 22 5 18.5 2.7 2.7 2.7 6.8 16.2 8.6 31.6<br />

Total Route 302 32.6 105 15 105 15 105 15 18.6 12.0 12.0 12.0 - 30.0 72.0 38.4 140.4 2200 16<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline (4) eb 12.2 15 15 15 30 51 51 51 51 14.3 3.4 3.4 3.4 1.7 13.6 20.4 10.2 5.1 49.3<br />

Boulder&Baseline-4thSt&E St. (3) wb 12.2 15 15 15 30 51 10 51 10 51 10 51 10 14.3 4.1 4.1 4.1 2.0 18.1 24.4 12.2 7.1 61.8<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4) wb 6.4 15 15 15 30 27 12 27 12 27 12 27 12 14.2 2.6 2.6 2.6 1.3 10.4 15.6 7.8 3.9 37.7<br />

4thSt&ESt - Boulder&Baseline (3) eb 6.4 15 15 15 30 29 29 29 29 13.2 1.9 1.9 1.9 1.0 8.6 11.6 5.8 3.4 29.4<br />

Total Route 3/4 37.0 158 22 158 22 158 22 158 22 14.1 12.0 12.0 12.0 6.0 50.7 72.0 36.0 19.5 178.2 7200 40<br />

5: San Bndo-Del Rosa-Cal State nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Univ nb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal State nb 6:05am-9:05pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:06am-9:06pm 3.9 6.0 3.0 3.0 15.9<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 2.1 10.5<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 3.6 19.1<br />

SierraWay&40th - Cal State nb 3.4 30 30 30 30 15 5 15 5 15 5 15 5 13.7 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.0 10.0<br />

sb 3.2 30 30 30 30 13 13 13 13 14.8 0.4 0.4 0.4 0.4 1.7 2.6 1.3 1.3 6.9<br />

Total Route 7 17.0 74 16 74 16 74 16 74 16 13.8 3.0 3.0 3.0 3.0 10.5 18.0 9.0 9.0 46.5 1129 24<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain View eb 7.1 30 30 30 60 27 27 27 27 15.7 0.9 0.9 0.9 0.5 3.2 5.4 2.7 1.4 12.6<br />

wb 7.8 30 30 30 60 31 5 31 5 31 5 31 5 15.1 1.2 1.2 1.2 0.6 4.8 7.2 3.6 1.7 17.3<br />

Redlands&MtnView-Redlands Mall eb 4.8 30 30 30 60 20 20 20 20 14.4 0.7 0.7 0.7 0.3 2.3 4.0 2.0 1.0 9.3<br />

wb 4.8 30 30 30 60 20 20 20 20 14.4 0.7 0.7 0.7 0.3 2.7 4.0 2.0 0.9 9.6<br />

Redlands Mall- Date&Fremont eb 14.1 30 30 30 60 51 5 51 5 51 5 37 5 16.6 1.9 1.9 1.9 0.7 6.5 11.2 5.6 2.1 25.4<br />

wb 13.3 30 30 30 60 51 51 51 35 15.7 1.7 1.7 1.7 0.6 6.8 10.2 5.1 1.6 23.7<br />

Total Route 8 51.9 200 10 200 10 200 10 170 10 15.6 7.0 7.0 7.0 3.0 26.3 42.0 21.0 8.7 98.0 1800 18<br />

9: San Bdno-Redlands-Yucaipa eb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 30 30 30 60 31 31 31 31 14.9 1.0 1.0 1.0 0.5 3.1 6.2 3.1 2.1 14.5<br />

wb 8.5 30 30 30 60 34 10 34 10 34 10 34 10 14.9 1.5 1.5 1.5 0.7 7.1 8.8 4.4 2.9 23.2<br />

Barton&Benton-Redlands Mall eb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 1.4 2.8 1.4 0.9 6.5<br />

wb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 2.3 2.8 1.4 0.9 7.4<br />

Redlands Mall- California&AvenueH eb 12.0 30 30 30 60 51 5 51 5 51 5 36 5 14.1 1.9 1.9 1.9 0.7 5.6 11.2 5.6 2.7 25.1<br />

wb 12.1 30 30 30 60 51 51 51 36 14.3 1.7 1.7 1.7 0.6 8.2 10.2 5.1 2.4 25.9<br />

Total Route 9 49.1 195 15 195 15 195 15 165 15 15.1 7.0 7.0 7.0 3.0 27.7 42.0 21.0 12.0 102.7 1900 18<br />

10: Fontana-Baseline-San Bdno wb 5:35am-8:35pm 3.3 6.5 2.5 3.0 15.3<br />

eb 5:30am-8:30pm 3.3 6.0 3.0 3.0 15.3<br />

4th&E St.- Baseline&Citrus wb 11.1 15 15 15 41 40 40 40 40 16.7 2.7 2.7 2.7 1.0 8.7 17.3 6.7 2.9 35.6<br />

eb 11.1 15 15 15 45 40 11 40 11 40 11 40 11 16.7 3.4 3.4 3.4 1.1 11.2 20.4 10.2 3.4 45.2<br />

Baseline&Citrus - Fontana Metrolink wb 2.6 15 15 15 30 12 5 12 5 12 5 12 5 13.0 1.1 1.1 1.1 0.6 3.7 7.4 2.8 1.7 15.6<br />

eb 3.1 15 15 15 41 12 12 12 12 15.3 0.8 0.8 0.8 0.3 2.6 4.8 2.4 0.9 10.7<br />

Total Route 10 27.9 104 16 104 16 104 16 104 16 16.1 8.0 8.0 8.0 3.0 26.2 49.9 22.1 8.9 107.1 2200 21<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

July 11, 2007 194


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-12: Unconstrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

11: San Bdno-Muscoy-Cal State nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5 *<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7 *<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.1 17.4<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana Metrolink wb 9.8 20 20 20 30 45 5 45 5 45 5 45 5 13.1 2.5 2.5 2.5 1.7 10.8 15.0 7.5 6.8 40.0<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 20 20 20 30 45 5 45 5 45 5 37 3 13.1 2.5 2.5 2.5 1.3 8.8 15.0 7.5 5.9 37.1<br />

Total Route 14 19.6 90 10 90 10 90 10 82 8 13.1 5.0 5.0 5.0 3.0 19.5 30.0 15.0 12.6 77.1 4518 59<br />

314: Foothill Limited Stop wb 6:00am-6::00pm 3.0 6.0 3.0 12.0<br />

eb 6:35am-6:20pm 3.0 6.0 3.0 12.0<br />

4th&Arrowhead-Fontana Metrolink wb 9.8 20 20 20 35 35 35 16.8 1.8 1.8 1.8 5.3 10.5 5.3 21.0<br />

eb 9.8 20 20 20 35 5 35 5 35 5 16.8 2.0 2.0 2.0 6.0 12.0 6.0 24.0<br />

Fontana ML - Montclair Transcenterwb 16.4 20 20 20 50 50 50 19.7 2.5 2.5 2.5 7.5 15.0 7.5 30.0<br />

eb 16.7 20 20 20 50 5 50 5 50 5 20.0 2.8 2.8 2.8 8.3 16.5 8.3 33.0<br />

Total Route 314 52.7 170 10 170 10 170 10 18.6 9.0 9.0 9.0 27.0 54.0 27.0 108.0 2200 20<br />

15: Fontana-SanB/Highland-Red. eb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

17: Redlands-San Bernerdino Aveeb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

wb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

Redlands <strong>Transit</strong> Center - 4th St. Traeb 10.3 30 30 30 60 50 10 50 10 50 10 50 10 12.4 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0<br />

wb 10.3 30 30 30 60 50 10 50 10 50 10 50 10 12.4 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0<br />

Total Route 17 20.6 100 20 100 20 100 20 100 20 12.4 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.0 54.0 1100 20<br />

18: SanBern-Sterling-SanManuel nb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

sb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

4th St. <strong>Transit</strong> Mall - San Manuel Canb 6.7 30 30 30 60 25 5 25 5 25 5 25 5 16.1 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

sb 6.7 30 30 30 60 25 5 25 5 25 5 25 5 16.1 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Total Route 18 13.4 50 10 50 10 50 10 50 10 16.1 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0 500 19<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLink wb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaiser<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsde nb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 5:45am-8:54pm 3.0 6.0 3.0 3.0 15.0<br />

wb 6:10am-9:10pm 3.0 6.0 3.0 3.0 15.0<br />

Beech&Summit-Fontana Metrolink sb 8.7 30 30 30 60 30 5 30 5 30 5 30 5 17.4 1.2 1.2 1.2 0.6 3.5 7.0 3.5 1.8 15.8<br />

nb 8.0 30 30 30 60 30 30 30 30 16.0 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Marygold&Sierra-11th&Cedar eb 7.0 30 30 30 60 25 25 25 25 16.8 0.8 0.8 0.8 0.4 2.5 5.0 2.5 1.3 11.3<br />

wb 7.0 30 30 30 60 25 5 25 5 25 5 25 5 16.8 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Total Route 29 30.7 110 10 110 10 110 10 110 10 16.7 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.0 54.0 1100 20<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Montclair TC<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 800 23<br />

East Valley Total 16.3 117 117 116 63 391 700 347 216 1654 46028 28<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

July 11, 2007 195


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-13: Unconstrained <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY<br />

TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMills eb 5:10am-9:10pm 4.0 6.0 3.0 3.3 16.3 *<br />

wb 4:40am-8:40pm 4.0 6.0 3.0 3.0 16.0 *<br />

Montclair TC-Holt&Vineyard sb 7.2 30 30 30 30 28 5 28 5 28 5 28 5 15.4 1.1 1.1 1.1 1.1 4.4 6.6 3.3 3.6 17.9<br />

nb 7.2 30 30 30 30 27 27 27 27 16.0 0.9 0.9 0.9 0.9 3.6 5.4 2.7 2.7 14.4<br />

Holt&Vineyard-Chaffey College eb 9.0 30 30 30 30 28 2 28 2 28 2 28 2 19.4 1.0 1.0 1.0 1.0 4.0 6.0 3.0 3.3 16.3<br />

wb 8.8 30 30 30 30 30 30 30 30 17.6 1.0 1.0 1.0 1.0 4.0 6.0 3.0 3.0 16.0<br />

Total Route 60 32.2 113 7 113 7 113 7 113 7 17.1 4.0 4.0 4.0 4.0 16.0 24.0 12.0 12.6 64.6 1500 23<br />

61:Fontana-OntarioMills-Pomona eb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario TC - Fontana Metrolink eb 16.5 16 15 15 30 62 16 64 11 64 11 64 11 16.0 4.9 5.0 5.0 2.5 18.2 28.8 16.3 8.6 71.8<br />

wb 16.7 16 15 15 30 58 2 57 2 57 2 57 2 17.3 3.8 3.9 3.9 2.0 15.0 22.6 12.8 8.5 59.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 25.0 200.7 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTC via Chaffeynb 9.5 30 30 30 30 32 32 32 32 17.8 1.1 1.1 1.1 1.1 3.2 6.4 3.2 3.5 16.3<br />

sb 9.5 30 30 30 30 32 7 32 7 32 7 32 7 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.8 19.4<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 30 30 30 22 22 22 22 16.9 0.7 0.7 0.7 0.7 2.2 4.4 2.2 2.4 11.2<br />

sb 6.0 30 30 30 30 22 5 22 5 22 5 22 5 16.4 0.9 0.9 0.9 0.9 2.7 5.4 2.7 2.7 13.5<br />

Total Route 62 31.2 108 12 108 12 108 12 108 12 17.3 4.0 4.0 4.0 4.0 12.0 24.0 12.0 12.4 60.4 1500 25<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hospita nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair Transcenter- ChinoTCsb 6.6 30 30 30 30 24 24 24 24 16.6 0.8 0.8 0.8 0.8 3.2 4.8 2.4 3.4 13.8<br />

nb 6.6 30 30 30 30 21 15 21 15 21 15 21 15 19.0 1.2 1.2 1.2 1.2 4.8 7.2 3.6 5.0 20.6<br />

A: ChinoTC-ChinoHillsMPvia Chino sb 3.6 60 60 60 60 11 11 11 11 19.7 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.8 3.2<br />

nb 3.6 60 60 60 60 11 11 11 11 19.7 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.8 3.1<br />

A: ChinoHillsMP- Glen Ridge Loop ccw 2.0 60 60 60 60 6 6 6 6 20.0 0.1 0.1 0.1 0.1 0.4 0.6 0.3 0.4 1.7<br />

B: ChinoTC-ChinoHillsMPvia Edisonsb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B: ChinoHillsMP- Valla Vista Loop cw 2.7 60 60 60 60 8 8 8 8 20.3 0.1 0.1 0.1 0.1 0.5 0.8 0.4 0.6 2.3<br />

Total Route 65 33.1 105 15 105 15 105 15 105 15 18.9 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.5 51.5 1300 25<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TC wb 16.4 20 20 20 30 66 10 66 10 66 10 66 20 14.9 3.8 3.8 3.8 2.9 15.6 22.8 11.4 10.5 60.3<br />

eb 16.7 20 20 20 30 75 9 75 9 75 9 75 19 13.3 4.2 4.2 4.2 3.1 16.4 25.2 12.6 7.8 62.0<br />

Total Route 68 33.1 141 19 141 19 141 19 141 39 14.1 8.0 8.0 8.0 6.0 32.0 48.0 24.0 18.3 122.3 2673 22<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 30 30 30 22 22 22 22 17.5 0.7 0.7 0.7 0.7 2.6 4.4 2.9 2.2 12.0<br />

sb 6.4 30 30 30 30 23 5 23 5 23 5 23 5 16.7 0.9 0.9 0.9 0.9 2.8 5.6 3.6 2.8 14.8<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 30 30 30 60 10 60 10 60 10 60 10 15.0 2.3 2.3 2.3 2.3 8.2 14.0 9.1 7.0 38.3<br />

wb 15.0 30 30 30 30 60 60 60 60 15.0 2.0 2.0 2.0 2.0 6.0 12.0 7.8 6.0 31.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 6.0 6.0 6.0 19.5 36.0 23.4 18.0 96.9 1900 20<br />

68: Chino-Montclair-Ch.College nb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

ChaffeyCollegeChino- Montclair TC nb 10.1 30 30 30 60 40 5 40 5 40 5 35 3 15.2 1.5 1.5 1.5 0.5 3.8 9.0 4.5 1.5 18.8<br />

sb 10.1 30 30 30 60 40 5 40 5 40 5 35 3 15.2 1.5 1.5 1.5 0.7 3.8 9.0 4.5 2.1 19.4<br />

Montclair TC- ChaffeyCollegeNorth. eb 12.4 30 30 30 60 51 15 51 15 51 15 51 3 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 45.0 185 25 185 25 185 25 171 9 14.6 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1569 18<br />

70:Ontario-via Riverside-Ont Millseb 6:34am-8:20pm 2.5 6.0 3.0 2.5 14.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.5 14.0<br />

D St& Sultana -Ontario Mills eb 13.0 30 30 30 60 45 45 45 45 17.3 1.5 1.5 1.5 0.8 3.8 9.0 4.5 1.9 19.1<br />

wb 12.0 30 30 30 60 41 8 41 8 41 8 41 8 17.6 1.6 1.6 1.6 0.8 4.1 9.8 4.9 2.0 20.8<br />

Ontario Mills - Chaffey College nb 11.1 30 30 30 60 38 10 38 10 38 10 38 10 17.5 1.6 1.6 1.6 0.8 4.0 9.6 4.8 2.0 20.4<br />

sb 11.1 30 30 30 60 38 38 38 38 17.5 1.3 1.3 1.3 0.6 3.2 7.6 3.8 1.6 16.2<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 6.0 6.0 6.0 3.0 15.0 36.0 18.0 7.5 76.5 1500 20<br />

71:Kaiser-S.Ridge-R.Cucamonga eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Jurupa&Cherry eb 7.8 30 30 30 60 33 33 33 33 14.2 1.1 1.1 1.1 0.6 4.4 6.6 3.3 1.7 16.0<br />

wb 6.8 30 30 30 60 28 10 28 10 28 10 28 10 14.6 1.3 1.3 1.3 0.6 5.1 7.6 3.8 1.9 18.4<br />

Jurupa&Cherry- Fontana Metrolink eb 8.2 30 30 30 60 30 10 30 10 30 10 30 10 16.4 1.3 1.3 1.3 0.7 5.3 8.0 4.0 2.0 19.3<br />

wb 8.2 30 30 30 60 30 30 30 30 16.4 1.0 1.0 1.0 0.5 4.0 6.0 3.0 1.5 14.5<br />

Fontana ML - Sierra&Sierra LakePkyeb 4.1 30 30 30 60 15 15 15 15 16.4 0.5 0.5 0.5 0.3 2.0 3.0 1.5 0.8 7.3<br />

wb 4.1 30 30 30 60 15 9 15 9 15 9 15 9 16.4 0.8 0.8 0.8 0.4 3.2 4.8 2.4 1.2 11.6<br />

Total Route 71 39.2 151 29 151 29 151 29 151 29 15.6 6.0 6.0 6.0 3.0 24.0 36.0 18.0 9.0 87.0 1800 21<br />

75:Ontario-via Francis-Ont Mills<br />

91:Orange County Connection eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 3.0 16.0<br />

Chino TC - Grand & Diamond Bar wb 7.5 60 60 30 25 35 35 15.0 0.5 0.6 2.0 0.0 1.8 0.0 3.8<br />

eb 7.5 60 60 30 5 35 5 35 5 35 5 15.0 0.6 0.7 2.3 0.0 2.0 0.0 4.3<br />

Grand&DiamondBar-Fullerton MLinkwb 14.0 60 60 45 20 5 20 5 20 5 18.7 0.8 0.4 3.0 0.0 1.3 0.0 4.3<br />

eb 14.0 60 60 45 5 20 20 20 18.7 0.8 0.3 3.3 0.0 1.0 0.0 4.3<br />

Total Route 91 43.0 150 10 100 10 110 10 110 10 17.2 2.7 2.0 10.7 0.0 6.0 0.0 16.7 1075 65<br />

West Valley Total 15.9 64 62 64 41 220 369 201 131 921 21760 24<br />

Total Unconstrained Strategy 16.2 181 179 180 104 611 1068 548 347 2574 67788 26<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

July 11, 2007 196


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

9.5 OmniLink Service Assessment<br />

Effective May 7, 2007, OmniLink annual revenue hours were reduced by 4,000 through a combination of<br />

the discontinuation of Saturday and Sunday service and a reduction in weekday service hours due to<br />

anticipated productivity improvements. No further OmniLink service cuts are scheduled for the remainder<br />

of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe. The proposed OmniLink service hour cuts and fare<br />

increases will result in a planned farebox recovery ratio ranging from 7.4% in <strong>2008</strong> to 7.6% in <strong>2013</strong>,<br />

peaking at 7.8% in 2012. During the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP timeframe, OmniLink farebox recovery<br />

will fall short of the 10% farebox recovery goal established for OmniLink service.<br />

Further productivity improvements and weekday revenue hour reductions are possible in the later stages<br />

of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP as the OmniLink service contractor is able to more effectively use the<br />

upgraded Trapeze PASS software. General public demand-response services in compact service areas<br />

such as Yucaipa should be able to carry five to six passengers per revenue hour. Through effective<br />

scheduling, demand-response services can reduce revenue hours and accommodate more trips with<br />

fewer revenue hours. This approach is the most effective way of reducing demand-response costs and<br />

improving farebox recovery.<br />

9.6 Potential OmniLink Service Improvements<br />

Assuming OmniLink productivity can be improved through enhanced trip assignment, the following<br />

weekday revenue hour reductions 9 are possible:<br />

Reduce Chino Hills OmniLink weekday revenue hours by 1,016 per annum.<br />

Contingent on improved scheduling efficiency, Chino Hills OmniLink can operate with 1,016 fewer annual<br />

revenue hours and one fewer bus. This reduction will facilitate reducing the peak bus pullout requirement<br />

from four to three buses. Figure 9-14 provides an overview of potential shifts for three weekday buses.<br />

Based on the analysis of passenger loads, there will be sufficient capacity to cover existing school loads,<br />

the Chino Senior Center shuttle and general trip making. This does not assume expanded school<br />

services.<br />

Reduce Yucaipa OmniLink weekday revenue hours by 3,946 per annum.<br />

Contingent on improved scheduling efficiency, Yucaipa OmniLink can operate with 3,946 fewer annual<br />

revenue hours and one fewer bus. This reduction will facilitate reducing the peak bus pullout requirement<br />

from seven to six buses. Figure 9-15 provides an overview of potential shifts for up to six weekday<br />

buses. One full straight shift was cut and the splits were left in on the days of high demand. Based on the<br />

analysis of passenger loads, there will be sufficient capacity to cover existing school loads, lunch breaks,<br />

and general trip making. This does not assume expanded school services.<br />

Procedural, service parameter and training assumptions necessary to improve scheduling efficiency are<br />

outlined in the following text.<br />

9<br />

Initially based on an assessment of OmniLink operations in October 2006. The assessment does not reflect May 7, 2007 service<br />

changes. However, it does provide a strategy worthy of consideration in the later stages of the SRTP.<br />

July 11, 2007 197


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-14: Proposed Chino Hills OmniLink Weekday Shift Coverage<br />

Time<br />

0700 to<br />

0800<br />

0800 to<br />

0900<br />

0900 to<br />

1000<br />

1000 to<br />

1100<br />

1100 to<br />

1200<br />

1200 to<br />

1300<br />

1300 to<br />

1400<br />

1400 to<br />

1500<br />

1500 to<br />

1600<br />

1600 to<br />

1700<br />

1700 to<br />

1800<br />

Bus 1<br />

Bus 2<br />

Bus 3<br />

indicates a bus in service<br />

Figure 9-15: Proposed Yucaipa OmniLink Weekday Shift Coverage<br />

Time 0700 to 0800 0800 to 0900 0900 to 1000 1000 to 1100 1100 to 1200 1200 to 1300 1300 to 1400 1400 to 1500 1500 to 1600 1600 to 1700 1700 to 1800<br />

Bus 1 (Mon - Fri)<br />

Bus 2 (Tues - Fri)<br />

Bus 3 (Mon - Fri)<br />

Bus 4 (Mon, Thur, Fri)<br />

Bus 5 (Mon - Fri)<br />

Operates as a split on Fridays<br />

Bus 6 (Tues, Wed, Fri)<br />

indicates a bus in service<br />

July 11, 2007 198


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

By <strong>2013</strong> the additional reduction in service hours would result in an hourly productivity of 4.10<br />

passengers/revenue hour and farebox recovery ratio of 9.5%. These potential revenue hour reductions<br />

assume:<br />

• 40-minute pick-up window. The continued application of a 40-minute pick-up<br />

window to facilitate greater scheduling flexibility while maintaining good on-time<br />

performance.<br />

• Improved OmniLink Scheduling. Chino Hills OmniLink Service is scheduled<br />

the day before service is required and manifests are posted the night before.<br />

Same day requests are processed in real time and assigned through dispatch.<br />

Yucaipa OmniLink Service is scheduled on the day of service and assigned trip<br />

by trip by the dispatcher. In both cases, Trapeze PASS is not used to optimize<br />

trip assignments. Both services offer advance reservations (up to three days in<br />

advance) and repeater subscription bookings (up to one calendar month in<br />

advance for trips that reoccur at least three days a week). In the case of Chino<br />

Hills OmniLink, the dispatcher estimated that approximately 80% of all trips were<br />

repeater bookings (reflecting the high student usage), 10% are advance<br />

bookings and the remaining 10% are same day bookings. Estimates of advance<br />

and repeater bookings were not available for Yucaipa OmniLink.<br />

• Enhanced Scheduling and the Effective Utilization of Trapeze PASS.<br />

Scheduling templates should be created in advance for repeater trips on both<br />

Chino Hills and Yucaipa OmniLink services. Scheduled repeater trips provide a<br />

scheduling framework for each OmniLink run and form a basis for effective<br />

advance booking assignments using the Trapeze “Assign Now” feature. The<br />

Assign Now feature can also be used to process same day bookings and<br />

facilitate more effective pick-up time negotiation 10 and more effective use of the<br />

pick-up window. More linked trips would be possible. Trips that do not fit onto a<br />

scheduled run could be placed on an unassigned list and dispatched on the day<br />

of service as cancellations create space. All advance schedules should be<br />

optimized using the Trapeze “Trip Optimizer” feature on the evening before the<br />

service day. Optimization tends to tighten up the schedules and actually create<br />

space through the more effective reassignment of trips within the 40-minute<br />

window and between runs. This in turn creates space for same day<br />

assignments. In the case of Yucaipa OmniLink, this process would result in<br />

fewer trips for same day scheduling. Same day scheduling is fine for small<br />

volumes of trips. However, Yucaipa OmniLink in particular is at a level of service<br />

that requires more advance scheduling to increase service productivity.<br />

OmniLink dispatchers and reservationists will be required to participate in the<br />

Trapeze PASS training suggested for Access scheduling and dispatch staff<br />

identified in the Draft <strong>Omnitrans</strong> Access Service <strong>Plan</strong>. This training is in<br />

conjunction with the installation of the new version of Trapeze PASS in<br />

December 2006.<br />

• Integration of OmniLink and Access Services. The operation of both<br />

OmniLink and Access Services under a single service agreement facilitates a<br />

more effective integration of OmniLink and Access Services. OmniLink Services<br />

are strategically operated to accommodate local Access trips within Chino Hills<br />

and Yucaipa. By integrating the scheduling functions of the two services, Access<br />

trips could be transferred from Access to available space on OmniLink runs<br />

during the schedule optimization process. Not only would this process increase<br />

10<br />

The two hour ADA negotiation model could be used for OmniLink.<br />

July 11, 2007 199


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

OmniLink productivity, but it could also reduce Access deadheading to either<br />

Chino Hills or Yucaipa. This in turn would free up Access capacity within the<br />

more central West and East Valley Service Areas to improve service productivity<br />

and on-time performance.<br />

• Establishment of a 60-minute OmniLink pulse at the Yucaipa Transcenter.<br />

The new Yucaipa Transcenter is scheduled to open in FY 2007/08 and will serve<br />

as the eastern terminus for <strong>Omnitrans</strong> fixed route services. Two Yucaipa<br />

OmniLink buses will pulse every 60 minutes from the new Yucaipa Transcenter<br />

to act as feeders for Route 8. OmniLink arrivals and departures will be timed to<br />

facilitate good connections with Route 8 to minimize passenger wait times. One<br />

of the OmniLink buses will serve the area of Yucaipa east of the new Transcenter<br />

while the second bus will serve the area west of the Transcenter. These two<br />

buses will act a zonal service. Passengers transferring from Route 8 will be able<br />

to walk onto the appropriate OmniLink bus serving their area without making an<br />

advance telephone request. Passengers transferring to Route 8 will be required<br />

to request OmniLink feeder service by telephone and their trip will be grouped<br />

onto the appropriate OmniLink bus as it makes its inbound sweep to meet Route<br />

8. The grouping of trips and the accommodation of walk on passengers at the<br />

Yucaipa Transcenter will increase service productivity and farebox revenue<br />

recovery.<br />

9.7 Potential Access Service Improvements<br />

The following section presents a series of service policies, strategies and plans designed to:<br />

• Preserve the integrity of the Access ADA paratransit services for those people<br />

with a disability who are unable to use accessible regular transit;<br />

• Recognize the investments made by Access in accessible regular transit and<br />

accompanying infrastructure and maximize the use of accessible regular buses;<br />

and<br />

• Provide flexible mobility options with a cost-effective mix of accessible sharedride<br />

public transportation services.<br />

Access can facilitate a more integrated approach between accessible regular transit services and ADA<br />

paratransit services. Access can build on current initiatives and further foster a user-friendly, accessible<br />

regular transit service that actually attracts older adults and riders with a disability away from ADA<br />

paratransit services. Access’ accessible public transit system provides a higher degree of trip making<br />

flexibility and facilitates greater travel spontaneity and independence. A truly accessible transit system<br />

can become the preferred choice for many people with a disability.<br />

In order to fully implement an effective near-term service plan as well provide for longer-term/ten-year<br />

strategic direction, Access must develop a corporate and community culture that recognizes and supports<br />

the strategic, social and economic benefits of a Mobility <strong>Plan</strong>. This culture must be fully accepted and<br />

supported by the <strong>Omnitrans</strong> and Access (First <strong>Transit</strong>) management and frontline staff.<br />

9.7.1 EVALUATION FRAMEWORK<br />

The following evaluation framework (Figure 9-16) presents key criteria for assessing the financial and<br />

operational feasibility of alternatives as they relate to operations and service improvement strategies. It is<br />

important to recognize that this high-level evaluation framework was developed to be all-encompassing,<br />

as various elements may not be applicable to all of the strategies being presented.<br />

July 11, 2007 200


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 9-16: Access Evaluation Framework<br />

Evaluation Criteria<br />

Description/Example<br />

Effectiveness • Number of trips<br />

• Population served<br />

Economy • Total cost of providing the service<br />

• Capital vs. operating costs<br />

• Large capital outlays<br />

• Present-valued expenditures over the long term<br />

Efficiency • Cost per trip<br />

• Cost per vehicle hour, etc.<br />

Level of service • Hours of service<br />

• Frequency of service (headways)<br />

• Trip purpose (discretionary/non-discretionary travel)<br />

Quality of service • Convenience, transfers, trip times, comfort, and flexibility<br />

• Safety and security of passengers and drivers<br />

Organizational issues • Operational flexibility<br />

• Control and accountability (including contract administration)<br />

• Schedule adherence and management of bus operations and<br />

fleet management<br />

• Value of collected data for planning service or managing<br />

performance<br />

• Human and labor relations<br />

• Ease of implementation<br />

Technical risk • If new or modified equipment is required<br />

• Ability to support the equipment (e.g. scheduling systems,<br />

vehicles, etc.)<br />

• Interfaces with other on-board and central electronic systems<br />

Corporate risk • Potential for changes in direction of corporate policies<br />

Financial risk • If large capital outlays are required<br />

9.7.2 OPERATIONS<br />

The following section describes opportunities for operational enhancements to the Access service. These<br />

have been identified as they relate to trip management and service delivery/fleet mix.<br />

Trip Management<br />

Trip management refers to the operational processes of trip booking, scheduling (trip assignment), and<br />

dispatch. In terms of amendments to existing processes, recommendations for improvement include:<br />

• Access trip reservationists to negotiate pick-up times (i.e., within one hour before<br />

or one hour after requested time). Increase the advance booking requirement to<br />

a minimum of two to four hours.<br />

July 11, 2007 201


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Encourage the use of subscription trips for individuals making regularly<br />

scheduled trips.<br />

• With enhanced staff training and maximizing the utility of scheduling software, do<br />

trip confirmations at time of booking.<br />

Many Access trip requests are for transportation for regularly scheduled trips for work, education, and<br />

medical purposes. The impact of the current scenario of discouraging such subscription bookings results<br />

in additional administrative burden, in the form of reservationists having to handle increased call and<br />

schedule volumes. Further, the constant requirement for customers to book regularly scheduled trips on<br />

a daily basis hinders the otherwise quality service provided by <strong>Omnitrans</strong>’ Access service.<br />

Figure 9-17: Trip Management Evaluation<br />

Evaluation Criteria Comments Rating<br />

Effectiveness • Accommodates all trip requests •<br />

Economy – total cost<br />

of providing the<br />

service<br />

Efficiency<br />

Level of service<br />

• Able to accommodate greater number of trips with<br />

existing financial resources<br />

• Able to accommodate greater number of trips with<br />

existing financial resources<br />

• Increase in productivity (trips/hour)<br />

• No change in hours of service<br />

• Introduction of negotiating pick-up times may be<br />

perceived as a degradation in the level of service<br />

•<br />

•<br />

•/<br />

Quality of Service<br />

• Subscription service will be perceived as an increase in<br />

the quality in service, given expectations of riders<br />

Organizational issues • Need to “manage” rider expectations ◦<br />

Technical risk<br />

• Need for additional staff training (negative if not<br />

addressed, neutral if addressed)<br />

Financial risk – if large<br />

capital outlays are • None •<br />

required<br />

Rating Legend: • Positive rating ◦ Neutral rating Negative rating<br />

•<br />

◦<br />

Service Delivery/Fleet Mix<br />

There is an opportunity to have marginal service expansion with the use of supplemental taxi contracts.<br />

The use of taxis brings financial advantages as well as flexibility to utilize this transportation resource on<br />

an as-needed basis to address peaking characteristics in demand. It will also foster a working<br />

relationship with the County’s vehicle-for-hire industry and allow the industry to make a possible business<br />

case for the procurement of accessible taxis. This would be of benefit to the entire community whether<br />

used in an Access contract or not. The only caveat is the need to address the regulatory regime of the<br />

taxi industry. It is imperative that qualitative considerations be addressed in the policing of the industry,<br />

July 11, 2007 202


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

including assurances of quality of vehicles and driver training (including sensitivity awareness in the<br />

handling of people with a disability).<br />

The use of taxis in a supplemental service mode needs to be further explored for possible integration into<br />

the Access service delivery framework over the next few years.<br />

Figure 9-18: Service Delivery/Fleet Mix Evaluation<br />

Evaluation Criteria Comments Rating<br />

Effectiveness • Accommodates all trip requests •<br />

Economy – total<br />

cost of providing the<br />

service<br />

• Savings in capital outlay by negating the need for an<br />

expansion in the number of Access vehicles<br />

• Cost savings in variable operating costs<br />

Efficiency • Cost savings in variable operating costs and costs per trip •<br />

•<br />

Level of service<br />

• No change in level of service<br />

• May be perceived positively<br />

•<br />

Quality of Service<br />

Organizational<br />

issues<br />

• Little change, may be perceived as improved quality,<br />

greater comfort<br />

• Need to address regulations for taxi industry <br />

•<br />

Technical risk<br />

• Need to incorporate fleet mix attributes in the scheduling<br />

parameters of existing scheduling software (Trapeze<br />

software currently has the capability)<br />

◦<br />

Financial risk – if<br />

large capital outlays<br />

are required<br />

Rating Legend: • Positive rating<br />

• Initial savings in capital outlay, but these will largely be<br />

negated in life-cycle costing<br />

◦ Neutral rating Negative rating<br />

◦<br />

9.7.3 ADMINISTRATIVE PROCESSES<br />

First <strong>Transit</strong> appears to be proficient in the administration and operation of Access services. However, an<br />

opportunity exists to restructure the operating contract to better reflect performance-based criteria for<br />

operations and compensation.<br />

<strong>Omnitrans</strong> staff is able to produce robust operating and performance-based data. These data may be<br />

best utilized in working with First <strong>Transit</strong> to ensure service efficiency, which may be tied to the contractor’s<br />

compensation (specifically the management fee component of the contract).<br />

Alternate approaches to the restructuring of the contractor agreement include a pricing component tied to<br />

system productivity and performance. This may include set rates for variables such as price per trip or<br />

hour. This would be supplemented with clauses addressing performance incentives and penalties tied to<br />

productivity and adherence to prescribed service standards. The latter will include on-time performance,<br />

travel times, complaints, and other measures of service quality.<br />

July 11, 2007 203


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

9.7.4 DEMAND MANAGEMENT<br />

Integration with Regular Fixed Route <strong>Transit</strong><br />

In spite of the growth in demand, ADA paratransit services will not need to be expanded appreciably if<br />

more is done to ensure that people with disabilities use Access regular services whenever possible. With<br />

the regular transit fleet being fully accessible, there are growing opportunities to use regular bus services<br />

to meet some of the needs of many ADA paratransit customers.<br />

It is recommended that <strong>Omnitrans</strong> encourage the voluntary use of fixed route transit services through the<br />

deployment of demand management elements as described herein.<br />

Partnership with Agencies/Mobility Manager<br />

The structure of ADA paratransit services is changing due to shifts in policy and funding scenarios for<br />

several agencies and organizations in the County. There is a need to develop partnerships with social<br />

service agencies, the medical community and others in order to address the continuity of access to<br />

programs and services.<br />

ADA paratransit is by definition shared-ride public transit for those unable to use accessible regular transit<br />

services. It is important to preserve the integrity of ADA paratransit services for those individuals who<br />

have few or no alternate modes of travel. Typically, agency program requirements entail the transport of<br />

individuals who may not otherwise be eligible for ADA paratransit services. This may include people with<br />

cognitive disabilities or mental illness. Building on the partnership concept or collaborative approach to<br />

mobility management, opportunity exists for <strong>Omnitrans</strong> staff to assume responsibility for the facilitation of<br />

agency- or program-specific transportation.<br />

It is recommended that <strong>Omnitrans</strong>:<br />

• Embrace the concept of mobility management in order to bring a more broadbased<br />

perspective to transportation service delivery; and<br />

• Encourage the use of subscription trips for services tailored to meet specific<br />

travel needs and requirements of local programs and agency specific<br />

transportation.<br />

Ancillary Demand Management Strategies<br />

Free Fare Policy – In order to encourage ADA paratransit registrants to voluntarily use conventional<br />

transit (possibly for some of their trips, some of the time), <strong>Omnitrans</strong> should consider instituting a free fare<br />

policy. This policy will provide for the free use of accessible conventional transit services for a select<br />

experimental group of ADA paratransit registrants for a six-month pilot period. It is important that the<br />

administration develop an evaluation framework in order to gauge the effectiveness of this initiative.<br />

Given the potential benefits (not only in cost savings for <strong>Omnitrans</strong>, but in the further integration and<br />

expansion of transportation options available to ADA paratransit service registrants), it is recommended<br />

that the administration select a sample of approximately 100 frequent ADA paratransit users to participate<br />

in a six-month pilot. It is suggested that one half of the sample be requested to maintain a trip diary.<br />

It is interesting to note that the experience in the paratransit industry with “free fare” policy is that while<br />

there may not be a significant number of trips “off-loaded” from the ADA paratransit service, registrants<br />

typically have increased their trip making rate and have chosen to make additional discretionary trips.<br />

This is viewed as an additional benefit of this policy as paratransit customers choose to “get out and<br />

about” more frequently.<br />

July 11, 2007 204


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

9.7.5 TECHNOLOGY PLAN<br />

Access currently uses Trapeze’s PASS paratransit scheduling software for reservations, scheduling and<br />

dispatching. The software is used essentially to build trips based on the receipt of advanced booked<br />

reservations. Access’ staff reports that this system of trip reservations and scheduling works and is costeffective.<br />

Trip insertions are done based on a manual understanding of trip origins and destinations,<br />

relatively short travel distances, and the generally good coverage the existing fleet is able to provide. For<br />

the foreseeable future there is no need to upgrade existing software. The latest iteration of the Trapeze<br />

software was upgraded in mid-December 2006.<br />

Furthermore, existing software is capable of:<br />

• Addressing requirements for negotiating pick-up times.<br />

• Expanded use of subscription trip bookings and the preparation of trip templates.<br />

• Addressing a fleet mix incorporating the use of taxis.<br />

• Conditional and trip-by-trip eligibility.<br />

• Accommodating trip confirmations at time of trip booking.<br />

The software currently has a functional interface with the Siemens Mobile Data Terminals (MDTs) and<br />

Automatic Vehicle Locating (AVL) capabilities. Customer interface elements including Interactive Voice<br />

Response (IVR) and web-based service access should be considered for inclusion into future system<br />

upgrades.<br />

July 11, 2007 205


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

10. SERVICE PLAN – FINANCIALLY CONSTRAINED<br />

Based on the Constrained <strong>Plan</strong> identified in Section 9.4, a Financially Constrained Service <strong>Plan</strong> has been<br />

developed for implementation over the FY 2007-2011 period (while the SRTP covers the period from FY<br />

<strong>2008</strong>-<strong>2013</strong>, implementation of the Constrained <strong>Plan</strong> identified in Section 9.4 began in May 2007 and will<br />

continue through to FY 2011). Note that the definition of the term “financially constrained” used herein<br />

varies somewhat from the industry-standard definition, which is a plan whose resource needs are limited<br />

to available funding. The Financially Constrained Service <strong>Plan</strong> described here does not fully draw-down<br />

the funds potentially available to <strong>Omnitrans</strong>. However, the ability to draw the funds is contingent on<br />

<strong>Omnitrans</strong> continuing to consistently meet a farebox recovery ratio of 20%; for the reasons discussed<br />

elsewhere in this document, the <strong>Omnitrans</strong> Board has decided to set a systemwide farebox recovery<br />

target of 25% to buffer against unforeseen cost spikes or ridership drops. The farebox recovery goal<br />

therefore becomes the limiting factor in <strong>Omnitrans</strong>’ ability to add service, and is essentially a financial<br />

constraint since non-attainment of the goal would jeopardize <strong>Omnitrans</strong>’ sources of operating funds.<br />

10.1 Stage 1 FY 2007<br />

The first stage of the Constrained Service <strong>Plan</strong> was implemented in May 2007. It covered the following<br />

route and service changes:<br />

Route 1 – Saturday frequency reduced from 15-30 to 30-60 minutes<br />

Route 8 – Diversion to Citrus Plaza eliminated on all days<br />

Route 11 – Unproductive trips reduced on Saturdays<br />

Route 14L – Discontinued<br />

Route 15 – Unproductive trips reduced on weekdays. Sunday frequencies reduced from 30 to 60<br />

minutes.<br />

Route 19 – Unproductive trips reduced on Saturdays<br />

Route 20 – Sunday frequencies reduced from 30 to 60 minutes<br />

Route 22 – Weekday frequencies reduced from 20 to 30 minutes<br />

Route 28 – Service reduced to peak periods only<br />

Route 31 – Discontinued<br />

Route 62 - Unproductive trips reduced on weekdays<br />

Route 68 – Discontinued on Sundays<br />

Route 75 – Unproductive trips reduced on weekdays<br />

Route 90 – Montclair section discontinued. Frequencies improved to 30 minutes on Riverside section.<br />

These changes reduced annual revenue hours by 44,000 and the peak fleet by eight buses. The existing<br />

system now provides 634,300 annual revenue hours and has a peak fleet of 138 buses. The weekday<br />

service characteristics of the existing system are shown in Figure 10-1 through Figure 10-3.<br />

July 11, 2007 206


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-1: Stage 1 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Cnb 6.3 15 15 15 15 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 1.9 5.0 11.5 6.0 8.5 31.0<br />

sb 6.9 15 15 15 15 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 2.1 12.0 17.3 9.0 9.6 47.9<br />

Tripper 1.0 1.0 1.0 2.6 3.6<br />

E St.&Court - Sterling & Date <strong>Plan</strong>b 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 6.0 24.5 42.9 21.0 25.1 113.4 4061 36<br />

2: Cal State-E Street-Loma Lindsb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 15 15 15 30 24 24 24 24 15.7 1.6 1.6 1.6 0.8 4.8 9.6 4.6 3.4 22.5<br />

nb 6.3 15 15 15 30 26 10 26 10 26 10 22 5 14.5 2.4 2.4 2.4 0.9 8.6 14.4 6.7 3.4 33.1<br />

Tripper 1.0 2.0 2.0<br />

E St.&Court - VA Hospital sb 6.8 15 15 15 30 34 7 34 7 34 7 34 7 11.9 2.7 2.7 2.7 1.4 8.2 16.4 7.9 5.9 38.4<br />

nb 6.8 15 15 15 30 34 34 34 28 11.9 2.3 2.3 2.3 0.9 6.0 13.6 6.3 3.5 29.5<br />

Total Route 2 26.1 118 17 118 17 118 17 108 12 13.3 9.0 9.0 10.0 4.0 27.6 54.0 27.6 16.2 125.5 4807 38<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.3 16.3<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline ( eb 12.2 20 20 20 30 51 5 51 5 51 5 51 5 14.3 2.8 2.8 2.8 1.9 11.2 16.8 8.4 6.1 42.5<br />

Boulder&Baseline-4thSt&E St. (3 wb 12.2 20 20 20 30 51 15 51 15 51 15 51 5 14.3 3.3 3.3 3.3 1.9 14.7 19.8 9.9 6.5 50.9<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4 wb 6.4 20 20 20 30 25 19 25 19 25 19 25 9 15.3 2.2 2.2 2.2 1.1 8.8 13.2 6.6 3.7 32.3<br />

4thSt&ESt - Boulder&Baseline (3 eb 6.4 20 20 20 30 29 5 29 5 29 5 29 5 13.2 1.7 1.7 1.7 1.1 7.6 10.2 5.1 4.0 26.8<br />

Total Route 3/4 37.0 156 44 156 44 156 44 156 24 14.2 10.0 10.0 10.0 6.0 42.3 60.0 30.0 20.3 152.6 6275 41<br />

5: San Bndo-Del Rosa-Cal Stat nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Unb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal St nb 6:05am-7:05pm 3.0 6.0 3.0 0.9 12.9<br />

sb 5:06am-6:06pm 3.9 6.0 3.0 0.7 13.6<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 0.6 9.0<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 0.8 16.3<br />

SierraWay&40th - Cal State nb 3.4 60 60 60 60 15 3 15 3 15 3 15 3 13.7 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.3 3.9<br />

sb 3.2 60 60 60 60 11 11 11 11 17.5 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.1 2.5<br />

Cal State - Kendall&Palm nb 4.2 60 60 60 60 13 11 13 11 13 11 13 11 19.2 0.4 0.4 0.4 0.4 1.2 2.4 1.2 0.4 5.2<br />

sb 2.3 60 60 60 60 8 5 8 5 8 5 8 5 17.3 0.2 0.2 0.2 0.2 0.8 1.3 0.7 0.2 2.9<br />

Total Route 7 23.4 93 30 93 30 93 30 93 30 15.1 3.0 3.0 3.0 3.0 10.4 18.0 9.0 2.4 39.8 1129 28<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain Vieeb 7.1 60 60 60 60 21 21 21 21 20.1 0.4 0.4 0.4 0.4 1.2 2.1 1.1 1.1 5.4<br />

wb 7.8 60 60 60 60 24 10 24 10 24 10 24 10 19.5 0.6 0.6 0.6 0.6 2.3 3.4 1.7 1.6 9.0<br />

Redlands&MtnView-Redlands Maeb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

wb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.1 6.3<br />

Redlands Mall- 4th&Yucaipa eb 11.8 60 60 60 60 35 9 35 9 35 9 35 9 20.3 0.7 0.7 0.7 0.7 2.6 4.4 2.2 2.2 11.4<br />

wb 11.0 60 60 60 60 33 33 33 33 20.0 0.6 0.6 0.6 0.6 2.2 3.3 1.7 1.5 8.7<br />

Total Route 8 47.3 161 19 161 19 161 19 161 19 17.6 3.0 3.0 3.0 3.0 11.3 18.0 9.0 8.7 47.0 900 19<br />

9: San Bdno-Redlands-Yucaipaeb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 60 60 60 60 31 31 31 31 14.9 0.5 0.5 0.5 0.5 1.6 3.1 1.6 2.1 8.3<br />

wb 8.5 60 60 60 60 34 15 34 15 34 15 34 15 14.9 0.8 0.8 0.8 0.8 4.0 4.9 2.5 3.3 14.6<br />

Barton&Benton-Redlands Mall eb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 0.7 1.4 0.7 0.9 3.7<br />

wb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 1.1 1.4 0.7 0.9 4.2<br />

Redlands Mall- California&D St. eb 10.4 60 60 60 60 33 5 33 5 33 5 33 5 18.9 0.6 0.6 0.6 0.6 1.9 3.8 1.9 2.5 10.1<br />

wb 10.5 60 60 60 60 34 34 34 34 18.6 0.6 0.6 0.6 0.6 2.7 3.4 1.7 2.3 10.1<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.0 51.0 1177 23<br />

10: Fontana-Baseline-San Bdnowb 5:35am-6:35pm 3.3 6.5 2.5 1.0 13.3<br />

eb 5:30am-7:30pm 3.3 6.0 3.0 1.5 13.8<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 41 38 38 38 38 17.6 1.3 1.3 1.3 0.9 4.1 8.2 3.2 0.9 16.4<br />

eb 11.1 30 30 30 45 38 15 38 15 38 15 38 15 17.6 1.8 1.8 1.8 1.2 5.8 10.6 5.3 1.8 23.5<br />

Baseline&Citrus - FontanaMetrol wb 2.6 30 30 30 30 12 5 12 5 12 5 12 6 13.0 0.6 0.6 0.6 0.6 1.8 3.7 1.4 0.6 7.5<br />

eb 3.1 30 30 30 41 12 12 12 12 15.3 0.4 0.4 0.4 0.3 1.3 2.4 1.2 0.4 5.4<br />

Total Route 10 27.9 100 20 100 20 100 20 100 21 16.7 4.0 4.0 4.0 3.0 13.1 24.9 11.1 3.7 52.8 1611 30<br />

11: San Bdno-Muscoy-Cal Stat nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 207


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-2: Stage 1 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.0 6.0 3.0 4.1 17.1 *<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9 *<br />

4th&Arrowhead-Fontana Metrolinwb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 13.3 20.0 10.0 6.8 50.1<br />

Tripper 1.0 1.0 1.0<br />

Fontana ML-4th&Arrowhead eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 8.0 7.0 7.0 3.0 27.2 42.0 21.0 12.6 102.8 4518 44<br />

15: Fontana-SanB/Highland-Reeb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLinkwb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaise sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemsb 3.2 30 30 30 30 9 9 9 9 21.4 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.8 4.4<br />

nb 2.9 30 30 30 30 14 15 14 15 14 15 14 15 12.5 1.0 1.0 1.0 1.0 3.4 5.8 2.9 2.9 15.0<br />

Randall&Hemlock - Marygold&Si sb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 9 9 9 9 20.3 0.3 0.3 0.3 0.3 1.1 1.8 0.9 0.9 4.7<br />

Total Route 20 12.2 45 15 45 15 45 15 45 15 16.3 2.0 2.0 2.0 2.0 6.7 12.0 6.0 5.9 30.6 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsdnb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaisewb 6:02am-6:02pm 2.7 3.0 5.7<br />

eb 6:31am-6:31pm 2.5 3.0 5.5<br />

Marygold&Sierra-Slover&Mulberr wb 4.8 60 60 60 20 20 14.4 0.3 0.3 0.8 0.9 1.7<br />

eb 5.4 60 60 60 21 6 21 6 15.5 0.5 0.5 1.3 1.5 2.8<br />

Slover&Mulberry-Slover&Marley cw 3.2 60 60 60 13 13 14.5 0.2 0.2 0.5 0.7 1.2<br />

54 6 54 6 1.0 1.0 2.6 3.1 5.7 100 18<br />

29: Bloomington-Valley-Kaiser eb 6:45am-5:54pm 2.0 6.0 3.8 11.8<br />

wb 7:10am-6:10pm 2.0 6.0 3.9 11.9<br />

Marygold&Sierra-11th&Cedar eb 5.8 60 60 60 25 25 25 13.8 0.4 0.4 0.4 0.8 2.5 1.6 4.9<br />

wb 5.7 60 60 60 25 10 25 10 25 10 13.7 0.6 0.6 0.6 1.2 3.5 2.3 6.9<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 1.0 1.0 1.0 2.0 6.0 3.9 11.9 245 21<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Montclair TC<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 645 18<br />

East Valley Total 16.3 81 79 80 62 275 470 238 205 1187 36822 31<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 208


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-3: Stage 1 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMillseb 5:10am-9:10pm 4.0 6.0 3.0 3.3 16.3 *<br />

wb 4:40am-8:40pm 4.0 6.0 3.0 3.0 16.0 *<br />

Montclair TC-Holt&Vineyard sb 7.2 30 30 30 30 28 5 28 5 28 5 28 5 15.4 1.1 1.1 1.1 1.1 4.4 6.6 3.3 3.6 17.9<br />

nb 7.2 30 30 30 30 27 27 27 27 16.0 0.9 0.9 0.9 0.9 3.6 5.4 2.7 2.7 14.4<br />

Holt&Vineyard-Chaffey College eb 9.0 60 60 60 60 28 2 28 2 28 2 28 2 19.4 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.7 8.2<br />

wb 8.8 60 60 60 60 30 30 30 30 17.6 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.5 8.0<br />

Total Route 60 32.2 113 7 113 7 113 7 113 7 17.1 3.0 3.0 3.0 3.0 12.0 18.0 9.0 9.5 48.5 732 15<br />

61:Fontana-OntarioMills-Pomoeb 4:40am-9:05pm 3.7 6.0 3.0 3.0 15.7<br />

wb4:20am-10:20pm 4.0 6.0 3.0 3.7 16.6<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 15 15 15 30 30 2 30 2 30 2 30 2 10.9 2.1 2.1 2.1 1.1 7.9 12.8 6.4 3.2 30.3<br />

wb 6.6 15 15 15 30 32 12 32 12 32 12 32 12 12.5 2.9 2.9 2.9 1.5 11.7 17.6 8.8 3.2 41.2<br />

Ontario Transfer Center - Airport eb 3.2 15 15 15 30 17 17 17 17 11.3 1.1 1.1 1.1 0.6 4.2 6.8 3.4 1.7 16.1<br />

wb 3.7 15 15 15 30 12 2 12 2 12 2 12 2 18.5 0.9 0.9 0.9 0.5 3.7 5.6 2.8 0.8 12.9<br />

Airport Drive - Fontana Metrolink eb 13.3 15 15 15 30 47 11 47 11 47 11 47 11 17.0 3.9 3.9 3.9 1.9 14.3 23.2 11.6 5.8 54.9<br />

wb 13.0 15 15 15 30 45 45 45 45 17.4 3.0 3.0 3.0 1.5 11.9 18.0 9.0 5.5 44.4<br />

Total Route 61 45.3 183 27 183 27 183 27 183 27 14.9 14.0 14.0 14.0 7.0 53.7 84.0 42.0 20.1 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 2.2 6.0 3.0 3.3 14.5<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

Chino <strong>Transit</strong> Ctr-Ontario TC nb 6.7 30 30 30 30 22 22 22 22 18.2 0.7 0.7 0.7 0.7 1.6 4.4 2.2 2.6 10.8<br />

sb 6.4 30 30 30 30 22 19 22 19 22 19 22 19 17.6 1.4 1.4 1.4 1.4 4.1 8.2 4.1 4.0 20.4<br />

Ontario <strong>Transit</strong> Ctr-Montclair TC nb 5.4 30 30 30 30 20 20 20 20 16.2 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.3 10.3<br />

sb 5.2 30 30 30 30 20 20 20 20 15.5 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.0 10.0<br />

Montclair Transcenter-19th&Eucl nb 6.4 30 30 30 30 23 23 23 23 16.7 0.8 0.8 0.8 0.8 2.3 4.6 2.3 2.7 11.9<br />

sb 6.4 30 30 30 30 24 24 24 24 16.0 0.8 0.8 0.8 0.8 2.4 4.8 2.4 2.4 12.0<br />

Total Route 62 23.4 131 19 131 19 131 19 131 19 10.7 5.0 5.0 5.0 5.0 14.4 30.0 15.0 16.0 75.4 1600 21<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hos nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair Transcenter- Chinosb 6.6 30 30 30 30 24 24 24 24 16.6 0.8 0.8 0.8 0.8 3.2 4.8 2.4 3.4 13.8<br />

nb 6.6 30 30 30 30 21 15 21 15 21 15 21 15 19.0 1.2 1.2 1.2 1.2 4.8 7.2 3.6 5.0 20.6<br />

A: ChinoTC-ChinoHillsMPvia Chi sb 3.6 60 60 60 60 14 14 14 14 15.5 0.2 0.2 0.2 0.2 0.9 1.4 0.7 1.0 4.0<br />

nb 3.6 60 60 60 60 15 15 15 15 14.5 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

B: ChinoTC-ChinoHillsMPvia Edi sb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.1 4.3<br />

nb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

A/B: ChinoHillsMP- LosSerronos cw 2.7 30 30 30 30 19 12 19 12 19 12 19 12 8.5 1.0 1.0 1.0 1.0 4.1 6.2 3.1 4.3 17.8<br />

Total Route 65 31.1 123 27 123 27 123 27 123 27 15.2 4.0 4.0 4.0 4.0 16.1 24.1 12.1 16.8 69.1 1426 21<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.9 15.9<br />

Fontana Metrolink - Montclair TCwb 16.4 15 15 15 30 66 15 66 15 66 15 66 20 14.9 5.4 5.4 5.4 2.9 18.8 32.4 16.2 10.5 77.9<br />

eb 16.7 15 15 15 30 75 9 75 9 75 9 75 19 13.3 5.6 5.6 5.6 3.1 19.2 33.6 16.8 8.7 78.3<br />

Total Route 68 33.1 141 24 141 24 141 24 141 39 14.1 11.0 11.0 11.0 6.0 38.0 66.0 33.0 19.2 156.2 3238 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-6:35pm 4.0 6.0 3.8 13.8<br />

sb 6:05am-7:05pm 3.8 6.0 3.9 13.7<br />

D St& Sultana - Euclid&Baseline nb 4.5 60 60 60 16 16 16 16.8 0.3 0.3 0.3 1.1 1.6 1.0 3.7<br />

sb 3.9 60 60 60 15 8 15 8 15 8 15.5 0.4 0.4 0.4 1.5 2.3 1.5 5.3<br />

Euclid&Baseline - Fontana Metro eb 14.2 60 60 60 63 11 63 11 63 11 13.5 1.2 1.2 1.2 4.9 7.4 4.6 17.0<br />

wb 14.2 60 60 60 67 67 67 12.7 1.1 1.1 1.1 4.2 6.7 4.4 15.3<br />

Total Route 67 36.8 161 19 161 19 161 19 0 0 13.7 3.0 3.0 3.0 11.7 18.0 11.5 41.2 676 16<br />

68: Chino-Montclair-Ch.Collegenb 5:25am-9:07pm 3.5 6.0 3.0 3.0 15.5<br />

sb 5:00am-9:19pm 3.5 6.0 2.5 3.1 15.1<br />

Chino <strong>Transit</strong> Center- Montclair Tnb 7.9 30 30 30 30 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 1.2 4.4 7.6 3.8 3.5 19.3<br />

sb 7.9 30 30 30 30 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 1.3 6.1 10.4 4.3 4.1 24.9<br />

Montclair Transcenter- ChaffeyCoeb 12.4 30 30 30 30 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 1.8 7.7 13.2 6.6 5.5 33.0<br />

wb 12.4 30 30 30 30 54 54 54 50 13.8 1.8 1.8 1.8 1.7 6.3 10.8 4.5 5.2 26.8<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 6.0 24.5 42.0 19.2 18.3 104.0 1770 17<br />

70:Ontario-via Riverside-Ont Meb 6:34am-7:20pm 3.0 6.0 3.0 1.8 13.8<br />

wb 6:44am-8:24pm 3.0 6.0 3.0 3.0 15.0<br />

D St& Sultana -Ontario Mills eb 13.0 60 60 60 60 39 32 39 32 39 32 39 32 19.9 1.2 1.2 1.2 1.2 3.6 7.1 3.6 2.1 16.3<br />

wb 12.0 60 60 60 60 41 8 41 8 41 8 41 8 17.6 0.8 0.8 0.8 0.8 2.5 4.9 2.5 2.5 12.3<br />

Total Route 70 25.0 80 40 80 40 80 40 80 40 18.7 2.0 2.0 2.0 2.0 6.0 12.0 6.0 4.5 28.5 476 17<br />

71:Kaiser-S.Ridge-R.Cucamon eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 60 60 60 60 23 23 23 23 14.1 0.4 0.4 0.4 0.4 1.5 2.3 1.2 1.2 6.1<br />

wb 4.0 60 60 60 60 18 10 18 10 18 10 18 10 13.3 0.5 0.5 0.5 0.5 1.9 2.8 1.4 1.2 7.3<br />

Etiwanda&Jurupa-Jurupa&Cherryeb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.5 2.7<br />

wb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.4 2.6<br />

Jurupa&Cherry- Fontana Metrolineb 8.2 60 60 60 60 30 10 30 10 30 10 30 10 16.5 0.7 0.7 0.7 0.7 2.7 4.0 2.0 2.0 10.7<br />

wb 8.2 60 60 60 60 30 30 30 30 16.5 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.3 7.8<br />

Fontana ML - Sierra&Sierra Lakeeb 4.1 60 60 60 60 15 15 15 15 16.4 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.8 4.0<br />

wb 4.1 60 60 60 60 15 9 15 9 15 9 15 9 16.4 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.0 6.2<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 3.0 3.0 3.0 3.0 12.0 18.0 9.0 8.4 47.4 1075 23<br />

75:Ontario-via Francis-Ont Mil eb 6:05-9:00a/3:05-6:00p 2.8 3.0 5.8<br />

wb 6:24-9:19a/3:24-6:19p 2.8 3.0 5.8<br />

D St& Sultana -Ontario Mills eb 13.1 60 60 30 30 26.2 0.5 0.5 1.4 1.5 2.9<br />

wb 11.6 60 60 30 30 23.2 0.5 0.5 1.4 1.5 2.9<br />

Total Route 75 24.7 60 60 24.7 1.0 1.0 2.8 3.0 5.8 180 31<br />

West Valley Total 15.9 57 56 57 38 203 336 172 119 830 18116 22<br />

Total Stage 1 System 16.2 138 135 137 100 478 806 409 324 2,017 54938 27<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 209


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

10.2 Stage 2 FY <strong>2008</strong><br />

The second stage of the Constrained Service <strong>Plan</strong> is to be implemented in September 2007. It covers<br />

the following route and service changes:<br />

Route 8 – Eliminate the 4th Street diversion in the north end<br />

Route 28 – Discontinue (to be replaced by an extended Route 71)<br />

Route 60 – Discontinue east section from Chaffey College (to be replaced by an extended Route 70).<br />

Extend west section along Holt to the Ontario Transcenter and then to Mountain and the Montclair<br />

Transcenter to replace Route 62 in this corridor. The extension, between the Ontario and Montclair<br />

Transcenters, would have 30-minute frequencies similar to Route 62 in this corridor. The Chaffey College<br />

section east of the Ontario Transcenter would not have Sunday service. Reduce the weekday span to 15<br />

hours.<br />

Route 62 – Discontinue present service north of the Ontario Transcenter (to be replaced by an extension<br />

of Route 60 and 67). Extend the route to run on Euclid to 21 st St. in the north end. On weekdays and<br />

Saturdays, extend the south end to serve Mountain, the new Chaffey College on Eucalyptus, and Chino<br />

Hills Marketplace. Use Edison until the roads are completed in this area. Interline or time-transfer Route<br />

62 with Route 65 at Chino Hills Marketplace for direct service from the south end to Chino Hills and the<br />

Central corridor.<br />

Route 65 – Discontinue the Los Serranos loop and replace with a shorter loop using Valle Vista. Reduce<br />

mid-day and evening frequencies on the loop from 30 to 60-minutes.<br />

Route 67 – Discontinue the Euclid section and extend to the Montclair Transcenter via 19th, Mountain<br />

and 7th replacing Route 62 in these corridors. Increase weekday peak period frequencies from 60 to 30-<br />

minutes.<br />

Route 70 – Restructure the south end section to serve the Francis, Riverside and Haven corridors to the<br />

Ontario Mills Mall. Extend the route north to the Rancho Cucamonga Metrolink Station on Milliken, the<br />

Civic Center at Haven and Foothill, and the areas served by the east section of Route 60 to Chaffey<br />

College. These changes will enable Routes 60 East and 75 to be discontinued.<br />

Route 71 – Restructure the west section to serve the Cherry, Mulberry, Marley, and Jurupa corridors in<br />

South Ridge, and the Etiwanda and 4 th St. corridors to the Ontario Mills Mall, enabling Route 28 to be<br />

discontinued. Drop the Poplar-Citrus loop and extend the east section up Sierra to South Highland and<br />

the Sierra Lakes Parkway.<br />

Route 75 – Discontinue (to be replaced by a restructured Route 70)<br />

The Stage 2 changes will be revenue hours neutral, as they will result in no net increase in the revenue<br />

hours resulting from the Stage 1 changes. The Stage 2 weekday service characteristics are shown in<br />

Figure 10-4 through Figure 10-6.<br />

July 11, 2007 210


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-4: Stage 2 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Cnb 6.3 15 15 15 15 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 1.9 5.0 11.5 6.0 8.5 31.0<br />

sb 6.9 15 15 15 15 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 2.1 12.0 17.3 9.0 9.6 47.9<br />

Tripper 1.0 1.0 1.0 2.6 3.6<br />

E St.&Court - Sterling & Date <strong>Plan</strong>b 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 6.0 24.5 42.9 21.0 25.1 113.4 4061 36<br />

2: Cal State-E Street-Loma Lindsb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 15 15 15 30 24 24 24 24 15.7 1.6 1.6 1.6 0.8 4.8 9.6 4.6 3.4 22.5<br />

nb 6.3 15 15 15 30 26 10 26 10 26 10 22 5 14.5 2.4 2.4 2.4 0.9 8.6 14.4 6.7 3.4 33.1<br />

Tripper 1.0 2.0 2.0<br />

E St.&Court - VA Hospital sb 6.8 15 15 15 30 34 7 34 7 34 7 34 7 11.9 2.7 2.7 2.7 1.4 8.2 16.4 7.9 5.9 38.4<br />

nb 6.8 15 15 15 30 34 34 34 28 11.9 2.3 2.3 2.3 0.9 6.0 13.6 6.3 3.5 29.5<br />

Total Route 2 26.1 118 17 118 17 118 17 108 12 13.3 9.0 9.0 10.0 4.0 27.6 54.0 27.6 16.2 125.5 4807 38<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.3 16.3<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline ( eb 12.2 20 20 20 30 51 5 51 5 51 5 51 5 14.3 2.8 2.8 2.8 1.9 11.2 16.8 8.4 6.1 42.5<br />

Boulder&Baseline-4thSt&E St. (3 wb 12.2 20 20 20 30 51 15 51 15 51 15 51 5 14.3 3.3 3.3 3.3 1.9 14.7 19.8 9.9 6.5 50.9<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4wb 6.4 20 20 20 30 25 19 25 19 25 19 25 9 15.3 2.2 2.2 2.2 1.1 8.8 13.2 6.6 3.7 32.3<br />

4thSt&ESt - Boulder&Baseline (3 eb 6.4 20 20 20 30 29 5 29 5 29 5 29 5 13.2 1.7 1.7 1.7 1.1 7.6 10.2 5.1 4.0 26.8<br />

Total Route 3/4 37.0 156 44 156 44 156 44 156 24 14.2 10.0 10.0 10.0 6.0 42.3 60.0 30.0 20.3 152.6 6275 41<br />

5: San Bndo-Del Rosa-Cal Stat nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highlandnb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Unb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal St nb 6:05am-7:05pm 3.0 6.0 3.0 0.9 12.9<br />

sb 5:06am-6:06pm 3.9 6.0 3.0 0.7 13.6<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 0.6 9.0<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 0.8 16.3<br />

SierraWay&40th - Cal State nb 3.4 60 60 60 60 15 3 15 3 15 3 15 3 13.7 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.3 3.9<br />

sb 3.2 60 60 60 60 11 11 11 11 17.5 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.1 2.5<br />

Cal State - Kendall&Palm nb 4.2 60 60 60 60 13 11 13 11 13 11 13 11 19.2 0.4 0.4 0.4 0.4 1.2 2.4 1.2 0.4 5.2<br />

sb 2.3 60 60 60 60 8 5 8 5 8 5 8 5 17.3 0.2 0.2 0.2 0.2 0.8 1.3 0.7 0.2 2.9<br />

Total Route 7 23.4 93 30 93 30 93 30 93 30 15.1 3.0 3.0 3.0 3.0 10.4 18.0 9.0 2.4 39.8 1129 28<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain Vieeb 7.1 60 60 60 60 21 21 21 21 20.1 0.4 0.4 0.4 0.4 1.2 2.1 1.1 1.1 5.4<br />

wb 7.8 60 60 60 60 24 10 24 10 24 10 24 10 19.5 0.6 0.6 0.6 0.6 2.3 3.4 1.7 1.6 9.0<br />

Redlands&MtnView-Redlands Maeb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

wb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.1 6.3<br />

Redlands Mall- 4th&Yucaipa eb 11.8 60 60 60 60 35 9 35 9 35 9 35 9 20.3 0.7 0.7 0.7 0.7 2.6 4.4 2.2 2.2 11.4<br />

wb 11.0 60 60 60 60 33 33 33 33 20.0 0.6 0.6 0.6 0.6 2.2 3.3 1.7 1.5 8.7<br />

Total Route 8 47.3 161 19 161 19 161 19 161 19 17.6 3.0 3.0 3.0 3.0 11.3 18.0 9.0 8.7 47.0 900 19<br />

9: San Bdno-Redlands-Yucaipaeb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 60 60 60 60 31 31 31 31 14.9 0.5 0.5 0.5 0.5 1.6 3.1 1.6 2.1 8.3<br />

wb 8.5 60 60 60 60 34 15 34 15 34 15 34 15 14.9 0.8 0.8 0.8 0.8 4.0 4.9 2.5 3.3 14.6<br />

Barton&Benton-Redlands Mall eb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 0.7 1.4 0.7 0.9 3.7<br />

wb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 1.1 1.4 0.7 0.9 4.2<br />

Redlands Mall- California&D St. eb 10.4 60 60 60 60 33 5 33 5 33 5 33 5 18.9 0.6 0.6 0.6 0.6 1.9 3.8 1.9 2.5 10.1<br />

wb 10.5 60 60 60 60 34 34 34 34 18.6 0.6 0.6 0.6 0.6 2.7 3.4 1.7 2.3 10.1<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.0 51.0 1177 23<br />

10: Fontana-Baseline-San Bdnowb 5:35am-6:35pm 3.3 6.5 2.5 1.0 13.3<br />

eb 5:30am-7:30pm 3.3 6.0 3.0 1.5 13.8<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 41 38 38 38 38 17.6 1.3 1.3 1.3 0.9 4.1 8.2 3.2 0.9 16.4<br />

eb 11.1 30 30 30 45 38 15 38 15 38 15 38 15 17.6 1.8 1.8 1.8 1.2 5.8 10.6 5.3 1.8 23.5<br />

Baseline&Citrus - FontanaMetrol wb 2.6 30 30 30 30 12 5 12 5 12 5 12 6 13.0 0.6 0.6 0.6 0.6 1.8 3.7 1.4 0.6 7.5<br />

eb 3.1 30 30 30 41 12 12 12 12 15.3 0.4 0.4 0.4 0.3 1.3 2.4 1.2 0.4 5.4<br />

Total Route 10 27.9 100 20 100 20 100 20 100 21 16.7 4.0 4.0 4.0 3.0 13.1 24.9 11.1 3.7 52.8 1611 30<br />

11: San Bdno-Muscoy-Cal Stat nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 211


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-5: Stage 2 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.1 17.4 *<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9 *<br />

4th&Arrowhead-Fontana Metrolinwb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.8 51.1<br />

Fontana ML-4th&Arrowhead eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 7.0 7.0 7.0 3.0 27.2 42.0 21.0 12.6 102.8 4518 44<br />

15: Fontana-SanB/Highland-Reeb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLinkwb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaise sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemsb 3.2 30 30 30 30 9 9 9 9 21.4 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.8 4.4<br />

nb 2.9 30 30 30 30 14 15 14 15 14 15 14 15 12.5 1.0 1.0 1.0 1.0 3.4 5.8 2.9 2.9 15.0<br />

Randall&Hemlock - Marygold&Si sb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 9 9 9 9 20.3 0.3 0.3 0.3 0.3 1.1 1.8 0.9 0.9 4.7<br />

Total Route 20 12.2 45 15 45 15 45 15 45 15 16.3 2.0 2.0 2.0 2.0 6.7 12.0 6.0 5.9 30.6 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsdnb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 6:45am-5:54pm 2.0 6.0 3.8 11.8<br />

wb 7:10am-6:10pm 2.0 6.0 3.9 11.9<br />

Marygold&Sierra-11th&Cedar eb 5.8 60 60 60 25 25 25 13.8 0.4 0.4 0.4 0.8 2.5 1.6 4.9<br />

wb 5.7 60 60 60 25 10 25 10 25 10 13.7 0.6 0.6 0.6 1.2 3.5 2.3 6.9<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 1.0 1.0 1.0 2.0 6.0 3.9 11.9 245 21<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Montclair TC<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 645 18<br />

East Valley Total 16.3 79 79 79 62 272 470 235 205 1181 36722 31<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 212


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-6: Stage 2 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMillseb 6:10am-9:10pm 3.0 6.0 3.0 3.0 15.0 *<br />

wb 5:26am-8:47pm 3.0 6.0 3.0 3.0 15.0 *<br />

Montclair TC-Ontario TC sb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

nb 5.4 30 30 30 60 20 10 20 10 20 10 20 10 16.2 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Ontario TC-Chaffey College eb 11.5 60 60 60 60 58 2 58 2 58 2 58 2 11.9 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

wb 11.3 60 60 60 60 60 60 60 60 11.3 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

Total Route 60 33.4 158 22 158 22 158 22 158 22 12.7 4.0 4.0 4.0 3.0 12.0 24.0 12.0 9.0 57.0 980 17<br />

61:Fontana-OntarioMills-Pomoeb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport eb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland ** nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTC via Chanb 9.5 30 30 30 30 32 34 32 34 17.8 1.1 1.1 1.1 1.1 3.2 6.8 3.2 3.7 16.9<br />

sb 9.5 30 30 30 30 32 7 34 5 32 7 34 5 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.9 19.5<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 60 30 60 22 18 22 18 16.9 0.7 0.3 0.7 0.3 2.2 1.8 2.2 1.0 7.2<br />

sb 6.0 30 60 30 60 22 5 18 22 5 18 16.4 0.9 0.3 0.9 0.3 2.7 1.8 2.7 0.9 8.1<br />

Total Route 62 31.2 108 12 104 5 108 12 104 5 17.3 4.0 3.0 4.0 3.0 12.0 18.2 12.0 9.5 51.7 1130 22<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hos nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair TC- ChinoTC sb 6.6 30 30 30 30 22 22 22 22 18.1 0.7 0.7 0.7 0.7 2.9 4.4 2.2 3.1 12.6<br />

nb 6.6 30 30 30 30 21 5 21 5 21 5 21 5 19.0 0.9 0.9 0.9 0.9 3.5 5.2 2.6 3.6 14.9<br />

A ChinoTC-ChinoHillsMPvia Chinsb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B ChinoTC-ChinoHillsMPvia Edissb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.1 4.3<br />

nb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

B:ChinoHillsMP- ValleVista Loop cw 2.7 30 60 30 60 15 15 15 15 15 15 10.8 0.5 0.5 0.5 0.5 2.0 3.0 1.5 2.1 8.6<br />

Total Route 65 31.1 112 5 112 20 112 5 112 20 16.7 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.5 51.5 1426 28<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.9 15.9<br />

Fontana Metrolink - Montclair TCwb 16.4 15 15 15 30 66 15 66 15 66 15 66 20 14.9 5.4 5.4 5.4 2.9 18.8 32.4 16.2 10.5 77.9<br />

eb 16.7 15 15 15 30 75 9 75 9 75 9 75 19 13.3 5.6 5.6 5.6 3.1 19.2 33.6 16.8 8.7 78.3<br />

Total Route 68 33.1 141 24 141 24 141 24 141 39 14.1 11.0 11.0 11.0 6.0 38.0 66.0 33.0 19.2 156.2 3238 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 60 30 60 22 22 22 22 17.5 0.7 0.4 0.7 0.4 2.6 2.2 2.9 1.1 8.7<br />

sb 6.4 30 60 30 60 23 5 23 5 23 5 23 5 16.7 0.9 0.5 0.9 0.5 2.8 2.8 3.6 1.4 10.6<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 60 30 60 60 10 60 10 60 10 60 10 15.0 2.3 1.2 2.3 1.2 8.2 7.0 9.1 3.5 27.8<br />

wb 15.0 30 60 30 60 60 60 60 60 15.0 2.0 1.0 2.0 1.0 6.0 6.0 7.8 3.0 22.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 3.0 6.0 3.0 19.5 18.0 23.4 9.0 69.9 1207 17<br />

68: Chino-Montclair-Ch.Collegenb 5:25am-9:07pm 3.5 6.0 3.0 3.0 15.5<br />

sb 5:00am-9:19pm 3.5 6.0 2.5 3.1 15.1<br />

Chino <strong>Transit</strong> Center- Montclair Tnb 7.9 30 30 30 30 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 1.2 4.4 7.6 3.8 3.5 19.3<br />

sb 7.9 30 30 30 30 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 1.3 6.1 10.4 4.3 4.1 24.9<br />

Montclair Transcenter- ChaffeyCoeb 12.4 30 30 30 30 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 1.8 7.7 13.2 6.6 5.5 33.0<br />

wb 12.4 30 30 30 30 54 54 54 50 13.8 1.8 1.8 1.8 1.7 6.3 10.8 4.5 5.2 26.8<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 6.0 24.5 42.0 19.2 18.3 104.0 1770 17<br />

70:Ontario-via Riverside-Ont Meb 6:34am-7:20pm 2.5 6.0 3.0 1.5 13.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.0 13.5<br />

D St& Sultana -Ontario Mills eb 13.0 60 60 60 60 45 45 45 45 17.3 0.8 0.8 0.8 0.8 1.9 4.5 2.3 1.1 9.8<br />

wb 12.0 60 60 60 60 41 8 41 8 41 8 41 8 17.6 0.8 0.8 0.8 0.8 2.0 4.9 2.5 1.6 11.0<br />

Ontario Mills - Foothill&Haven nb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.3 2.8<br />

sb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.4 2.9<br />

Foothill&Haven - Chaffey Collegenb 7.4 60 60 60 60 25 10 25 10 25 10 25 10 17.8 0.6 0.6 0.6 0.6 1.5 3.5 1.8 0.9 7.6<br />

sb 7.4 60 60 60 60 25 25 25 25 17.8 0.4 0.4 0.4 0.4 1.0 2.5 1.3 0.8 5.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 3.0 3.0 3.0 3.0 7.5 18.0 9.0 5.2 39.7 800 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamon eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 60 60 60 60 23 23 23 23 14.1 0.4 0.4 0.4 0.4 1.5 2.3 1.2 1.2 6.1<br />

wb 4.0 60 60 60 60 18 10 18 10 18 10 18 10 13.3 0.5 0.5 0.5 0.5 1.9 2.8 1.4 1.2 7.3<br />

Etiwanda&Jurupa-Jurupa&Cherryeb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.5 2.7<br />

wb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.4 2.6<br />

Jurupa&Cherry- Fontana Metrolineb 8.2 60 60 60 60 30 10 30 10 30 10 30 10 16.5 0.7 0.7 0.7 0.7 2.7 4.0 2.0 2.0 10.7<br />

wb 8.2 60 60 60 60 30 30 30 30 16.5 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.3 7.8<br />

Fontana ML - Sierra&Sierra Lakeeb 4.1 60 60 60 60 15 15 15 15 16.4 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.8 4.0<br />

wb 4.1 60 60 60 60 15 9 15 9 15 9 15 9 16.4 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.0 6.2<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 3.0 3.0 3.0 3.0 12.0 18.0 9.0 8.4 47.4 1075 23<br />

West Valley Total 15.9 58 55 59 39 199 327 184 122 832 18569 22<br />

** Route 62 interlined with Route 65 at Chino Hills Marketplace Total Stage 2 System 16.2 137 134 138 101 471 796 419 327 2,013 55291 27<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 213


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

10.3 Stage 3 FY 2009<br />

The third stage of the Constrained Service <strong>Plan</strong> is to be implemented in September <strong>2008</strong>. It covers the<br />

following route and service changes:<br />

Route 1 – Reduce weekday evening frequencies from 15 to 30-minutes<br />

Routes 3/4 – Cut recovery time in half to save one bus on the combined routes<br />

Route 66 – Reduce weekday mid-day frequencies from 15 to 30-minutes<br />

Route 68 – Start services one-half hour later on morning weekdays, and reduce weekday evening<br />

frequencies from 30 to 60-minutes<br />

The Stage 3 changes should reduce annual revenue hours by 21,000 and the peak fleet by one bus. The<br />

Stage 3 weekday service characteristics are shown in Figure 10-7 through Figure 10-9.<br />

July 11, 2007 214


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-7: Stage 3 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Cnb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date <strong>Plan</strong>b 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Lindsb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 15 15 15 30 24 24 24 24 15.7 1.6 1.6 1.6 0.8 4.8 9.6 4.6 3.4 22.5<br />

nb 6.3 15 15 15 30 26 10 26 10 26 10 22 5 14.5 2.4 2.4 2.4 0.9 8.6 14.4 6.7 3.4 33.1<br />

Tripper 1.0 2.0 2.0<br />

E St.&Court - VA Hospital sb 6.8 15 15 15 30 34 7 34 7 34 7 34 7 11.9 2.7 2.7 2.7 1.4 8.2 16.4 7.9 5.9 38.4<br />

nb 6.8 15 15 15 30 34 34 34 28 11.9 2.3 2.3 2.3 0.9 6.0 13.6 6.3 3.5 29.5<br />

Total Route 2 26.1 118 17 118 17 118 17 108 12 13.3 9.0 9.0 10.0 4.0 27.6 54.0 27.6 16.2 125.5 4807 38<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline ( eb 12.2 20 20 20 30 54 54 54 54 13.5 2.7 2.7 2.7 1.8 10.8 16.2 8.1 5.4 40.5<br />

Boulder&Baseline-4thSt&E St. (3 wb 12.2 20 20 20 30 54 12 54 12 54 12 54 12 13.5 3.3 3.3 3.3 2.2 14.7 19.8 9.9 7.7 52.1<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4 wb 6.4 20 20 20 30 26 5 26 5 26 5 26 5 14.7 1.6 1.6 1.6 1.0 6.2 9.3 4.7 3.1 23.3<br />

4thSt&ESt - Boulder&Baseline (3 eb 6.4 20 20 20 30 29 29 29 29 13.2 1.5 1.5 1.5 1.0 6.5 8.7 4.4 3.4 22.9<br />

Total Route 3/4 37.0 163 17 163 17 163 17 163 17 13.6 9.0 9.0 9.0 6.0 38.1 54.0 27.0 19.6 138.7 6275 45<br />

5: San Bndo-Del Rosa-Cal Stat nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Unb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal St nb 6:05am-7:05pm 3.0 6.0 3.0 0.9 12.9<br />

sb 5:06am-6:06pm 3.9 6.0 3.0 0.7 13.6<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 0.6 9.0<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 0.8 16.3<br />

SierraWay&40th - Cal State nb 3.4 60 60 60 60 15 3 15 3 15 3 15 3 13.7 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.3 3.9<br />

sb 3.2 60 60 60 60 11 11 11 11 17.5 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.1 2.5<br />

Cal State - Kendall&Palm nb 4.2 60 60 60 60 13 11 13 11 13 11 13 11 19.2 0.4 0.4 0.4 0.4 1.2 2.4 1.2 0.4 5.2<br />

sb 2.3 60 60 60 60 8 5 8 5 8 5 8 5 17.3 0.2 0.2 0.2 0.2 0.8 1.3 0.7 0.2 2.9<br />

Total Route 7 23.4 93 30 93 30 93 30 93 30 15.1 3.0 3.0 3.0 3.0 10.4 18.0 9.0 2.4 39.8 1129 28<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain Vieeb 7.1 60 60 60 60 21 21 21 21 20.1 0.4 0.4 0.4 0.4 1.2 2.1 1.1 1.1 5.4<br />

wb 7.8 60 60 60 60 24 10 24 10 24 10 24 10 19.5 0.6 0.6 0.6 0.6 2.3 3.4 1.7 1.6 9.0<br />

Redlands&MtnView-Redlands Maeb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

wb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.1 6.3<br />

Redlands Mall- 4th&Yucaipa eb 11.8 60 60 60 60 35 9 35 9 35 9 35 9 20.3 0.7 0.7 0.7 0.7 2.6 4.4 2.2 2.2 11.4<br />

wb 11.0 60 60 60 60 33 33 33 33 20.0 0.6 0.6 0.6 0.6 2.2 3.3 1.7 1.5 8.7<br />

Total Route 8 47.3 161 19 161 19 161 19 161 19 17.6 3.0 3.0 3.0 3.0 11.3 18.0 9.0 8.7 47.0 900 19<br />

9: San Bdno-Redlands-Yucaipaeb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 60 60 60 60 31 31 31 31 14.9 0.5 0.5 0.5 0.5 1.6 3.1 1.6 2.1 8.3<br />

wb 8.5 60 60 60 60 34 15 34 15 34 15 34 15 14.9 0.8 0.8 0.8 0.8 4.0 4.9 2.5 3.3 14.6<br />

Barton&Benton-Redlands Mall eb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 0.7 1.4 0.7 0.9 3.7<br />

wb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 1.1 1.4 0.7 0.9 4.2<br />

Redlands Mall- California&D St. eb 10.4 60 60 60 60 33 5 33 5 33 5 33 5 18.9 0.6 0.6 0.6 0.6 1.9 3.8 1.9 2.5 10.1<br />

wb 10.5 60 60 60 60 34 34 34 34 18.6 0.6 0.6 0.6 0.6 2.7 3.4 1.7 2.3 10.1<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.0 51.0 1177 23<br />

10: Fontana-Baseline-San Bdnowb 5:35am-6:35pm 3.3 6.5 2.5 1.0 13.3<br />

eb 5:30am-7:30pm 3.3 6.0 3.0 1.5 13.8<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 41 38 38 38 38 17.6 1.3 1.3 1.3 0.9 4.1 8.2 3.2 0.9 16.4<br />

eb 11.1 30 30 30 45 38 15 38 15 38 15 38 15 17.6 1.8 1.8 1.8 1.2 5.8 10.6 5.3 1.8 23.5<br />

Baseline&Citrus - FontanaMetrol wb 2.6 30 30 30 30 12 5 12 5 12 5 12 6 13.0 0.6 0.6 0.6 0.6 1.8 3.7 1.4 0.6 7.5<br />

eb 3.1 30 30 30 41 12 12 12 12 15.3 0.4 0.4 0.4 0.3 1.3 2.4 1.2 0.4 5.4<br />

Total Route 10 27.9 100 20 100 20 100 20 100 21 16.7 4.0 4.0 4.0 3.0 13.1 24.9 11.1 3.7 52.8 1611 30<br />

11: San Bdno-Muscoy-Cal Stat nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 215


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-8: Stage 3 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays)<br />

– (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.1 17.4 *<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9 *<br />

4th&Arrowhead-Fontana Metrolinwb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.8 51.1<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 7.0 7.0 7.0 3.0 27.2 42.0 21.0 12.6 102.8 4518 44<br />

15: Fontana-SanB/Highland-Reeb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLinkwb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaise sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemsb 3.2 30 30 30 30 9 9 9 9 21.4 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.8 4.4<br />

nb 2.9 30 30 30 30 14 15 14 15 14 15 14 15 12.5 1.0 1.0 1.0 1.0 3.4 5.8 2.9 2.9 15.0<br />

Randall&Hemlock - Marygold&Si sb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 9 9 9 9 20.3 0.3 0.3 0.3 0.3 1.1 1.8 0.9 0.9 4.7<br />

Total Route 20 12.2 45 15 45 15 45 15 45 15 16.3 2.0 2.0 2.0 2.0 6.7 12.0 6.0 5.9 30.6 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsdnb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 6:45am-5:54pm 2.0 6.0 3.8 11.8<br />

wb 7:10am-6:10pm 2.0 6.0 3.9 11.9<br />

Marygold&Sierra-11th&Cedar eb 5.8 60 60 60 25 25 25 13.8 0.4 0.4 0.4 0.8 2.5 1.6 4.9<br />

wb 5.7 60 60 60 25 10 25 10 25 10 13.7 0.6 0.6 0.6 1.2 3.5 2.3 6.9<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 1.0 1.0 1.0 2.0 6.0 3.9 11.9 245 21<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Montclair TC<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 645 18<br />

East Valley Total 16.3 78 78 78 60 268 465 232 195 1159 36661 32<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 216


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-9: Stage 3 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMillseb 5:10am-9:10pm 3.0 6.0 3.0 3.0 15.0 *<br />

wb 4:40am-8:40pm 3.0 6.0 3.0 3.0 15.0 *<br />

Montclair TC-Ontario TC sb 7.2 30 30 30 60 20 10 20 10 20 10 20 10 21.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

nb 7.2 30 30 30 60 20 10 20 10 20 10 20 10 21.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Ontario TC-Chaffey College eb 9.0 60 60 60 60 58 2 58 2 58 2 58 2 9.3 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

wb 8.8 60 60 60 60 60 60 60 60 8.8 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

Total Route 60 32.2 158 22 158 22 158 22 158 22 12.2 4.0 4.0 4.0 3.0 12.0 24.0 12.0 9.0 57.0 980 17<br />

61:Fontana-OntarioMills-Pomoeb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport eb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTC via Chanb 9.5 30 30 30 30 32 34 32 34 17.8 1.1 1.1 1.1 1.1 3.2 6.8 3.2 3.7 16.9<br />

sb 9.5 30 30 30 30 32 7 34 5 32 7 34 5 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.8 19.4<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 60 30 60 22 18 22 18 16.9 0.7 0.3 0.7 0.3 2.2 1.8 2.2 1.0 7.2<br />

sb 6.0 30 60 30 60 22 5 18 22 5 18 16.4 0.9 0.3 0.9 0.3 2.7 1.8 2.7 0.9 8.1<br />

Total Route 62 31.2 108 12 104 5 108 12 104 5 17.3 4.0 3.0 4.0 3.0 12.0 18.2 12.0 9.5 51.7 1130 22<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hos nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair TC- ChinoTC sb 6.6 30 30 30 30 22 22 22 22 18.1 0.7 0.7 0.7 0.7 2.9 4.4 2.2 3.1 12.6<br />

nb 6.6 30 30 30 30 21 5 21 5 21 5 21 5 19.0 0.9 0.9 0.9 0.9 3.5 5.2 2.6 3.6 14.9<br />

A ChinoTC-ChinoHillsMPviaChin sb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B ChinoTC-ChinoHillsMPviaEdis sb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.1 4.3<br />

nb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

A/B ChinoHillsMP- Valla Vista Locw 2.7 30 60 30 60 15 15 15 15 15 15 10.8 0.5 0.5 0.5 0.5 2.0 3.0 1.5 2.1 8.6<br />

Total Route 65 31.1 112 5 112 20 112 5 112 20 16.7 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.5 51.5 1300 25<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TCwb 16.4 15 30 15 30 66 15 66 20 66 15 66 20 14.9 5.4 2.9 5.4 2.9 18.8 17.2 16.2 10.5 62.7<br />

eb 16.7 15 30 15 30 75 9 75 19 75 9 75 19 13.3 5.6 3.1 5.6 3.1 19.2 18.8 16.8 7.8 62.6<br />

Total Route 68 33.1 141 24 141 39 141 24 141 39 14.1 11.0 6.0 11.0 6.0 38.0 36.0 33.0 18.3 125.3 2673 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 60 30 60 22 22 22 22 17.5 0.7 0.4 0.7 0.4 2.6 2.2 2.9 1.1 8.7<br />

sb 6.4 30 60 30 60 23 5 23 5 23 5 23 5 16.7 0.9 0.5 0.9 0.5 2.8 2.8 3.6 1.4 10.6<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 60 30 60 60 10 60 10 60 10 60 10 15.0 2.3 1.2 2.3 1.2 8.2 7.0 9.1 3.5 27.8<br />

wb 15.0 30 60 30 60 60 60 60 60 15.0 2.0 1.0 2.0 1.0 6.0 6.0 7.8 3.0 22.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 3.0 6.0 3.0 19.5 18.0 23.4 9.0 69.9 1207 17<br />

68: Chino-Montclair-Ch.Collegenb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

Chino <strong>Transit</strong> Center- Montclair Tnb 7.9 30 30 30 60 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 0.5 3.2 7.6 3.8 1.5 16.1<br />

sb 7.9 30 30 30 60 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 0.7 4.3 10.4 5.2 2.1 22.0<br />

Montclair Transcenter- ChaffeyCoeb 12.4 30 30 30 60 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1569 18<br />

70:Ontario-via Riverside-Ont Meb 6:34am-7:20pm 2.5 6.0 3.0 1.5 13.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.0 13.5<br />

D St& Sultana -Ontario Mills eb 13.0 60 60 60 60 45 45 45 45 17.3 0.8 0.8 0.8 0.8 1.9 4.5 2.3 1.1 9.8<br />

wb 12.0 60 60 60 60 41 8 41 8 41 8 41 8 17.6 0.8 0.8 0.8 0.8 2.0 4.9 2.5 1.6 11.0<br />

Ontario Mills - Foothill&Haven nb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.3 2.8<br />

sb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.4 2.9<br />

Foothill&Haven - Chaffey Collegenb 7.4 60 60 60 60 25 10 25 10 25 10 25 10 17.8 0.6 0.6 0.6 0.6 1.5 3.5 1.8 0.9 7.6<br />

sb 7.4 60 60 60 60 25 25 25 25 17.8 0.4 0.4 0.4 0.4 1.0 2.5 1.3 0.8 5.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 3.0 3.0 3.0 3.0 7.5 18.0 9.0 5.2 39.7 800 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamon eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 60 60 60 60 23 23 23 23 14.1 0.4 0.4 0.4 0.4 1.5 2.3 1.2 1.2 6.1<br />

wb 4.0 60 60 60 60 18 10 18 10 18 10 18 10 13.3 0.5 0.5 0.5 0.5 1.9 2.8 1.4 1.2 7.3<br />

Etiwanda&Jurupa-Jurupa&Cherryeb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.5 2.7<br />

wb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.4 2.6<br />

Jurupa&Cherry- Fontana Metrolineb 8.2 60 60 60 60 30 10 30 10 30 10 30 10 16.5 0.7 0.7 0.7 0.7 2.7 4.0 2.0 2.0 10.7<br />

wb 8.2 60 60 60 60 30 30 30 30 16.5 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.3 7.8<br />

Fontana ML - Sierra&Sierra Lakeeb 4.1 60 60 60 60 15 15 15 15 16.4 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.8 4.0<br />

wb 4.1 60 60 60 60 15 9 15 9 15 9 15 9 16.4 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.0 6.2<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 3.0 3.0 3.0 3.0 12.0 18.0 9.0 8.4 47.4 1075 23<br />

West Valley Total 15.9 58 50 59 36 192 297 186 112 786 17677 22<br />

Total Stage 3 System 16.2 136 128 137 96 460 761 417 307 1,945 54338 28<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 217


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

10.4 Stage 4 FY 2010/2011<br />

The fourth stage of the Constrained Service <strong>Plan</strong> is to be implemented by FY 2011. It covers the<br />

following route and service changes, which will likely be implemented in September 2009:<br />

Route 302 – Add sbX in the Route 2 corridor between 6:00 a.m. and 6:00 p.m. on weekdays. This limited<br />

stop service would operate between Kendall and Palm in North San Bernardino and Barton and Prospect<br />

in Loma Linda. It would have 10-minute frequencies to supplement the Route 2 daytime service on<br />

weekdays.<br />

Route 2 – Reduce daytime frequencies on weekdays from 15 to 20-minutes<br />

Route 7 – <strong>Short</strong>en Route 7 to terminate at Cal State. This is made possible by having Route 302 operate<br />

from Kendall and Palm.<br />

The Stage 4 changes should increase annual revenue hours by 21,000 and the peak fleet by seven<br />

buses. The Stage 4 weekday service characteristics are shown in Figure 10-10 through Figure 10-12.<br />

When the Constrained Service <strong>Plan</strong> is completely implemented, annual revenue hours should be about<br />

the same as the present system. Figure 10-13 provides a summary of the impacts of each stage on<br />

revenue hours, buses and operators.<br />

July 11, 2007 218


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-10: Stage 4 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes (Weekdays) – (a)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8 *<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3 *<br />

Arrowhead Reg. Med Ctr-E St.&Ct nb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date Place nb 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Linda sb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 20 20 20 30 24 24 24 24 15.7 1.2 1.2 1.2 0.8 4.1 7.2 3.5 3.4 18.2<br />

nb 6.3 20 20 20 30 24 2 24 2 24 2 22 5 15.7 1.3 1.3 1.3 0.9 4.7 7.8 3.6 3.4 19.5<br />

E St.&Court - VA Hospital sb 6.8 20 20 20 30 34 2 34 2 34 2 34 7 11.9 1.8 1.8 1.8 1.4 6.5 10.8 5.2 5.9 28.4<br />

nb 6.8 20 20 20 30 34 34 34 28 11.9 1.7 1.7 1.7 0.9 4.9 10.2 4.8 3.5 23.4<br />

Total Route 2 26.1 116 4 116 4 116 4 108 12 13.5 6.0 6.0 6.0 4.0 20.2 36.0 17.1 16.2 89.5 4000 45<br />

302: Kendall-ESt-Loma Linda sbX sb 4:20am-6:20pm 2.5 6.0 3.2 12.0<br />

nb 5:20am-6:25pm 2.5 6.0 3.2 12.0<br />

Kendall@Palm - Cal State Univ sb 2.2 10 10 10 8 5 8 5 8 5 16.5 1.3 1.3 1.3 3.3 7.8 4.2 15.2<br />

nb 4.2 10 10 10 16 16 16 15.8 1.6 1.6 1.6 4.0 9.6 5.1 18.7<br />

Cal State Univ. - E St.&Court sb 6.3 10 10 10 18 18 18 21.0 1.8 1.8 1.8 4.5 10.8 5.8 21.1<br />

nb 6.3 10 10 10 19 5 19 5 19 5 19.9 2.4 2.4 2.4 6.0 14.4 7.7 28.1<br />

E St.&Court - Barton&Prospect sb 6.8 10 10 10 22 22 22 18.5 2.2 2.2 2.2 5.5 13.2 7.0 25.7<br />

nb 6.8 10 10 10 22 5 22 5 22 5 18.5 2.7 2.7 2.7 6.8 16.2 8.6 31.6<br />

Total Route 302 32.6 105 15 105 15 105 15 18.6 12.0 12.0 12.0 - 30.0 72.0 38.4 140.4 2200 16<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline (4) eb 12.2 20 20 20 30 51 51 51 51 14.3 2.6 2.6 2.6 1.7 10.2 15.3 7.7 5.1 38.3<br />

Boulder&Baseline-4thSt&E St. (3) wb 12.2 20 20 20 30 51 10 51 10 51 10 51 10 14.3 3.1 3.1 3.1 2.0 13.6 18.3 9.2 7.1 48.1<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4) wb 6.4 20 20 20 30 27 12 27 12 27 12 27 12 14.2 2.0 2.0 2.0 1.3 7.8 11.7 5.9 3.9 29.3<br />

4thSt&ESt - Boulder&Baseline (3) eb 6.4 20 20 20 30 29 29 29 29 13.2 1.5 1.5 1.5 1.0 6.5 8.7 4.4 3.4 22.9<br />

Total Route 3/4 37.0 158 22 158 22 158 22 158 22 14.1 9.0 9.0 9.0 6.0 38.0 54.0 27.0 19.5 138.5 6275 45<br />

5: San Bndo-Del Rosa-Cal State nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Univ. nb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal State nb 6:05am-7:05pm 3.0 6.0 3.0 0.9 12.9<br />

sb 5:06am-6:06pm 3.9 6.0 3.0 0.7 13.6<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 0.6 9.0<br />

sb 5.8 30 30 30 30 24 3 24 3 24 3 24 3 14.4 0.9 0.9 0.9 0.9 3.5 5.4 2.7 0.6 12.2<br />

SierraWay&40th - Cal State nb 3.4 60 60 60 60 12 1 12 1 12 1 12 1 17.1 0.2 0.2 0.2 0.2 0.7 1.3 0.7 0.2 2.8<br />

sb 3.2 60 60 60 60 11 11 11 11 17.5 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.1 2.5<br />

Total Route 7 17.0 68 4 68 4 68 4 68 4 15.0 2.0 2.0 2.0 2.0 7.0 12.0 6.0 1.6 26.6 1000 38<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain View eb 7.1 60 60 60 60 21 21 21 21 20.1 0.4 0.4 0.4 0.4 1.2 2.1 1.1 1.1 5.4<br />

wb 7.8 60 60 60 60 24 10 24 10 24 10 24 10 19.5 0.6 0.6 0.6 0.6 2.3 3.4 1.7 1.6 9.0<br />

Redlands&MtnView-Redlands Mall eb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

wb 4.8 60 60 60 60 24 24 24 24 12.0 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.1 6.3<br />

Redlands Mall- 4th&Yucaipa eb 11.8 60 60 60 60 35 9 35 9 35 9 35 9 20.3 0.7 0.7 0.7 0.7 2.6 4.4 2.2 2.2 11.4<br />

wb 11.0 60 60 60 60 33 33 33 33 20.0 0.6 0.6 0.6 0.6 2.2 3.3 1.7 1.5 8.7<br />

Total Route 8 47.3 161 19 161 19 161 19 161 19 17.6 3.0 3.0 3.0 3.0 11.3 18.0 9.0 8.7 47.0 900 19<br />

9: San Bdno-Redlands-Yucaipa eb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 60 60 60 60 31 31 31 31 14.9 0.5 0.5 0.5 0.5 1.6 3.1 1.6 2.1 8.3<br />

wb 8.5 60 60 60 60 34 15 34 15 34 15 34 15 14.9 0.8 0.8 0.8 0.8 4.0 4.9 2.5 3.3 14.6<br />

Barton&Benton-Redlands Mall eb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 0.7 1.4 0.7 0.9 3.7<br />

wb 4.4 60 60 60 60 14 14 14 14 18.8 0.2 0.2 0.2 0.2 1.1 1.4 0.7 0.9 4.2<br />

Redlands Mall- California&D St. eb 10.4 60 60 60 60 33 5 33 5 33 5 33 5 18.9 0.6 0.6 0.6 0.6 1.9 3.8 1.9 2.5 10.1<br />

wb 10.5 60 60 60 60 34 34 34 34 18.6 0.6 0.6 0.6 0.6 2.7 3.4 1.7 2.3 10.1<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.0 51.0 1177 23<br />

10: Fontana-Baseline-San Bdno wb 5:35am-6:35pm 3.3 6.5 2.5 1.0 13.3<br />

eb 5:30am-7:30pm 3.3 6.0 3.0 1.5 13.8<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 41 38 38 38 38 17.6 1.3 1.3 1.3 0.9 4.1 8.2 3.2 0.9 16.4<br />

eb 11.1 30 30 30 45 38 15 38 15 38 15 38 15 17.6 1.8 1.8 1.8 1.2 5.8 10.6 5.3 1.8 23.5<br />

Baseline&Citrus - FontanaMetrolink wb 2.6 30 30 30 30 12 5 12 5 12 5 12 6 13.0 0.6 0.6 0.6 0.6 1.8 3.7 1.4 0.6 7.5<br />

eb 3.1 30 30 30 41 12 12 12 12 15.3 0.4 0.4 0.4 0.3 1.3 2.4 1.2 0.4 5.4<br />

Total Route 10 27.9 100 20 100 20 100 20 100 21 16.7 4.0 4.0 4.0 3.0 13.1 24.9 11.1 3.7 52.8 1611 30<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 219


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-11: Stage 4 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley<br />

Routes (Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

11: San Bdno-Muscoy-Cal State nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5 *<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7 *<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.1 17.4<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana Metrolink wb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.8 51.1<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 7.0 7.0 7.0 3.0 27.2 42.0 21.0 12.6 102.8 4518 44<br />

15: Fontana-SanB/Highland-Red. eb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLink wb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaiser sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemlk sb 3.2 30 30 30 30 9 9 9 9 21.4 0.3 0.3 0.3 0.3 0.9 1.8 0.9 0.8 4.4<br />

nb 2.9 30 30 30 30 14 15 14 15 14 15 14 15 12.5 1.0 1.0 1.0 1.0 3.4 5.8 2.9 2.9 15.0<br />

Randall&Hemlock - Marygold&Sierra sb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 9 9 9 9 20.3 0.3 0.3 0.3 0.3 1.1 1.8 0.9 0.9 4.7<br />

Total Route 20 12.2 45 15 45 15 45 15 45 15 16.3 2.0 2.0 2.0 2.0 6.7 12.0 6.0 5.9 30.6 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsde nb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 6:45am-5:54pm 2.0 6.0 3.8 11.8<br />

wb 7:10am-6:10pm 2.0 6.0 3.9 11.9<br />

Marygold&Sierra-11th&Cedar eb 5.8 60 60 60 25 25 25 13.8 0.4 0.4 0.4 0.8 2.5 1.6 4.9<br />

wb 5.7 60 60 60 25 10 25 10 25 10 13.7 0.6 0.6 0.6 1.2 3.5 2.3 6.9<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 1.0 1.0 1.0 2.0 6.0 3.9 11.9 245 21<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Montclair TC<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 645 18<br />

East Valley Total 16.3 86 86 85 59 287 513 256 194 1,250 37925 30<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 220


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-12: Stage 4 Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes (Weekdays)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMills eb 5:10am-9:10pm 3.0 6.0 3.0 3.0 15.0 *<br />

wb 4:40am-8:40pm 3.0 6.0 3.0 3.0 15.0 *<br />

Montclair TC-Ontario TC sb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

nb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Ontario TC-Chaffey College eb 11.5 60 60 60 60 58 2 58 2 58 2 58 2 11.9 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

wb 11.5 60 60 60 60 60 60 60 60 11.5 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

Total Route 60 33.4 158 22 158 22 158 22 158 22 12.7 4.0 4.0 4.0 3.0 12.0 24.0 12.0 9.0 57.0 980 17<br />

61:Fontana-OntarioMills-Pomona eb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport Dr. eb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTC via Chaffey nb 9.5 30 30 30 30 32 34 32 34 17.8 1.1 1.1 1.1 1.1 3.2 6.8 3.2 3.7 16.9<br />

sb 9.5 30 30 30 30 32 7 34 5 32 7 34 5 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.8 19.4<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 60 30 60 22 18 22 18 16.9 0.7 0.3 0.7 0.3 2.2 1.8 2.2 1.0 7.2<br />

sb 6.0 30 60 30 60 22 5 18 22 5 18 16.4 0.9 0.3 0.9 0.3 2.7 1.8 2.7 0.9 8.1<br />

Total Route 62 31.2 108 12 104 5 108 12 104 5 17.3 4.0 3.0 4.0 3.0 12.0 18.2 12.0 9.5 51.7 1130 22<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hospital nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair TC- ChinoTC sb 6.6 30 30 30 30 22 22 22 22 18.1 0.7 0.7 0.7 0.7 2.9 4.4 2.2 3.1 12.6<br />

nb 6.6 30 30 30 30 21 5 21 5 21 5 21 5 19.0 0.9 0.9 0.9 0.9 3.5 5.2 2.6 3.6 14.9<br />

A ChinoTC-ChinoHillsMPviaChino sb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.6 60 60 60 60 12 12 12 12 18.1 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B ChinoTC-ChinoHillsMPviaEdison sb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.1 4.3<br />

nb 3.9 60 60 60 60 15 15 15 15 15.8 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

A/B ChinoHillsMP- Valla Vista Loop cw 2.7 30 60 30 60 15 15 15 15 15 15 10.8 0.5 0.5 0.5 0.5 2.0 3.0 1.5 2.1 8.6<br />

Total Route 65 31.1 112 5 112 20 112 5 112 20 16.7 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.5 51.5 1300 25<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TC wb 16.4 15 30 15 30 66 15 66 20 66 15 66 20 14.9 5.4 2.9 5.4 2.9 18.8 17.2 16.2 10.5 62.7<br />

eb 16.7 15 30 15 30 75 9 75 19 75 9 75 19 13.3 5.6 3.1 5.6 3.1 19.2 18.8 16.8 7.8 62.6<br />

Total Route 68 33.1 141 24 141 39 141 24 141 39 14.1 11.0 6.0 11.0 6.0 38.0 36.0 33.0 18.3 125.3 2673 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 60 30 60 22 22 22 22 17.5 0.7 0.4 0.7 0.4 2.6 2.2 2.9 1.1 8.7<br />

sb 6.4 30 60 30 60 23 5 23 5 23 5 23 5 16.7 0.9 0.5 0.9 0.5 2.8 2.8 3.6 1.4 10.6<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 60 30 60 60 10 60 10 60 10 60 10 15.0 2.3 1.2 2.3 1.2 8.2 7.0 9.1 3.5 27.8<br />

wb 15.0 30 60 30 60 60 60 60 60 15.0 2.0 1.0 2.0 1.0 6.0 6.0 7.8 3.0 22.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 3.0 6.0 3.0 19.5 18.0 23.4 9.0 69.9 1207 17<br />

68: Chino-Montclair-Ch.College nb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

Chino <strong>Transit</strong> Center- Montclair TC nb 7.9 30 30 30 60 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 0.5 3.2 7.6 3.8 1.5 16.1<br />

sb 7.9 30 30 30 60 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 0.7 4.3 10.4 5.2 2.1 22.0<br />

Montclair Transcenter- ChaffeyCol. eb 12.4 30 30 30 60 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1569 18<br />

70:Ontario-via Riverside-Ont Mills eb 6:34am-7:20pm 2.5 6.0 3.0 1.5 13.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.0 13.5<br />

D St& Sultana -Ontario Mills eb 13.0 60 60 60 60 45 45 45 45 17.3 0.8 0.8 0.8 0.8 1.9 4.5 2.3 1.1 9.8<br />

wb 12.0 60 60 60 60 41 8 41 8 41 8 41 8 17.6 0.8 0.8 0.8 0.8 2.0 4.9 2.5 1.6 11.0<br />

Ontario Mills - Foothill&Haven nb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.3 2.8<br />

sb 3.7 60 60 60 60 13 13 13 13 17.1 0.2 0.2 0.2 0.2 0.5 1.3 0.7 0.4 2.9<br />

Foothill&Haven - Chaffey College nb 7.4 60 60 60 60 25 10 25 10 25 10 25 10 17.8 0.6 0.6 0.6 0.6 1.5 3.5 1.8 0.9 7.6<br />

sb 7.4 60 60 60 60 25 25 25 25 17.8 0.4 0.4 0.4 0.4 1.0 2.5 1.3 0.8 5.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 3.0 3.0 3.0 3.0 7.5 18.0 9.0 5.2 39.7 800 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamonga eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 60 60 60 60 23 23 23 23 14.1 0.4 0.4 0.4 0.4 1.5 2.3 1.2 1.2 6.1<br />

wb 4.0 60 60 60 60 18 10 18 10 18 10 18 10 13.3 0.5 0.5 0.5 0.5 1.9 2.8 1.4 1.2 7.3<br />

Etiwanda&Jurupa-Jurupa&Cherry eb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.5 2.7<br />

wb 2.4 60 60 60 60 10 10 10 10 14.4 0.2 0.2 0.2 0.2 0.7 1.0 0.5 0.4 2.6<br />

Jurupa&Cherry- Fontana Metrolink eb 8.2 60 60 60 60 30 10 30 10 30 10 30 10 16.5 0.7 0.7 0.7 0.7 2.7 4.0 2.0 2.0 10.7<br />

wb 8.2 60 60 60 60 30 30 30 30 16.5 0.5 0.5 0.5 0.5 2.0 3.0 1.5 1.3 7.8<br />

Fontana ML - Sierra&Sierra LakePky eb 4.1 60 60 60 60 15 15 15 15 16.4 0.3 0.3 0.3 0.3 1.0 1.5 0.8 0.8 4.0<br />

wb 4.1 60 60 60 60 15 9 15 9 15 9 15 9 16.4 0.4 0.4 0.4 0.4 1.6 2.4 1.2 1.0 6.2<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 3.0 3.0 3.0 3.0 12.0 18.0 9.0 8.4 47.4 1075 23<br />

West Valley Total 15.9 58 50 59 36 192 297 186 112 786 17677 22<br />

Total Stage 4 System 16.2 144 136 144 95 479 809 442 306 2,037 55602 27<br />

*First two lines of each route provide span of service data by direction and time period. They do not provide revenue vehicle hour data and do not figure into the totals for each route.<br />

below standard performance<br />

July 11, 2007 221


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 10-13: Resource Impacts of the Constrained Service <strong>Plan</strong> (FY 2007 – FY 2011)<br />

Stage 1 Existing System Implementation (May 07) Stage 2 For Implementation in FY <strong>2008</strong> (Sept 07) Stage 3 For Implementation in FY 2009 (Sept 08)<br />

Stage 4 For Implementation in FY 2010/2011<br />

Rte Weekday Saturday Sunday Annual Weekday Saturday Sunday Annual Weekday Saturday Sunday Annual Weekday Saturday Sunday Annual<br />

Bus RvHr Pass. Bus RvHr Pass. Bus RvHr Pass. Rev.Hrs Bus RvHr Pass. Bus RvHr Pass. Bus RvHr Pass. Rev.Hrs Bus RvHr Pass. Bus RvHr Pass. Bus RvHr Pass. Rev.Hrs Bus RvHr Pass. Bus RvHr Pass. Bus RvHr Pass. Rev.Hrs<br />

1 7 113 4061 3 36 1093 3 36 970 32,665 7 113 4061 3 36 1093 3 36 970 32,665 7 105 4000 3 36 1093 3 36 970 30,559 7 105 4000 3 36 1093 3 36 970 30,559<br />

2 10 126 4807 7 83 2337 7 69 1750 39,929 10 126 4807 7 83 2337 7 69 1750 39,929 10 126 4807 7 83 2337 7 69 1750 39,929 6 90 4000 6 72 2337 4 48 1750 29,105<br />

sbX 12 140 2200 35,650<br />

3/4 10 153 6275 10 118 1754 10 111 1231 50,889 10 153 6275 10 118 1754 10 111 1231 50,889 9 139 6275 9 106 1754 9 100 1231 46,147 9 139 6275 9 106 1754 9 100 1231 46,147<br />

5 4 65 1984 4 46 769 2 24 412 20,320 4 65 1984 4 46 769 2 24 412 20,320 4 65 1984 4 46 769 2 24 412 20,320 4 65 1984 4 46 769 2 24 412 20,320<br />

7 3 40 1129 2 22 283 2 21 196 12,367 3 40 1129 2 22 283 2 21 196 12,367 3 40 1129 2 22 283 2 21 196 12,367 2 27 1000 2 22 250 2 21 190 9,014<br />

8 3 47 900 3 34 314 2 16 212 14,600 3 47 900 3 34 314 2 16 212 14,600 3 47 900 3 34 314 2 16 212 14,607 3 47 900 3 34 314 2 16 212 14,607<br />

9 3 51 1177 3 48 469 2 16 102 16,335 3 51 1177 3 48 469 2 16 102 16,335 3 51 1177 3 48 469 15,489 3 51 1177 3 48 469 15,489<br />

10 4 53 1611 2 26 592 2 22 396 15,948 4 53 1611 2 26 592 2 22 396 15,948 4 53 1611 2 26 592 2 22 396 15,948 4 53 1611 2 26 592 2 22 396 15,948<br />

11 4 66 1402 4 43 688 2 23 415 20,344 4 66 1402 4 43 688 2 23 415 20,344 4 66 1402 4 43 688 2 23 415 20,343 4 66 1402 4 43 688 2 23 415 20,343<br />

14 8 103 4518 7 83 2428 7 78 1753 34,667 8 103 4518 7 83 2428 7 78 1753 34,667 8 103 4518 7 83 2428 7 78 1753 34,667 8 103 4518 7 83 2428 7 78 1753 34,667<br />

14L<br />

15 8 118 2660 8 91 1359 4 45 520 37,258 8 118 2660 8 91 1359 4 45 520 37,258 8 118 2660 8 91 1359 4 45 520 37,258 8 118 2660 8 91 1359 4 45 520 37,258<br />

19 7 104 2640 4 48 811 4 47 735 31,454 7 104 2640 4 48 811 4 47 735 31,454 7 104 2640 4 48 811 4 47 735 31,454 7 104 2640 4 48 811 4 47 735 31,454<br />

20 2 31 780 2 23 415 1 11 156 9,587 2 31 780 2 23 415 1 11 156 9,587 2 31 780 2 23 415 1 11 156 9,587 2 31 780 2 23 415 1 11 156 9,587<br />

22 4 65 1888 4 44 894 2 25 490 20,066 4 65 1888 4 44 894 2 25 490 20,066 4 65 1888 4 44 894 2 25 490 20,066 4 65 1888 4 44 894 2 25 490 20,066<br />

28 1 6 100 1,461<br />

29 1 12 245 1 11 189 3,580 1 12 245 1 11 189 3,580 1 12 245 1 11 189 3,580 1 12 245 1 11 189 3,580<br />

31<br />

90 2 36 645 2 31 308 2 24 252 11,910 2 36 645 2 31 308 2 24 252 11,910 2 36 645 2 31 308 2 24 252 11,910 2 36 645 2 31 308 2 24 252 11,910<br />

EV 81 1187 36822 66 787 14703 51 564 9590 373,379 80 1181 36722 66 787 14703 51 564 9590 371,919 79 1159 36661 65 775 14703 49 537 9488 364,232 86 1250 37925 64 764 14670 46 517 9482 385,705<br />

60 3 49 732 3 34 241 3 34 163 15,860 4 57 980 3 34 400 1 24 120 17,536 4 57 980 3 34 400 1 24 120 17,529 4 57 980 3 34 400 1 12 120 16,887<br />

61 14 200 5729 14 176 3784 14 158 2993 68,490 13 200 5729 14 176 3784 14 158 2993 68,490 13 200 5729 14 176 3784 14 158 2993 68,490 13 200 5729 14 176 3784 14 158 2993 68,490<br />

62 5 75 1600 3 35 560 3 35 430 22,906 4 52 1130 3 35 500 2 24 430 16,271 4 52 1130 3 35 500 2 24 430 16,271 4 52 1130 3 35 500 2 24 430 16,271<br />

63 4 55 1214 2 24 478 2 25 418 16,445 4 55 1214 2 24 478 2 25 418 16,445 4 55 1214 2 24 478 2 25 418 16,445 4 55 1214 2 24 478 2 25 418 16,445<br />

65 4 69 1426 2 26 587 2 23 355 20,203 3 52 1426 2 26 587 2 23 355 15,809 3 52 1300 2 26 587 2 23 355 15,771 3 52 1300 2 26 587 2 23 355 15,771<br />

66 11 156 3238 6 80 1552 6 62 989 47,271 11 156 3238 6 80 1552 6 62 989 47,271 11 125 2673 6 80 1552 6 62 989 39,422 11 125 2673 6 80 1552 6 62 989 39,422<br />

67 3 41 676 3 35 325 3 35 223 14,189 6 70 1207 3 35 400 3 35 300 21,482 6 70 1207 3 35 400 3 35 300 21,482 6 70 1207 3 35 400 3 35 300 21,482<br />

68 7 104 1770 3 37 527 28,451 7 104 1770 3 37 527 28,382 7 90 1569 3 37 527 24,705 7 90 1569 3 37 527 24,705<br />

70 2 29 476 2 23 245 2 23 190 9,725 3 40 800 3 36 379 3 36 300 13,918 3 40 800 3 36 379 3 36 300 13,918 3 40 800 3 36 379 2 36 300 13,918<br />

71 3 47 1075 3 38 486 3 34 34 15,858 3 47 1075 3 38 486 3 34 34 15,872 3 47 1075 3 38 486 3 14,070 3 47 1075 3 38 486 3 14,070<br />

75 1 6 180 1,486<br />

WV 57 831 18116 41 507 8785 38 429 5795 260,885 58 832 18569 42 520 9093 36 421 5939 261,475 58 787 17677 42 520 9093 36 387 5905 248,100 58 787 17677 42 520 9093 35 375 5905 247,458<br />

Total 138 2018 54938 107 1294 23488 89 992 15385 634,265 138 2014 55291 108 1307 23796 87 985 15529 633,394 137 1946 54338 107 1295 23796 85 924 15393 612,332 144 2037 55602 106 1284 23763 81 892 15387 633,163<br />

Peak Buses 138 Peak Buses 138 Peak Buses 137 Peak Buses 144<br />

Operators 415 Operators 415 Operators 400 Operators 415<br />

Annual Revenue Hours 634,265 Annual Revenue Hours 633,394 Annual Revenue Hours 612,332 Annual Revenue Hours 633,163<br />

Est. Annual Passengers Carried 15,547,000 Est.Annual Passengers Carried 15,647,002<br />

Est.Annual Passengers Carried 15,378,000<br />

Est.Annual Passengers Carried 15,735,000<br />

Passengers per Rev.Hour 24.51 Passengers per Rev.Hour 24.70 Passengers per Rev.Hour 25.11 Passengers per Rev.Hour 24.85<br />

Shows the routes that will be changed from the previous stage.<br />

July 11, 2007 222


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

11. FINANCIAL PLAN – FINANCIALLY CONSTRAINED<br />

Current funding, assuming fare increases presented in other sections of this SRTP, supports the<br />

Financially Constrained plan. Operating costs and revenues, by service type, for this scenario are shown<br />

in Figure 11-1.<br />

July 11, 2007 223


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-1: Financially Constrained <strong>Plan</strong><br />

Financial Information Year 1 FY <strong>2008</strong> Year 2 FY 2009 Year 3 FY 2010 Year 4 FY 2011 Year 5 FY 2012 Year 6 FY <strong>2013</strong><br />

Operating Expense<br />

Directly Operated Fixed Route Bus $ 59,150,273 $ 60,248,848 $ 64,924,624 $ 67,961,691 $ 72,897,830 $ 76,102,458<br />

Contracted Fixed Route Bus $ - $ - $ - $ - $ - $<br />

-<br />

OmniLink Service $ 1,159,026 $ 1,234,624 $ 1,294,676 $ 1,345,631 $ 1,385,274 $ 1,436,357<br />

Access Service $ 11,453,598 $ 12,033,379 $ 12,631,862 $ 13,129,023 $ 13,514,004 $ 14,008,358<br />

Total Operating Expense $ 71,762,896 $ 73,516,852 $ 78,851,162 $ 82,436,344 $ 87,797,108 $ 91,547,173<br />

Operating Revenues<br />

Fixed Route Bus Fares $ 12,535,861 $ 13,035,659 $ 13,204,888 $ 14,429,142 $ 18,116,904 $ 18,321,403<br />

Demand Response Fares $ 1,334,464 $ 1,431,368 $ 1,482,128 $ 1,718,061 $ 1,964,229 $ 1,992,820<br />

Measure I Fare Subsidy - Fixed Route $ 284,581 $ 395,915 $ 415,135 $ 646,447 $ 750,641 $ 742,676<br />

Measure I Fare Subsidy - OmniLink $ 7,556 $ 7,568 $ 7,633 $ 7,602 $ 7,519 $ 7,498<br />

Measure I Fare Subsidy - Access $ 101,620 $ 101,324 $ 103,511 $ 107,200 $ 105,112 $ 104,080<br />

Measure I General Subsidy $ 6,626,242 $ 6,795,993 $ 7,066,553 $ 7,135,296 $ 7,349,135 $ 7,686,649<br />

Interest Revenue $ 845,600 $ 859,130 $ 876,312 $ 893,838 $ 911,715 $ 929,950<br />

Advertising Revenue $ 699,992 $ 699,992 $ 699,992 $ 699,992 $ 699,992 $ 699,992<br />

Total Operating Revenues $ 22,435,917 $ 23,326,950 $ 23,856,152 $ 25,637,579 $ 29,905,248 $ 30,485,068<br />

Fare Revenues By Service Type<br />

Directly Operated Fixed Route Bus $ 12,535,861 $ 13,035,659 $ 13,204,888 $ 14,429,142 $ 18,116,904 $ 18,321,403<br />

OmniLink Service $ 77,640 $ 78,190 $ 78,856 $ 88,713 $ 101,180 $ 101,297<br />

Access Service $ 1,256,824 $ 1,353,178 $ 1,403,272 $ 1,629,349 $ 1,863,049 $ 1,891,523<br />

July 11, 2007 224


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The operating deficit before application of operating subsidies and capitalization of vehicle maintenance<br />

costs is approximately $49 million in FY <strong>2008</strong>. The Local Transportation Fund (LTF), <strong>Omnitrans</strong>’ primary<br />

operating funding source, is used to pay for this deficit, as shown in Figure 11-2.<br />

July 11, 2007 225


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-2: LTF Requirements for the Financially Constrained <strong>Plan</strong><br />

Financial Information Year 1 FY <strong>2008</strong> Year 2 FY 2009 Year 3 FY 2010 Year 4 FY 2011 Year 5 FY 2012 Year 6 FY <strong>2013</strong><br />

Gross Operating Expenses $ 71,762,896 $ 73,516,852 $ 78,851,162 $ 82,436,344 $ 87,797,108 $ 91,547,173<br />

Operating Revenues $ 22,435,917 $ 23,326,950 $ 23,856,152 $ 25,637,579 $ 29,905,248 $ 30,485,068<br />

Net Operating Expense $ 49,326,979 $ 50,189,903 $ 54,995,010 $ 56,798,765 $ 57,891,861 $ 61,062,105<br />

Less Capitalized Operations $ 6,246,003 $ 11,938,370 $ 11,476,569 $ 2,687,400 $ 7,058,602 $ 11,499,666<br />

LTF Operations Subsidy $ 43,080,976 $ 38,251,532 $ 43,518,441 $ 54,111,365 $ 50,833,259 $ 49,562,440<br />

Gross Capital Expenses $ 45,930,430 $ 21,264,517 $ 83,810,687 $ 63,054,211 $ 38,969,736 $ 20,630,578<br />

STA $ 7,712,083 $ 1,334,065 $ 5,625,349 $ 3,322,923 $ 2,610,874 $ 1,836,145<br />

FTA Section 5307 $ 11,684,348 $ 5,189,551 $ 6,074,338 $ 13,674,628 $ 10,751,629 $ 7,771,523<br />

FTA Section 5307 for Preventative Maintenance $ 1,444,832 $ 8,824,449 $ 8,477,682 $ 1,412,667 $ 4,875,549 $ 8,393,087<br />

FTA Section 5307 Security & Enhancements $ 270,810 $ 286,000 $ 296,980 $ 307,904 $ 318,922 $ 329,890<br />

FTA 5309 Bus & Bus Facilities $ 200,640 $ 242,778 $ - $ - $ - $ -<br />

STIP/Caltrans $ 8,000,000 $ - $ - $ - $ - $ -<br />

CMAQ $ 9,317,200 $ - $ 18,464,263 $ - $ - $ -<br />

In-kind Transfers $ - $ - $ 4,500,000 $ 4,500,000 $ - $ -<br />

Proposition 1B Bonds $ - $ 3,000,000 $ 5,000,000 $ - $ - $ -<br />

FTA Section 5310 $ 401,041 $ - $ - $ - $ - $ -<br />

Measure I Capital $ - $ - $ 703,200 $ 2,366,000 $ 2,494,000 $ -<br />

FTA 5309 New Starts $ - $ - $ 32,373,561 $ 36,932,608 $ 5,692,591 $ -<br />

LTF Capital Subsidy $ 6,899,476 $ 2,387,674 $ 2,295,314 $ 537,480 $ 12,226,171 $ 2,299,933<br />

Total LTF Subsidy Required $ 49,980,452 $ 40,639,206 $ 45,813,755 $ 54,648,845 $ 63,059,430 $ 51,862,373<br />

Current Year LTF Revenues $ 49,518,594 $ 52,984,895 $ 56,693,838 $ 60,662,407 $ 64,908,775 $ 69,452,389<br />

Prior Year LTF Carryover $ 10,881,864 $ 10,420,006 $ 22,765,695 $ 33,645,778 $ 39,659,339 $ 41,508,684<br />

LTF Cumulative Balance $ 10,420,006 $ 22,765,695 $ 33,645,778 $ 39,659,339 $ 41,508,684 $ 59,098,701<br />

July 11, 2007 226


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-2 shows that the LTF cumulative balance grows between FY <strong>2008</strong> and FY <strong>2013</strong>. The amount<br />

of LTF available to <strong>Omnitrans</strong> increases because of the reductions in service assumed in the Constrained<br />

Service <strong>Plan</strong>. The Constrained Service <strong>Plan</strong> reductions are tied to the goal of attaining the 25% operating<br />

ratio set by the <strong>Omnitrans</strong> Board of Directors. Figure 11-3 provides performance indicators of cost<br />

efficiency and effectiveness for the Financially Constrained <strong>Plan</strong> by type of service, including the<br />

operating ratio.<br />

July 11, 2007 227


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-3: Performance Indicators by Service Type – Financially Constrained <strong>Plan</strong><br />

Financial Information Year 1 FY <strong>2008</strong> Year 2 FY 2009 Year 3 FY 2010 Year 4 FY 2011 Year 5 FY 2012 Year 6 FY <strong>2013</strong><br />

Operating Costs Per Hour - System $ 88.71 $ 93.08 $ 99.83 $ 104.37 $ 107.06 $ 111.64<br />

Directly Operated Fixed Route Bus $ 93.82 $ 98.55 $ 106.20 $ 111.17 $ 113.63 $ 118.62<br />

OmniLink Service $ 77.27 $ 82.31 $ 86.31 $ 89.71 $ 92.35 $ 95.76<br />

Access Service $ 70.06 $ 73.60 $ 77.26 $ 80.30 $ 82.66 $ 85.68<br />

Passengers Per Hour - System 18.5 18.5 18.5 18.2 19.1 18.9<br />

Directly Operated Fixed Route Bus 23.0 23.1 23.1 22.7 23.7 23.4<br />

OmniLink Service 3.1 3.1 3.1 3.1 3.0 3.0<br />

Access Service 2.5 2.5 2.6 2.7 2.6 2.6<br />

Operating Ratios - System 19.9% 20.4% 19.3% 20.5% 23.9% 23.1%<br />

General Public Services 21.4% 22.0% 20.7% 21.9% 25.5% 24.7%<br />

Specialized Transportation Service 11.9% 12.1% 11.9% 13.2% 14.6% 14.2%<br />

July 11, 2007 228


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The operating ratios by service type shown above in Figure 11-3 consist of passenger fares and the<br />

Measure I fare subsidies for seniors and persons with disabilities, divided by operating costs. The<br />

minimum operating ratios specified by California’s Transportation Development Act (TDA) are 20% for<br />

General Public Services (directly operated fixed route and OmniLink) and 10% for Specialized<br />

Transportation Services (Access). The operating ratio for General Public Services is projected to grow<br />

from 21.4% in FY <strong>2008</strong> to 24.7% in FY <strong>2013</strong>, which not only meets the minimum TDA requirement but<br />

also comes close to attaining the 25% operating ratio goal set by the <strong>Omnitrans</strong> Board of Directors. The<br />

operating ratio for Specialized Transportation Services is projected to grow from 11.9% in FY <strong>2008</strong> to<br />

14.2% in FY <strong>2013</strong>, which would easily meet the minimum TDA requirement.<br />

The operating ratios presented in Figure 11-3 do not include exemptions for new service allowed by<br />

Transportation Development Act law. Application of qualifying exemptions would result in a higher<br />

operating ratio for the years in which they could be applied.<br />

The Financially Constrained plan was designed primarily to meet the minimum TDA operating ratio<br />

requirement and the 25% operating ratio goal set by the <strong>Omnitrans</strong> Board of Directors. As such, a series<br />

of significant fare increases were assumed in order to increase fare revenues at a greater rate than the<br />

rise in operating costs.<br />

From FY <strong>2008</strong> to FY <strong>2013</strong>, <strong>Omnitrans</strong> will need to restrain the growth in costs and/or increase ridership in<br />

order to decrease the number and severity of the assumed fare increases. Under current assumptions,<br />

the fare increases would result in a net loss of ridership between FY <strong>2008</strong> and FY <strong>2013</strong> (even when<br />

considering increases in population and employment, and rising fuel costs), although fare revenue would<br />

increase.<br />

11.1 Revenue Sources<br />

The funding sources assumed in the Financially Constrained Scenario are those currently available to<br />

<strong>Omnitrans</strong>, as described below. This includes existing revenue sources at the federal, state and local<br />

levels. The level of funding estimated to be available over the next six years (FY <strong>2008</strong>-<strong>2013</strong>) is based on<br />

the fund estimates provided by the San Bernardino Associated Governments (SANBAG) and <strong>Omnitrans</strong><br />

projections.<br />

11.1.1 LOCAL TRANSPORTATION FUNDS (LTF)<br />

In 1972, SB 325 created a fund for transportation purposes. These funds are derived from a ¼-cent sales<br />

tax and distributed by SANBAG. These funds are intended to be "transit first" funding, meaning that<br />

funds are expected to be spent on transit projects to the extent that such projects are meeting all "transit<br />

needs that are reasonable to meet." There is no universally accepted definition of reasonable to meet,<br />

and individual Regional Transportation <strong>Plan</strong>ning Agencies (RTPAs) must make their own determination.<br />

These funds can be used for capital expenditures, operations, or a combination thereof. For the SRTP<br />

and consistent with <strong>Omnitrans</strong> practices, LTF funds are assumed to be used for operations first, then as<br />

local match to federally funded capital projects when STA funds cannot be used.<br />

LTF is apportioned to area cities and the County based on population; transit operators are eligible as<br />

long as required operating ratios are maintained. The operating ratio shows the amount of operating<br />

costs covered by fares and other operating revenue. For <strong>Omnitrans</strong>, the operating ratio is defined as fare<br />

revenue plus Measure I fare subsidy divided by operating costs.<br />

SANBAG is responsible for allocating LTF in the San Bernardino Valley. Current SANBAG practice is to<br />

allocate the balance of LTF, after commuter rail needs are met, to <strong>Omnitrans</strong>. LTF is estimated to grow<br />

between 4.1% and 4.8% annually between FY <strong>2008</strong> and FY <strong>2013</strong>. SANBAG plans to allocate<br />

approximately $10.3 million to $13.5 million annually to the Southern California Regional Railway<br />

Authority (SCRRA) in support of the Metrolink commuter rail program. The level of LTF available to<br />

<strong>Omnitrans</strong> is estimated to be $49.5 million in FY <strong>2008</strong> and $53.0 million in FY 2009, exclusive of allocated<br />

July 11, 2007 229


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

and unallocated prior year carryover funds. In FY 2010 and FY 2011, LTF funds are forecasted to<br />

increase to $56.7 and $60.7 million, respectively. In FY 2012 and FY <strong>2013</strong>, LTF funds are forecasted to<br />

increase to $64.9 and $69.4 million. Prior year unallocated LTF funds may be made available to<br />

<strong>Omnitrans</strong> to supplement current year revenues, pending SANBAG Board action.<br />

11.1.2 STATE TRANSIT ASSISTANCE FUNDS (STAF)<br />

State <strong>Transit</strong> Assistance funds (STA) are derived from the statewide sales tax on gasoline and diesel fuel<br />

through the Public Transportation Account (PTA) as part of the State Transportation Improvement<br />

Program (STIP). Proposition 42, passed by the voters in 2002, requires that state sales and use taxes on<br />

the sale of motor vehicle fuel be used for public transportation, city and county street and road repairs<br />

and improvements, and state highway improvements. Proposition 42 revenue partially funds the Public<br />

Transportation Account, with some of those funds available for STIP projects and some for State <strong>Transit</strong><br />

Assistance.<br />

STA funds are allocated to SANBAG and to each public operator. Funds apportioned to SANBAG are<br />

made available to operators based on their service area population. STA funds can be used either for<br />

transit operations or capital projects. For the SRTP and consistent with <strong>Omnitrans</strong> practices, STA funds<br />

are assumed to be used as local match to federally funded capital projects.<br />

There are eligibility requirements that must be met in order for a transit operator to receive these funds.<br />

The operator must meet the applicable ratio of passenger fares to operating cost. In addition, operators<br />

seeking STA for operations must show that their most-recent audited operating cost per revenue vehicle<br />

hour does not exceed the prior year’s or average of the prior three years’ operating cost per revenue hour<br />

adjusted by the change in the Consumer Price Index for the same period.<br />

STA is estimated to grow at 6% annually between FY <strong>2008</strong> and FY <strong>2013</strong>. The level of STA available to<br />

<strong>Omnitrans</strong> in FY <strong>2008</strong> was originally estimated to be $5.4 million, but SANBAG allocated an extra $2.5<br />

million for the sbX BRT project, bringing the FY <strong>2008</strong> total to $7.9 million. <strong>Omnitrans</strong> is expected to<br />

receive approximately $5.7 million in FY 2009. In FY 2010 and FY 2011, STA funds are forecasted to<br />

increase to $6.1 and $6.4 million, respectively. In FY 2012 and FY <strong>2013</strong>, STA funds are forecasted to<br />

increase to $6.8 and $7.2 million.<br />

An additional amount of prior year unallocated carryover funds are being held in reserve by SANBAG as<br />

a contingency in the event that actual STA funds available to the County fall below the forecast in any one<br />

year. The reserve fund provides a safety cushion for STA funds, which is especially needed since the<br />

Governor partially suspended Proposition 42 funds in the FY 2004 budget and fully suspended the funds<br />

in FY 2005 due to the State budget crisis.<br />

11.1.3 FTA FORMULA FUNDS<br />

At the federal level, the Safe, Accountable, Flexible, Efficient Transportation Equity Act – A Legacy for<br />

Users (SAFETEA-LU), signed into law in August 2005, provides funding through the Federal <strong>Transit</strong><br />

Administration (FTA) specifically to support transit operating and capital needs. The FTA Section 5307<br />

Large Urban Cities is a formula program with funds apportioned to urbanized areas with populations over<br />

50,000. Funds can only be used for capital projects, including the purchase of vehicles and facility<br />

maintenance. While Section 5307 funds are targeted for capital purposes, operating expenses<br />

associated with vehicle maintenance may be “capitalized” and paid for with Section 5307 funds, up to<br />

80% of total vehicle maintenance costs. Section 5307 funds require a 20% local match.<br />

<strong>Omnitrans</strong> receives Section 5307 funds from two urbanized areas (UZA): 1) Los Angeles/Long Beach<br />

UZA; and 2) Riverside/San Bernardino UZA. SCAG is the designated recipient. Using federal transit<br />

data, SCAG determines the amount of Section 5307 funds apportioned to the areas based on a variety of<br />

variables. In the Riverside/San Bernardino UZA, funds are apportioned by SANBAG based on a variety<br />

of variables.<br />

July 11, 2007 230


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Section 5307 funds apportioned to San Bernardino County are estimated to be between $17.8 million and<br />

$20.9 million annually between FY <strong>2008</strong> and FY <strong>2013</strong>, with approximately 75% to 79% of the funds going<br />

to <strong>Omnitrans</strong>. The remaining funds are Fixed Guideway Funds used for Metrolink projects. Fixed<br />

Guideway funds are determined based on revenue miles and directional route miles.<br />

The level of Section 5307 funds available to <strong>Omnitrans</strong> is estimated to be $13.4 million in FY <strong>2008</strong> and<br />

$14.3 million in FY 2009. In FY 2010 and FY 2011, Section 5307 funds are forecasted to increase to<br />

$14.8 and $15.4 million, respectively. In FY 2012 and FY <strong>2013</strong>, Section 5307 funds are forecasted to<br />

increase to $15.9 and $16.5 million.<br />

11.1.4 FTA DISCRETIONARY FUNDS<br />

FTA Section 5309 discretionary funds are limited to capital purchases and fall into three categories: 1)<br />

Bus or Bus facilities; 2) New Starts; and 3) Rail and Fixed Guideway Modernization. <strong>Omnitrans</strong> is eligible<br />

for Section 5309 funds in the Bus or Bus Facilities category as well as the New Starts category. New<br />

Starts funding is discussed later in this section.<br />

Bus and Bus Facilities funds are distributed directly by FTA to support capital transit needs including<br />

vehicle acquisition, capital equipment and other intermodal transfer facility needs. In the past, <strong>Omnitrans</strong><br />

has been successful in securing “earmarks” for Section 5309 funds (e.g., Chino and Yucaipa<br />

Transcenters in FY 2004).<br />

Section 5309 grants provide 80% of the capital funds and require a 20% local match. These funds are<br />

fully discretionary and can be somewhat difficult to acquire. Section 5309 discretionary funds are usually<br />

earmarked and appropriated by Congress. Obtaining a Congressional earmark depends on the “clout” of<br />

the local delegation and the ability of <strong>Omnitrans</strong> or other local officials to communicate the need for these<br />

funds.<br />

In the past, individual jurisdictions and agencies have sought and secured Section 5309 discretionary<br />

funds. While this approach maximizes the benefits to individual jurisdictions and agencies, such activities<br />

are outside established planning processes. Funds secured on an individual basis detract from the<br />

amount of funds potentially available to overall transit funding priorities in the County.<br />

The Ontario Transcenter has been identified to receive $443,000 of Section 5309 Bus and Bus Facilities<br />

funds in the Constrained <strong>Plan</strong>. Other projects, such as replacement paratransit vehicles and the Mid-<br />

Valley Facility, may be assumed to receive Section 5309 Bus and Bus Facilities funds in the Partially<br />

Constrained and Unconstrained <strong>Plan</strong>s.<br />

Additional discretionary funds would not be programmed outside of the countywide planning process.<br />

This approach will help to ensure that countywide priorities have been agreed upon through the planning<br />

process and that other lower-priority projects do not directly compete for limited discretionary funds. If<br />

other jurisdictions are pursuing Section 5309 Bus and Bus Facilities funds, these should be identified and<br />

included in countywide funding priorities approved by SANBAG as part of the <strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong><br />

and TIP processes.<br />

In the past, securing Discretionary Funding in this ad hoc manner also has had a significant impact on<br />

<strong>Omnitrans</strong>’ staffing requirements and potentially on FTA Triennial Review compliance findings. As an<br />

eligible grant recipient, <strong>Omnitrans</strong> is called upon to apply for, administer and accept Discretionary Grant<br />

funds on behalf of other jurisdictions. This requires the dedication of staff resources charged to the<br />

operating budget. Increasing staff to accommodate this additional work has a negative impact on<br />

<strong>Omnitrans</strong>’ ability to maintain cost per hour increases to no more than the increase in the Consumer Price<br />

Index (CPI). In addition, all procurements using federal funds must adhere to specific federal<br />

procurement and other compliance requirements. Failure to meet these requirements can result in<br />

findings of non-compliance for <strong>Omnitrans</strong>. One of the recommendations of the recently-completed TDA<br />

Performance Audit is for <strong>Omnitrans</strong> to evaluate charging a cost recovery fee for federal grant<br />

administration and monitoring, which should offset the costs of acquiring grant funding.<br />

July 11, 2007 231


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

11.1.5 NEW STARTS/SMALL STARTS/VERY SMALL STARTS<br />

The FTA Section 5309 New Starts program provides funds for construction of new fixed guideway<br />

systems or extensions to existing fixed guideway systems. There are three categories of New Starts<br />

funding: 1) New Starts for projects costing over $250 million; 2) Small Starts for projects costing between<br />

$75 million and $250 million; and 3) Very Small Starts for projects costing under $75 million.<br />

Small Starts are intended to be low cost projects that qualify for a highly simplified project evaluation and<br />

rating process by FTA. A Small Starts project must meet one of the following guideway criteria:<br />

• Substantial <strong>Transit</strong> Stations<br />

• Signal Priority/Pre-emption (for Bus/LRT)<br />

• Low Floor/Level Boarding Vehicles<br />

• Special Branding of Service<br />

• Frequent Service – 10 min peak/15 min off-peak<br />

• Service offered at least 14 hours per day<br />

<strong>Omnitrans</strong> intends to apply for $75 million (the maximum funding amount allowable by FTA) in Small<br />

Starts funding for Preliminary Engineering, <strong>Transit</strong>-Oriented Development, Project Management,<br />

Environmental Review, Final Design, Engineering, and Construction related to the $171 million sbX BRT<br />

project. The sbX project is included in the Constrained <strong>Plan</strong>.<br />

Section 5309 New Starts funding is discretionary and funding is very competitive, with well over 300<br />

projects seeking New Starts funding. The completion for Small Starts funds is not yet as great, but more<br />

transit operators are turning to this program to fund BRT projects throughout the nation. It is important<br />

that <strong>Omnitrans</strong> attempts to secure Small Starts funding in the near future in order to avoid the increase in<br />

Small Starts competition that is sure to occur in the next few years.<br />

11.1.6 CONGESTION MITIGATION AND AIR QUALITY (CMAQ)<br />

Certain funds made available through the Federal Highway Administration are considered flexible funds<br />

and can be used for transit capital projects. They are the Surface Transportation Program (STP) and the<br />

Congestion Mitigation and Air Quality Program (CMAQ). In reality, STP funds are generally used for<br />

streets and road projects and are not available for transit. The exception to this rule is discussed under<br />

new funding alternatives.<br />

The CMAQ program provides funds for projects that contribute to the attainment or maintenance of<br />

federal air quality standards. These funds are distributed by SANBAG to all eligible jurisdictions in the<br />

County. A wide variety of public agencies is eligible for CMAQ funds; however, <strong>Omnitrans</strong> has received a<br />

set-aside of funds for the sbX BRT project and for the purchase of vehicles. CMAQ funds are primarily<br />

used for capital projects, and are restricted to projects that improve air quality. A portion of CMAQ<br />

funding may be used to support the operating expenses for new or expanded transit service, but only for<br />

the first three years of operation.<br />

SANBAG has determined priorities for the $133.5 million in CMAQ funds estimated to be available<br />

between FY <strong>2008</strong> and FY <strong>2013</strong>. <strong>Omnitrans</strong> has secured a commitment of approximately $27.8 million in<br />

CMAQ funds, with $16.1 million committed to the sbX BRT project and the remaining $11.7 million for<br />

fixed route replacement vehicles.<br />

July 11, 2007 232


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

11.1.7 MEASURE I LOCAL SALES TAX FOR TRANSIT<br />

The ½-cent sales tax available for transportation projects in San Bernardino County is administered by<br />

SANBAG and includes a provision of 6% of funds for the Senior & Disabled and Service Subsidy<br />

Program. There is a 1% set-aside for Americans with Disabilities Act (ADA) Mediation services and other<br />

educational projects in the Valley.<br />

In FY 2010 the current Measure I Local Sales Tax for <strong>Transit</strong> will sunset. In November 2004, this<br />

Measure was approved for extension by voters and effective 2010, Measure I will include 2% express<br />

bus/BRT, and 8% to senior and disabled services, including 2% for the creation of a Consolidated <strong>Transit</strong><br />

Services Agency (CTSA) and continuation of the training and scholarships educational programs that<br />

currently exist.<br />

SANBAG and <strong>Omnitrans</strong> have recently entered into an agreement that increases the senior and disabled<br />

fare subsidy. The current cash fare subsidy of $0.10 would increase with <strong>Omnitrans</strong>’ fares, to a maximum<br />

of $0.25. This agreement lessens the impact of fare increases on senior and disabled passengers and<br />

also serves to maintain or increase farebox recovery. It should be noted that the overall Measure I<br />

allocation to <strong>Omnitrans</strong> is not expected to change; the agreement merely shifts available funds from the<br />

direct services subsidy to the senior and disabled fare subsidy.<br />

Measure I Senior & Disabled Fare and Service Subsidy funds are estimated at $7.0 million in FY <strong>2008</strong><br />

with growth of 4.0% annually through FY <strong>2013</strong>. It is estimated that these subsidy funds will reach $8.5<br />

million annually by FY <strong>2013</strong>.<br />

An additional $0.7 million in funds for BRT service are estimated to be available in FY 2010 and to grow<br />

to $2.4 million in FY 2011, the first full year of the Measure I Reauthorization. The BRT service amount is<br />

expected to be $2.5 million in FY 2012 when sbX BRT service is started, bringing the total Measure I BRT<br />

contribution to $5.6 million. These funds are assumed as local match for FTA Section 5309 capital funds<br />

for the sbX project.<br />

Also under the Measure I Reauthorization, some $2.4 million in funds will be available for CTSA and<br />

educational program purposes in FY 2011. <strong>Omnitrans</strong> may seek to obtain a portion of these funds to<br />

support increased levels of service to seniors who would otherwise not be eligible for ADA service. Under<br />

the Constrained, Partially Constrained and Unconstrained <strong>Plan</strong>s, <strong>Omnitrans</strong> would likely link service<br />

expansion to increased Measure I funding.<br />

11.1.8 OTHER FEDERAL GRANT PROGRAMS<br />

There are other federal funding sources available to <strong>Omnitrans</strong>. These funding sources include FTA<br />

Section 5310 Transportation for Elderly Persons and Persons with Disabilities; Section 5316 Job Access<br />

and Reverse Commute (JARC), and Section 5317 New Freedom Program. To date, <strong>Omnitrans</strong> has not<br />

greatly utilized these programs due to their restrictions or, in the case of the New Freedoms program,<br />

because they are new.<br />

Section 5310 funds are used to provide transportation services to meet the special needs of the elderly<br />

and persons with disabilities. Funds are obligated based on the annual program of projects included in a<br />

statewide grant application. The program is administered by Caltrans and grants are awarded on a<br />

competitive basis. Caltrans is in the process of developing a statewide program. <strong>Omnitrans</strong> is currently<br />

using some Section 5310 to replace paratransit vehicles. Section 5310 funding requires a 20% local<br />

match.<br />

Section 5316 funds are used to develop transportation services designed to transport welfare recipients<br />

and low-income individuals to and from jobs and to develop transportation services for residents of urban<br />

centers and rural and suburban areas to suburban employment opportunities. Section 5316 funds are<br />

allocated on a discretionary basis and require a 50% local match. In the future, <strong>Omnitrans</strong> may utilize<br />

July 11, 2007 233


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Section 5316 funds to pay for services that more closely tie to shift schedules for industrial entry-level<br />

workers, or other such services that qualify under the reverse commute or job access provisions.<br />

Section 5317 is a new program with the passage of SAFETEA-LU and is designed to encourage services<br />

and facility improvements to address the transportation needs of persons with disabilities that go beyond<br />

those required by the Americans with Disabilities Act. Operating grants require a 50% local match while<br />

capital grants require an 80% local match. <strong>Omnitrans</strong> may consider applying for funds depending on that<br />

the program requirements, and possibly on the development of the Consolidated <strong>Transit</strong> Services Agency<br />

funded through Measure I.<br />

It is assumed that for the purposes of this SRTP, SANBAG’s Public <strong>Transit</strong> – Human Services<br />

Transportation Coordination <strong>Plan</strong> will further address specific funding opportunities that the respective<br />

program partners may be eligible for in meeting their core business needs as well as for enhanced<br />

coordination amongst the partners.<br />

11.1.9 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)<br />

The State Transportation Improvement Program (STIP) is funded through the State Highway Account and<br />

other sources for projects to increase the capacity of the transportation system. STIP projects may<br />

include projects on state highways, local roads, intercity rail, or public transit systems.<br />

SANBAG administers the STIP funds in San Bernardino County through the Regional Improvement<br />

Program (RIP). The RIP is funded from 75% of the funds made available for transportation capital<br />

improvement projects under the STIP. This program targets urban projects that are needed to improve<br />

transportation within the region. SANBAG recommends to the California Transportation Commission<br />

(CTC) the selection of these projects, which can include state highway improvements, local roads, public<br />

transit, intercity rail, grade separations, and more.<br />

The STIP requires a portion of funds to be allocated for public transit, such as passenger rail or bus<br />

programs. SANBAG has committed $5 million in STIP funds to the sbX BRT project, and $3 million for<br />

the Chaffey Regional Transportation Center.<br />

11.1.10 PROPOSITION 1B STATE INFRASTRUCTURE BONDS<br />

The Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006, approved by the<br />

voters as Proposition 1B on November 7, 2006, authorized $19.9 billion in general obligation bond<br />

proceeds, of which $2 billion were to be available for projects in the State Transportation Improvement<br />

Program to augment funds otherwise available for the STIP from other sources. SANBAG has committed<br />

$8 million in Proposition 1B STIP Augmentation funds to the sbX BRT project.<br />

11.1.11 IN-KIND TRANSFERS<br />

In-kind transfers are donations of land or other assets used to complete an infrastructure project. In-kind<br />

transfers can be of various forms, including transfers from private developers and/or from other<br />

government agencies. <strong>Omnitrans</strong> has identified $9 million in in-kind transfers for the sbX BRT project,<br />

consisting primarily of street improvements to be made by cities along the corridor, and station and site<br />

improvements to be made by private developers. <strong>Omnitrans</strong> is in the process of securing additional inkind<br />

transfers for the sbX BRT project.<br />

11.1.12 ADVERTISING AND AUXILIARY REVENUES<br />

<strong>Omnitrans</strong> generates revenues from investment income and advertising allowed on its vehicles. On an<br />

annual basis, these two sources generate about $1.5 million in annual revenue that is used for<br />

operations. Because of low interest rates, and an uncertain economy, these funds are projected to<br />

increase at a rate of 1.6-2% annually, far below the forecast rate of inflation for the <strong>Plan</strong> period.<br />

July 11, 2007 234


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

11.2 Financial <strong>Plan</strong> – Capital and Operating<br />

Figure 11-6 through Figure 11-10 summarize the financial, operating, capital, and fleet information for the<br />

six-year planning period. Information is provided for fixed route, OmniLink, and Access services, along<br />

with a combined fixed route and OmniLink table, and an all services table. Figure 11-11 summarizes<br />

operating expenses and revenues. Figure 11-12 provides annual fund balance estimates for key<br />

operating and capital funding sources. The following assumptions were used in preparing the financial<br />

information:<br />

• Operating cost budget assumes fixed route service cuts of 44,000 hours in FY<br />

<strong>2008</strong> and 22,943 in FY 2009, and an OmniLink service cut of 4,000 hours in FY<br />

<strong>2008</strong>.<br />

• Operating costs increase each year based on historical increases, except noted<br />

below.<br />

• Administrative cost increases held to no more than inflation for FY 2009 through<br />

FY <strong>2013</strong>.<br />

• FY <strong>2008</strong> operating cost budget matches preliminary budget supplied by<br />

<strong>Omnitrans</strong>.<br />

• Operating costs reflect new cost allocation process developed by <strong>Omnitrans</strong>.<br />

• Operating costs associated with service changes determined using marginal<br />

costs.<br />

• FY <strong>2008</strong> capital budget matches preliminary Capital Improvement <strong>Plan</strong> (CIP)<br />

supplied by <strong>Omnitrans</strong>, with adjustments based on comments by SANBAG.<br />

• Fare increases in FY <strong>2008</strong>, FY 2009, FY 2011, and FY 2012 resulting in the<br />

following base and average fares:<br />

Figure 11-4: Base and Average Fares<br />

Fare Type FY <strong>2008</strong> FY 2009 FY 2010 FY 2011 FY 2012 FY <strong>2013</strong><br />

Fixed Route Base $1.35 $1.50 $1.50 $1.75 $2.00 $2.00<br />

Fixed Route Avg. $0.87 $0.92 $0.94 $1.04 $1.19 $1.22<br />

OmniLink Base $3.00 $3.00 $3.00 $3.50 $4.00 $4.00<br />

OmniLink Avg. $1.69 $1.69 $1.69 $1.91 $2.22 $2.22<br />

Access Base $2.45 $2.75 $2.75 $3.25 $3.75 $3.75<br />

Access Avg. $3.02 $3.26 $3.31 $3.71 $4.33 $4.44<br />

July 11, 2007 235


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Fare increases are structured to reach the goal of a 25% Operating Ratio. The goal is achieved in FY<br />

2012, with the Operating Ratio slightly under goal in FY <strong>2013</strong>. The Operating Ratio will change with<br />

modifications to operating and capital budgets. Estimated operating ratios for the plan period are shown<br />

in Figure 11-5:<br />

Figure 11-5: Operating Ratios<br />

Operating Ratio 1 FY <strong>2008</strong> FY 2009 FY 2010 FY 2011 FY 2012 FY <strong>2013</strong><br />

Fixed Route (Direct &<br />

OmniLink)<br />

21.4% 22.0% 20.7% 21.9% 25.5% 24.7%<br />

Access 11.9% 12.1% 11.9% 13.2% 14.6% 14.2%<br />

1 Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost<br />

• Measure I subsidy calculated using methodology from new agreement between<br />

by <strong>Omnitrans</strong> and SANBAG.<br />

• Grant revenues reflect data provided by SANBAG.<br />

• Fixed Route operating costs increased by $1.5 million in FY 2010 to account for<br />

expiration of fuel tax credit.<br />

• Capital costs for FY 2009 through FY <strong>2013</strong> reflect draft CIP supplied by<br />

<strong>Omnitrans</strong>, except as noted below.<br />

• Capital costs after FY <strong>2008</strong> inflated at the Consumer Price Index for All Urban<br />

Consumers (CPI-U) for the Los Angeles Consolidated Metropolitan Statistical<br />

Area (CMSA). Source: Cal CPI Forecast BBFYCPI_003.xls, September 2006.<br />

• Fixed route vehicle replacement assumed to be 15 vehicles per year for FY 2010<br />

through FY <strong>2013</strong> to lessen impact of large vehicle replacements expected in FY<br />

2011 and FY 2012.<br />

• Costs and funding for E Street BRT project (sbX) assumed to be $142.7 million<br />

(year-of-expenditure dollars) for Phase 1 (including vehicles). Funding based on<br />

data provided by <strong>Omnitrans</strong> and reviewed by SANBAG.<br />

• Funding shortfall for E Street BRT project (sbX) of approximately $10.8 million in<br />

FY 2012 assumed to be paid with excess Local Transportation Funds (LTF)<br />

pending acquisition of other funds.<br />

• Future Access service assumed to be operated with existing fleet and revenue<br />

hours due to improved productivity and dampened demand due to fare<br />

increases. No supplemental taxi service is assumed.<br />

July 11, 2007 236


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-6: Projected Characteristics <strong>Omnitrans</strong> Total<br />

SYSTEM: TOTAL OMNITRANS 1<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Fixed Route:<br />

Peak-Hour Fleet 145 145 145 138 136 136 136 148 148<br />

Spare Vehicles for Maintenance<br />

and Other Purposes 31 31 31 28 28 28 28 32 32<br />

Spare Ratio 21.4% 21.4% 21.4% 20.3% 20.6% 20.6% 20.6% 21.6% 21.6%<br />

Energy Contingency Reserve 7 7 7 7 7 7 7 7 7<br />

Subtotal Fixed Route Vehicles 183 183 183 173 171 171 171 187 187<br />

Demand Response:<br />

Peak-Hour Fleet 89 89 89 90 90 90 90 90 90<br />

Spare Vehicles 12 12 12 12 12 12 12 12 12<br />

Spare Ratio 13.5% 13.5% 13.5% 13.3% 13.3% 13.3% 13.3% 13.3% 13.3%<br />

Total Vehicles 284 284 284 275 273 273 273 289 289<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 12 0<br />

New Replacement Vehicles Delivered 23 25 25 44 31 27 17 42 17<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $11,837.9 $12,280.1 $12,963.4 $13,870.3 $14,467.0 $14,687.0 $16,147.2 $20,081.1 $20,314.2<br />

Measure I Fare Subsidy ($000) $271.3 $264.9 $298.0 $393.8 $504.8 $526.3 $761.2 $863.3 $854.3<br />

Operating Cost ($000's) $64,070.1 $64,286.4 $70,771.6 $71,762.9 $73,516.9 $78,851.2 $82,436.3 $87,797.1 $91,547.2<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 11,461.6 11,699.8 11,631.8 10,993.6 10,747.5 10,747.5 10,747.5 11,136.5 11,136.5<br />

Total Vehicle Miles (000's) 13,783.2 13,962.7 13,285.8 12,575.8 12,306.9 12,306.9 12,306.9 12,732.0 12,732.0<br />

Revenue Vehicle Hours (000's) 859.1 861.9 858.7 812.8 789.8 789.8 789.8 820.0 820.0<br />

Total Vehicle Hours (000's) 930.4 992.3 947.9 898.5 874.5 874.5 874.5 906.1 906.1<br />

Linked Passengers (000's) 11,534.4 11,441.7 11,370.6 11,019.1 10,756.0 10,751.4 10,599.0 11,554.1 11,432.3<br />

Unlinked Passengers (000's) 15,583.2 15,497.7 15,418.8 14,943.6 14,583.1 14,573.3 14,358.7 15,672.4 15,506.9<br />

Full-Time Employee Equivalent 992 789 796 775 764 764 764 764 764<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $0.76 $0.79 $0.84 $0.93 $0.99 $1.01 $1.12 $1.28 $1.31<br />

Cost/Unlinked Passenger $4.11 $4.15 $4.59 $4.80 $5.04 $5.41 $5.74 $5.60 $5.90<br />

Subsidy/Unlinked Passenger $3.35 $3.36 $3.75 $3.87 $4.05 $4.40 $4.62 $4.32 $4.59<br />

Cost/Revenue Vehicle Hour $74.58 $74.59 $82.42 $88.30 $93.08 $99.83 $104.37 $107.06 $111.64<br />

Passengers/Revenue Vehicle Hour 18.1 18.0 18.0 18.4 18.5 18.5 18.2 19.1 18.9<br />

Operating Ratio (Fares+MI/Cost) 2<br />

Fixed Route (Directly Operated + Omnilin 19.5% 20.5% 19.8% 21.4% 22.0% 20.7% 21.9% 25.5% 24.7%<br />

Access 14.7% 13.2% 12.0% 11.9% 12.1% 11.9% 13.2% 14.6% 14.2%<br />

NOTES:<br />

1. FY2005 and FY2006 includes contracted fixed route data.<br />

2. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 237


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-7: Projected Characteristics Fixed Route Total<br />

SYSTEM: OMNITRANS TOTAL FIXED ROUTE (Directly Operated + Contracted + OmniLink) 1<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Fixed Route:<br />

Peak-Hour Fleet 145 145 145 138 136 136 136 148 148<br />

Spare Vehicles for Maintenance<br />

and Other Purposes 31 31 31 28 28 28 28 32 32<br />

Spare Ratio 21.4% 21.4% 21.4% 20.3% 20.6% 20.6% 20.6% 21.6% 21.6%<br />

Energy Contingency Reserve 7 7 7 7 7 7 7 7 7<br />

Subtotal Fixed Route Vehicles 183 183 183 173 171 171 171 187 187<br />

Demand Response:<br />

Peak-Hour Fleet 8 8 8 9 9 9 9 9 9<br />

Spare Vehicles 4 4 4 4 4 4 4 4 4<br />

Spare Ratio 50.0% 50.0% 50.0% 44.4% 44.4% 44.4% 44.4% 44.4% 44.4%<br />

Total Vehicles 195 195 195 186 184 184 184 200 200<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 12 0<br />

New Replacement Vehicles Delivered 23 2 4 19 15 17 17 17 17<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $10,796.3 $11,230.6 $11,910.7 $12,613.5 $13,113.8 $13,283.7 $14,517.9 $18,218.1 $18,422.7<br />

Measure I Fare Subsidy ($000) $160.7 $156.3 $195.1 $292.1 $403.5 $422.8 $654.0 $758.2 $750.2<br />

Operating Cost ($000's) $56,205.4 $55,535.4 $61,180.1 $60,309.3 $61,483.5 $66,219.3 $69,307.3 $74,283.1 $77,538.8<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 8,834.4 9,005.3 8,937.3 8,299.0 8,052.9 8,052.9 8,052.9 8,441.9 8,441.9<br />

Total Vehicle Miles (000's) 10,421.7 10,503.4 9,826.5 9,116.5 8,847.6 8,847.6 8,847.6 9,272.7 9,272.7<br />

Revenue Vehicle Hours (000's) 699.0 698.4 695.2 649.3 626.3 626.3 626.3 656.5 656.5<br />

Total Vehicle Hours (000's) 723.1 777.4 733.0 683.6 659.6 659.6 659.6 691.2 691.2<br />

Linked Passengers (000's) 11,042.3 10,972.8 10,949.7 10,603.0 10,341.2 10,327.6 10,160.1 11,123.8 11,006.2<br />

Unlinked Passengers (000's) 15,091.1 15,028.8 14,997.8 14,527.6 14,168.3 14,149.5 13,919.8 15,242.0 15,080.7<br />

Full-Time Employee Equivalent 816 628 634 613 602 602 602 602 602<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $0.72 $0.75 $0.79 $0.87 $0.93 $0.94 $1.04 $1.20 $1.22<br />

Cost/Unlinked Passenger $3.72 $3.70 $4.08 $4.15 $4.34 $4.68 $4.98 $4.87 $5.14<br />

Subsidy/Unlinked Passenger $3.01 $2.95 $3.29 $3.28 $3.41 $3.74 $3.94 $3.68 $3.92<br />

Cost/Revenue Vehicle Hour $80.41 $79.52 $88.00 $92.89 $98.16 $105.73 $110.66 $113.14 $118.10<br />

Passengers/Revenue Vehicle Hour 21.6 21.5 21.6 22.4 22.6 22.6 22.2 23.2 23.0<br />

Operating Ratio (Fares+MI/Cost) 2 19.5% 20.5% 19.8% 21.4% 22.0% 20.7% 21.9% 25.5% 24.7%<br />

NOTES:<br />

1. FY2005 and FY2006 includes contracted service data.<br />

2. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 238


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-8: Projected Characteristics Fixed Route<br />

SYSTEM: OMNITRANS FIXED ROUTE (Directly Operated + Contracted) 1<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Fixed Route:<br />

Peak-Hour Fleet 145 145 145 138 136 136 136 148 148<br />

Spare Vehicles for Maintenance<br />

and Other Purposes 31 31 31 28 28 28 28 32 32<br />

Spare Ratio 21.4% 21.4% 21.4% 20.3% 20.6% 20.6% 20.6% 21.6% 21.6%<br />

Energy Contingency Reserve 7 7 7 7 7 7 7 7 7<br />

Subtotal Fixed Route Vehicles 183 183 183 173 171 171 171 187 187<br />

Demand Response:<br />

Peak-Hour Fleet 0 0 0 0 0 0 0 0 0<br />

Spare Vehicles 0 0 0 0 0 0 0 0 0<br />

Spare Ratio<br />

Total Vehicles 183 183 183 173 171 171 171 187 187<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 12 0<br />

New Replacement Vehicles Delivered 23 0 0 15 15 15 15 15 15<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $10,736.8 $11,177.3 $11,854.0 $12,535.9 $13,035.7 $13,204.9 $14,429.1 $18,116.9 $18,321.4<br />

Measure I Fare Subsidy ($000) $151.9 $147.7 $185.4 $284.6 $395.9 $415.1 $646.4 $750.6 $742.7<br />

Operating Cost ($000's) $55,152.2 $54,598.8 $60,127.7 $59,150.3 $60,248.8 $64,924.6 $67,961.7 $72,897.8 $76,102.5<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 8,581.8 8,783.3 8,704.3 8,115.1 7,869.0 7,869.0 7,869.0 8,258.0 8,258.0<br />

Total Vehicle Miles (000's) 10,039.1 10,122.9 9,512.9 8,869.0 8,600.0 8,600.0 8,600.0 9,025.1 9,025.1<br />

Revenue Vehicle Hours (000's) 676.6 679.3 676.2 634.3 611.3 611.3 611.3 641.5 641.5<br />

Total Vehicle Hours (000's) 692.4 747.6 706.6 662.8 638.8 638.8 638.8 670.4 670.4<br />

Linked Passengers (000's) 10,989.3 10,919.7 10,889.7 10,557.1 10,295.0 10,281.0 10,113.7 11,078.2 10,960.6<br />

Unlinked Passengers (000's) 15,038.2 14,975.7 14,937.9 14,481.7 14,122.1 14,102.9 13,873.4 15,196.5 15,035.2<br />

Full-Time Employee Equivalent 774 610 617 596 585 585 585 585 585<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $0.71 $0.75 $0.79 $0.87 $0.92 $0.94 $1.04 $1.19 $1.22<br />

Cost/Unlinked Passenger $3.67 $3.65 $4.03 $4.08 $4.27 $4.60 $4.90 $4.80 $5.06<br />

Subsidy/Unlinked Passenger $2.95 $2.90 $3.23 $3.22 $3.34 $3.67 $3.86 $3.60 $3.84<br />

Cost/Revenue Vehicle Hour $81.51 $80.37 $88.92 $93.26 $98.55 $106.20 $111.17 $113.63 $118.62<br />

Passengers/Revenue Vehicle Hour 22.2 22.0 22.1 22.8 23.1 23.1 22.7 23.7 23.4<br />

Operating Ratio (Fares+MI/Cost) 1 19.7% 20.7% 20.0% 21.7% 22.3% 21.0% 22.2% 25.9% 25.1%<br />

NOTES:<br />

1. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 239


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-9: Projected Characteristics OmniLink<br />

SYSTEM: OMNILINK<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Peak-Hour Fleet 8 8 8 9 9 9 9 9 9<br />

Spare Vehicles 4 4 4 4 4 4 4 4 4<br />

Spare Ratio 50.0% 50.0% 50.0% 44.4% 44.4% 44.4% 44.4% 44.4% 44.4%<br />

Total Vehicles 12 12 12 13 13 13 13 13 13<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 0 0<br />

New Replacement Vehicles Delivered 0 2 4 4 0 2 2 2 2<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $59.5 $53.3 $56.6 $77.6 $78.2 $78.9 $88.7 $101.2 $101.3<br />

Measure I Fare Subsidy ($000) $8.7 $8.7 $9.8 $7.6 $7.6 $7.6 $7.6 $7.5 $7.5<br />

Operating Cost ($000's) $1,053.2 $936.7 $1,052.4 $1,159.0 $1,234.6 $1,294.7 $1,345.6 $1,385.3 $1,436.4<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 252.6 222.0 233.0 183.9 183.9 183.9 183.9 183.9 183.9<br />

Total Vehicle Miles (000's) 382.6 380.4 313.6 247.6 247.6 247.6 247.6 247.6 247.6<br />

Revenue Vehicle Hours (000's) 22.4 19.1 19.0 15.0 15.0 15.0 15.0 15.0 15.0<br />

Total Vehicle Hours (000's) 30.7 29.8 26.4 20.8 20.8 20.8 20.8 20.8 20.8<br />

Linked Passengers (000's) 52.9 53.1 60.0 45.9 46.2 46.6 46.4 45.6 45.6<br />

Unlinked Passengers (000's) 52.9 53.1 60.0 45.9 46.2 46.6 46.4 45.6 45.6<br />

Full-Time Employee Equivalent 42 18 17 17 17 17 17 17 17<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $1.12 $1.00 $0.94 $1.69 $1.69 $1.69 $1.91 $2.22 $2.22<br />

Cost/Unlinked Passenger $19.90 $17.64 $17.55 $25.24 $26.74 $27.80 $29.03 $30.41 $31.52<br />

Subsidy/Unlinked Passenger $18.78 $16.63 $16.61 $23.55 $25.05 $26.11 $27.12 $28.19 $29.30<br />

Cost/Revenue Vehicle Hour $47.10 $49.17 $55.39 $77.27 $82.31 $86.31 $89.71 $92.35 $95.76<br />

Passengers/Revenue Vehicle Hour 2.4 2.8 3.2 3.1 3.1 3.1 3.1 3.0 3.0<br />

Operating Ratio (Fares+MI/Cost) 1 6.5% 6.6% 6.3% 7.4% 6.9% 6.7% 7.2% 7.8% 7.6%<br />

NOTES:<br />

1. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 240


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-10: Projected Characteristics Access<br />

SYSTEM: ACCESS<br />

PREPARED BY: IBI/CTG<br />

2005 2006 2007 <strong>2008</strong> 2009 2010 2011 2012 FY <strong>2013</strong><br />

FLEET CHARACTERISTICS: Actual Actual Estimated <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned <strong>Plan</strong>ned<br />

Peak-Hour Fleet 81 81 81 81 81 81 81 81 81<br />

Spare Vehicles 8 8 8 8 8 8 8 8 8<br />

Spare Ratio 9.9% 9.9% 9.9% 9.9% 9.9% 9.9% 9.9% 9.9% 9.9%<br />

Total Vehicles 89 89 89 89 89 89 89 89 89<br />

New Expansion Vehicles Delivered 0 0 0 0 0 0 0 0 0<br />

New Replacement Vehicles Delivered 0 23 21 25 16 10 0 25 0<br />

FINANCIAL DATA:<br />

Fare Revenue ($000's) $1,041.6 $1,049.4 $1,052.7 $1,256.8 $1,353.2 $1,403.3 $1,629.3 $1,863.0 $1,891.5<br />

Measure I Fare Subsidy ($000) $110.6 $108.6 $102.8 $101.6 $101.3 $103.5 $107.2 $105.1 $104.1<br />

Operating Cost ($000's) $7,864.7 $8,751.0 $9,591.5 $11,453.6 $12,033.4 $12,631.9 $13,129.0 $13,514.0 $14,008.4<br />

OPERATING CHARACTERISTICS:<br />

Revenue Vehicle Miles (000's) 2,627.2 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5 2,694.5<br />

Total Vehicle Miles (000's) 3,361.5 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3 3,459.3<br />

Revenue Vehicle Hours (000's) 160.1 163.5 163.5 163.5 163.5 163.5 163.5 163.5 163.5<br />

Total Vehicle Hours (000's) 207.4 214.9 214.9 214.9 214.9 214.9 214.9 214.9 214.9<br />

Linked Passengers (000's) 492.1 468.9 420.9 416.1 414.8 423.8 438.9 430.3 426.1<br />

Unlinked Passengers (000's) 492.1 468.9 420.9 416.1 414.8 423.8 438.9 430.3 426.1<br />

Full-Time Employee Equivalent 176 161 162 162 162 162 162 162 162<br />

PERFORMANCE CHARACTERISTICS:<br />

Revenue/Unlinked Passenger $2.12 $2.24 $2.50 $3.02 $3.26 $3.31 $3.71 $4.33 $4.44<br />

Cost/Unlinked Passenger $15.98 $18.66 $22.79 $27.53 $29.01 $29.81 $29.91 $31.40 $32.87<br />

Subsidy/Unlinked Passenger $13.87 $16.42 $20.28 $24.51 $25.75 $26.50 $26.20 $27.07 $28.44<br />

Cost/Revenue Vehicle Hour $49.12 $53.53 $58.67 $70.06 $73.60 $77.26 $80.30 $82.66 $85.68<br />

Passengers/Revenue Vehicle Hour 3.1 2.9 2.6 2.5 2.5 2.6 2.7 2.6 2.6<br />

Operating Ratio (Fares+MI/Cost) 1 14.7% 13.2% 12.0% 11.9% 12.1% 11.9% 13.2% 14.6% 14.2%<br />

NOTES:<br />

1. Operating Ratio = (Fare Revenue + Measure I Subsidy)/Operating Cost. Does not include exemptions allowed by Transportation Development Act (TDA) law. Application of qualifying exemptions would result in a higher<br />

farebox recovery ratio for the years in which they could be applied.<br />

July 11, 2007 241


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-11: Summary of Six-Year (FY <strong>2008</strong>-<strong>2013</strong>) Operating Expenses and Revenues ($000)<br />

Fiscal Year<br />

Operating Revenues<br />

Operating<br />

Passenger FTA Measure Other<br />

Expenses LTF STAF<br />

Revenue SEC. 5307 "I" Revenue<br />

FIXED ROUTE $54,906.3 $12,613.5 $40,455.1 $0.0 $0.0 $292.1 $1,545.6<br />

ACCESS $11,453.6 $1,256.8 $3,468.9 $0.0 $0.0 $6,727.9 $0.0<br />

2007-<strong>2008</strong> $66,359.9 $13,870.3 $43,924.0 $0.0 $0.0 $7,020.0 $1,545.6<br />

FIXED ROUTE $50,056.0 $13,113.8 $34,979.5 $0.0 $0.0 $403.5 $1,559.1<br />

ACCESS $12,033.4 $1,353.2 $3,782.9 $0.0 $0.0 $6,897.3 $0.0<br />

<strong>2008</strong>-2009 $62,089.4 $14,467.0 $38,762.4 $0.0 $0.0 $7,300.8 $1,559.1<br />

FIXED ROUTE $55,273.5 $13,283.7 $39,990.6 $0.0 $0.0 $422.8 $1,576.3<br />

ACCESS $12,631.9 $1,403.3 $4,058.5 $0.0 $0.0 $7,170.1 $0.0<br />

2009-2010 $67,905.3 $14,687.0 $44,049.2 $0.0 $0.0 $7,592.8 $1,576.3<br />

FIXED ROUTE $67,171.1 $14,517.9 $50,405.3 $0.0 $0.0 $654.0 $1,593.8<br />

ACCESS $13,129.0 $1,629.3 $4,257.2 $0.0 $0.0 $7,242.5 $0.0<br />

2010-2011 $80,300.1 $16,147.2 $54,662.5 $0.0 $0.0 $7,896.5 $1,593.8<br />

FIXED ROUTE $67,795.6 $18,218.1 $47,207.6 $0.0 $0.0 $758.2 $1,611.7<br />

ACCESS $13,514.0 $1,863.0 $4,196.7 $0.0 $0.0 $7,454.2 $0.0<br />

2011-2012 $81,309.6 $20,081.1 $51,404.4 $0.0 $0.0 $8,212.4 $1,611.7<br />

FIXED ROUTE $66,630.6 $18,422.7 $45,827.8 $0.0 $0.0 $750.2 $1,629.9<br />

ACCESS $14,008.4 $1,891.5 $4,326.1 $0.0 $0.0 $7,790.7 $0.0<br />

2012-<strong>2013</strong> $80,639.0 $20,314.2 $50,153.9 $0.0 $0.0 $8,540.9 $1,629.9<br />

6-Year Total $438,603.3 $99,566.9 $282,956.4 $0.0 $0.0 $46,563.5 $9,516.5<br />

* Excludes capitalized Preventive Maintenance, Leases, and Security for Fixed Route service.<br />

July 11, 2007 242


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-12: Six-Year (FY <strong>2008</strong>-<strong>2013</strong>) Fund Balance Estimates<br />

Fund Source<br />

Year 1 FY<br />

<strong>2008</strong><br />

Year 2 FY<br />

2009<br />

Year 3 FY<br />

2010<br />

Year 4 FY<br />

2011<br />

Year 5 FY<br />

2012<br />

Year 6 FY<br />

<strong>2013</strong><br />

Six-Year Total<br />

FTA Section 5307<br />

Beginning Balance -$10 $0 $0 $0 $0 $0<br />

Allocation $13,400,000 $14,300,000 $14,849,000 $15,395,200 $15,946,100 $16,494,500 $90,384,800<br />

Available for Capital Projects $13,399,990 $14,300,000 $14,849,000 $15,395,200 $15,946,100 $16,494,500 $90,384,790<br />

1% Enhancements $135,405 $143,000 $148,490 $153,952 $159,461 $164,945 $905,253<br />

1% Security $135,405 $143,000 $148,490 $153,952 $159,461 $164,945 $905,253<br />

Net Available for Capital Projects $13,129,180 $14,014,000 $14,552,020 $15,087,296 $15,627,178 $16,164,610 $88,574,284<br />

Used for Capital (except PM) $11,684,348 $5,189,551 $6,074,338 $13,674,628 $10,751,629 $7,771,523 $55,146,017<br />

Available for Preventive Maintenance $1,444,832 $8,824,449 $8,477,682 $1,412,667 $4,875,549 $8,393,087 $33,428,267<br />

Used for PM $1,444,832 $8,824,449 $8,477,682 $1,412,667 $4,875,549 $8,393,087 $33,428,267<br />

Ending Balance $0 $0 $0 $0 $0 $0<br />

LTF<br />

Beginning Balance $9,241,864 $8,430,006 $20,775,695 $31,655,778 $37,669,339 $39,518,684<br />

Allocation $49,518,594 $52,984,895 $56,693,838 $60,662,407 $64,908,775 $69,452,389 $354,220,898<br />

Available $58,760,458 $61,414,901 $77,469,533 $92,318,184 $102,578,114 $108,971,073 $501,512,263<br />

LTF Operating Subsidy $43,430,976 $38,251,532 $43,518,441 $54,111,365 $50,833,259 $49,562,440 $279,708,013<br />

Available for Capital Projects $15,329,482 $23,163,369 $33,951,091 $38,206,819 $51,744,855 $59,408,634 $221,804,250<br />

Used for Capital (except PM) $3,144,645 $0 $0 $0 $10,814,451 $0 $13,959,096<br />

Available for Capitalized Operations $12,010,752 $22,981,807 $33,775,198 $38,022,506 $40,737,571 $59,206,972 $206,734,806<br />

Used for Capitalized Operations $3,754,831 $2,387,674 $2,295,314 $537,480 $1,411,720 $2,299,933 $12,686,952<br />

Ending Balance $8,430,006 $20,775,695 $31,655,778 $37,669,339 $39,518,684 $57,108,701<br />

STA<br />

Beginning Balance $0 $178,454 $4,558,360 $4,989,819 $8,087,113 $12,281,669<br />

Allocation $7,890,538 $5,713,970 $6,056,808 $6,420,217 $6,805,430 $7,213,755 $40,100,718<br />

Available for Capital Projects $7,890,538 $5,892,425 $10,615,168 $11,410,036 $14,892,543 $19,495,424 $70,196,134<br />

Used for Capital $7,712,083 $1,334,065 $5,625,349 $3,322,923 $2,610,874 $1,836,145 $22,441,438<br />

Ending Balance $178,454 $4,558,360 $4,989,819 $8,087,113 $12,281,669 $17,659,280<br />

Local Measure I Sales Tax<br />

Beginning Balance $0 $0 $0 $0 $0 $0<br />

Allocation $7,020,000 $7,300,800 $7,592,832 $7,896,545 $8,212,407 $8,540,903 $46,563,488<br />

Measure I -- Fare Assistance FR $284,581 $395,915 $415,135 $646,447 $750,641 $742,676 $3,235,396<br />

Measure I -- Fare Assistance OL $7,556 $7,568 $7,633 $7,602 $7,519 $7,498 $45,377<br />

Measure I -- Fare Assistance Access $101,620 $101,324 $103,511 $107,200 $105,112 $104,080 $622,848<br />

Measure I -- Grant Subsidy $6,626,242 $6,795,993 $7,066,553 $7,135,296 $7,349,135 $7,686,649 $42,659,867<br />

Ending Balance $0 $0 $0 $0 $0 $0<br />

FHWA CMAQ<br />

Beginning Balance $0 $0 $9,317,200 $0 $0 $0<br />

Allocation $9,317,200 $9,317,200 $9,147,063 $0 $0 $0 $27,781,463<br />

Used for Capital $9,317,200 $0 $18,464,263 $0 $0 $0 $27,781,463<br />

Ending Balance $0 $9,317,200 $0 $0 $0 $0<br />

Measure I Express Bus/BRT<br />

Beginning Balance $0 $0 $0 $0 $0 $0<br />

Allocation $0 $0 $703,200 $2,366,000 $2,494,000 $2,626,000 $8,189,200<br />

Used for Capital $0 $0 $703,200 $2,366,000 $2,494,000 $0 $5,563,200<br />

Ending Balance $0 $0 $0 $0 $0 $2,626,000<br />

July 11, 2007 243


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

11.3 Capital Projects<br />

<strong>Omnitrans</strong> proposes a six-year capital plan that emphasizes replacement first and includes significant<br />

constraints compared to previous expansion plans. The Constrained Scenario capital plan is summarized<br />

in this section. Unless stated otherwise, all capital items will be funded with a combination of FTA Section<br />

5307 (~80%) matched with State <strong>Transit</strong> Assistance Funds (~20%).<br />

Revenue Vehicles<br />

The capital replacement plan for fixed route vehicles assumes constrained funding and some service<br />

reductions. Because of this situation, fleet requirements are programmed to decrease until FY 2012,<br />

when new sbX vehicles will be added to the fleet.<br />

During the next six years, 90 fixed route vehicles will require replacement, based on a 12-year useful life<br />

cycle. Thirty coaches are scheduled for replacement in FY <strong>2008</strong>, and then coaches will be replaced at<br />

approximately 15 coaches a year starting in 2010.<br />

<strong>Omnitrans</strong> will smooth the purchase of large coaches after FY <strong>2008</strong> in order to decrease pressure on<br />

capital funding sources that would be required to replace a large quantity of vehicles in any one year.<br />

The plan is to purchase 15 coaches a year starting in FY 2010. <strong>Omnitrans</strong> will use federal CMAQ funds<br />

(when available), alone or in combination with FTA Section 5307, that will be matched locally with STAF.<br />

Federal funds will comprise 80% of the vehicle replacement costs. CMAQ funding is currently<br />

programmed for FY <strong>2008</strong> and 2009. The FY 2009 CMAQ funds will be moved to FY 2010 to match the<br />

current revenue vehicle replacement assumptions. The overall fixed route vehicle spare ratio ranges<br />

from 18% in FY <strong>2008</strong> to 19% in FY <strong>2013</strong>.<br />

Service Vehicles<br />

Service vehicles are used in Operations, Marketing and for <strong>Omnitrans</strong> support staff. Vehicles are<br />

replaced once they reach their standard replacement life: five years or 100,000 miles. Service vehicles<br />

include supervisor vans, road call repair vehicles, stops and zones repair and maintenance vehicles,<br />

facility repair and maintenance vehicles and other support vehicles. Replacements are planned as<br />

follows:<br />

Service Equipment<br />

• <strong>2008</strong> – 7 vans, 1 road call truck, 1 marketing truck, 1 marketing trailer<br />

• 2009 – 2 marketing trucks, 9 vans, 1 marketing van<br />

• 2010 – 1 facilities truck, 1 lift truck, 6 leased vehicles<br />

• 2011 – 1 lift truck<br />

• 2012 – 1 road call truck, 24 leased vehicles<br />

• <strong>2013</strong> – 1 road call truck<br />

New equipment is needed on an ongoing basis to replace and supplement outmoded materials now in<br />

use at both the East and West Valley facilities. Shop items to be replaced include those used for vehicle<br />

and facilities maintenance, and safety equipment. The goal is to improve operational efficiency.<br />

July 11, 2007 244


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

<strong>Transit</strong> Enhancements<br />

This funding will be used to enhance pedestrian improvements in conjunction with city projects to<br />

increase accessibility to bus stops.<br />

<strong>Transit</strong> Security<br />

This project enables capitalization of security costs. These expenditures are intended to abate operating<br />

costs by shifting the expenses to capital financing. According to FTA guidelines, at least 1% of Section<br />

5307 funds must be used for security purposes. Local Transportation Funds (LTF) will be used as local<br />

match because California Transportation Development Act (TDA) guidelines do not allow the use of STAF<br />

funds for capitalized security projects.<br />

Preventive Maintenance<br />

Federal Section 5307 funding guidelines allow transit agencies to use a portion of these formula funds for<br />

preventive maintenance activities. <strong>Omnitrans</strong> funds preventative maintenance after funding all capital<br />

programs. The amount will fluctuate with each SRTP as new programs become critical for <strong>Omnitrans</strong>.<br />

LTF will be used as local match because California Transportation Development Act (TDA) guidelines do<br />

not allow the use of STAF funds for capitalized maintenance projects.<br />

Management Information Systems<br />

This project will provide Management Information Systems (MIS) for East and West Valley facilities, and<br />

provide training for new/upgraded equipment. MIS equipment will also be used to replace/supplement<br />

outmoded equipment now in use and incorporate new technologies. The goal is to improve operational<br />

efficiency.<br />

Office Equipment<br />

This item provides office equipment for East and West Valley facilities to replace worn out furnishings and<br />

expand and update administrative/support capabilities. The goal is to improve operational efficiency.<br />

Stops and Zones<br />

Stops and zones equipment is needed to replace, improve, or enhance fixed route stops. Equipment is<br />

needed to accommodate continuation and expansion of fixed route service.<br />

Replacement Paratransit Vehicles<br />

This project will purchase replacement paratransit vans. Vans will be lift-equipped and run on<br />

conventional fuel sources, unless a CARB-approved engine is found that meets <strong>Omnitrans</strong> service<br />

requirements. Vehicles being replaced will have reached standard replacement life of four years or<br />

100,000 miles. Replacements are planned as follows:<br />

• <strong>2008</strong> – 25<br />

• 2009 – 16<br />

• 2010 – 10<br />

• 2012 – 25<br />

The funding pattern of the paratransit fleet changed as <strong>Omnitrans</strong> moved up delivery of paratransit<br />

vehicles. <strong>Omnitrans</strong> took delivery of 25 vehicles in FY 2006 and should take delivery of an additional 25<br />

July 11, 2007 245


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

in FY 2007. This will smooth the replacement pattern. In addition to FTA Section 5307 and STAF<br />

funding, paratransit vehicle replacement will be partially funded with an FTA Section 5310 (Transportation<br />

for Elderly Persons and Persons with Disabilities) grant in FY <strong>2008</strong>.<br />

Capitalization of Leases<br />

<strong>Omnitrans</strong> made a decision in FY <strong>2008</strong> to capitalize its tire lease in accordance with capitalization<br />

procedures. This action increased the capitalization of leases total funding request. <strong>Omnitrans</strong> does not<br />

own appropriate property and facilities for these purposes and therefore these expenditures can be<br />

shifted to capital financing. Also, <strong>Omnitrans</strong> uses FTA capital funds to fund the operating facility lease for<br />

West Valley Access and OmniLink service/voice/data communications base station and antenna tower<br />

sites. LTF funding will be used as local match because California Transportation Development Act (TDA)<br />

guidelines do not allow the use of STAF funds for capitalized leases.<br />

Revenue Equipment<br />

This project includes the improvement, upkeep, or replacement of equipment used in revenue service.<br />

Alternative Fueling Facilities<br />

Various maintenance equipment pieces will be replaced, repaired and/or refurbished to enhance fueling<br />

capabilities and to replace parts that have become worn or no longer able to meet up-to-date air quality<br />

standards. Refurbishment will occur every four years.<br />

Chino Transcenter<br />

The Chino Transcenter serves as the transportation hub for <strong>Omnitrans</strong> West Valley Service and provides<br />

intercounty transit connections to Los Angeles and Orange Counties. The existing facility has reached<br />

capacity with three different transit agencies stopping there. Phase II of the project involves building<br />

additional bus bays for future intercounty routes to/from Los Angeles and Riverside Counties.<br />

Ontario Transcenter<br />

In conjunction with the city of Ontario, <strong>Omnitrans</strong> is creating a Transcenter in downtown Ontario. The<br />

funding for this project was appropriated in 2006 under SAFETEA-LU. The funding was for four years<br />

and started in FY 2006. <strong>Omnitrans</strong> will only need to provide a match to the FTA Section 5309 Bus and<br />

Bus Facilities grant funding it obtained for this project. FY 2006 funds totaled $190,654 and FY 2007<br />

funds totaled $200,640. These amounts were funded with FTA 5309 and STAF funds. The amount<br />

budgeted in FY <strong>2008</strong> is a Section 5309 FY 2007 appropriation.<br />

Chaffey Transcenter<br />

The student population of the Chaffey College campus continues to grow. Providing convenient public<br />

transportation service can reduce the demand for parking stalls and provide opportunities for post-high<br />

school education for young adults that do not own a car. The Chaffey College Transcenter will provide a<br />

centralized location for several <strong>Omnitrans</strong> routes to pick-up and drop off passengers integrated into the<br />

campus. The stop will have shelters, seating areas and information kiosks. Chaffey Transcenter is<br />

scheduled for STIP funding in FY <strong>2008</strong>.<br />

Mid-Valley Facility<br />

This project will fund architectural, engineering, and construction costs for development of the site for<br />

revenue service. The Mid-Valley Phase I project will develop a paratransit facility to replace the existing<br />

Rancho Cucamonga facility currently being leased by <strong>Omnitrans</strong>. This funding is in addition to the<br />

July 11, 2007 246


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

funding received in the FY 2007 Budget. The FY 2007 budget amount is $15,993,047. A combination of<br />

STAF and LTF will be used as local match for this project.<br />

Midlife Rehab<br />

<strong>Omnitrans</strong> replaces, updates, and overhauls parts on buses to keep them running. This project funds the<br />

midlife repair of coaches and replacement of worn/outmoded parts. LTF will be used as local match<br />

because California Transportation Development Act (TDA) guidelines do not allow the use of STAF funds<br />

for this function.<br />

Facility Improvements<br />

Improvements and upkeep are necessary to make sure that <strong>Omnitrans</strong> facilities are kept in working order<br />

and do not fall into disrepair. Each year the maintenance department identifies specific projects that are<br />

included in this allocation.<br />

sbX<br />

This project covers the activities for the San Bernardino Valley-wide Rapid <strong>Transit</strong> Program. The project<br />

includes the Preliminary Engineering, <strong>Transit</strong>-Oriented Development, Project Management,<br />

Environmental Review, Final Design, Engineering, and Construction phases. The locally preferred<br />

alternative was selected and approved in FY 2006. Engineering and Environmental will begin in FY <strong>2008</strong>.<br />

This project has been included in the SCAG RTP and RTIP. Funding is included for the purchase of 16<br />

articulated coaches for the service. Funding will be supplied by a variety of sources, including FTA<br />

Section 5307, FTA Section 5309 New Starts/Small Starts, CMAQ, STAF, LTF, Proposition 1B<br />

infrastructure bonds, San Bernardino County Measure A sales tax, STIP, and in-kind transfers (donations<br />

of land and/or services by governmental or private entities).<br />

Figure 11-13 provides a summary of <strong>Omnitrans</strong>’ capital funding picture over the SRTP timeframe.<br />

July 11, 2007 247


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 11-13: Summary of Six-Year (FY <strong>2008</strong>-<strong>2013</strong>) Capital Costs and Funding ($000)<br />

Fiscal Year<br />

Capital Revenues<br />

Capital<br />

FTA FTA Measure Other<br />

Expenses* LTF STAF<br />

CMAQ<br />

SEC. 5307 SEC. 5309 "I" Revenue<br />

FIXED ROUTE $43,531.4 $6,899.5 $7,633.3 $11,480.7 $200.6 $9,317.2 $0.0 $8,000.0<br />

ACCESS $2,399.1 $0.0 $78.8 $1,919.3 $0.0 $0.0 $0.0 $401.0<br />

2007-<strong>2008</strong> $45,930.4 $6,899.5 $7,712.1 $13,400.0 $200.6 $9,317.2 $0.0 $8,401.0<br />

FIXED ROUTE $19,247.9 $2,387.7 $930.7 $12,686.7 $242.8 $0.0 $0.0 $3,000.0<br />

ACCESS $2,016.7 $0.0 $403.3 $1,613.3 $0.0 $0.0 $0.0 $0.0<br />

<strong>2008</strong>-2009 $21,264.5 $2,387.7 $1,334.1 $14,300.0 $242.8 $0.0 $0.0 $3,000.0<br />

FIXED ROUTE $82,916.8 $2,295.3 $5,446.6 $14,133.9 $32,373.6 $18,464.3 $703.2 $9,500.0<br />

ACCESS $893.9 $0.0 $178.8 $715.1 $0.0 $0.0 $0.0 $0.0<br />

2009-2010 $83,810.7 $2,295.3 $5,625.3 $14,849.0 $32,373.6 $18,464.3 $703.2 $9,500.0<br />

FIXED ROUTE $63,054.2 $537.5 $3,322.9 $15,395.2 $36,932.6 $0.0 $2,366.0 $4,500.0<br />

ACCESS $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0<br />

2010-2011 $63,054.2 $537.5 $3,322.9 $15,395.2 $36,932.6 $0.0 $2,366.0 $4,500.0<br />

FIXED ROUTE $36,414.8 $12,226.2 $2,099.9 $13,902.2 $5,692.6 $0.0 $2,494.0 $0.0<br />

ACCESS $2,554.9 $0.0 $511.0 $2,043.9 $0.0 $0.0 $0.0 $0.0<br />

2011-2012 $38,969.7 $12,226.2 $2,610.9 $15,946.1 $5,692.6 $0.0 $2,494.0 $0.0<br />

FIXED ROUTE $20,630.6 $2,299.9 $1,836.1 $16,494.5 $0.0 $0.0 $0.0 $0.0<br />

ACCESS $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0<br />

2012-<strong>2013</strong> $20,630.6 $2,299.9 $1,836.1 $16,494.5 $0.0 $0.0 $0.0 $0.0<br />

6-Year Total $273,660.2 $26,646.0 $22,441.4 $90,384.8 $75,442.2 $27,781.5 $5,563.2 $25,401.0<br />

* Includes capitalized Preventive Maintenance, Leases, and Security for Fixed Route service.<br />

July 11, 2007 248


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

12. UNCONSTRAINED SERVICE PLANS<br />

This chapter describes the route and frequency changes that could be considered if there are fewer<br />

financial constraints in future years. The first priority after implementing the Constrained Service <strong>Plan</strong> is<br />

to bring all routes to standardized frequencies and spans, which could be covered by a Partially<br />

Constrained Service <strong>Plan</strong>. The second priority would be to have all existing and new areas of the East<br />

and West Valleys properly served by transit, including all improvements suggested in the Chapter 9<br />

Needs Assessment but not implemented in the Constrained or Partially Unconstrained <strong>Plan</strong>s; these could<br />

be covered by an Unconstrained Service <strong>Plan</strong>.<br />

The changes and additions to the constrained route structures, frequencies and spans are described<br />

below for the Partially Constrained and Unconstrained Service <strong>Plan</strong>s. The characteristics of each route in<br />

the two plans, including the spans of service, headways, running times, vehicles, service hours, and<br />

ridership estimates are shown in Figure 12-1 through Figure 12-3 for the Partially Unconstrained <strong>Plan</strong>,<br />

and in Figure 12-4 through Figure 12-6 for the Unconstrained <strong>Plan</strong>. The resource impacts are described<br />

in Section 1.1 below.<br />

12.1 Partially Constrained Service <strong>Plan</strong><br />

• Route 7: San Bernardino-Sierra Way-Cal State – daytime frequencies would<br />

be improved from 60 to 30-minutes, and the span would be extended to 9:00<br />

p.m.<br />

• Route 8: Redlands-San Bernardino-Mentone-Yucaipa – daytime frequencies<br />

would be improved from 60 to 30-minutes.<br />

• Route 9: San Bernardino-Redlands-Yucaipa – daytime frequencies would be<br />

improved from 60 to 30-minutes.<br />

• Route 10: Fontana-Baseline-San Bernardino – the span would be extended to<br />

9:00 p.m. on this route.<br />

• Route 29: Bloomington-Valley-Kaiser – daytime frequencies would be<br />

improved from 60 to 30-minutes and the span would e extended to 9:00 p.m.<br />

• Route 60: Chaffey College-Montclair Transcenter– daytime frequencies<br />

would be improved from 60 to 30-minutes.<br />

• Route 62: Chino-Euclid-North Upland – mid-day frequencies would be<br />

improved from 60 to 30-minutes.<br />

• Route 67: Montclair-Baseline-Fontana – mid-day frequencies would be<br />

improved from 60 to 30-minutes.<br />

• Route 70: Chaffey College-Rancho Cucamonga-Ontario – daytime<br />

frequencies would be improved from 60 to 30-minutes.<br />

• Route 71: Sierra-South Ridge-Rancho Cucamonga – daytime frequencies<br />

would be improved from 60 to 30-minutes.<br />

July 11, 2007 249


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 12-1: Partially Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3<br />

Arrowhead Reg. Med Ctr-E St.&Cnb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date <strong>Plan</strong>b 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Lindsb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 20 20 20 30 24 24 24 24 15.7 1.2 1.2 1.2 0.8 4.1 7.2 3.5 3.4 18.2<br />

nb 6.3 20 20 20 30 26 12 26 12 26 12 22 5 14.5 1.9 1.9 1.9 0.9 6.8 11.4 5.3 3.4 26.9<br />

E St.&Court - VA Hospital sb 6.8 20 20 20 30 34 10 34 10 34 10 34 7 11.9 2.2 2.2 2.2 1.4 7.2 13.2 6.4 5.9 32.7<br />

nb 6.8 20 20 20 30 34 34 34 28 11.9 1.7 1.7 1.7 0.9 4.9 10.2 4.8 3.5 23.4<br />

Total Route 2 26.1 118 22 118 22 118 22 108 12 13.3 7.0 7.0 7.0 4.0 23.1 42.0 19.9 16.2 101.2 4000 40<br />

302: Kendall-E St-Loma Linda sb 6:20am-6:20pm 2.5 6.0 3.2 11.7<br />

nb 6:20am-6:25pm 2.5 6.0 3.2 11.7<br />

Kendall@Palm - Cal State Univ sb 2.2 10 10 10 8 5 8 5 8 5 16.5 1.3 1.3 1.3 3.3 7.8 4.1 15.2<br />

nb 4.2 10 10 10 16 16 16 15.8 1.6 1.6 1.6 4.0 9.6 5.1 18.7<br />

Cal State Univ. - E St.&Court sb 6.3 10 10 10 18 18 18 21.0 1.8 1.8 1.8 4.5 10.8 5.7 21.0<br />

nb 6.3 10 10 10 19 5 19 5 19 5 19.9 2.4 2.4 2.4 6.0 14.4 7.6 28.0<br />

E St.&Court - Barton&Prospect sb 6.8 10 10 10 22 22 22 18.5 2.2 2.2 2.2 5.5 13.2 7.0 25.7<br />

nb 6.8 10 10 10 22 5 22 5 22 5 18.5 2.7 2.7 2.7 6.8 16.2 8.6 31.5<br />

Total Route 302 32.6 105 15 105 15 105 15 18.6 12.0 12.0 12.0 30.0 72.0 38.0 140.0 2200 16<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline ( eb 12.2 20 20 20 30 51 51 51 51 14.3 2.6 2.6 2.6 1.7 10.2 15.3 7.7 5.1 38.3<br />

Boulder&Baseline-4thSt&E St. (3 wb 12.2 20 20 20 30 51 10 51 10 51 10 51 10 14.3 3.1 3.1 3.1 2.0 13.6 18.3 9.2 7.1 48.1<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4 wb 6.4 20 20 20 30 27 12 27 12 27 12 27 12 14.2 2.0 2.0 2.0 1.3 7.8 11.7 5.9 3.9 29.3<br />

4thSt&ESt - Boulder&Baseline (3 eb 6.4 20 20 20 30 29 29 29 29 13.2 1.5 1.5 1.5 1.0 6.5 8.7 4.4 3.4 22.9<br />

Total Route 3/4 37.0 158 22 158 22 158 22 158 22 14.1 9.0 9.0 9.0 6.0 38.0 54.0 27.0 19.5 138.5 6275 45<br />

5: San Bndo-Del Rosa-Cal Stat nb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Unb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal St nb 6:05am-9:05pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:06am-9:06pm 3.9 6.0 3.0 3.0 15.9<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 2.1 10.5<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 3.6 19.1<br />

SierraWay&40th - Cal State nb 3.4 30 30 30 30 15 5 15 5 15 5 15 5 13.7 0.7 0.7 0.7 0.7 2.0 4.0 2.0 2.0 10.0<br />

sb 3.2 30 30 30 30 13 13 13 13 14.8 0.4 0.4 0.4 0.4 1.7 2.6 1.3 1.3 6.9<br />

Total Route 7 17.0 74 16 74 16 74 16 74 16 13.8 3.0 3.0 3.0 3.0 10.5 18.0 9.0 9.0 46.5 1129 24<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain Vieeb 7.1 30 30 30 60 27 27 27 27 15.7 0.9 0.9 0.9 0.5 3.2 5.4 2.7 1.4 12.6<br />

wb 7.8 30 30 30 60 31 5 31 5 31 5 31 5 15.1 1.2 1.2 1.2 0.6 4.8 7.2 3.6 1.7 17.3<br />

Redlands&MtnView-Redlands Maeb 4.8 30 30 30 60 20 20 20 20 14.4 0.7 0.7 0.7 0.3 2.3 4.0 2.0 1.0 9.3<br />

wb 4.8 30 30 30 60 20 20 20 20 14.4 0.7 0.7 0.7 0.3 2.7 4.0 2.0 0.9 9.6<br />

Redlands Mall- 4th&Yucaipa eb 11.8 30 30 30 60 37 5 37 5 37 5 37 5 19.2 1.4 1.4 1.4 0.7 4.9 8.4 4.2 2.1 19.6<br />

wb 11.0 30 30 30 60 35 35 35 35 18.9 1.2 1.2 1.2 0.6 4.7 7.0 3.5 1.6 16.8<br />

Total Route 8 47.3 170 10 170 10 170 10 170 10 16.7 6.0 6.0 6.0 3.0 22.5 36.0 18.0 8.7 85.2 900 11<br />

9: San Bdno-Redlands-Yucaipaeb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 30 30 30 60 31 31 31 31 14.9 1.0 1.0 1.0 0.5 3.1 6.2 3.1 2.1 14.5<br />

wb 8.5 30 30 30 60 34 15 34 15 34 15 34 15 14.9 1.6 1.6 1.6 0.8 7.9 9.8 4.9 3.3 25.9<br />

Barton&Benton-Redlands Mall eb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 1.4 2.8 1.4 0.9 6.5<br />

wb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 2.3 2.8 1.4 0.9 7.4<br />

Redlands Mall- California&D St. eb 10.4 30 30 30 60 33 5 33 5 33 5 33 5 18.9 1.3 1.3 1.3 0.6 3.8 7.6 3.8 2.5 17.7<br />

wb 10.5 30 30 30 60 34 34 34 34 18.6 1.1 1.1 1.1 0.6 5.5 6.8 3.4 2.3 18.0<br />

Total Route 9 45.9 160 20 160 20 160 20 160 20 17.2 6.0 6.0 6.0 3.0 24.0 36.0 18.0 12.0 90.0 1177 13<br />

10: Fontana-Baseline-San Bdnowb 5:35am-8:35pm 3.3 6.5 2.5 3.0 15.3<br />

eb 5:30am-8:30pm 3.3 6.0 3.0 3.0 15.3<br />

4th&E St.- Baseline&Citrus wb 11.1 30 30 30 30 40 40 40 40 16.7 1.3 1.3 1.3 1.3 4.3 8.7 3.3 4.0 20.3<br />

eb 11.1 30 30 30 30 40 11 40 11 40 11 40 11 16.7 1.7 1.7 1.7 1.7 5.6 10.2 5.1 5.1 26.0<br />

Baseline&Citrus - FontanaMetrol wb 2.6 30 30 30 30 12 5 12 5 12 5 12 5 13.0 0.6 0.6 0.6 0.6 1.8 3.7 1.4 1.7 8.6<br />

eb 3.1 30 30 30 30 12 12 12 12 15.3 0.4 0.4 0.4 0.4 1.3 2.4 1.2 1.2 6.1<br />

Total Route 10 27.9 104 16 104 16 104 16 104 16 16.1 4.0 4.0 4.0 4.0 13.1 25.0 11.1 12.0 61.1 1611 26<br />

July 11, 2007 250


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 12-2: Partially Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

11: San Bdno-Muscoy-Cal Stat nb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.0 17.3<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana Metrolinwb 9.8 15 15 15 30 45 5 45 5 45 5 45 5 13.1 3.3 3.3 3.3 1.7 14.3 20.0 10.0 6.7 51.0<br />

Tripper 1.0 1.0 1.0<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 15 15 15 30 45 10 45 10 45 10 37 3 13.1 3.7 3.7 3.7 1.3 12.8 22.0 11.0 5.9 51.7<br />

Total Route 14 19.6 90 15 90 15 90 15 82 8 13.1 8.0 7.0 7.0 3.0 28.2 42.0 21.0 12.5 103.7 4518 44<br />

15: Fontana-SanB/Highland-Reeb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 15 49 15 49 15 49 15 15.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 8.1 33.3<br />

4th St& E St - Redlands Mall eb 16.7 30 30 30 30 53 7 53 7 53 7 53 7 18.9 2.0 2.0 2.0 2.0 5.0 12.0 6.0 5.0 28.0<br />

wb 16.7 30 30 30 30 59 5 59 5 59 5 59 5 17.0 2.1 2.1 2.1 2.1 6.0 12.8 6.4 5.3 30.5<br />

Total Route 15 57.8 208 32 208 32 208 32 208 32 16.7 8.0 8.0 8.0 8.0 21.3 48.0 24.0 25.0 118.3 2660 22<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 14.9 30 30 30 30 60 5 60 5 60 5 60 5 14.9 2.2 2.2 2.2 2.2 6.8 13.0 6.5 4.9 31.2<br />

eb 14.9 30 30 30 30 60 15 60 15 60 15 60 15 14.9 2.5 2.5 2.5 2.5 6.3 15.0 7.5 9.4 38.1<br />

Arrowhead RMC - Fontana MLinkwb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 44.6 180 30 180 30 180 30 180 30 14.9 7.0 7.0 7.0 7.0 19.7 42.0 21.0 21.3 103.9 2640 25<br />

20: FontanaML-Hemlock-Kaise sb 5:35am-9:05pm 3.0 6.0 3.0 2.8 14.8<br />

nb 4:57am-9:27pm 3.6 6.0 3.0 3.0 15.6<br />

Fontana Metrolink - Randall&Hemsb 3.2 30 30 30 30 12 12 12 12 16.1 0.4 0.4 0.4 0.4 1.2 2.4 1.2 1.1 5.9<br />

nb 2.9 30 30 30 30 14 9 14 9 14 9 14 9 12.5 0.8 0.8 0.8 0.8 2.7 4.6 2.3 2.3 11.9<br />

Randall&Hemlock - Marygold&Si sb 3.0 30 30 30 30 13 13 13 13 14.0 0.4 0.4 0.4 0.4 1.3 2.6 1.3 1.2 6.4<br />

nb 3.0 30 30 30 30 12 12 12 12 15.2 0.4 0.4 0.4 0.4 1.4 2.4 1.2 1.2 6.2<br />

Total Route 20 12.2 51 9 51 9 51 9 51 9 14.4 2.0 2.0 2.0 2.0 6.6 12.0 6.0 5.8 30.5 780 26<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsdnb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 2000 31<br />

28: Southridge-Slover Av-Kaiser<br />

29: Bloomington-Valley-Kaiser eb 5:45am-8:54pm 3.0 6.0 3.0 3.0 15.0<br />

wb 6:10am-8:10pm 3.0 6.0 3.0 3.0 15.0<br />

Marygold&Sierra-11th&Cedar eb 5.8 30 30 30 60 25 25 25 25 13.8 0.8 0.8 0.8 0.4 2.5 5.0 2.5 1.3 11.3<br />

wb 5.7 30 30 30 60 25 10 25 10 25 10 25 10 13.7 1.2 1.2 1.2 0.6 3.5 7.0 3.5 1.8 15.8<br />

Total Route 29 11.5 50 10 50 10 50 10 13.7 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0 500 19<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.7 17.7<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 4.8 17.8<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 12.0 30 30 30 30 27 5 27 5 27 5 27 5 26.7 1.1 1.1 1.1 1.1 4.3 6.4 3.2 5.0 18.9<br />

nb 12.0 30 30 30 30 28 28 28 28 25.7 0.9 0.9 0.9 0.9 3.7 5.6 2.8 4.5 16.6<br />

Total Route 90 24.0 55 5 55 5 55 5 55 5 26.2 2.0 2.0 2.0 2.0 8.0 12.0 6.0 9.5 35.5 645 18<br />

East Valley Total 16.3 96 95 94 62 322 567 282 213 1,383 38421 28<br />

July 11, 2007 251


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 12-3: Partially Constrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMillseb 5:10am-9:10pm 3.0 6.0 3.0 3.0 15.0<br />

wb 4:40am-8:40pm 3.0 6.0 3.0 3.0 15.0<br />

Montclair TC-Ontario TC sb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

nb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Ontario TC-Chaffey College eb 11.5 60 60 60 60 58 2 58 2 58 2 58 2 11.9 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

wb 11.5 60 60 60 60 60 60 60 60 11.5 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

Total Route 60 33.4 158 22 158 22 158 22 158 22 12.7 4.0 4.0 4.0 3.0 12.0 24.0 12.0 9.0 57.0 980 17<br />

61:Fontana-OntarioMills-Pomoeb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport eb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

Chino <strong>Transit</strong> Ctr-Ontario TC nb 8.7 30 30 30 30 34 34 34 34 15.4 1.1 1.1 1.1 1.1 3.4 6.8 3.4 3.7 17.3<br />

sb 8.4 30 30 30 30 34 11 34 5 34 11 34 11 14.8 1.5 1.3 1.5 1.5 4.5 7.8 4.5 4.4 21.2<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 5.0 30 30 30 30 18 18 18 18 16.7 0.6 0.6 0.6 0.6 1.8 3.6 1.8 2.0 9.2<br />

sb 4.8 30 30 30 30 18 5 18 18 5 18 5 16.0 0.8 0.6 0.8 0.8 2.3 3.6 2.3 2.3 10.5<br />

Total Route 62 26.9 104 16 104 5 104 16 104 16 15.5 4.0 3.6 4.0 4.0 12.0 21.8 12.0 12.4 58.2 1130 19<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hos nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair Transcenter- Chinosb 6.6 30 30 30 30 24 24 24 24 16.6 0.8 0.8 0.8 0.8 3.2 4.8 2.4 3.4 13.8<br />

nb 6.6 30 30 30 30 21 15 21 15 21 15 21 15 19.0 1.2 1.2 1.2 1.2 4.8 7.2 3.6 5.0 20.6<br />

A: ChinoTC-ChinoHillsMPvia Chi sb 3.6 60 60 60 60 14 14 14 14 15.5 0.2 0.2 0.2 0.2 0.9 1.4 0.7 1.0 4.0<br />

nb 3.6 60 60 60 60 15 15 15 15 14.5 0.3 0.3 0.3 0.3 1.0 1.5 0.8 1.0 4.3<br />

B: ChinoTC-ChinoHillsMPvia Edi sb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B: ChinoHillsMP- Valla Vista Loo cw 2.7 60 60 60 60 8 8 8 8 20.3 0.1 0.1 0.1 0.1 0.5 0.8 0.4 0.6 2.3<br />

Total Route 65 31.1 106 15 106 15 106 15 106 15 17.6 3.0 3.0 3.0 3.0 12.1 18.1 9.1 12.6 51.8 1300 25<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TCwb 16.4 15 30 15 30 66 15 66 20 66 15 66 20 14.9 5.4 2.9 5.4 2.9 18.8 17.2 16.2 10.5 62.7<br />

eb 16.7 15 30 15 30 75 9 75 19 75 9 75 19 13.3 5.6 3.1 5.6 3.1 19.2 18.8 16.8 7.8 62.6<br />

Total Route 68 33.1 141 24 141 39 141 24 141 39 14.1 11.0 6.0 11.0 6.0 38.0 36.0 33.0 18.3 125.3 2673 21<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 30 30 30 22 22 22 22 17.5 0.7 0.7 0.7 0.7 2.6 4.4 2.9 2.2 12.0<br />

sb 6.4 30 30 30 30 23 5 23 5 23 5 23 5 16.7 0.9 0.9 0.9 0.9 2.8 5.6 3.6 2.8 14.8<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 30 30 30 60 10 60 10 60 10 60 10 15.0 2.3 2.3 2.3 2.3 8.2 14.0 9.1 7.0 38.3<br />

wb 15.0 30 30 30 30 60 60 60 60 15.0 2.0 2.0 2.0 2.0 6.0 12.0 7.8 6.0 31.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 6.0 6.0 6.0 19.5 36.0 23.4 18.0 96.9 1800 19<br />

68: Chino-Montclair-Ch.Collegenb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

Chino <strong>Transit</strong> Center- Montclair Tnb 7.9 30 30 30 60 35 3 35 3 35 3 32 3 13.5 1.3 1.3 1.3 0.5 3.2 7.6 3.8 1.5 16.1<br />

sb 7.9 30 30 30 60 30 22 30 22 30 22 30 10 15.7 1.7 1.7 1.7 0.7 4.3 10.4 5.2 2.1 22.0<br />

Montclair Transcenter- ChaffeyCoeb 12.4 30 30 30 60 51 15 51 15 51 15 51 4 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 40.5 170 40 170 40 170 40 163 17 14.3 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1569 18<br />

70:Ontario-via Riverside-Ont Meb 6:34am-8:20pm 2.5 6.0 3.0 2.5 14.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.5 14.0<br />

D St& Sultana -Ontario Mills eb 13.0 30 30 30 60 45 45 45 45 17.3 1.5 1.5 1.5 0.8 3.8 9.0 4.5 1.9 19.1<br />

wb 12.0 30 30 30 60 41 8 41 8 41 8 41 8 17.6 1.6 1.6 1.6 0.8 4.1 9.8 4.9 2.0 20.8<br />

Ontario Mills - Foothill&Haven nb 3.7 30 30 30 60 13 13 13 13 17.1 0.4 0.4 0.4 0.2 1.1 2.6 1.3 0.5 5.5<br />

sb 3.7 30 30 30 60 13 13 13 13 17.1 0.4 0.4 0.4 0.2 1.1 2.6 1.3 0.5 5.5<br />

Foothill&Haven - Chaffey Collegenb 7.4 30 30 30 60 25 10 25 10 25 10 25 10 17.8 1.2 1.2 1.2 0.6 2.9 7.0 3.5 1.5 14.9<br />

sb 7.4 30 30 30 60 25 25 25 25 17.8 0.8 0.8 0.8 0.4 2.1 5.0 2.5 1.0 10.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 6.0 6.0 6.0 3.0 15.0 36.0 18.0 7.5 76.5 1500 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamon eb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Ontario Mills-Etiwanda&Jurupa eb 5.4 30 30 30 60 23 23 23 23 14.1 0.8 0.8 0.8 0.4 3.1 4.6 2.3 1.2 11.1<br />

wb 4.0 30 30 30 60 18 10 18 10 18 10 18 10 13.3 0.9 0.9 0.9 0.5 3.7 5.6 2.8 1.2 13.3<br />

Etiwanda&Jurupa-Jurupa&Cherryeb 2.4 30 30 30 60 10 10 10 10 14.4 0.3 0.3 0.3 0.2 1.3 2.0 1.0 0.5 4.8<br />

wb 2.4 30 30 30 60 10 10 10 10 14.4 0.3 0.3 0.3 0.2 1.3 2.0 1.0 0.4 4.8<br />

Jurupa&Cherry- Fontana Metrolineb 8.2 30 30 30 60 30 10 30 10 30 10 30 10 16.5 1.3 1.3 1.3 0.7 5.3 8.0 4.0 2.0 19.3<br />

wb 8.2 30 30 30 60 30 30 30 30 16.5 1.0 1.0 1.0 0.5 4.0 6.0 3.0 1.3 14.3<br />

Fontana ML - Sierra&Sierra Lakeeb 4.1 30 30 30 60 15 15 15 15 16.4 0.5 0.5 0.5 0.3 2.0 3.0 1.5 0.8 7.3<br />

wb 4.1 30 30 30 60 15 9 15 9 15 9 15 9 16.4 0.8 0.8 0.8 0.4 3.2 4.8 2.4 1.0 11.4<br />

Total Route 71 38.9 151 29 151 29 151 29 151 29 15.4 6.0 6.0 6.0 3.0 24.0 36.0 18.0 8.4 86.4 1075 12<br />

West Valley Total 64 60 65 40 212 354 204 126 896 18970 21<br />

Total Partially Constrained System 160 155 159 102 533 921 486 339 2,279 57391 25<br />

Total Constrained System 136 127 136 96 461 655 414 308 1,939 54338 28<br />

Total Current System 145 144 145 99 499 849 441 334 2,123 56268 27<br />

July 11, 2007 252


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

12.2 Unconstrained Service <strong>Plan</strong><br />

• Route 8: San Bernardino-Mentone-Yucaipa – this local route would be<br />

extended to serve the Cedar/Date corridor in Yucaipa.<br />

• Route 9: San Bernardino-Redlands-Yucaipa – this local route would be<br />

extended to serve the California and Bryant corridors in Yucaipa.<br />

• Route 314 sbX: Fontana-Foothill-San Bernardino – this new limited stop<br />

service would be introduced in the Foothill corridor between the Fourth Street<br />

<strong>Transit</strong> Mall and the Montclair Transcenter; it would parallel the Route 14 and 66<br />

service areas. The Route 14/66 and limited stop service would provide<br />

combined headways of 10-minutes during the day on weekdays.<br />

• Route 15: Fontana-San Bernardino/Highland-Redlands – this local route<br />

would be straightened to operate on 9th between the Fourth Street <strong>Transit</strong> Mall<br />

and Palm, and on Orange between 5th and the Redlands Mall. At the Redlands<br />

Mall, it would be extended to serve the Cypress corridor and the Redlands<br />

Community Hospital previously served by the Redlands Trolley, which has been<br />

discontinued.<br />

• Route 17: Redlands-San Bernardino – this new local route would operate on E<br />

Street and San Bernardino Avenue between the Fourth Street <strong>Transit</strong> Mall and<br />

the Redlands Mall. It would provide 30-minute daytime service and 60-minute<br />

evening service six days a week.<br />

• Route 18: San Bernardino-3rd Street-Sterling – this new local route would<br />

operate in the 3rd Street/Sterling/Lynwood corridor between the Fourth Street<br />

<strong>Transit</strong> Mall and the San Manuel Casino. It would provide 30-minute daytime<br />

service and 60-minute evening service six days a week.<br />

• Route 19: Redlands-Colton-Fontana – this base route be changed to operate<br />

on Lugonia rather than Redlands between Mountain View and Orange. This<br />

would provide service to the Citrus Plaza previously served by Route 8.<br />

• Route 20: Fontana Metrolink-Hemlock-Kaiser – this route would be dropped<br />

as its service area would be served by the restructured Route 29.<br />

• Route 29: North Fontana-Fontana Metrolink-Bloomington – this local route<br />

would be extended to the Fontana Metrolink Station and then into North Fontana<br />

via Merrill, Cherry and Beech to Summit Avenue. It would provide 30-minute<br />

daytime and 60-minute evening service six days a week.<br />

• Route 65 A/B: Montclair-Chino Hills – the A and B branches of this West<br />

Valley base route would operate to the Chino Hills Marketplace. The A branch<br />

would be extended to the Glen Ridge corridor in Los Serranos. The B branch<br />

would be unchanged, serving the Valle Vista corridor in Los Serranos. The<br />

frequencies and spans would remain the same as the route in the Constrained<br />

<strong>Plan</strong>.<br />

• Route 68: Chino-Montclair-Chaffey College Chino – this local route would be<br />

extended south to serve Chaffey College Chino via Ramona, Chino, Central and<br />

Eucalyptus. It would continue to provide 30-minute service.<br />

July 11, 2007 253


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Route 91: Diamond Bar-North Orange County Connection – this new<br />

commuter express route would operate from the Chino Transcenter through<br />

Chino Hills on Grand Avenue to Diamond Bar and then to Cal State Fullerton and<br />

the Fullerton Metrolink via the 57 Freeway. It would provide 30-minute peak and<br />

60-minute off-peak service.<br />

July 11, 2007 254


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 12-4: Unconstrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (a)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

1: ARMC-San Bdno-Del Rosa nb 5:45am-10:00pm<br />

2.5 5.8 3.0 4.6 15.8<br />

sb 4:38am-10:22pm<br />

4.0 5.8 3.0 4.5 17.3<br />

Arrowhead Reg. Med Ctr-E St.&C nb 6.3 15 15 15 30 27 3 27 3 27 3 25 3 14.0 2.0 2.0 2.0 0.9 5.0 11.5 6.0 4.2 26.7<br />

sb 6.9 15 15 15 30 30 15 30 15 30 15 27 5 13.8 3.0 3.0 3.0 1.1 12.0 17.3 9.0 4.8 43.1<br />

Tripper 1.0 1.0 1.0 3.5 4.5<br />

E St.&Court - Sterling & Date Placnb 6.3 30 30 30 30 28 3 28 3 28 3 28 3 13.4 1.0 1.0 1.0 1.0 2.6 5.9 3.1 3.7 15.3<br />

sb 5.1 30 30 30 30 27 2 27 2 27 2 27 2 11.3 1.0 1.0 1.0 1.0 3.9 5.6 2.9 3.4 15.7<br />

Total Route 1 24.5 112 23 112 23 112 23 107 13 13.1 8.0 8.0 7.0 4.0 24.5 43.8 21.0 16.1 105.3 4000 38<br />

2: Cal State-E Street-Loma Lindsb4:20am-10:20pm 4.3 6.0 2.9 4.3 17.5<br />

nb5:20am -9:25pm 3.6 6.0 2.8 3.8 16.2<br />

Cal State Univ. - E St.&Court sb 6.3 20 20 20 30 24 24 24 24 15.7 1.2 1.2 1.2 0.8 4.1 7.2 3.5 3.4 18.2<br />

nb 6.3 20 20 20 30 24 2 24 2 24 2 22 5 15.7 1.3 1.3 1.3 0.9 4.7 7.8 3.6 3.4 19.5<br />

E St.&Court - Barton&Prospect sb 6.8 20 20 20 30 34 2 34 2 34 2 34 7 11.9 1.8 1.8 1.8 1.4 6.5 10.8 5.2 5.9 28.4<br />

nb 6.8 20 20 20 30 34 34 34 28 11.9 1.7 1.7 1.7 0.9 4.9 10.2 4.8 3.5 23.4<br />

Total Route 2 26.1 116 4 116 4 116 4 108 12 13.5 6.0 6.0 6.0 4.0 20.2 36.0 17.1 16.2 89.5 4000 45<br />

302: Kendall-ESt-Loma Linda sbsb 4:20am-6:20pm 2.5 6.0 3.2 12.0<br />

nb 5:20am-6:25pm 2.5 6.0 3.2 12.0<br />

Kendall@Palm - Cal State Univ sb 2.2 10 10 10 8 5 8 5 8 5 16.5 1.3 1.3 1.3 3.3 7.8 4.1 15.2<br />

nb 4.2 10 10 10 16 16 16 15.8 1.6 1.6 1.6 4.0 9.6 5.1 18.7<br />

Cal State Univ. - E St.&Court sb 6.3 10 10 10 18 18 18 21.0 1.8 1.8 1.8 4.5 10.8 5.7 21.0<br />

nb 6.3 10 10 10 19 5 19 5 19 5 19.9 2.4 2.4 2.4 6.0 14.4 7.6 28.0<br />

E St.&Court - Barton&Prospect sb 6.8 10 10 10 22 22 22 18.5 2.2 2.2 2.2 5.5 13.2 7.0 25.7<br />

nb 6.8 10 10 10 22 5 22 5 22 5 18.5 2.7 2.7 2.7 6.8 16.2 8.6 31.5<br />

32.6 105 15 105 15 105 15 18.6 12.0 12.0 12.0 30.0 72.0 38.0 140.0 2200 16<br />

3/4: Highland-San Bernardino eb5:05am-10:05pm 4.0 6.0 3.0 3.0 16.0<br />

wb4:24am-10:29pm 4.5 6.0 3.0 3.5 17.0<br />

4th St.&Arrowhd-Bldr&Baseline (4eb 12.2 20 20 20 30 51 51 51 51 14.3 2.6 2.6 2.6 1.7 10.2 15.3 7.7 5.1 38.3<br />

Boulder&Baseline-4thSt&E St. (3) wb 12.2 20 20 20 30 51 10 51 10 51 10 51 10 14.3 3.1 3.1 3.1 2.0 13.6 18.3 9.2 7.1 48.1<br />

3/4: Baseline-San Bernardino<br />

Bldr&Baseline-4th&Arrowhead (4) wb 6.4 20 20 20 30 27 12 27 12 27 12 27 12 14.2 2.0 2.0 2.0 1.3 7.8 11.7 5.9 3.9 29.3<br />

4thSt&ESt - Boulder&Baseline (3) eb 6.4 20 20 20 30 29 29 29 29 13.2 1.5 1.5 1.5 1.0 6.5 8.7 4.4 3.4 22.9<br />

Total Route 3/4 37.0 158 22 158 22 158 22 158 22 14.1 9.0 9.0 9.0 6.0 38.0 54.0 27.0 19.5 138.5 6275 45<br />

5: San Bndo-Del Rosa-Cal Statenb 5:50am-9:50pm 3.9 6.0 3.0 3.5 16.4<br />

sb 4:58am-9:28pm 3.8 6.0 3.0 3.5 16.3<br />

E St&Court - Del Rosa&Highland nb 4.9 30 30 30 30 25 25 25 25 11.7 0.8 0.8 0.8 0.8 3.3 5.0 2.5 2.9 13.7<br />

sb 5.1 30 30 30 30 23 5 23 5 23 5 23 5 13.3 0.9 0.9 0.9 0.9 3.5 5.6 2.8 3.3 15.2<br />

Del Rosa&Highland - Cal State Unnb 7.3 30 30 30 30 30 7 30 7 30 7 30 7 14.6 1.2 1.2 1.2 1.2 4.8 7.4 3.7 4.3 20.2<br />

sb 7.3 30 30 30 30 30 30 30 30 14.6 1.0 1.0 1.0 1.0 3.8 6.0 3.0 3.5 16.3<br />

Total Route 5 24.6 108 12 108 12 108 12 108 12 13.7 4.0 4.0 4.0 4.0 15.4 24.0 12.0 14.0 65.4 1984 30<br />

7: San Bdno-Sierra Way-Cal Stanb 6:05am-9:05pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:06am-8:06pm 3.9 6.0 3.0 3.0 15.9<br />

4th&E St- SierraWay&40th nb 4.6 30 30 30 30 21 21 21 21 13.1 0.7 0.7 0.7 0.7 2.1 4.2 2.1 2.1 10.5<br />

sb 5.8 30 30 30 30 25 11 25 11 25 11 25 11 13.8 1.2 1.2 1.2 1.2 4.7 7.2 3.6 3.6 19.1<br />

SierraWay&40th - Cal State nb 3.4 30 30 30 30 15 5 15 5 15 5 15 4 13.7 0.7 0.7 0.7 0.6 2.0 4.0 2.0 1.9 9.9<br />

sb 3.2 30 30 30 30 13 13 13 13 14.8 0.4 0.4 0.4 0.4 1.7 2.6 1.3 1.3 6.9<br />

Total Route 7 17.0 74 16 74 16 74 16 74 16 13.8 3.0 3.0 3.0 3.0 10.5 18.0 9.0 8.9 46.4 1129 24<br />

8: San Bdno-Mentone-Yucaipa eb 5:35am-8:30pm 3.5 6.0 3.0 3.0 15.5<br />

wb 5:02am-9:02pm 4.0 6.0 3.0 2.8 15.8<br />

4th&E St-Redlands&Mountain Vie eb 7.1 30 30 30 60 24 24 24 24 17.6 0.8 0.8 0.8 0.4 2.8 4.8 2.4 1.2 11.2<br />

wb 7.8 30 30 30 60 27 5 27 5 27 5 27 2 17.3 1.1 1.1 1.1 0.5 4.3 6.4 3.2 1.4 15.2<br />

Redlands&MtnView-Redlands Ma eb 4.8 30 30 30 60 24 24 24 18 12.0 0.8 0.8 0.8 0.3 2.8 4.8 2.4 0.9 10.9<br />

wb 4.8 30 30 30 60 24 24 24 18 12.0 0.8 0.8 0.8 0.3 3.2 4.8 2.4 0.8 11.2<br />

Redlands Mall- 4th&Yucaipa eb 11.8 30 30 30 60 39 5 39 5 39 5 39 1 18.2 1.5 1.5 1.5 0.7 5.1 8.8 4.4 2.0 20.3<br />

wb 11.0 30 30 30 60 37 37 37 37 17.9 1.2 1.2 1.2 0.6 4.9 7.4 3.7 1.7 17.8<br />

4th&Yucaipa-Date&Freemont 2.2 30 30 30 60 10 10 10 7 13.2 0.3 0.3 0.3 0.1 1.2 2.0 1.0 0.4 4.5<br />

wb 2.2 30 30 30 60 10 5 10 5 10 5 7 13.2 0.5 0.5 0.5 0.1 2.0 3.0 1.5 0.3 6.8<br />

Total Route 8 51.7 195 15 195 15 195 15 177 3 15.9 7.0 7.0 7.0 3.0 26.3 42.0 21.0 8.7 98.0 1500 15<br />

9: San Bdno-Redlands-Yucaipa eb 6:10am-9:05pm 3.0 6.0 3.0 4.0 16.0<br />

wb 4:33am-8:33pm 4.9 6.0 3.0 4.0 17.9<br />

4th&E St. - Barton&Benton eb 7.7 30 30 30 60 31 31 31 29 14.9 1.0 1.0 1.0 0.5 3.1 6.2 3.1 1.9 14.3<br />

wb 8.5 30 30 30 60 34 10 34 10 34 10 32 5 14.9 1.5 1.5 1.5 0.6 7.1 8.8 4.4 2.5 22.8<br />

Barton&Benton-Redlands Mall eb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 1.4 2.8 1.4 0.9 6.5<br />

wb 4.4 30 30 30 60 14 14 14 14 18.8 0.5 0.5 0.5 0.2 2.3 2.8 1.4 0.9 7.4<br />

Redlands Mall- California&D St. eb 10.4 30 30 30 60 33 10 33 10 33 10 33 5 18.9 1.4 1.4 1.4 0.6 4.3 8.6 4.3 2.5 19.7<br />

wb 10.5 30 30 30 60 34 34 34 34 18.6 1.1 1.1 1.1 0.6 5.5 6.8 3.4 2.3 18.0<br />

California&D St.-San Carlos&Bryasb 2.2 30 30 30 60 10 10 10 7 13.2 0.3 0.3 0.3 0.1 1.0 2.0 1.0 0.5 4.5<br />

nb 2.2 30 30 30 60 10 10 10 10 10 10 7 13.2 0.7 0.7 0.7 0.1 3.2 4.0 2.0 0.5 9.7<br />

Total Route 9 50.3 180 30 180 30 180 30 170 10 16.8 7.0 7.0 7.0 3.0 27.9 42.0 21.0 12.0 102.9 1500 15<br />

10: Fontana-Baseline-San Bdnowb 5:35am-8:35pm 3.3 6.5 2.5 2.0 14.3<br />

eb 5:30am-8:30pm 3.3 6.0 3.0 2.5 14.8<br />

4th&E St.- Baseline&Citrus wb 11.1 15 15 15 30 40 40 40 40 16.7 2.7 2.7 2.7 1.3 8.7 17.3 6.7 2.7 35.3<br />

eb 11.1 15 15 15 30 38 13 38 13 38 13 38 13 17.6 3.4 3.4 3.4 1.7 11.2 20.4 10.2 4.3 46.1<br />

Baseline&Citrus - FontanaMetrolinwb 2.6 15 15 15 30 12 5 12 5 12 5 12 6 13.0 1.1 1.1 1.1 0.6 3.7 7.4 2.8 1.2 15.1<br />

eb 3.1 15 15 15 30 12 12 12 12 15.3 0.8 0.8 0.8 0.4 2.6 4.8 2.4 1.0 10.8<br />

Total Route 10 27.9 102 18 102 18 102 18 102 19 16.4 8.0 8.0 8.0 4.0 26.2 49.9 22.1 9.1 107.3 1611 15<br />

July 11, 2007 255


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 12-5: Unconstrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route East Valley Routes<br />

(Weekdays) – (b)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES<br />

REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir mi. Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

11: San Bdno-Muscoy-Cal Statenb 5:25am-9:25pm 3.7 6.0 3.0 3.8 16.5<br />

sb 5:27am-9:55pm 3.7 6.0 3.0 4.1 16.7<br />

4th&E St. - 17th&Medical Center nb 4.8 30 30 30 30 20 20 20 20 14.3 0.7 0.7 0.7 0.7 2.4 4.0 2.0 2.5 11.0<br />

sb 4.8 30 30 30 30 20 6 20 11 20 11 20 11 14.3 0.9 1.0 1.0 1.0 3.2 6.2 3.1 4.2 16.6<br />

17th&MedicalCenter-Cal State U nb 6.7 30 30 30 30 27 15 27 15 27 15 27 15 14.9 1.4 1.4 1.4 1.4 5.1 8.4 4.2 5.3 23.0<br />

sb 6.7 30 30 30 30 32 27 27 27 12.6 1.1 0.9 0.9 0.9 3.9 5.4 2.7 3.6 15.6<br />

Total Route 11 22.9 99 21 94 26 94 26 94 26 13.9 4.0 4.0 4.0 4.0 14.6 24.0 12.0 15.7 66.3 1402 21<br />

14: Fontana-Foothill-San Bern. wb3:46am-10:02pm 4.3 6.0 3.0 4.0 17.3<br />

eb4:35am-10:20pm 3.5 6.0 3.0 4.4 16.9<br />

4th&Arrowhead-Fontana Metrolinkwb 9.8 20 20 20 30 45 5 45 5 45 5 45 5 13.1 2.5 2.5 2.5 1.7 10.8 15.0 7.5 6.7 39.9<br />

Tripper<br />

Fontana ML-4th&Arrowhead (14) eb 9.8 20 20 20 30 45 5 45 5 45 5 37 3 13.1 2.5 2.5 2.5 1.3 8.8 15.0 7.5 5.9 37.1<br />

Total Route 14 19.6 90 10 90 10 90 10 82 8 13.1 5.0 5.0 5.0 3.0 19.5 30.0 15.0 12.5 77.0 3500 45<br />

314: Foothill Limited Stop wb 3:46am-10:02pm 3.0 6.0 3.0 12.0<br />

eb 4:35am-10:20pm 3.0 6.0 3.0 12.0<br />

4th&Arrowhead-Fontana Metrolinkwb 9.8 20 20 20 35 35 35 16.8 1.8 1.8 1.8 5.3 10.5 5.3 21.0<br />

eb 9.8 20 20 20 35 5 35 5 35 5 16.8 2.0 2.0 2.0 6.0 12.0 6.0 24.0<br />

Fontana ML - Montclair Transcentwb 16.4 20 20 20 50 50 50 19.7 2.5 2.5 2.5 7.5 15.0 7.5 30.0<br />

eb 16.7 20 20 20 50 5 50 5 50 5 20.0 2.8 2.8 2.8 8.3 16.5 8.3 33.0<br />

52.7 170 10 170 10 170 10 18.6 9.0 9.0 9.0 27.0 54.0 27.0 108.0 2000 19<br />

15: Fontana-SanB/Highland-Redeb 5:30am-9:40pm 2.5 6.0 3.0 3.8 15.3<br />

wb 5:05am-9:45pm 2.8 6.0 3.0 3.8 15.6<br />

Fontana Metrolink - 4th St& E St eb 12.2 30 30 30 30 47 5 47 5 47 5 47 5 15.6 1.7 1.7 1.7 1.7 4.3 10.4 5.2 6.6 26.5<br />

wb 12.2 30 30 30 30 49 5 49 5 49 5 49 5 15.0 1.8 1.8 1.8 1.8 5.0 10.8 5.4 6.8 28.1<br />

4th St& E St - Redlands Mall eb 12.7 30 30 30 30 47 47 47 47 16.2 1.6 1.6 1.6 1.6 3.9 9.4 4.7 3.9 21.9<br />

wb 12.7 30 30 30 30 47 5 47 5 47 5 47 5 16.2 1.7 1.7 1.7 1.7 4.9 10.4 5.2 4.3 24.8<br />

Redlands Mall-Redlands Comm.Hsb 3.3 30 30 30 30 15 15 15 15 13.2 0.5 0.5 0.5 0.5 1.3 3.0 1.5 1.3 7.0<br />

nb 3.3 30 30 30 30 15 5 15 5 15 5 15 5 13.2 0.7 0.7 0.7 0.7 1.9 4.0 2.0 1.7 9.5<br />

Total Route 15 56.5 220 20 220 20 220 20 220 20 15.4 8.0 8.0 8.0 8.0 21.3 48.0 24.0 24.6 117.9 2660 23<br />

17: Redlands-San Bernerdino Aeb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

wb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

Redlands <strong>Transit</strong> Center - 4th St. eb 10.3 30 30 30 60 50 10 50 10 50 10 50 10 12.4 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0<br />

wb 10.3 30 30 30 60 50 10 50 10 50 10 50 10 12.4 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0<br />

20.6 100 20 100 20 100 20 100 20 12.4 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.0 54.0 800 15<br />

18: SanBern-Sterling-SanManuenb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

sb 6:00am-9:00pm 3.0 6.0 3.0 3.0 15.0<br />

4th St. <strong>Transit</strong> Mall - San Manuel nb 6.7 30 30 30 60 25 5 25 5 25 5 25 5 16.1 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

sb 6.7 30 30 30 60 25 5 25 5 25 5 25 5 16.1 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

13.4 50 10 50 10 50 10 50 10 16.1 2.0 2.0 2.0 1.0 6.0 12.0 6.0 3.0 27.0 400 15<br />

19: Redlands-Colton-Fontana wb4:50am -8:20pm 3.2 6.0 3.0 2.3 14.4<br />

eb5:30am-10:00pm 2.5 6.0 3.0 3.8 15.3<br />

Redlands Mall-Arrowhead RMC wb 15.9 30 30 30 30 65 5 65 5 65 5 65 5 14.7 2.3 2.3 2.3 2.3 7.4 14.0 7.0 5.3 33.6<br />

eb 15.9 30 30 30 30 65 5 65 5 65 5 65 5 14.7 2.3 2.3 2.3 2.3 5.8 14.0 7.0 8.8 35.6<br />

Arrowhead RMC - Fontana MLink wb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 3.7 7.0 3.5 2.6 16.8<br />

eb 7.4 30 30 30 30 30 5 30 5 30 5 30 5 14.8 1.2 1.2 1.2 1.2 2.9 7.0 3.5 4.4 17.8<br />

Total Route 19 46.6 190 20 190 20 190 20 190 20 14.7 7.0 7.0 7.0 7.0 19.8 42.0 21.0 21.0 103.8 2640 25<br />

20: FontanaML-Hemlock-Kaiser<br />

22: N. Rialto-Riverside-ARMC nb 4:40am-8:57pm 4.1 6.0 3.0 3.0 16.1<br />

sb 5:05am-9:50pm 4.0 6.0 3.0 3.2 16.2<br />

Arrowhead RMC-Live Oak&Rvrsd nb 11.3 30 30 30 30 47 8 47 8 47 8 47 8 14.5 1.8 1.8 1.8 1.8 7.5 11.0 5.5 5.5 29.5<br />

sb 11.7 30 30 30 30 50 15 50 15 50 15 50 15 14.1 2.2 2.2 2.2 2.2 8.7 13.0 6.5 6.9 35.1<br />

Total Route 22 23.1 97 23 97 23 97 23 97 23 14.3 4.0 4.0 4.0 4.0 16.2 24.0 12.0 12.4 64.6 1888 29<br />

28: Southridge-Slover Av-Kaiser<br />

29: N. Fontana-ML-Bloomingtoneb 5:45am-8:54pm 3.0 6.0 3.0 3.0 15.0<br />

wb 6:10am-9:10pm 3.0 6.0 3.0 3.0 15.0<br />

Beech&Summit-Fontana Metrolinksb 8.7 30 30 30 60 30 5 30 5 30 5 30 5 17.4 1.2 1.2 1.2 0.6 3.5 7.0 3.5 1.8 15.8<br />

nb 8.0 30 30 30 60 30 30 30 30 16.0 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Fontana Metrolink-11th&Cedar eb 7.0 30 30 30 60 25 25 25 25 16.8 0.8 0.8 0.8 0.4 2.5 5.0 2.5 1.3 11.3<br />

wb 7.0 30 30 30 60 25 5 25 5 25 5 25 5 16.8 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Total Route 29 30.7 110 10 110 10 110 10 110 10 16.7 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.0 54.0 600 11<br />

31: Redlands Trolley Blue Line<br />

90: Inland Empire Connection eb 4:40am-8:45pm 4.0 6.0 3.0 4.9 17.9<br />

wb 4:56am-9:30pm 4.0 6.0 3.0 5.0 18.0<br />

4th St <strong>Transit</strong> Mall-Montclair TC<br />

4th St <strong>Transit</strong> Mall-Riverside TC sb 14.7 30 35 45 45 26 5 26 9 28 22 28 22 33.8 1.0 1.0 1.1 1.1 4.1 6.0 3.3 5.4 18.9<br />

nb 14.7 30 35 45 45 29 35 38 38 30.3 1.0 1.0 0.8 0.8 3.9 6.0 2.5 4.2 16.6<br />

Total Route 90 29.3 55 5 61 9 66 22 66 22 32.0 2.0 2.0 2.0 2.0 8.0 12.0 5.9 9.7 35.5 645 18<br />

East Valley Total 113 113 112 64 375 676 335 215 1,601 40734 25<br />

July 11, 2007 256


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 12-6: Unconstrained Service <strong>Plan</strong> for <strong>Omnitrans</strong> Fixed Route West Valley Routes<br />

(Weekdays)<br />

HEADWAY TRIP TIME (min) PKRUN BUSES REVENUE VEHICLE HOURS Est. Pass.<br />

ROUTE DIST. SPAN AM Mid PM AM Peak Mid Day PM Peak Eve SPEED AM Mid PM AM Mid PM PASSENGER Per<br />

Dir miles Pk Day Pk Eve Run Rec Run Rec Run Rec Run Rec mph Pk Day Pk Eve Pk Day Pk Eve Total BOARDINGS Hour<br />

60:OntCC-ChaffeyColl-OntMills eb 5:10am-9:10pm 3.0 6.0 3.0 3.0 15.0<br />

wb 4:40am-8:40pm 3.0 6.0 3.0 3.0 15.0<br />

Montclair TC-Ontario TC sb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

nb 5.2 30 30 30 60 20 10 20 10 20 10 20 10 15.6 1.0 1.0 1.0 0.5 3.0 6.0 3.0 1.5 13.5<br />

Ontario TC-Chaffey College eb 11.5 60 60 60 60 58 2 58 2 58 2 58 2 11.9 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

wb 11.5 60 60 60 60 60 60 60 60 11.5 1.0 1.0 1.0 1.0 3.0 6.0 3.0 3.0 15.0<br />

Total Route 60 33.4 158 22 158 22 158 22 158 22 12.7 4.0 4.0 4.0 3.0 12.0 24.0 12.0 9.0 57.0 1000 18<br />

61:Fontana-OntarioMills-Pomoneb 4:40am-9:05pm 3.7 5.8 3.3 3.5 16.2<br />

wb4:20am-10:20pm 4.0 5.8 3.3 4.3 17.3<br />

Pomona <strong>Transit</strong> Ctr- Ontario TC eb 5.5 16 15 15 30 26 2 30 2 30 2 30 2 12.6 1.8 2.1 2.1 1.1 6.5 12.3 6.9 3.7 29.4<br />

wb 6.6 16 15 15 30 29 11 32 12 32 12 32 12 13.7 2.5 2.9 2.9 1.5 10.0 16.9 9.5 4.2 40.6<br />

Ontario Transfer Center - Airport Deb 3.2 16 15 15 30 15 17 17 17 12.8 0.9 1.1 1.1 0.6 3.5 6.5 3.7 2.0 15.6<br />

wb 3.7 16 15 15 30 16 2 12 2 12 2 12 2 13.9 1.1 0.9 0.9 0.5 4.5 5.4 3.0 1.2 14.1<br />

Airport Drive - Fontana Metrolink eb 13.3 16 15 15 30 47 16 47 11 47 11 47 11 17.0 4.0 3.9 3.9 1.9 14.7 22.2 12.6 6.7 56.1<br />

wb 13.0 16 15 15 30 42 45 45 45 18.6 2.6 3.0 3.0 1.5 10.5 17.3 9.8 6.5 44.0<br />

Total Route 61 45.3 175 31 183 27 183 27 183 27 15.5 13.0 14.0 14.0 7.0 49.7 80.5 45.5 24.2 199.9 5729 29<br />

62: Chino-Euclid-N. Upland nb 5:48am-9:18pm 3.0 6.0 3.0 3.3 15.3<br />

sb 5:26am-8:23pm 3.0 6.0 3.0 3.0 15.0<br />

ChinoHillsMP-OntarioTCviaChaffenb 9.5 30 30 30 30 32 32 32 34 17.8 1.1 1.1 1.1 1.1 3.2 6.4 3.2 3.7 16.5<br />

sb 9.5 30 30 30 30 32 7 32 7 32 7 34 5 17.8 1.3 1.3 1.3 1.3 3.9 7.8 3.9 3.8 19.4<br />

Ontario <strong>Transit</strong> Ctr-Euclid&21st nb 6.2 30 30 30 30 22 22 22 18 16.9 0.7 0.7 0.7 0.6 2.2 4.4 2.2 2.0 10.8<br />

sb 6.0 30 30 30 30 22 5 22 5 22 5 18 16.4 0.9 0.9 0.9 0.6 2.7 5.4 2.7 1.8 12.6<br />

Total Route 62 31.2 108 12 108 12 108 12 104 5 17.3 4.0 4.0 4.0 3.6 12.0 24.0 12.0 11.3 59.3 1200 20<br />

63: Chino - Ontario - Upland nb 5:50am-8:50pm 3.0 6.0 3.0 3.0 15.0<br />

sb 5:45am-9:45pm 3.0 6.0 3.0 3.6 15.6<br />

Chino <strong>Transit</strong> Ctr-Sultana&D St. nb 6.4 30 30 30 55 21 2 21 2 21 2 21 2 18.3 0.8 0.8 0.8 0.4 2.3 4.6 2.3 1.3 10.5<br />

sb 6.4 30 30 30 55 27 17 27 17 27 17 27 6 14.2 1.5 1.5 1.5 0.6 4.4 8.8 4.4 2.1 19.7<br />

Sultana&D St - San Antonio Hosp nb 7.1 30 30 30 55 30 2 30 2 30 2 30 2 14.2 1.1 1.1 1.1 0.6 3.2 6.4 3.2 1.7 14.5<br />

sb 5.3 30 30 30 55 21 21 21 21 15.1 0.7 0.7 0.7 0.4 2.1 4.2 2.1 1.4 9.8<br />

Total Route 63 25.2 99 21 99 21 99 21 99 10 15.3 4.0 4.0 4.0 2.0 12.0 24.0 12.0 6.5 54.5 1214 22<br />

65A/B: Montclair-Chino Hills sb 4:50am-9:50pm 4.0 6.0 3.0 4.2 17.2<br />

nb 4:53am-9:53pm 4.0 6.0 3.0 4.2 17.2<br />

A/B:Montclair Transcenter- ChinoTsb 6.6 30 30 30 30 24 24 24 24 16.6 0.8 0.8 0.8 0.8 3.2 4.8 2.4 3.4 13.8<br />

nb 6.6 30 30 30 30 21 15 21 15 21 15 21 15 19.0 1.2 1.2 1.2 1.2 4.8 7.2 3.6 5.0 20.6<br />

A: ChinoTC-ChinoHillsMPvia Chinsb 3.6 60 60 60 60 11 11 11 11 19.7 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.8 3.2<br />

nb 3.6 60 60 60 60 11 11 11 11 19.7 0.2 0.2 0.2 0.2 0.7 1.1 0.6 0.8 3.1<br />

A: ChinoHillsMP- Glen Ridge Loo ccw 2.0 60 60 60 60 6 6 6 6 20.0 0.1 0.1 0.1 0.1 0.4 0.6 0.3 0.4 1.7<br />

B: ChinoTC-ChinoHillsMPvia Edissb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

nb 3.9 60 60 60 60 12 12 12 12 19.7 0.2 0.2 0.2 0.2 0.8 1.2 0.6 0.8 3.4<br />

B: ChinoHillsMP- Valla Vista Loopcw 2.7 60 60 60 60 8 8 8 8 20.3 0.1 0.1 0.1 0.1 0.5 0.8 0.4 0.6 2.3<br />

Total Route 65 33.1 105 15 105 15 105 15 105 15 18.9 3.0 3.0 3.0 3.0 12.0 18.0 9.0 12.5 51.5 1400 27<br />

66: Fontana-Foothill-Montclair wb4:19am-10:00pm 4.0 6.0 3.0 3.5 16.5<br />

eb5:00am -9:15pm 4.0 6.0 3.0 2.6 15.6<br />

Fontana Metrolink - Montclair TC wb 16.4 20 20 20 30 66 10 66 10 66 10 66 4 14.9 3.8 3.8 3.8 2.3 15.6 22.8 11.4 10.5 60.3<br />

eb 16.7 20 20 20 30 75 9 75 9 75 9 75 5 13.3 4.2 4.2 4.2 2.7 16.4 25.2 12.6 7.8 62.0<br />

Total Route 68 33.1 141 19 141 19 141 19 141 9 14.1 8.0 8.0 8.0 5.0 32.0 48.0 24.0 18.3 122.3 2673 22<br />

67: Ontario-Baseline-Fontana nb 5:25am-8:35pm 3.5 6.0 3.9 3.0 16.4<br />

sb 6:05am-9:05pm 3.0 6.0 3.9 3.0 15.9<br />

Montclair TC - 19th&Euclid nb 6.4 30 30 30 30 22 22 22 22 17.5 0.7 0.7 0.7 0.7 2.6 4.4 2.9 2.2 12.0<br />

sb 6.4 30 30 30 30 23 5 23 5 23 5 23 5 16.7 0.9 0.9 0.9 0.9 2.8 5.6 3.6 2.8 14.8<br />

19th&Euclid - Fontana Metrolink eb 15.0 30 30 30 30 60 10 60 10 60 10 60 10 15.0 2.3 2.3 2.3 2.3 8.2 14.0 9.1 7.0 38.3<br />

wb 15.0 30 30 30 30 60 60 60 60 15.0 2.0 2.0 2.0 2.0 6.0 12.0 7.8 6.0 31.8<br />

Total Route 67 42.8 165 15 165 15 165 15 165 15 15.6 6.0 6.0 6.0 6.0 19.5 36.0 23.4 18.0 96.9 1800 19<br />

68: Chino-Montclair-Ch.College nb 6:03am-9:07pm 2.5 6.0 3.0 3.0 14.5<br />

sb 5:49am-9:19pm 2.5 6.0 3.0 3.0 14.5<br />

Chaffey College Chino- Montclair nb 10.1 30 30 30 60 40 5 40 5 40 5 35 3 15.1 1.5 1.5 1.5 0.5 3.8 9.0 4.5 1.5 18.8<br />

sb 10.1 30 30 30 60 40 5 40 5 40 5 35 3 15.1 1.5 1.5 1.5 0.7 3.8 9.0 4.5 2.1 19.4<br />

Montclair TC- Chaffey College No eb 12.4 30 30 30 60 51 15 51 15 51 15 51 3 14.6 2.2 2.2 2.2 0.9 5.5 13.2 6.6 2.7 28.0<br />

wb 12.4 30 30 30 60 54 54 54 50 13.8 1.8 1.8 1.8 0.9 4.5 10.8 5.4 2.7 23.4<br />

Total Route 68 44.9 185 25 185 25 185 25 171 9 14.6 7.0 7.0 7.0 3.0 17.5 42.0 21.0 9.0 89.5 1700 19<br />

70:Ontario-via Riverside-Ont M eb 6:34am-8:20pm 2.5 6.0 3.0 2.5 14.0<br />

wb 6:44am-8:24pm 2.5 6.0 3.0 2.5 14.0<br />

D St& Sultana -Ontario Mills eb 13.0 30 30 30 60 45 45 45 45 17.3 1.5 1.5 1.5 0.8 3.8 9.0 4.5 1.9 19.1<br />

wb 12.0 30 30 30 60 41 8 41 8 41 8 41 8 17.6 1.6 1.6 1.6 0.8 4.1 9.8 4.9 2.0 20.8<br />

Ontario Mills - Foothill&Haven nb 3.7 30 30 30 60 13 13 13 13 17.1 0.4 0.4 0.4 0.2 1.1 2.6 1.3 0.5 5.5<br />

sb 3.7 30 30 30 60 13 13 13 13 17.1 0.4 0.4 0.4 0.2 1.1 2.6 1.3 0.5 5.5<br />

Foothill&Haven - Chaffey College nb 7.4 30 30 30 60 25 10 25 10 25 10 25 10 17.8 1.2 1.2 1.2 0.6 2.9 7.0 3.5 1.5 14.9<br />

sb 7.4 30 30 30 60 25 25 25 25 17.8 0.8 0.8 0.8 0.4 2.1 5.0 2.5 1.0 10.6<br />

Total Route 70 47.2 162 18 162 18 162 18 162 18 17.5 6.0 6.0 6.0 3.0 15.0 36.0 18.0 7.5 76.5 1500 20<br />

75:Ontario-via Francis-Ont Mills<br />

71:Kaiser-S.Ridge-R.Cucamongeb 5:10am-9:07pm 4.0 6.0 3.0 3.0 16.0<br />

wb 5:35am-8:35pm 4.0 6.0 3.0 2.6 15.6<br />

Haven&Foothill-Etiwanda&Jurupa eb 8.1 30 30 30 60 30 23 23 23 16.2 1.0 0.8 0.8 0.4 4.0 4.6 2.3 1.2 12.1<br />

wb 8.1 30 30 30 60 30 5 18 10 18 10 18 10 16.2 1.2 0.9 0.9 0.5 4.7 5.6 2.8 1.2 14.3<br />

Etiwanda&Jurupa- Fontana Metro eb 10.6 30 30 30 60 38 5 40 10 40 10 40 10 16.8 1.4 1.7 1.7 0.8 5.7 10.0 5.0 2.5 23.2<br />

wb 10.6 30 30 30 60 38 40 40 40 16.8 1.3 1.3 1.3 0.7 5.1 8.0 4.0 1.7 18.8<br />

Fontana ML - Sierra&Sierra LakePeb 4.1 30 30 30 60 15 15 15 15 16.4 0.5 0.5 0.5 0.3 2.0 3.0 1.5 0.8 7.3<br />

wb 4.1 30 30 30 60 15 4 15 9 15 9 15 9 16.4 0.6 0.8 0.8 0.4 2.5 4.8 2.4 1.0 10.8<br />

Total Route 71 45.7 166 14 151 29 151 29 151 29 16.5 6.0 6.0 6.0 3.0 24.0 36.0 18.0 8.4 86.4 1075 12<br />

West Valley Total 61 62 62 39 206 369 195 125 894 19291 22<br />

Total Unconstrained System 174 175 174 103 581 1044 530 340 2,495 60025 24<br />

Total Partially Constrained System 160 155 159 103 537 921 486 341 2,285 57391 25<br />

Total Constrained System 136 127 136 96 461 655 414 308 1,939 54338 28<br />

Total Current System 145 144 145 99 499 849 441 334 2,123 56268 27<br />

July 11, 2007 257


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

12.3 Resource Impacts<br />

Figure 12-7 illustrates the resource impacts of the various scenarios.<br />

Present<br />

System (as of<br />

July 1, 2007)<br />

Figure 12-7: Resource Impacts<br />

Constrained<br />

Scenario (by<br />

2012)<br />

Partially<br />

Constrained<br />

Scenario<br />

Unconstrained<br />

Scenario<br />

Peak Buses 138 143 163 182<br />

Operators 415 415 472 522<br />

Annual Rev. Hrs 634,000 634,000 730,000 800,000<br />

July 11, 2007 258


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

13. IMPLEMENTATION STRATEGY<br />

Several major actions are required to implement this plan, including services, marketing, amenities, and –<br />

perhaps most important – the supporting policies that will ensure the best possible fit between transit<br />

service and the region’s growing communities. This chapter outlines recommended implementation<br />

efforts.<br />

13.1 Steps Towards Implementation<br />

This section describes the next steps required to successfully implement the proposed <strong>Omnitrans</strong> service<br />

redesign. This section consists four parts that comprise the implementation path:<br />

• Phasing – Because the agency’s resources are expected to grow gradually over<br />

time, a phasing plan will be needed. A phasing plan identifies specific parts of<br />

the plan that are independent of one another and can be implemented<br />

separately. It then assigns these elements to different years. These elements<br />

become the basis of the annual service change process for each year of the<br />

plan.<br />

• Achieving Service Change Adoption – This section discusses the steps<br />

required to receive adequate public input – and respond to that input with<br />

revisions to the plan as needed – so that the Board is comfortable directing staff<br />

to implement each service change outlined in the plan.<br />

• From Adoption to Implementation – This section discusses the steps required<br />

for a successful service implementation of each phase.<br />

• Monitoring After Implementation<br />

In addition, this section describes four efforts that will occur in parallel with the SRTP implementation:<br />

13.2 Phasing<br />

• Ongoing Proactive <strong>Plan</strong>ning<br />

• Supporting Policies<br />

• Marketing Strategies<br />

• Long <strong>Range</strong> <strong>Plan</strong>ning<br />

The Scenario 1: Constrained Service <strong>Plan</strong> was developed through a comprehensive planning process<br />

that included substantial technical analysis of the existing service operation, and research on travel<br />

demands and development trends in the service area. The process included several Board workshops,<br />

public and stakeholder involvement sessions, meetings with employees, and review of the service<br />

changes at public hearings.<br />

The Scenario 1: Constrained Service <strong>Plan</strong> was designed to address declining ridership, increasing<br />

operating costs and the need to stabilize farebox recovery above the minimum State mandated<br />

requirements. Phasing is designed to begin addressing these issues in the early stages of the SRTP.<br />

The <strong>Plan</strong> calls for a reduction of 64,892 annual revenue service hours by FY 2009 and a reduction in the<br />

peak fixed route fleet requirement from 145 to 136, although both those metrics will increase in the latter<br />

part of the SRTP due to the introduction of sbX service, as delineated in Section 2.2.8. Access demand<br />

July 11, 2007 259


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

management and productivity incentives are phased in gradually over the <strong>2008</strong>-<strong>2013</strong> timeframe. Several<br />

OmniLink and Access service standards will be deferred until the beginning of the next service contract<br />

cycle on July 1, 2009.<br />

A number of service changes were approved by <strong>Omnitrans</strong>’ Board of Directors effective May 7, 2007.<br />

These include:<br />

• Route 1 – Reduce Saturday frequency from 15/30 minutes to 30/60 minutes.<br />

• Route 8 – Alignment changes near Citrus Plaza.<br />

• Route 11 – Eliminate Saturday Northbound 5:53 PM trip.<br />

• Route 14 – Discontinue weekday 14L Limited Stop Service.<br />

• Route 15 –Eliminate weekday Eastbound 9:10 PM trip.<br />

• Route 19 – Reduce Saturday frequency from 30 minutes to 60 minutes.<br />

• Route 20 – Reduce Sunday frequency from 30 minutes to 60 minutes.<br />

• Route 22 – Reduce weekday frequency from 20 minutes to 30 minutes.<br />

• Route 28 – Reduce weekday frequency to peak service only (6:02 AM to 8:56<br />

AM and 4:02 PM to 6:52 PM).<br />

• Route 31 – Eliminate route.<br />

• Route 62 – Eliminate weekday Northbound 5:48 AM trip between Chino<br />

Transcenter and D at Sultana. Start service at Montclair Transcenter.<br />

• Route 68 – Discontinue Sunday service.<br />

• Route 75 – Eliminate weekday 9:05 AM eastbound trip, 9:24 AM westbound trip,<br />

6:24 eastbound trip and 6:24 westbound trip.<br />

• Route 90 – Discontinue service between Riverside and Montclair.<br />

• OmniLink – Discontinue Saturday and Sunday service.<br />

The following changes will be introduced in 2009:<br />

• Route 11 – Change Saturday evening frequency from 30 to 60 minutes.<br />

• Route 15 – Change Sunday frequency from 30 to 60 minutes.<br />

• Route 28 – Eliminate route.<br />

• Route 60 – Restructure east and west sections. Extend west section along Holt<br />

and Mountain to the Montclair Transcenter. Eliminate east section (this section<br />

will be served by an extended Route 70).<br />

• Route 62 – Restructure to run on Euclid Avenue.<br />

July 11, 2007 260


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Route 65 – Eliminate Los Serranos service.<br />

• Route 66 – Reduce weekday midday and evening service from 15 minutes to 30<br />

minutes.<br />

• Route 67 – Restructure to service 16 th Street, the Mountain corridor and<br />

Montclair. Increase weekday service from 60 minutes to 30 minutes. Extend<br />

weekday service to 9:00 p.m. with 60 minute frequency.<br />

• Route 70 – Restructure to serve Milliken corridor and west section of Route 60.<br />

• Route 71 – Restructure and extend up Sierra corridor. Eliminate Sunday service.<br />

• Route 75 – Eliminate route.<br />

• Access – Adjust service area boundaries as needed based on changes to fixed<br />

route and OmniLink service.<br />

For a description of July 1, 2007 fare changes, see Section 2.3.5 (Figure 2-5, Figure 2-11, Figure 2-12,<br />

and Figure 2-22). Additional fare increases are proposed for FYs 2009, 2011, and 2012.<br />

sbX service will be introduced in FY 2012, providing Bus Rapid <strong>Transit</strong> (BRT) service along the E Street<br />

corridor between CSUSB and LLUMC.<br />

The Scenario 1: Constrained Service <strong>Plan</strong> is intended to address more immediate service productivity<br />

and farebox recovery issues. If the initial reductions of unproductive service scheduled for FY 2007 and<br />

FY 2009 stabilize the current farebox recovery ratio issue, some of the reduced service could be<br />

reintroduced, or service enhancements proposed in the Scenario 2: Partially Constrained Service <strong>Plan</strong><br />

and Scenario 3: Unconstrained Service <strong>Plan</strong> could be considered for implementation.<br />

13.3 Achieving Service Change Adoption<br />

The changes implemented May 8, 2007 and July 1, 2007 have gone through the public hearing process<br />

and have been approved by the Board of Directors. Changes scheduled for implementation in FY 2009<br />

have not yet been approved. These service changes, as well as the service designs included in the<br />

Scenario 2 and Scenario 3 Service <strong>Plan</strong>s, indicate what <strong>Omnitrans</strong> could propose to the public during the<br />

years covered by this <strong>Plan</strong>. The following process is intended for the consideration of those <strong>Plan</strong><br />

elements that were not initially approved for implementation on May 8, 2007 and July 1, 2007.<br />

If the remaining <strong>Plan</strong> is divided into phases for implementation, then each phase will go through its own<br />

outreach/adoption process as part of the Annual Service Change process. For major changes,<br />

recommended steps of this process are:<br />

1. Notify the public of the proposed change – Good notification requires outreach not<br />

just to “already interested” parties, such as current riders, but also to parties who may not<br />

know they are affected. Outreach typically includes press releases to trigger media<br />

coverage, presentations to community, civic, neighborhood groups, and “open house”<br />

style public meetings where people can speak individually with <strong>Omnitrans</strong><br />

representatives. The most effective tools include a brochure presenting the proposed<br />

changes (both the big-picture goals and the details) and a presentation that covers the<br />

same material.<br />

2. Collect input over a specified period with a clear deadline – All outreach materials<br />

should state this deadline. They should provide an array of opportunities for the public to<br />

July 11, 2007 261


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

find out more and to comment. Comments should be welcomed by mail, phone, e-mail,<br />

or through the <strong>Omnitrans</strong> website.<br />

3. Review comments – Summarize areas of major concern, and develop proposed<br />

modifications to the service design to address those concerns.<br />

4. Public Hearing and Adoption – This is described in the following section.<br />

Possible “Fixes” and Public Hearings<br />

At the public hearings, staff should present the results of the outreach. Prior to this presentation, staff<br />

and/or a consultant should conduct the following analysis:<br />

• If major concerns have been raised by large numbers of people, staff should ask:<br />

“Can the concern be resolved in a way that does not compromise the key<br />

principles of the plan?”<br />

• If the answer to the previous question is YES, then staff should develop a<br />

proposed change to the plan that resolved the concern.<br />

• If the answer is NO, staff should develop a proposed change, but should first ask<br />

the Board whether it wants to (1) change the SRTP’s basic principles so as to<br />

make the change, (2) refuse to make the change based on the SRTP principles,<br />

or (3) make an exception to the principles due to overriding considerations.<br />

At the public hearing, staff should present these issues. Each issue should have a potential resolution<br />

and a clear description of (1) whether that resolution is consistent with the principles and (2) whether that<br />

resolution creates other problems that could generate other complaints.<br />

Additional testimony at the public hearing may raise new issues. Beginning the public hearing with a<br />

presentation of issues already raised can help reassure attendees that they have been heard. This can<br />

allow them to focus their testimony on possible solutions and the real tradeoffs these solutions imply.<br />

Although the strategy for managing the public hearing lies with the Board chair, some simple strategies<br />

can be used to ensure an efficient and fair public hearing:<br />

• Where groups of people have come to testify on the same point, the Board chair<br />

can ask a single person to testify on that point, and then to ask for show of hands<br />

of people who have come solely to say the same thing. The Chair would then<br />

acknowledge the testimony as coming for all of those people, and ask them to<br />

forego testifying individually.<br />

• In advance of testimony, the Board of Directors should decide whether it will<br />

make an adoption decision at that meeting. This decision can be made based on<br />

the actual hearing attendance. If the Board knows in advance that there is<br />

enough controversy to justify postponing action, they should announce this<br />

intention at the beginning of the hearing, so that people will feel free to leave<br />

once they have had their say. This approach respects the valuable time of the<br />

citizens, who may otherwise be aggravated when they wait through the entire<br />

hearing for a Board action, only to have it postponed.<br />

July 11, 2007 262


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Options for the Board of Directors<br />

Board action on the <strong>Plan</strong> should occur either at the public hearing or at a special meeting no more than<br />

two weeks later. Given the tremendous effort that will have gone into consolidating input, based on a<br />

widely advertised deadline, it is only fair that input received prior to the deadline and at the public hearing<br />

be the basis for a Board decision. A long delay provides opportunities for consensus to deteriorate.<br />

The staff recommendation will include a date for implementation. Many considerations go into this<br />

decision. Summer implementation is ideal for <strong>Omnitrans</strong> operations, because drivers can test the service<br />

before they encounter school demand or winter weather.<br />

At the public hearing, or at a special meeting no more than two weeks later, the Board of Directors should<br />

make one of the following choices:<br />

1. Adopt the plan as previously proposed, and direct staff to implement it.<br />

2. Adopt the plan with specific changes selected from the issues list – Each<br />

change is studied by staff in advance, and is ready to implement.<br />

3. Direct staff to study changes other than those that appear on the issues list<br />

– This choice should be necessary only if staff has failed to respond to a major<br />

issue. It also may result from a new issue raised in the public hearing process<br />

that the Board of Directors feels must be addressed (it may not have been<br />

presented prior to the questionnaire deadline). If the issues remaining are small,<br />

it still may be possible for staff to address them in two weeks and present a<br />

revised plan for final adoption to meet the target implementation date.<br />

4. Shelve the plan and elect not to implement any major changes to the<br />

present system – In this case, the <strong>Omnitrans</strong> Board should revisit the initial<br />

discussion of service design principles. This will give staff direction towards<br />

developing new service change ideas for later implementation. Since the Board<br />

will be consulted several times throughout the development of the service<br />

changes, outright rejection of the plan should be a last resort.<br />

What It Means to Vote Yes on a Service Change<br />

A member of the Board of Directors should vote for Service <strong>Plan</strong> Option 1 or 2 – adoption of the plan in<br />

some form – only with the knowledge that:<br />

• Further changes should not be made for a year, except as noted below –<br />

Any major service restructuring must operate for a year before significant<br />

changes are made. Ridership resulting from new service patterns takes a year to<br />

develop, and a complete cycle of seasonal variations must also be observed.<br />

For further details on warrants for continuance and discontinuance, see Section<br />

6.12.<br />

• Service redesigns are changeable but not practically “reversible” – Given<br />

the previous point, by the time the system is ready for further redesign, the new<br />

system will have been running for a year, memories of the “old” system will be<br />

fading, and enough travel patterns will have changed that “going back to the old<br />

system” will itself be a disruption to many riders. Should the Board of Directors<br />

choose to undo the entire restructuring, or parts of it, after a year, it should take<br />

into account that the political process for doing so will likely lead to a new set of<br />

concerns.<br />

July 11, 2007 263


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• A storm of complaint could greet the implementation of new service. This<br />

does not indicate failure – Those who are inconvenienced by a change will<br />

complain at once, while those who benefit will notice the improvements gradually<br />

and may never express appreciation. As a result, negative feedback is always<br />

louder than positive feedback in the wake of the service change, regardless of<br />

the overall benefit of the change to the community. Ridership, after several<br />

months, is a better indication than public comment of whether the service change<br />

is succeeding.<br />

Despite the potential complaints, and even negative statistics in the first months, there are only three<br />

reasons to make service changes in the first year of a major restructuring. These are:<br />

• Cycle Failure – If a line is failing to cycle in the scheduled amount of time,<br />

causing timed connections to be missed or providing inadequate driver breaks,<br />

service may be streamlined to eliminate this problem. Staff will have already<br />

tried to minimize the chances of this by extensive field testing of the <strong>Plan</strong> prior to<br />

implementation.<br />

• Safety – As always, a safety problem should be corrected immediately. Again,<br />

staff will have already tried to minimize the chances of this by extensive field<br />

testing of the <strong>Plan</strong>, and will continue to monitor for safety during implementation<br />

steps such as the placement of bus stops. However, some safety issues are not<br />

foreseeable, such as those arising from land use activities that may affect bus<br />

stops or movements.<br />

• Overloads and Pass-ups – If buses are overloaded beyond <strong>Omnitrans</strong>’<br />

standard, or must pass up passengers due to lack of space, immediate corrective<br />

action is required. <strong>Omnitrans</strong> passengers must have complete confidence that<br />

they will be able to board the trip of their choice. Exceptional pass-ups can be<br />

covered by the “extra board” of spare drivers and vehicles, or a spare paratransit<br />

capacity. Chronic pass-ups may require corrective action such as additional<br />

service.<br />

The above principles are time-tested and are critical for any successful implementation of a major service<br />

change.<br />

13.4 From Adoption to Implementation<br />

If the Board directs staff to implement a major service change, staff must be ready to undertake a series<br />

of accelerated actions in every department. Most actions are simply amplified versions of things that staff<br />

does anyway, such as training drivers on lines or moving bus stops, but the amplification of staff effort will<br />

be dramatic. A detailed review of staffing should be conducted well in advance to ensure maximum staff<br />

availability in the timeframe for the implementation tasks, and to identifying the level of staffing needed to<br />

implement the plan.<br />

The most labor-intensive implementation tasks for a major service change are as follows:<br />

• Developing new informational materials for the new service, not only describing<br />

the service but also promoting the service in the best light.<br />

• Distributing informational materials and responding constructively to inquiries.<br />

• Hiring new drivers (if needed).<br />

July 11, 2007 264


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Finalizing schedules and runcutting. Runcutting is the process of dividing the<br />

bus schedule into pieces of work for the drivers.<br />

• Training drivers on the new services, so that they can not only drive the new lines<br />

but also answer questions about them.<br />

• Moving bus stop signs, and possibly some shelters. This is a particularly laborintensive<br />

task because it must be done rapidly to avoid confusing customers prior<br />

to implementation. A huge effort on the weekend prior to service startup is<br />

typically the best way to achieve bus stop sign revisions. This is the most<br />

common area of failure in implementations, simply because agencies often<br />

underestimate the magnitude of the task. In addition, the implementation of a<br />

service change is the most appropriate time to introduce more informative bus<br />

stop signage, identifying the lines and their frequencies, if <strong>Omnitrans</strong> chooses to<br />

do so. This issue is discussed in greater detail below.<br />

• Reprogramming overhead signage. The simpler lines should generally permit<br />

simpler signage that advertises the service in addition to identifying it. This issue<br />

is discussed in greater detail below.<br />

To do all of this while sustaining day-to-day operations requires additional staff, and a special<br />

management structure for the implementation activities. A common mistake is to assume that the existing<br />

staff can handle implementation alongside their ongoing duties; this assumption inevitably causes<br />

implementation errors that reflect badly on the agency and on the service change.<br />

The following are the most predictable pitfalls of a major implementation, and strategies for minimizing<br />

them. The first, signage replacement, is a common logistical failure. All of the others fall under a general<br />

principle, which is “The whole information system should convey the plan’s values.”<br />

Bus Stop Signage Replacement<br />

There are three categories of bus stop changes that occur due to a service change:<br />

• Deleted stops<br />

• New stops<br />

• Stops that are retained, but with new route information<br />

The steps for changing stops are as follows:<br />

• Deleted stops – As early as possible in the implementation, and no later than a<br />

month in advance, place a decal on each sign at a deleted stop. The decal<br />

should say: “No service to this stop after (date). For information, call<br />

(information phone number)”. This gives customers plenty of warning that<br />

service is changing, so that people are not standing forlornly at abandoned bus<br />

stops on opening day. The decals will remain useful information even after<br />

implementation has occurred. As time permits, deleted stops should then be<br />

uninstalled.<br />

• New stops – New signs can be posted at new stops at any time prior to<br />

implementation, though the later the better. Typically, these signs are covered<br />

with plastic bags marked “New OMNITRANS service begins (date),” with the<br />

phone number. In this case, all the bags must be removed the night before<br />

July 11, 2007 265


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

implementation. A way to eliminate this time pressure is to put a removable<br />

decal at the top of the sign loudly announcing the new service and its effective<br />

date. These signs then do not have to be modified on implementation day,<br />

though the decals should eventually be removed. If the new signs have a new<br />

look, as this report recommends, then the difference will further call customer<br />

attention to the fact that they need to study the sign closely for new information.<br />

This approach helps to ensure that passengers are not standing forlornly at new<br />

stops before the new service begins.<br />

• Changed stops – Stops that are remaining in service, but with different routes<br />

serving them, present the biggest challenge, especially since these are likely to<br />

include the busiest stops in the system. There are two ways to handle changed<br />

stops:<br />

1. Treat a changed stop as a new stop and a deleted stop at the same location,<br />

dealing with each as described above. This is the most capital-intensive<br />

approach, since it requires replacing all signs (and briefly having two signs<br />

on the same pole), but it is also the easiest to implement accurately, offers<br />

the best promotional value, and requires the least intensive overtime effort in<br />

the days before the new service begins. It also permits the whole system to<br />

be “re-inaugurated” with a new look, including new signs everywhere.<br />

2. Use decals to change the route number information on each existing sign. At<br />

stops where old information must be removed, this effort must occur<br />

intensively in the 24 hours before implementation. Decals announcing new<br />

service can be added earlier, so long as the decals identify the start date of<br />

the new service. Using a different “look” for the decals makes it easier for<br />

riders to identify the new service. Service that is unchanged would get these<br />

decals last, after all the other implementation tasks are complete.<br />

Route Naming/Numbering and Overhead Signage<br />

Many <strong>Omnitrans</strong> routes are associated with one or two arterials. Most key destinations are along these<br />

arterials, not just at the route terminals. In these cases, <strong>Omnitrans</strong> should consider adopting an arterialbased<br />

style of route naming – a style also used by San Francisco Muni, Portland’s Tri-Met, Spokane<br />

<strong>Transit</strong>, and several other agencies.<br />

In this style, a key arterial, rather than the terminals, forms the basis for the route name. Since most<br />

people in Southern California navigate by arterials, this style is more useful, because it helps people to<br />

think of the route as an intrinsic part of the arterial.<br />

Several ideas are at work in this signage style:<br />

• Route names are consistently the name of a primary arterial used, not simply the<br />

terminals. The arterial named may in some cases describe only part of the route<br />

(as with 65-Central) but it gives some sense of the corridor that the bus follows.<br />

• The sign announces both the name – that is, the major arterial – and the<br />

terminus. This helps clarify which way on the route the bus is going, and also<br />

whether it is turning back at a shortline. More importantly, though, it serves as a<br />

“passive advertisement” of the service. “Euclid/to 19th” is a pretty complete<br />

description of what the bus in question does, and by announcing both the route<br />

and terminal, the overhead sign gives the casual observer some potentially<br />

useful information about the bus system.<br />

July 11, 2007 266


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Signage/Decal Design<br />

• On the newer, more versatile overhead signs, the route name or arterial could<br />

appear in a different “font” than the terminus, typically larger. As a citizen grows<br />

used to seeing these signs, the possibility of confusing the routing arterial with<br />

the terminus disappears. The terminus is always preceded with the small word<br />

“to” for the same reason.<br />

• The route number is continuously visible, unlike on some changeable overhead<br />

signs.<br />

A good bus stop sign is not just an indicator, but a small advertisement. It not only tells you that the bus<br />

stops here, but also gives you some information about where it goes and why you might want to use it.<br />

<strong>Omnitrans</strong> should consider acquiring new bus stop signs that do several things differently:<br />

• Identify the arterial and destination in different fonts, as on the proposed<br />

overhead sign.<br />

• Reflect the plan’s emphasis on high-frequency Primary Corridors. This can be<br />

done either by showing primary routes in a different color or by adding a decal<br />

that advertises “15 minute service.” This prominent and catchy symbol should be<br />

carried through the information system, including the Bus Book.<br />

13.5 Monitoring After Implementation<br />

Once the new service is in place, performance should be monitored using the standards discussed in<br />

Chapters 6 and 7 of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP. Close attention should also be given to individual<br />

route productivity and farebox recovery as well as route running times, to ensure that the routes are<br />

meeting efficiency standards and are cycling as planned. Small schedule adjustments, such as shifting a<br />

few minutes from one timepoint to another, are sometimes in order after three months of observations.<br />

However, as noted above, no significant changes should be made for one year except in cases of cycle<br />

failure, safety problems, or overloads and pass-ups. See the discussion under “What It Means to Vote<br />

Yes on a Service Change” in Section 13.3. Except for these issues, no adjustments should be made until<br />

the following annual service change cycle.<br />

13.6 Proactive <strong>Plan</strong>ning and <strong>Plan</strong>ning for the Unexpected<br />

This <strong>Plan</strong> covers the fiscal years <strong>2008</strong>-<strong>2013</strong> in as much detail as can be foreseen from the current<br />

vantage point in 2007, but many events may occur between now and then that cannot be predicted, or<br />

which are not definite enough to reflect in the detailed service packages presented here. Aside from<br />

ongoing short term restructuring and rescheduling related to major road work projects, response to<br />

emergency requirements, and planning for major events, a number of significant initiatives will impact<br />

transit planning priorities within the <strong>2008</strong>-<strong>2013</strong> timeframe. These include:<br />

• E Street <strong>Transit</strong> Corridor and San Bernardino Transcenter Projects – With<br />

the implementation of sbX service along the E Street Corridor in 2012, there will<br />

be a requirement to reroute base and local fixed routes in the Downtown to<br />

establish good, convenient connections along E Street prior to the opening of<br />

San Bernardino Transcenter. There will also be a requirement to establish a<br />

Downtown San Bernardino transit circulation plan with appropriate routing and<br />

schedule changes to accommodate fixed route bus service to/from the new San<br />

Bernardino Transcenter.<br />

July 11, 2007 267


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• San Bernardino Downtown Redevelopment – Anticipated redevelopment in<br />

San Bernardino’s Downtown will require ongoing short term routing changes<br />

during construction phases. Downtown redevelopment also offers an opportunity<br />

for <strong>Omnitrans</strong> planners to be involved in the early phases of design and planning<br />

to ensure transit operational requirements are accommodated, and to assist in<br />

the design of effective transit-oriented development (TOD).<br />

• I-210 Completion (FY 2007/08) – Offers an opportunity to plan an east-west<br />

limited stop express connecting the planned Chaffey College Transcenter and<br />

new residential developments in the West Valley with the E Street sbX. A new I-<br />

210 express service could be integrated with E Street sbX as an overlay,<br />

increasing E Street capacity and frequency while providing an attractive, singleseat<br />

service for West Valley commuters.<br />

• Yucaipa and Chaffey College Transcenters – The opening of the Yucaipa<br />

Transcenter in FY 2007/08 is an opportunity to formally structure the Yucaipa<br />

OmniLink service into a flexroute service pulsed with the arrival and departure of<br />

Route 9 service. The opening of the Chaffey College Transcenter will require<br />

some schedule and route changes. This new Transcenter could also serve as a<br />

strategic focal point for a possible I-210 express service.<br />

• Redlands Passenger Rail – The Redlands Passenger Rail planning process will<br />

continue during the <strong>2008</strong>-<strong>2013</strong> timeframe and provide <strong>Omnitrans</strong> planners a<br />

good opportunity to assist in the development of TOD projects, and the planning<br />

of feeder services for the key stations along the rail corridor.<br />

• SCRRA Strategic Assessment – Metrolink service increases along the San<br />

Bernardino Line are planned for 2015 and along the Inland Empire-Orange<br />

County Line in 2010 and 2015. Service increases may impact Metrolink station<br />

parking capacity and generate a need for peak hour express bus feeder services<br />

in the West Valley. <strong>Plan</strong>ning for enhanced bus feeder services could begin<br />

during the <strong>2008</strong>-<strong>2013</strong> timeframe.<br />

• Gold Line Extension – The planned extension of the Gold Line to the Montclair<br />

Transcenter will impact <strong>Omnitrans</strong> service in the West Valley. Although the<br />

planned extension will not be completed until 2014, feeder service planning will<br />

begin in the <strong>2008</strong>-<strong>2013</strong> timeframe. Again, this is an opportunity for <strong>Omnitrans</strong><br />

<strong>Plan</strong>ners to proactively plan new feeder bus services.<br />

• The SCAG Compass Blueprint 2% Strategy – As part of SCAG’s Compass<br />

Blueprint 2% Strategy, SANBAG has identified opportunities for TOD in San<br />

Bernardino, Loma Linda and Redlands. As with other redevelopment and<br />

regional transportation initiatives, the SCAG Compass Blueprint 2% Strategy<br />

offers an opportunity for <strong>Omnitrans</strong> planners to become proactively involved in<br />

site design and in the planning of TOD-supportive transit services.<br />

• SANBAG Public <strong>Transit</strong>-Human Services Transportation Coordination <strong>Plan</strong><br />

for San Bernardino County – A Coordination <strong>Plan</strong> is scheduled for completion<br />

in the fall of 2007. Outcomes could include an expanded role for <strong>Omnitrans</strong> as a<br />

“mobility manager,” coordinating human service transportation beyond the<br />

current Access scope. A mobility manager role could also go beyond the<br />

delivery of human service transportation to include the management of carpool<br />

July 11, 2007 268


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

and vanpool programs for situations where regular transit services cannot<br />

efficiently or effectively meet commuter travel needs.<br />

13.7 Supporting Policies<br />

Since World War II, population growth in San Bernardino has been accommodated in low-density,<br />

automobile-oriented single family neighborhoods with local and regional shopping centers and lowdensity<br />

employment areas, typically called sprawl. In the past ten years in Southern California, decisionmakers<br />

and planners have begun to think about more efficient ways to develop that reduce automobile<br />

dependency and create more compact, transit-accessible, pedestrian-oriented, mixed-use development<br />

areas.<br />

Both the Southern California Association of Governments (SCAG) and San Bernardino Associated<br />

Governments (SANBAG) are leading the way in determining how growth should occur in San Bernardino.<br />

The studies underway identify opportunity areas (city centers, regional hubs, and Transcenters) where<br />

future growth can be accommodated with a mix of uses at higher densities. This is particularly relevant to<br />

<strong>Omnitrans</strong>’ efforts to plan for future transit.<br />

<strong>Transit</strong> and land use policies are inextricably linked in two basic ways, as shown in Figure 13-1. First,<br />

transit investments and policies can influence development patterns: with new highway development,<br />

commercial development stretches out along highway corridors, new subdivisions pop up after the new<br />

freeway opens, and shopping malls and gas stations congregate at interchanges. With the introduction or<br />

expansion of higher order transit services, there are opportunities to increase densities and create or<br />

enhance the range of uses around the new transit stations. Second, development patterns shape travel<br />

patterns: the design of suburban areas makes transit and walking a challenge, and the separation<br />

between land uses in low-density developments makes driving a necessity. In this way, sprawl<br />

contributes to automobile dependence, but policies designed to fight sprawl can potentially help to reduce<br />

automobile dependence.<br />

Figure 13-1: Basic Links Between Transportation and Land Use<br />

How San Bernardino continues to grow in the future affects <strong>Omnitrans</strong>’ ability to service both existing<br />

development and future growth. In a financially constrained environment, it will be difficult for <strong>Omnitrans</strong><br />

to continue to provide transit services to existing neighborhoods and cities as well as provide new transit<br />

services to new low-density single family residential neighborhoods or to low-density employment areas<br />

that are designed to discourage walking and taking transit. Difficult choices will lie ahead for <strong>Omnitrans</strong> in<br />

expanding its existing transit service to new growth areas if they continue to be developed in the same<br />

pattern. At the same time, if the cities promote higher-density, mixed-use nodes in key locations, it will be<br />

July 11, 2007 269


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

important for <strong>Omnitrans</strong> to work with the cities to provide the necessary transit connections and upgrade<br />

services as growth occurs in these areas.<br />

13.8 Marketing Strategies<br />

As a result of the findings of the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP, <strong>Omnitrans</strong> has the opportunity to market its<br />

existing services and to communicate proposed changes to its transit plan. From the SRTP, a set of key<br />

messages or significant communication points should be identified, which are of consequence to the<br />

<strong>Omnitrans</strong> customer and key audiences.<br />

13.8.1 MARKETING OPPORTUNITIES<br />

<strong>Omnitrans</strong> should utilize its existing Marketing <strong>Plan</strong> to channel identified key messages to its customer<br />

base. These may include, but are not limited to:<br />

• Media Relations – Press release summarizing the changes, dates they take<br />

effect, and overall impact on <strong>Omnitrans</strong> services.<br />

• Collateral Material – Existing <strong>Omnitrans</strong> collateral material should be updated to<br />

reflect the changes, including any potential change to the image/presentation of<br />

materials.<br />

• Advertising/Billboards/Bus Boards – As appropriate, major messages should<br />

be communicated en masse via established ad buys and/or <strong>Omnitrans</strong>’ own bus<br />

boards and in-bus messaging.<br />

13.8.2 OTHER PUBLIC RELATIONS OPPORTUNITIES<br />

Again, depending upon the nature of the key messages, additional public relations opportunities may be<br />

appropriate avenues of marketing. These may include, but are not limited to:<br />

• Organizational Presentations – During scheduled meetings with various<br />

community/professional groups and organizations, and government agencies.<br />

• Special Events – In booth or kiosk viewing at numerous community fairs and<br />

events.<br />

• Movie Theaters – As appropriate, on-screen viewing at movie theaters prior to<br />

the start of the feature film.<br />

13.9 Long <strong>Range</strong> <strong>Plan</strong><br />

The next 20 years will be both exciting and challenging for <strong>Omnitrans</strong>. The <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP<br />

provides a blueprint for the stabilization of <strong>Omnitrans</strong> farebox recovery ratio and standards for the design<br />

and operation of efficient and effective transit services in both the near and long term. The <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP offers a service strategy for the near term horizon. Implementation of the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP service strategies will minimize reactive planning and free <strong>Omnitrans</strong> management and<br />

staff to focus on proactively planning for the future. A focused Long <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong>ning Process is<br />

critical to fiscal, facility, and resource planning. Longer range projections of capital requirements and<br />

service volumes are essential to the establishment of priorities, and to ensure <strong>Omnitrans</strong>’ effectiveness in<br />

meeting the San Bernardino Valley’s increasing mobility needs and supporting land use, economic<br />

development, and quality of life goals.<br />

July 11, 2007 270


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The <strong>Omnitrans</strong> Long <strong>Range</strong> <strong>Plan</strong> will build on the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP service strategies and<br />

focus on the expansion of sbX services to attract choice riders, supporting TOD initiatives, and designing<br />

seamless feeder services for regional mass transit commuter initiatives. With Metrolink service increases<br />

and expansion, SCAG Compass 2% initiatives, San Bernardino Downtown redevelopment, Loma Linda<br />

development, the expansion of the Gold Line, and the development of the Redlands Passenger Rail,<br />

there is a significant supportive role for <strong>Omnitrans</strong> in the realization of quality of life improvements in the<br />

San Bernardino Valley.<br />

July 11, 2007 271


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX A – CURRENT VEHICLE LISTING AND DESCRIPTION OF COACHES<br />

July 11, 2007 272


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

New Flyer Series Coaches<br />

Manufacture Years: 2000 - 2005<br />

Dimensions - Length: 39.9 - 40.8<br />

Width: 10.3<br />

Seats: 37<br />

Wheelchair Tiedown Positions: 2<br />

Fuel Type: CNG<br />

Total Vehicles in Series: 127<br />

Detailed Listing<br />

Usage: Local Fixed Route Services<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

0001 2000 New Flyer C40LF 38<strong>2013</strong> 311,387 CNG 37 2012<br />

0002 2000 New Flyer C40LF 382012 232,447 CNG 37 2012<br />

0003 2000 New Flyer C40LF 382010 362,465 CNG 37 2012<br />

0004 2000 New Flyer C40LF 382011 355,461 CNG 37 2012<br />

0005 2000 New Flyer C40LF 381997 364,575 CNG 37 2012<br />

0006 2000 New Flyer C40LF 382009 368,537 CNG 37 2012<br />

0007 2000 New Flyer C40LF 381986 366,168 CNG 37 2012<br />

0008 2000 New Flyer C40LF 382027 361,176 CNG 37 2012<br />

0009 2000 New Flyer C40LF 381996 369,224 CNG 37 2012<br />

0010 2000 New Flyer C40LF 381998 366,006 CNG 37 2012<br />

0011 2000 New Flyer C40LF 381988 369,762 CNG 37 2012<br />

0012 2000 New Flyer C40LF 382000 370,272 CNG 37 2012<br />

0013 2000 New Flyer C40LF 381985 365,729 CNG 37 2012<br />

0014 2000 New Flyer C40LF 381987 366,455 CNG 37 2012<br />

0015 2000 New Flyer C40LF 382026 353,158 CNG 37 2012<br />

0016 2000 New Flyer C40LF 381999 333,437 CNG 37 2012<br />

0017 2000 New Flyer C40LF 382002 375,738 CNG 37 2012<br />

0018 2000 New Flyer C40LF 382023 367,894 CNG 37 2012<br />

0019 2000 New Flyer C40LF 382001 359,631 CNG 37 2012<br />

0020 2000 New Flyer C40LF 381994 372,323 CNG 37 2012<br />

0021 2000 New Flyer C40LF 381989 360,405 CNG 37 2012<br />

0022 2000 New Flyer C40LF 382024 352,651 CNG 37 2012<br />

July 11, 2007 273


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

0023 2000 New Flyer C40LF 433809 362,665 CNG 37 2012<br />

0024 2000 New Flyer C40LF 382025 381,622 CNG 37 2012<br />

0025 2000 New Flyer C40LF 382022 377,078 CNG 37 2012<br />

0026 2000 New Flyer C40LF 382021 370,254 CNG 37 2012<br />

0027 2000 New Flyer C40LF 382020 382,499 CNG 37 2012<br />

0028 2000 New Flyer C40LF 382019 387,322 CNG 37 2012<br />

0029 2000 New Flyer C40LF 382028 387,932 CNG 37 2012<br />

0030 2000 New Flyer C40LF 382004 375,710 CNG 37 2012<br />

0031 2000 New Flyer C40LF 382029 382,032 CNG 37 2012<br />

0032 2000 New Flyer C40LF 382003 334,202 CNG 37 2012<br />

0033 2000 New Flyer C40LF 382006 373,549 CNG 37 2012<br />

0034 2000 New Flyer C40LF 433808 371,332 CNG 37 2012<br />

0035 2000 New Flyer C40LF 381995 378,333 CNG 37 2012<br />

0036 2000 New Flyer C40LF 38<strong>2008</strong> 368,551 CNG 37 2012<br />

0037 2000 New Flyer C40LF 382018 386,794 CNG 37 2012<br />

0038 2000 New Flyer C40LF 382007 395,238 CNG 37 2012<br />

0039 2000 New Flyer C40LF 381993 388,942 CNG 37 2012<br />

0040 2000 New Flyer C40LF 381992 365,902 CNG 37 2012<br />

0041 2000 New Flyer C40LF 382017 367,475 CNG 37 2012<br />

0042 2000 New Flyer C40LF 381991 377,802 CNG 37 2012<br />

0043 2000 New Flyer C40LF 382005 377,462 CNG 37 2012<br />

0044 2000 New Flyer C40LF 382016 369,515 CNG 37 2012<br />

0101 2001 New Flyer C40LF 1041920 340,948 CNG 37 <strong>2013</strong><br />

0102 2001 New Flyer C40LF 1041917 334,995 CNG 37 <strong>2013</strong><br />

0103 2001 New Flyer C40LF 1023548 335,193 CNG 37 <strong>2013</strong><br />

0104 2001 New Flyer C40LF 1041921 339,779 CNG 37 <strong>2013</strong><br />

0105 2001 New Flyer C40LF 1041916 344,129 CNG 37 <strong>2013</strong><br />

0106 2001 New Flyer C40LF 1041918 340,692 CNG 37 <strong>2013</strong><br />

0107 2001 New Flyer C40LF 1041919 342,925 CNG 37 <strong>2013</strong><br />

0108 2001 New Flyer C40LF 1023545 346,352 CNG 37 <strong>2013</strong><br />

0109 2001 New Flyer C40LF 1023544 336,538 CNG 37 <strong>2013</strong><br />

0110 2001 New Flyer C40LF 1023543 340,490 CNG 37 <strong>2013</strong><br />

0111 2001 New Flyer C40LF 1023542 348,869 CNG 37 <strong>2013</strong><br />

0112 2001 New Flyer C40LF 1023540 347,522 CNG 37 <strong>2013</strong><br />

0113 2001 New Flyer C40LF 1023541 345,029 CNG 37 <strong>2013</strong><br />

0114 2001 New Flyer C40LF 1023539 341,893 CNG 37 <strong>2013</strong><br />

0115 2001 New Flyer C40LF 1023546 344,707 CNG 37 <strong>2013</strong><br />

0116 2001 New Flyer C40LF 1041928 327,351 CNG 37 <strong>2013</strong><br />

0117 2001 New Flyer C40LF 1023547 341,455 CNG 37 <strong>2013</strong><br />

0118 2001 New Flyer C40LF 1041932 338,911 CNG 37 <strong>2013</strong><br />

0119 2001 New Flyer C40LF 1041930 334,433 CNG 37 <strong>2013</strong><br />

0120 2001 New Flyer C40LF 1041929 341,567 CNG 37 <strong>2013</strong><br />

0121 2001 New Flyer C40LF 1041931 349,571 CNG 37 <strong>2013</strong><br />

0122 2001 New Flyer C40LF 1041927 334,977 CNG 37 <strong>2013</strong><br />

July 11, 2007 274


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

0123 2001 New Flyer C40LF 1041926 352,174 CNG 37 <strong>2013</strong><br />

0124 2001 New Flyer C40LF 1041925 342,291 CNG 37 <strong>2013</strong><br />

0125 2001 New Flyer C40LF 1041924 332,078 CNG 37 <strong>2013</strong><br />

0126 2001 New Flyer C40LF 1041923 288,099 CNG 37 <strong>2013</strong><br />

0127 2001 New Flyer C40LF 1041922 337,136 CNG 37 <strong>2013</strong><br />

0131 2001 New Flyer C40LF 1120293 277,200 CNG 37 <strong>2013</strong><br />

0132 2001 New Flyer C40LF 1120291 297,073 CNG 37 <strong>2013</strong><br />

0133 2001 New Flyer C40LF 1120290 321,310 CNG 37 <strong>2013</strong><br />

0134 2001 New Flyer C40LF 1120289 308,021 CNG 37 <strong>2013</strong><br />

0135 2001 New Flyer C40LF 1120288 317,724 CNG 37 <strong>2013</strong><br />

0136 2001 New Flyer C40LF 1120287 306,428 CNG 37 <strong>2013</strong><br />

0137 2001 New Flyer C40LF 1120286 314,476 CNG 37 <strong>2013</strong><br />

0138 2001 New Flyer C40LF 1120285 323,221 CNG 37 <strong>2013</strong><br />

0139 2001 New Flyer C40LF 1120292 312,298 CNG 37 <strong>2013</strong><br />

0140 2001 New Flyer C40LF 1120284 311,843 CNG 37 <strong>2013</strong><br />

0141 2001 New Flyer C40LF 1120283 310,883 CNG 37 <strong>2013</strong><br />

0151 2003 New Flyer C40LF 1177111 179,820 CNG 37 2015<br />

0152 2003 New Flyer C40LF 1177110 192,166 CNG 37 2015<br />

0153 2003 New Flyer C40LF 1177081 207,864 CNG 37 2015<br />

0154 2003 New Flyer C40LF 1177080 190,351 CNG 37 2015<br />

0155 2003 New Flyer C40LF 1177093 200,853 CNG 37 2015<br />

0156 2003 New Flyer C40LF 1177102 202,590 CNG 37 2015<br />

0157 2003 New Flyer C40LF 1177103 206,882 CNG 37 2015<br />

0158 2003 New Flyer C40LF 1177107 199,307 CNG 37 2015<br />

0159 2003 New Flyer C40LF 1177096 206,248 CNG 37 2015<br />

0160 2003 New Flyer C40LF 1177106 209,505 CNG 37 2015<br />

0161 2003 New Flyer C40LF 1177105 210,794 CNG 37 2015<br />

0162 2003 New Flyer C40LF 1177104 207,605 CNG 37 2015<br />

0163 2003 New Flyer C40LF 1177112 196,199 CNG 37 2015<br />

0164 2003 New Flyer C40LF 1177097 207,974 CNG 37 2015<br />

0165 2003 New Flyer C40LF 1177113 213,445 CNG 37 2015<br />

0166 2003 New Flyer C40LF 1177098 198,468 CNG 37 2015<br />

0167 2003 New Flyer C40LF 1177099 208,179 CNG 37 2015<br />

0168 2003 New Flyer C40LF 1177100 210,518 CNG 37 2015<br />

0169 2003 New Flyer C40LF 1177101 207,699 CNG 37 2015<br />

0170 2003 New Flyer C40LF 1177108 204,283 CNG 37 2015<br />

0171 2003 New Flyer C40LF 1177109 217,320 CNG 37 2015<br />

0172 2003 New Flyer C40LF 1177094 216,885 CNG 37 2015<br />

0175 2005 New Flyer C40LF 1202903 98,154 CNG 37 2017<br />

0176 2005 New Flyer C40LF 1202900 117,059 CNG 37 2017<br />

0177 2005 New Flyer C40LF 1149095 105,576 CNG 37 2017<br />

0178 2005 New Flyer C40LF 1149096 120,932 CNG 37 2017<br />

0179 2005 New Flyer C40LF 1149097 117,010 CNG 37 2017<br />

0180 2005 New Flyer C40LF 1149098 111,062 CNG 37 2017<br />

0181 2005 New Flyer C40LF 1184187 117,596 CNG 37 2017<br />

0182 2005 New Flyer C40LF 1202901 110,391 CNG 37 2017<br />

0183 2005 New Flyer C40LF 1184188 116,303 CNG 37 2017<br />

0184 2005 New Flyer C40LF 1184189 111,018 CNG 37 2017<br />

0185 2005 New Flyer C40LF 1184198 117,142 CNG 37 2017<br />

0186 2005 New Flyer C40LF 1184197 108,148 CNG 37 2017<br />

0187 2005 New Flyer C40LF 1184190 114,162 CNG 37 2017<br />

0188 2005 New Flyer C40LF 1184191 121,438 CNG 37 2017<br />

0189 2005 New Flyer C40LF 1184196 127,213 CNG 37 2017<br />

0190 2005 New Flyer C40LF 1184192 119,160 CNG 37 2017<br />

0191 2005 New Flyer C40LF 1184193 112,660 CNG 37 2017<br />

0192 2005 New Flyer C40LF 1184194 113,476 CNG 37 2017<br />

0193 2005 New Flyer C40LF 1184186 128,779 CNG 37 2017<br />

0194 2005 New Flyer C40LF 1202902 118,420 CNG 37 2017<br />

0195 2005 New Flyer C40LF 1202904 106,350 CNG 37 2017<br />

0196 2005 New Flyer C40LF 1184199 108,827 CNG 37 2017<br />

0197 2005 New Flyer C40LF 1184195 88,916 CNG 37 2017<br />

July 11, 2007 275


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

New Flyer Hybrid Series Coaches<br />

Manufacture Years: 2000<br />

Dimensions - Length: 40.8<br />

Width: 10.3<br />

Seats: 37<br />

Wheelchair Tiedown Positions: 2<br />

Total Vehicles in Series: 3<br />

Detailed Listing<br />

Fuel Type: Gasoline/Electric<br />

Usage: Local Fixed Route Services - Downtown San Bernardino<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

0045 2000 New Flyer C40LF 1140417 101,112 Gasoline/Electric 37 2012<br />

0046 2000 New Flyer C40LF 1113943 51,403 Gasoline/Electric 37 2012<br />

0047 2000 New Flyer C40LF 1184177 87,690 Gasoline/Electric 37 2012<br />

July 11, 2007 276


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

Orion Series Coaches<br />

Manufacture Years: 1997<br />

Dimensions - Length: 40.8<br />

Width: 10.0<br />

Seats: 37<br />

Wheelchair Tiedown Positions: 2<br />

Fuel Type: CNG<br />

Total Vehicles in Series: 24<br />

Detailed Listing<br />

Usage: Local Fixed Route Services<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

700 1997 Orion 05.501 496883 455,965 CNG 37 2009<br />

701 1997 Orion 05.501 36530 390,293 CNG 37 2009<br />

702 1997 Orion 05.501 496887 432,410 CNG 37 2009<br />

703 1997 Orion 05.501 36531 464,235 CNG 37 2009<br />

704 1997 Orion 05.501 36536 425,129 CNG 37 2009<br />

705 1997 Orion 05.501 36529 419,805 CNG 37 2009<br />

706 1997 Orion 05.501 496886 426,871 CNG 37 2009<br />

707 1997 Orion 05.501 496888 442,633 CNG 37 2009<br />

708 1997 Orion 05.501 496890 452,409 CNG 37 2009<br />

709 1997 Orion 05.501 496889 451,972 CNG 37 2009<br />

710 1997 Orion 05.501 496884 463,094 CNG 37 2009<br />

711 1997 Orion 05.501 496885 468,837 CNG 37 2009<br />

712 1997 Orion 05.501 496882 406,228 CNG 37 2009<br />

713 1997 Orion 05.501 496881 444,727 CNG 37 2009<br />

714 1997 Orion 05.501 36535 435,020 CNG 37 2009<br />

715 1997 Orion 05.501 36540 447,606 CNG 37 2009<br />

716 1997 Orion 05.501 36532 437,548 CNG 37 2009<br />

717 1997 Orion 05.501 36537 433,712 CNG 37 2009<br />

718 1997 Orion 05.501 36534 429,892 CNG 37 2009<br />

719 1997 Orion 05.501 36528 392,707 CNG 37 2009<br />

720 1997 Orion 05.501 36538 435,317 CNG 37 2009<br />

721 1997 Orion 05.501 36533 393,378 CNG 37 2009<br />

722 1997 Orion 05.501 36539 415,817 CNG 37 2009<br />

723 1997 Orion 05.501 36503 430,127 CNG 37 2009<br />

July 11, 2007 277


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

TMC Series Coaches<br />

Manufacture Years: 1994<br />

Dimensions - Length: 40.0 - 40.3<br />

Width: 10.0<br />

Seats: 37<br />

Wheelchair Tiedown Positions: 2<br />

Fuel Type: Diesel<br />

Total Vehicles in Series: 7<br />

Detailed Listing<br />

Usage: Local Fixed Route Services<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

2690 1994 TMC T80206 380363 640,952 Diesel 37 2007<br />

2691 1994 TMC T80206 1057385 564,683 Diesel 37 2007<br />

2692 1994 TMC T80206 380365 647,920 Diesel 37 2007<br />

2693 1994 TMC T80206 380366 650,996 Diesel 37 2007<br />

2695 1994 TMC T80206 380368 596,113 Diesel 37 2007<br />

2696 1994 TMC T80206 380369 553,908 Diesel 37 2007<br />

2698 1994 TMC T80206 380371 568,628 Diesel 37 2007<br />

July 11, 2007 278


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

Thomas Series Coaches<br />

Manufacture Years: 2003<br />

Dimensions - Length: 32.9<br />

Width: 7.9<br />

Seats: 37<br />

Wheelchair Tiedown Positions: 2<br />

Fuel Type: CNG<br />

Total Vehicles in Series: 12<br />

Detailed Listing<br />

Usage: Local Fixed Route<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of 11/31/06 Fuel Type Passenger Capacity Estimated Replacement Year<br />

501 2003 Thomas SLF232G 1171478 163,356 CNG 37 2015<br />

502 2003 Thomas SLF232G 1171479 183,206 CNG 37 2015<br />

503 2003 Thomas SLF232G 1171443 175,540 CNG 37 2015<br />

504 2003 Thomas SLF232G 1171444 122,916 CNG 37 2015<br />

505 2003 Thomas SLF232G 1171445 149,387 CNG 37 2015<br />

506 2003 Thomas SLF232G 1171446 133,634 CNG 37 2015<br />

507 2003 Thomas SLF232G 1171447 196,887 CNG 37 2015<br />

508 2003 Thomas SLF232G 1171448 190,925 CNG 37 2015<br />

509 2003 Thomas SLF232G 171480 185,627 CNG 37 2015<br />

510 2003 Thomas SLF232G 1171481 165,611 CNG 37 2015<br />

511 2003 Thomas SLF232G 1171482 193,311 CNG 37 2015<br />

512 2003 Thomas SLF232G 1171483 163,279 CNG 37 2015<br />

July 11, 2007 279


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

Ford Goshen Series Coaches<br />

Manufacture Years: 2000<br />

Dimensions -<br />

Length:<br />

Width:<br />

Wheelchair Tiedown Positions: 3<br />

Seats: Van 16, Minibus 20<br />

Fuel Type: Gasoline<br />

Total Vehicles in Series: 52<br />

Detailed Listing<br />

Usage: Demand Response<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

A0628 2000 Ford GOSHEN GCII Van E1055499 203,812 Gasoline 16/3 2007<br />

A0629 2000 Ford GOSHEN GCII Van E1055453 210,291 Gasoline 16/3 2007<br />

A0630 2000 Ford GOSHEN GCII Van E1055479 235,382 Gasoline 16/3 2007<br />

A0631 2000 Ford GOSHEN GCII Van E1055455 184,085 Gasoline 16/3 2007<br />

A0634 2000 Ford GOSHEN GCII Van E1055201 200,676 Gasoline 16/3 2007<br />

A0635 2000 Ford GOSHEN GCII Van E1055454 188,097 Gasoline 16/3 2007<br />

A0636 2000 Ford GOSHEN GCII Van E1055457 200,632 Gasoline 16/3 2007<br />

A0831 2000 Ford GOSHEN GCII Van E1055493 223,358 Gasoline 16/3 2007<br />

A0833 2000 Ford GOSHEN GCII Minibus E1055160 223,963 Gasoline 20/3 2007<br />

A0836 2000 Ford GOSHEN GCII Minibus E1055460 216,205 Gasoline 20/3 2007<br />

A0837 2000 Ford GOSHEN GCII Minibus E1055494 243,863 Gasoline 20/3 2007<br />

A0844 2000 Ford GOSHEN GCII Minibus E1055205 247,625 Gasoline 20/3 2007<br />

A0853 2000 Ford GOSHEN GCII Minibus E1055260 224,480 Gasoline 20/3 2007<br />

A0855 2000 Ford GOSHEN GCII Van E1055364 222,916 Gasoline 16/3 2007<br />

A0918 2000 Ford GOSHEN GCII Van E1055437 240,468 Gasoline 16/3 2007<br />

A0919 2000 Ford GOSHEN GCII Van E1055410 237,082 Gasoline 16/3 2007<br />

A0920 2000 Ford GOSHEN GCII Van E1055408 224,177 Gasoline 16/3 2007<br />

A0921 2000 Ford GOSHEN GCII Van E1055431 192,962 Gasoline 16/3 2007<br />

A0922 2000 Ford GOSHEN GCII Van E1055409 223,462 Gasoline 16/3 2007<br />

A0923 2000 Ford GOSHEN GCII Van E1055428 216,301 Gasoline 16/3 2007<br />

A0924 2000 Ford GOSHEN GCII Van E1055427 237,217 Gasoline 16/3 2007<br />

A0925 2000 Ford GOSHEN GCII Minibus E1055164 204,094 Gasoline 20/3 2007<br />

July 11, 2007 280


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

A0926 2000 Ford GOSHEN GCII Minibus E1055207 199,514 Gasoline 20/3 2007<br />

A0928 2000 Ford GOSHEN GCII Minibus E1055165 225,034 Gasoline 20/3 2007<br />

A0929 2000 Ford GOSHEN GCII Minibus E1055157 212,522 Gasoline 20/3 2007<br />

A0930 2000 Ford GOSHEN GCII Minibus E1055254 205,091 Gasoline 20/3 2007<br />

A0931 2000 Ford GOSHEN GCII Minibus E1055155 209,374 Gasoline 20/3 2007<br />

A0932 2000 Ford GOSHEN GCII Minibus E0155171 205,229 Gasoline 20/3 2007<br />

A0934 2000 Ford GOSHEN GCII Minibus E1055161 196,888 Gasoline 20/3 2007<br />

A0935 2000 Ford GOSHEN GCII Minibus E1055173 193,282 Gasoline 20/3 2007<br />

A0936 2000 Ford GOSHEN GCII Minibus E1055487 219,830 Gasoline 20/3 2007<br />

A0937 2000 Ford GOSHEN GCII Minibus E1055251 188,923 Gasoline 20/3 2007<br />

A0938 2000 Ford GOSHEN GCII Minibus E1055199 226,607 Gasoline 20/3 2007<br />

A0939 2000 Ford GOSHEN GCII Minibus E1055250 201,590 Gasoline 20/3 2007<br />

A0940 2000 Ford GOSHEN GCII Minibus E1055198 203,300 Gasoline 20/3 2007<br />

A0941 2000 Ford GOSHEN GCII Minibus E1055259 209,702 Gasoline 20/3 2007<br />

A0942 2000 Ford GOSHEN GCII Van E1055368 232,169 Gasoline 16/3 2007<br />

A0943 2000 Ford GOSHEN GCII Van E1055366 203,337 Gasoline 16/3 2007<br />

A0944 2000 Ford GOSHEN GCII Van E1055367 218,950 Gasoline 16/3 2007<br />

A0945 2000 Ford GOSHEN GCII Van E1055287 241,498 Gasoline 16/3 2007<br />

A0946 2000 Ford GOSHEN GCII Van E1055281 257,266 Gasoline 16/3 2007<br />

A0947 2000 Ford GOSHEN GCII Van E1055286 208,054 Gasoline 16/3 2007<br />

A0948 2000 Ford GOSHEN GCII Van E1055282 236,639 Gasoline 16/3 2007<br />

A0950 2000 Ford GOSHEN GCII Van E1055284 204,206 Gasoline 16/3 2007<br />

A0951 2000 Ford GOSHEN GCII Van E1055220 209,475 Gasoline 16/3 2007<br />

A0952 2000 Ford GOSHEN GCII Van E1055312 210,864 Gasoline 16/3 2007<br />

A0953 2000 Ford GOSHEN GCII Van E1055313 216,083 Gasoline 16/3 2007<br />

A0954 2000 Ford GOSHEN GCII Van E1055311 201,964 Gasoline 16/3 2007<br />

A0956 2000 Ford GOSHEN GCII Van E1055314 226,859 Gasoline 16/3 2007<br />

A0957 2000 Ford GOSHEN GCII Van E1068106 207,105 Gasoline 16/3 2007<br />

A0958 2000 Ford GOSHEN GCII Van E1068104 233,537 Gasoline 16/3 2007<br />

A0960 2000 Ford GOSHEN GCII Van E1055322 237,723 Gasoline 16/3 2007<br />

July 11, 2007 281


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

Starcraft AllStar Series Coaches<br />

Manufacture Years: 2006<br />

Dimensions -<br />

Length:<br />

Width:<br />

Seats:<br />

Wheelchair Tiedown Positions:<br />

Fuel Type:<br />

Usage:<br />

Total Vehicles in Series: 25<br />

Detailed Listing<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

A9026 2006 Starcraft AllStar 7,899<br />

A9027 2006 Starcraft AllStar 2,322<br />

A9028 2006 Starcraft AllStar 8,635<br />

A9029 2006 Starcraft AllStar 7,769<br />

A9030 2006 Starcraft AllStar 6,754<br />

A9031 2006 Starcraft AllStar 2,751<br />

A9032 2006 Starcraft AllStar 6,283<br />

A9033 2006 Starcraft AllStar 6,997<br />

A9034 2006 Starcraft AllStar 7,948<br />

A9035 2006 Starcraft AllStar 6,696<br />

A9036 2006 Starcraft AllStar 7,727<br />

A9037 2006 Starcraft AllStar 7,249<br />

A9038 2006 Starcraft AllStar 2,756<br />

A9039 2006 Starcraft AllStar 7,847<br />

A9040 2006 Starcraft AllStar 8,954<br />

A9041 2006 Starcraft AllStar 7,301<br />

A9042 2006 Starcraft AllStar 7,937<br />

A9043 2006 Starcraft AllStar 6,997<br />

A9044 2006 Starcraft AllStar 2,996<br />

A9045 2006 Starcraft AllStar 6,615<br />

A9046 2006 Starcraft AllStar 7,012<br />

A9047 2006 Starcraft AllStar 2,941<br />

A9048 2006 Starcraft AllStar 6,169<br />

A9049 2006 Starcraft AllStar 8,106<br />

A9050 2006 Starcraft AllStar 7,039<br />

July 11, 2007 282


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

El Dorado Series Coaches<br />

Manufacture Years: 2004 & 2006<br />

Dimensions -<br />

Length:<br />

Width:<br />

Seats:<br />

Wheelchair Tiedown Positions: 3<br />

Fuel Type: Gasoline<br />

Total Vehicles in Series: 35<br />

Detailed Listing<br />

Usage: Demand Response<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

A0859 2004 El Dorado Aerotech E1150946 101,616 Gasoline 2011<br />

A0860 2004 El Dorado Aerotech E1174168 98,373 Gasoline 2011<br />

A0861 2004 El Dorado Aerotech E1174169 114,591 Gasoline 2011<br />

A0862 2004 El Dorado Aerotech E1174170 115,320 Gasoline 2011<br />

A0863 2004 El Dorado Aerotech E1174171 112,789 Gasoline 2011<br />

A0864 2004 El Dorado Aerotech E1150948 126,659 Gasoline 2011<br />

A0865 2004 El Dorado Aerotech E1174172 132,740 Gasoline 2011<br />

A0637 2004 El Dorado Aerotech E1150945 101,832 Gasoline 2011<br />

A0638 2004 El Dorado Aerotech E1150947 106,673 Gasoline 2011<br />

A0639 2004 El Dorado Aerotech E1150949 93,455 Gasoline 2011<br />

A09001 2006 El Dorado Aerotech 1241503 16,106 Gasoline <strong>2013</strong><br />

A09002 2006 El Dorado Aerotech 1241500 22,167 Gasoline <strong>2013</strong><br />

A09003 2006 El Dorado Aerotech 1241501 21,283 Gasoline <strong>2013</strong><br />

A09004 2006 El Dorado Aerotech 1241502 23,252 Gasoline <strong>2013</strong><br />

A09005 2006 El Dorado Aerotech 1241516 12,856 Gasoline <strong>2013</strong><br />

A09006 2006 El Dorado Aerotech 1241512 26,382 Gasoline <strong>2013</strong><br />

A09007 2006 El Dorado Aerotech 1241513 16,849 Gasoline <strong>2013</strong><br />

A09008 2006 El Dorado Aerotech 1241546 21,515 Gasoline <strong>2013</strong><br />

A09009 2006 El Dorado Aerotech 1241635 21,299 Gasoline <strong>2013</strong><br />

A09010 2006 El Dorado Aerotech 1241568 21,900 Gasoline <strong>2013</strong><br />

A09011 2006 El Dorado Aerotech 1241565 19,469 Gasoline <strong>2013</strong><br />

A09012 2006 El Dorado Aerotech 1241564 17,036 Gasoline <strong>2013</strong><br />

A09013 2006 El Dorado Aerotech 1241563 10,030 Gasoline <strong>2013</strong><br />

A09014 2006 El Dorado Aerotech 1241562 15,509 Gasoline <strong>2013</strong><br />

A09015 2006 El Dorado Aerotech 1241557 16,463 Gasoline <strong>2013</strong><br />

A09016 2006 El Dorado Aerotech 1241561 19,902 Gasoline <strong>2013</strong><br />

A09017 2006 El Dorado Aerotech 1241558 18,458 Gasoline <strong>2013</strong><br />

A09018 2006 El Dorado Aerotech 1241556 18,154 Gasoline <strong>2013</strong><br />

A09019 2006 El Dorado Aerotech 1231152 24,215 Gasoline <strong>2013</strong><br />

A09020 2006 El Dorado Aerotech 1241660 20,787 Gasoline <strong>2013</strong><br />

A09021 2006 El Dorado Aerotech 1231151 13,777 Gasoline <strong>2013</strong><br />

A09022 2006 El Dorado Aerotech 1231153 26,162 Gasoline <strong>2013</strong><br />

A09023 2006 El Dorado Aerotech 1231154 11,825 Gasoline <strong>2013</strong><br />

A09024 2006 El Dorado Aerotech 1241659 16,160 Gasoline <strong>2013</strong><br />

A09025 2006 El Dorado Aerotech 1241658 18,179 Gasoline <strong>2013</strong><br />

July 11, 2007 283


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Series Summary<br />

GM Series Coaches<br />

Manufacture Years: 1958<br />

Dimensions -<br />

Length:<br />

Width:<br />

Seats:<br />

Wheelchair Tiedown Positions:<br />

Fuel Type: Diesel<br />

Total Vehicles in Series: 1<br />

Detailed Listing<br />

Usage: Service Promotion<br />

Equipment # Year of Manufacture Manufacturer Model # License # Mileage as of May 2007 Fuel Type Passenger Capacity Estimated Replacement Year<br />

5876 1958 GM TDH4801 E1023483 1,082 Diesel N/A<br />

July 11, 2007 284


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX B – TRANSCENTER AND FACILITY DESCRIPTIONS<br />

July 11, 2007 285


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

4th Street <strong>Transit</strong> Mall<br />

Address<br />

City<br />

Description:<br />

4th and E Street<br />

San Bernardino<br />

The Mall spreads over a four-block length and includes E<br />

Street as part of the transit mall. There are several<br />

regional connections, including MARTA and <strong>Omnitrans</strong><br />

Route 90.<br />

Location Map<br />

Jurisdiction:<br />

San Bernardino<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

Telephones:<br />

Lighting:<br />

Shelters:<br />

Benches:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

14<br />

No<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

Details<br />

Wall Panels in Shelters with bus<br />

route info & maps<br />

Boarding Passengers<br />

Monday - Friday: 4848 pax. daily<br />

Saturday: 1511 pax. daily<br />

Sunday: 1205 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Routes: 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 14, 15<br />

Regional <strong>Transit</strong> Connections Available<br />

MARTA Route: Off The Mountain Service<br />

<strong>Omnitrans</strong> IEC: 90<br />

Historic Site Information<br />

None<br />

Yes<br />

No<br />

No<br />

No<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Surrounding Land Uses<br />

Retail and office space.<br />

Retail and office space.<br />

Available Driver Amenities<br />

None<br />

July 11, 2007 286


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Redlands Mall<br />

Address<br />

City<br />

Description:<br />

Redlands Blvd & Orange<br />

Redlands<br />

Redlands currently does not have a formal Transcenter.<br />

This Transcenter is located on Redlands Boulevard next<br />

to the Redlands Mall. Redlands has one regional<br />

connection from RTA.<br />

Jurisdiction:<br />

Redlands<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

5<br />

No<br />

No<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

Yes<br />

No<br />

No<br />

No<br />

DETAILS<br />

Boarding Passengers<br />

Monday - Friday: 563 pax. daily<br />

Saturday: 131 pax. daily<br />

Sunday: 82 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Routes: 8, 9, 15, 19<br />

Telephones:<br />

Shelters:<br />

Benches:<br />

Regional <strong>Transit</strong> Connections Available:<br />

Bicycle Racks: RTA Route: 36<br />

Historic Site Information<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

None<br />

Surrounding Land Uses<br />

Commercial<br />

Mixed-use (residential and commercial)<br />

Available Driver Amenities:<br />

None<br />

* NOTE: Counts do not reflect discontinued Redlands Trolley Service<br />

July 11, 2007 287


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

S. Fontana Transcenter<br />

Address<br />

City<br />

Marygold and Sierra<br />

Fontana<br />

Site Picture<br />

Description:<br />

South Fontana Transcenter is located on Marygold and<br />

Sierra Streets. This Transcenter has one regional<br />

connection. This Transcenter is in an excellent location<br />

as it is adjacent to Kaiser Hospital.<br />

Location Map<br />

Jurisdiction:<br />

Fontana<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

4<br />

No<br />

No<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

Yes<br />

No<br />

No<br />

No<br />

Boarding Passengers<br />

Monday - Friday: 754 pax. daily<br />

Saturday: 287 pax. daily<br />

Sunday: 137 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Routes: 19, 20, 28, 29, 61, 71<br />

Telephones:<br />

Shelters:<br />

Benches:<br />

Regional <strong>Transit</strong> Connections Available:<br />

Bicycle Racks: <strong>Omnitrans</strong> IEC: 90<br />

Historic Site Information<br />

None<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

Details<br />

Surrounding Land Uses<br />

Yes Current - Hospital, retail, and general commercial uses.<br />

<strong>Plan</strong>ned - Hospital, retail, and general commercial uses.<br />

Available Driver Amenities<br />

None<br />

July 11, 2007 288


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Fontana Metrolink Station<br />

Address<br />

City<br />

16777 Orange Way<br />

Fontana<br />

Description:<br />

The Fontana Metrolink Station Transcenter allows for all<br />

buses to layover. There are additional amenities on site<br />

including restroom facilities, landscaping and shelters.<br />

In addition there are driver amenities available. The<br />

Metrolink services this Transcenter.<br />

Location Map<br />

Jurisdiction:<br />

Fontana<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

9<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

Yes<br />

Yes<br />

Details<br />

Boarding Passengers<br />

Monday - Friday: 3082 pax. daily<br />

Saturday: 992 pax. daily<br />

Sunday: 527 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Routes: 10, 14, 15, 19, 20, 61, 66, 67, 71<br />

Telephones:<br />

Shelters:<br />

Benches:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

Regional <strong>Transit</strong> Connections Available<br />

Metrolink: San Bernardino Line<br />

Historic Site Information<br />

None<br />

Surrounding Land Uses<br />

Residential (single- and multi-family), vacant,<br />

Yes Current - some commercial.<br />

<strong>Plan</strong>ned - Residential (senior housing), commercial.<br />

Available Driver Amenities<br />

Bathrooms<br />

July 11, 2007 289


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Ontario Transcenter<br />

Address<br />

City<br />

Description:<br />

D & Sultana<br />

Ontario<br />

The Ontario Transcenter is located on D Street and<br />

Sultana Avenue. It is not a traditional Transcenter and<br />

there are no regional connections available.<br />

Location Map<br />

Jurisdiction:<br />

Ontario<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

6<br />

No<br />

No<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

No<br />

No<br />

No<br />

No<br />

Details<br />

Boarding Passengers<br />

Monday - Friday: 446 pax. daily<br />

Saturday: 20 pax. daily<br />

Sunday: 44 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Routes:61, 62, 63, 67, 70, 75<br />

Telephones:<br />

Shelters:<br />

Benches:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

Regional <strong>Transit</strong> Connections Available<br />

None<br />

Historic Site Information<br />

None<br />

Surrounding Land Uses<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Available Driver Amenities<br />

None<br />

Government, education, commercial, residential<br />

Residential, commercial<br />

July 11, 2007 290


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Montclair Transcenter<br />

Address<br />

City<br />

Description:<br />

5091 Richton St.<br />

Montclair<br />

Montclair Transcenter has connections to <strong>Omnitrans</strong>, RTA,<br />

Foothill <strong>Transit</strong> and Metrolink commuter rail service. There is<br />

parking available and there is a day care center located on the<br />

premises. There are also driver amenities available.<br />

Location Map<br />

Jurisdiction:<br />

Montclair<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

14<br />

Yes<br />

Yes<br />

Details<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Boarding Passengers<br />

Monday - Friday: 1053 pax. daily<br />

Saturday: 260 pax. daily<br />

Sunday: 152 pax. daily<br />

Telephones:<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting:<br />

Shelters:<br />

Benches:<br />

Yes<br />

Yes<br />

Yes<br />

Routes: 62, 65, 66, 68<br />

Regional <strong>Transit</strong> Connections Available<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

<strong>Omnitrans</strong> IEC: 90<br />

RTA Route: 204<br />

Metrolink: San Bernardino Line<br />

Foothill <strong>Transit</strong> Routes: 699, 187, 292, 294, 492, 480,<br />

190, 197, 690, Silver Streak BRT<br />

Historic Site Information<br />

None<br />

Surrounding Land Uses<br />

Available Driver Amenities<br />

Bathrooms<br />

Industrial, vacant<br />

Mixed use (residential, commercial), Gold Line Extensio<br />

July 11, 2007 291


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Chino Transcenter<br />

Address<br />

City<br />

Description:<br />

Sixth Street and Chino Avenue<br />

Chino<br />

The Transcenter is located near the Civic Center on<br />

Sixth Street and Chino Avenue in the City of Chino.<br />

Local and Regional routes provide service to this<br />

Transcenter.<br />

Location Map<br />

Jurisdiction:<br />

Chino<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

Telephones:<br />

Lighting:<br />

Shelters:<br />

7<br />

No<br />

No<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

Details<br />

Boarding Passengers<br />

Monday - Friday: 459 pax. daily<br />

Saturday: 65 pax. daily<br />

Sunday: 39 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Routes: 62, 63, 65a, 65b, 68, Omnilink<br />

Benches:<br />

Regional <strong>Transit</strong> Connections Available<br />

Bicycle Racks: Foothill <strong>Transit</strong> 497<br />

OCTA 758<br />

Information Kiosks: Yes<br />

Historic Site Information<br />

Public Art Features: Yes<br />

None<br />

Landscaping: Yes<br />

Parking Available:<br />

ADA Compliance:<br />

Surrounding Land Uses<br />

Yes<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Available Driver Amenities<br />

None<br />

Government, commercial, residential.<br />

Government, commercial, residential.<br />

July 11, 2007 292


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Montclair Plaza<br />

Address<br />

City<br />

Monte Vista & Moreno<br />

Montclair<br />

Site Picture<br />

Description:<br />

The Montclair Plaza Transcenter is located on Moreno<br />

Street and Monte Vista Avenue. There are no special<br />

amenities available to passengers and/or drivers.<br />

However, this Transcenter is adjacent to a large<br />

shopping and restaurant area.<br />

Location Map<br />

Jurisdiction:<br />

Montclair<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

4<br />

No<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

No<br />

Yes<br />

Details<br />

Boarding Passengers<br />

Monday - Friday: 76 pax. daily<br />

Saturday: 14 pax. daily<br />

Sunday: 14 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Routes: 62, 65, 66, 68<br />

Telephones:<br />

Shelters:<br />

Benches:<br />

Regional <strong>Transit</strong> Connections Available<br />

Bicycle Racks: <strong>Omnitrans</strong> IEC 90<br />

Historic Site Information<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

None<br />

Surrounding Land Uses<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Available Driver Amenities<br />

None<br />

Commercial, residential<br />

Mixed use (residential, commercial)<br />

July 11, 2007 293


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Inland Center Mall<br />

Address<br />

City<br />

Inland Center Dr.<br />

San Bernardino<br />

Site Picture<br />

Description:<br />

This Transcenter is located on the premises of the Inland<br />

Center Mall in the City of San Bernardino. Only one<br />

local route stops at this location.<br />

Location Map<br />

Jurisdiction:<br />

San Bernardino<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

Shelters:<br />

Benches:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

1<br />

No<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

No<br />

Yes<br />

Boarding Passengers<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Route: 2<br />

Telephones:<br />

Details<br />

Regional <strong>Transit</strong> Connections Available<br />

None<br />

Historic Site Information<br />

None<br />

Surrounding Land Uses<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Monday - Friday: 127 pax. daily<br />

Saturday: 70 pax. daily<br />

Sunday: 224 pax. daily<br />

Available Driver Amenities<br />

None<br />

Commercial<br />

Commercial, Future <strong>Omnitrans</strong> sbX<br />

July 11, 2007 294


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Ontario Mills<br />

Address<br />

City<br />

Milliken & Fourth<br />

Ontario<br />

Description:<br />

The Ontario Mills Transcenter has Route 61 on Milliken<br />

and Fourth streets. In addition, there is available room<br />

to accommodate buses within the Ontario Mills premises<br />

to hold the other routes. Regional connections are<br />

provided by <strong>Omnitrans</strong> and RTA. There are no<br />

amenities for drivers or passengers at this location.<br />

Location Map<br />

Jurisdiction:<br />

Ontario<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

4<br />

No<br />

No<br />

Details<br />

Boarding Passengers<br />

Telephones:<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting:<br />

Shelters:<br />

Benches:<br />

Yes<br />

No<br />

No<br />

Routes: 60, 61, 70, 71, 75<br />

Regional <strong>Transit</strong> Connections Available<br />

<strong>Omnitrans</strong> IEC: 90<br />

RTA Route: 204<br />

Historic Site Information<br />

No<br />

Yes<br />

No<br />

No<br />

Yes<br />

No Current -<br />

<strong>Plan</strong>ned -<br />

Monday - Friday: 822 pax. daily<br />

Saturday: 209 pax. daily<br />

Sunday: 153 pax. daily<br />

None<br />

Surrounding Land Uses<br />

Commercial<br />

Commercial<br />

Available Driver Amenities<br />

None<br />

July 11, 2007 295


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Pomona Transcenter<br />

Address<br />

City<br />

101 W. First Street<br />

Pomona<br />

Description:<br />

The Pomona Transcenter is located on Garey Avenue<br />

and 2nd Street in the City of Pomona. The Pomona<br />

Transcenter provides regional transit connections with<br />

Foothill <strong>Transit</strong>, LACMTA and Metrolink Commuter Rail<br />

service. <strong>Omnitrans</strong> currently has only one route that<br />

goes to Pomona. There is parking available and<br />

amenities available for passengers and drivers.<br />

Location Map<br />

Jurisdiction:<br />

Pomona<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

Telephones:<br />

Lighting:<br />

Shelters:<br />

Benches:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

10<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Details<br />

Boarding Passengers<br />

Monday - Friday: 479 pax. daily<br />

Saturday: 115 pax. daily<br />

Sunday: 65 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Route 61<br />

Yes<br />

Yes<br />

No<br />

Yes<br />

Yes<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Regional <strong>Transit</strong> Connections Available<br />

Foothill <strong>Transit</strong> Routes: 191, 193, 195, 292, 294, 291s,<br />

291n, 480w, 480e 482<br />

LAMTA Routes: 484<br />

Metrolink: San Bernardino Line<br />

Historic Site Information<br />

None<br />

Surrounding Land Uses<br />

Available Driver Amenities<br />

Bathrooms<br />

Mixed use (retail), parking<br />

Specific plan being updated. May remain the same.<br />

July 11, 2007 296


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Ontario Airport<br />

Address<br />

City<br />

Airport Drive<br />

Ontario<br />

Site Picture<br />

Description:<br />

<strong>Omnitrans</strong> has only one route that serves the Ontario<br />

Airport and is located on Airport Drive. Passengers can<br />

use this route to connect to the Free Airport Shuttle that<br />

will take them inside the Ontario International airport.<br />

There are no special amenities for passengers or drivers.<br />

Location Map<br />

Jurisdiction:<br />

Ontario<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

Shelters:<br />

Benches:<br />

Bicycle Racks:<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

1<br />

No<br />

No<br />

No<br />

No<br />

No<br />

No<br />

No<br />

No<br />

No<br />

No<br />

Details<br />

Boarding Passengers<br />

Monday - Friday: 13 pax. daily<br />

Saturday: 9 pax. daily<br />

Sunday: 1 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Route: 61<br />

Telephones:<br />

Regional <strong>Transit</strong> Connections Available<br />

Airport Shuttle<br />

Historic Site Information<br />

None<br />

Surrounding Land Uses<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Airport<br />

Airport<br />

Available Driver Amenities<br />

None<br />

July 11, 2007 297


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Arrowhead Regional Medical Center<br />

Address<br />

City<br />

400 North Pepper Avenue<br />

Colton<br />

Site Picture<br />

Description:<br />

The ARMC Transcenter is located within the facility's<br />

property. There is one regional connection provided at<br />

this location.<br />

Location Map<br />

Jurisdiction:<br />

Colton<br />

Facility Amenities<br />

Size:<br />

Bus Bays:<br />

Public Restrooms:<br />

4<br />

No<br />

No<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

Yes<br />

No<br />

No<br />

Yes<br />

Boarding Passengers<br />

Monday - Friday: 987 pax. daily<br />

Saturday: 359 pax. daily<br />

Sunday: 109 pax. daily<br />

<strong>Omnitrans</strong> Bus Services Provided<br />

Lighting: Routes: 1, 19, 22<br />

Telephones:<br />

Shelters:<br />

Benches:<br />

Regional <strong>Transit</strong> Connections Available<br />

Bicycle Racks: <strong>Omnitrans</strong> IEC: 90<br />

Historic Site Information<br />

Information Kiosks:<br />

Public Art Features:<br />

Landscaping:<br />

Parking Available:<br />

ADA Compliance:<br />

Details<br />

None<br />

Surrounding Land Uses<br />

Yes Current -<br />

<strong>Plan</strong>ned -<br />

Available Driver Amenities<br />

None<br />

Hospital, vacant, residential, commercial.<br />

Hospital, hotel, residential, commercial.<br />

July 11, 2007 298


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

East Valley Facility<br />

Address: 1700 W. Fifth Street, San Bernardino, CA 92411-2499<br />

Features Include:<br />

Houses the Agency's Administrative, Maintenance, and Operations Dept.<br />

Equipped to handle short and long term needs of the Agency<br />

Equipped to handle major engine, paint and body repair<br />

Formal Board Room capable of accommodating 20 Board members<br />

plus seating for up to 50 additional persons<br />

Size: 12.7 acres - Administrative, Operations, and Maint. Facility<br />

Administrative Facility<br />

Operations/Maintenance Facility:<br />

Fuel, Fare, and Vacuum Facility:<br />

Bus Wash Facility:<br />

Parking:<br />

23,769 sq. feet<br />

119,364 sq. feet<br />

3,077 sq. feet<br />

6,154 sq. feet<br />

250,320 sq. feet<br />

Facility Details<br />

Quantity/Space<br />

Comments<br />

Bus Bays 22<br />

Justification: 50,000 Pound Hoists 9<br />

Service Pits 3<br />

Bus/Truck Lift 0<br />

Automobile Lift 2<br />

Location Map (not to scale) Bus Wash 1<br />

Steam Cleaning Area 1<br />

Diesel Fueling 3 20,000 gallons per tank<br />

Gasoline Fueling 1 10,000 gallons per tank<br />

LCNG Fueling 2 30,000 gallon per tank<br />

Major Bus Cleaning<br />

Yes<br />

Vehicle Detailing<br />

Yes<br />

Training Room<br />

Yes<br />

Parts Room<br />

Yes<br />

Garage Area<br />

Yes<br />

Maintenance Offices<br />

Yes<br />

Facility Amenities Preventive Maintenance Yes<br />

Employee Parking 289 Employee Spaces<br />

Body Work Yes<br />

Guest Parking Yes<br />

Storage Yes<br />

Guard House Yes<br />

Bus Parking 155 spaces<br />

Camera System Yes<br />

Body Shop 5 bays<br />

Emergency Power/Lighting<br />

Wellness Facilities<br />

Childcare Facilities<br />

Yes<br />

Yes<br />

No<br />

July 11, 2007 299


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

West Valley Facility<br />

Address: 4748 Arrow Highway, Montclair, CA 91763-1208<br />

Picture of Facility<br />

Features Include:<br />

Located within 1/2 mile of the Montclair Transcenter<br />

W.V. maint., street supervision and dispatch conducted on-site<br />

Handicap accessible<br />

Monthly bus pass sales outlet<br />

Size:<br />

5.5 Acres - Operations and Maintenance Facility<br />

Maintenance Facility:<br />

Operations Facility:<br />

Fuel, Fare, and Vacuum Facility:<br />

Bus Wash Facility:<br />

Parking:<br />

20,475 sq. feet<br />

7,835 sq. feet<br />

3,077 sq. feet<br />

3,123 sq. feet<br />

75,000 sq. feet<br />

Facility Details<br />

Quantity/Space<br />

Comments<br />

Bus Bays 9<br />

Justification: 50,000 Pound Hoists 6<br />

Service Pits 2<br />

Bus/Truck Lift 0<br />

Automobile Lift 1<br />

Location Map (not to scale) Bus Wash 1<br />

Steam Cleaning Area 1<br />

Diesel Fueling 2 Tanks 25,000 gallons per tank<br />

Gasoline Fueling 1 Tank 10,000 gallons per tank<br />

LCNG Fueling 1 20,000 gallons per tank<br />

Major Bus Cleaning<br />

Yes<br />

Vehicle Detailing<br />

Yes<br />

Training Room<br />

Yes<br />

Parts Room<br />

Yes<br />

Garage Area<br />

Yes<br />

Maintenance Offices<br />

Yes<br />

Facility Amenities Preventive Maintenance Yes<br />

Employee Parking 69 Employee Spaces<br />

Body Work No<br />

Guest Parking Yes<br />

Storage Yes<br />

Guard House Yes<br />

Bus Parking 68 spaces Large Buses<br />

Camera System<br />

Emergency Power/Lighting<br />

Wellness Facilities<br />

Childcare Facilities<br />

Yes<br />

Yes<br />

Yes<br />

No<br />

July 11, 2007 300


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Mid-Valley Facility<br />

Address: Etiwanda Ave & Arrow Route<br />

Features Include:<br />

Will be handicapped accessible<br />

Will have monthly bus pass sales outlet<br />

Will model after East Valley<br />

Size:<br />

28.8 acres<br />

Maintenance Facility<br />

Operations/Administrative Facility:<br />

Fuel, Fare, and Vacuum Facility:<br />

~50,000 sq. feet<br />

~20,000 sq. feet<br />

~13,000 sq. feet<br />

Facility Details<br />

Bus Wash Facility:<br />

~5,400 sq. feet<br />

Parking:<br />

~40,000 sq. feet<br />

Quantity/Space<br />

Bus Bays<br />

TBD<br />

Justification: 50,000 Pound Hoists TBD<br />

Service Pits<br />

TBD<br />

Bus/Truck Lift<br />

Yes<br />

Automobile Lift<br />

TBD<br />

Location Map (not to scale) Bus Wash Yes<br />

Steam Cleaning Area<br />

Diesel Fueling<br />

Gasoline Fueling<br />

CNG Fueling<br />

Major Bus Cleaning<br />

Vehicle Detailing<br />

Training Room<br />

Parts Room<br />

Garage Area<br />

Maintenance Offices<br />

Facility Amenities Preventive Maintenance Yes<br />

Employee Parking Yes<br />

Body Work Yes<br />

Guest Parking Yes<br />

Storage Yes<br />

Guard House Yes<br />

Bus Parking Yes<br />

Camera System<br />

Emergency Power/Lighting<br />

Wellness Facilities<br />

Childcare Facilities<br />

Yes<br />

Yes<br />

Yes<br />

TBD<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Comments<br />

July 11, 2007 301


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

I Street Facility<br />

Address: 234 South I Street, San Bernardino, CA<br />

Features Include:<br />

Maintenance & Parking facilities large enough to handle expansion<br />

over the next 20 years<br />

On-site fueling facility<br />

Easy freeway access<br />

Size:<br />

4.7 Acres - Operations and Vehicle Maintenance Garage<br />

Office Building<br />

4,520 sq. ft.<br />

Maintenance Building<br />

11,339 sq. ft.<br />

Fuel, Fare, and Vacuum Facility:<br />

Bus Wash Facility:<br />

Facility Details<br />

Parking:<br />

Quantity/Space<br />

Bus Bays 10<br />

Justification: 50,000 Pound Hoists 0<br />

Service Pits 0<br />

Comments<br />

Bus/Truck Lift 4<br />

Automobile Lift<br />

No<br />

Location Map (not to scale) Bus Wash Yes General Cleaning Area<br />

Steam Cleaning Area Yes General Cleaning Area<br />

Diesel Fueling<br />

No<br />

Gasoline Fueling 2 4,000 gallon tanks<br />

CNG Fueling<br />

No<br />

Major Bus Cleaning<br />

Yes<br />

Vehicle Detailing<br />

Yes<br />

Training Room<br />

Yes<br />

Parts Room<br />

Yes<br />

Garage Area<br />

Yes<br />

Maintenance Offices<br />

Yes<br />

Facility Amenities Preventive Maintenance Yes<br />

Employee Parking Yes<br />

Body Work No<br />

Guest Parking No<br />

Storage Yes<br />

Guard House No<br />

Bus Parking 70 For Access Vans<br />

Camera System<br />

Emergency Power/Lighting<br />

Wellness Facilities<br />

Childcare Facilities<br />

Yes<br />

No<br />

No<br />

No<br />

July 11, 2007 302


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

West Valley Paratransit Facility<br />

Address: 9421 Feron Blvd., Rancho Cucamonga, CA 91730<br />

Features Include:<br />

Located in an industrial park<br />

Picture of Facility<br />

Size:<br />

1.3 Acres - Operations and Vehicle Maintenance<br />

Office and Vehicle Maintenance Facility<br />

Operations:<br />

Fuel, Fare, and Vacuum Facility:<br />

Bus Wash Facility:<br />

Parking:<br />

4,312 sq. ft.<br />

Facility Details<br />

Quantity/Space<br />

Comments<br />

Bus Bays 0<br />

Justification: 50,000 Pound Hoists 0<br />

Service Pits 0<br />

Bus/Truck Lift 1<br />

Automobile Lift 0<br />

Location Map (not to scale) Bus Wash Yes General Cleaning Area<br />

Steam Cleaning Area Yes General Cleaning Area<br />

Diesel Fueling<br />

No<br />

Gasoline Fueling No Fueling is conducted off-site<br />

CNG Fueling<br />

No<br />

Major Bus Cleaning<br />

Yes<br />

Vehicle Detailing<br />

Yes<br />

Training Room<br />

Yes<br />

Parts Room<br />

Yes<br />

Garage Area<br />

Yes<br />

Maintenance Offices<br />

Yes<br />

Facility Amenities Preventive Maintenance Yes<br />

Employee Parking Yes<br />

Body Work No<br />

Guest Parking Yes<br />

Storage Yes<br />

Guard House No<br />

Bus Parking 60 For Access Vans<br />

Camera System<br />

Emergency Power/Lighting<br />

Wellness Facilities<br />

Childcare Facilities<br />

No<br />

No<br />

No<br />

No<br />

July 11, 2007 303


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX C – CAPITAL PROJECT DESCRIPTIONS<br />

July 11, 2007 304


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

sbX PE, Environmental, TOD, and Construction<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID:<br />

Program Code:<br />

200625<br />

FTA Scope: 11.21.01<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

sbX Program for San Bernardino Valley-wide Rapid <strong>Transit</strong> Program.<br />

Project Justification:<br />

sbX program for San Bernardino Valley-wide Rapid <strong>Transit</strong> Program. This project includes the Preliminary Engineering, <strong>Transit</strong>-Oriented Development,<br />

Project Management, Environmental Review, Final Design , Engineering, and Construction.<br />

Significant Changes Since Last SRTP:<br />

The locally preferred alternative was selected and approved in FY 2006. Engineering and Environmental will begin in FY <strong>2008</strong>. This project has been included<br />

in SCAG's RTP and RTIP.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ In Kind STAF LTF Prop 1B Measure I LTF Art. 3 STIP<br />

<strong>2008</strong> sbX - PE/Environmental $ 3,653<br />

3,413 2,500 $ 5,000 $ 14,567<br />

2009 sbX - <strong>Plan</strong>ned $ -<br />

$ 3,000<br />

$ - $ 3,000<br />

2010 sbX - <strong>Plan</strong>ned $ - $ 32,374<br />

$ 1,720 $ 4,500<br />

$ 5,000 $ 703<br />

$ 44,297<br />

2011 sbX - <strong>Plan</strong>ned $ - $ 36,933<br />

$ 4,500<br />

$ 2,366<br />

$ 43,799<br />

2012 sbX - <strong>Plan</strong>ned $ - $ 5,693<br />

$ 10,814<br />

$ 2,494<br />

$ 19,001<br />

<strong>2013</strong> sbX - <strong>Plan</strong>ned $ -<br />

$ -<br />

TOTAL $ 3,653 $ 74,999 $ - $ 1,720 $ 9,000 $ 14,228 $ 2,500 $ 8,000 $ 5,563 $ - $ 5,000 $ 124,663<br />

TOTAL<br />

July 11, 2007 305


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

sbX Vehicles<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID:<br />

Program Code:<br />

Status:<br />

200625<br />

FTA Scope: 11.21.01<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

sbX Vehicles for San Bernardino Valley-wide Rapid <strong>Transit</strong> Program.<br />

Project Justification:<br />

Funding here provides for the purchase of 16 articulated coaches to be used for the sbX project.<br />

Significant Changes Since Last SRTP:<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ In Kind STAF LTF Prop 1B Measure I LTF Art. 3 STIP<br />

<strong>2008</strong> sbX - PE/Environmental $ -<br />

2009 sbX - <strong>Plan</strong>ned $ -<br />

2010 sbX - <strong>Plan</strong>ned $ 14,427<br />

$ 3,607<br />

$ 18,034<br />

2011 sbX - <strong>Plan</strong>ned $ -<br />

2012 sbX - <strong>Plan</strong>ned $ -<br />

<strong>2013</strong> sbX - <strong>Plan</strong>ned $ -<br />

TOTAL $ - $ - $ - $ 14,427 $ - $ 3,607 $ - $ - $ - $ - $ - $ 18,034<br />

TOTAL<br />

July 11, 2007 306


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Revenue Vehicles<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: SBD090105<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

Fiscal Year/Project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Purchase replacement coaches. Vehicles will be equiped with wheelchair lift or low floor, two tie-downs, kneeling features, air conditioning and auxilary<br />

equipment. Engines will be alternative fuel.<br />

Project Justification:<br />

Replacement Coaches are needed to replace coaches that have reached standard replacement life. Thrity (30) coaches are scheduled for replacment in FY<br />

<strong>2008</strong>, and then coaches will be replaced at approximately 15 coaches a year starting in 2010.<br />

Significant Changes Since Last SRTP:<br />

<strong>Omnitrans</strong> decided to smooth purchase of large coaches after FY <strong>2008</strong>. The plan is to purchase 15 coaches a year starting FY 2010. <strong>Omnitrans</strong> will utilize<br />

CMAQ funding when available. CMAQ funding moved from FY <strong>2008</strong> and 2009 to FY <strong>2008</strong>, 2010.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Revenue Vehicles<br />

$ 826<br />

$ 9,317<br />

$ 2,536<br />

$ 12,679<br />

2009 Revenue Vehicles<br />

$ -<br />

$ -<br />

$ -<br />

2010 Revenue Vehicles<br />

$ 2,790<br />

$ 2,317<br />

$ 1,277<br />

$ 6,384<br />

2011 Revenue Vehicles<br />

$ 5,304<br />

$ 1,326<br />

$ 6,629<br />

2012 Revenue Vehicles<br />

$ 5,495<br />

$ -<br />

$ 1,374<br />

$ 6,869<br />

<strong>2013</strong> Revenue Vehicles<br />

$ 5,692<br />

$ -<br />

$ 1,423<br />

$ 7,115<br />

TOTAL $ 20,107 $ - $ - $ 11,634 $ - $ 7,935 $ - $ - $ - $ - $ - $ 39,677<br />

TOTAL<br />

July 11, 2007 307


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Service Vehicles<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: SBD31084<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Purchase replacement vehicles. Vehicles are used to provide service to the <strong>Omnitrans</strong> operation. The vehicles are used in Operations, Marketing and for<br />

<strong>Omnitrans</strong> support staff.<br />

Project Justification:<br />

Replacement vehicles are replaced once they reached standard replacement life; 5 years or 100,000 miles. Service include: Supervisor Vans, Roadcall<br />

Repair Vehicles, Stops and Zones Repair and Maintenance Vehicles, Facility Repair and Maintenance Vehicles and other support vehicles. Replacements<br />

are planned as followed: <strong>2008</strong> - 7 vans, 1 roadcall truck, 1 marketing truck, 1 marketing trailer; 2009 - 2 marketing trucks, 9 vans, 1<br />

marketing van; 2010 - 1 facilities truck, 1 lift truck, 6 leases vehicles; 2011 - 1 lift truck; 2012 - 1 roadcall truck, 24 leased vehicles; <strong>2013</strong> - 1 roadcall<br />

truck.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Service Vehicles<br />

$ 316<br />

$ 79<br />

$ 395<br />

2009 Service Vehicles<br />

$ 486<br />

$ 122<br />

$ 608<br />

2010 Service Vehicles<br />

$ 223<br />

$ 56<br />

$ 279<br />

2011 Service Vehicles<br />

$ 46<br />

$ 12<br />

$ 58<br />

2012 Service Vehicles<br />

$ 726<br />

$ 182<br />

$ 908<br />

<strong>2013</strong> Service Vehicles<br />

$ 36<br />

$ 9<br />

$ 45<br />

TOTAL $ 1,834 $ - $ - $ - $ - $ 459 $ - $ - $ - $ - $ - $ 2,293<br />

TOTAL<br />

July 11, 2007 308


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Service Equipment<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 200088<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Bus System - Service Equipment: Purchase maintenance equipment for East and West Valley facilities.<br />

Project Justification:<br />

Equipment will be used to replace/supplement outmoded equipment now in use. The goal is to improve operational efficiency.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Service Equipment<br />

$ 60<br />

$ 60<br />

2009 Service Equipment<br />

$ 75<br />

$ 75<br />

2010 Service Equipment<br />

$ 11<br />

$ 11<br />

2011 Service Equipment<br />

$ -<br />

$ -<br />

2012 Service Equipment<br />

$ 24<br />

$ 24<br />

<strong>2013</strong> Service Equipment<br />

$ -<br />

$ -<br />

TOTAL $ - $ - $ - $ - $ - $ 171 $ - $ - $ - $ - $ - $ 171<br />

TOTAL<br />

July 11, 2007 309


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

<strong>Transit</strong> Enhancements<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 981111<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Enhancements: 1% <strong>Transit</strong> Enhancement.<br />

Project Justification:<br />

This funding will be used to enhance pedestrian improvements in conjunction with city projects to increase accessibility to bus stops.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/ Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> <strong>Transit</strong> Enhancements $ 135<br />

$ 34<br />

$ 169<br />

2009 <strong>Transit</strong> Enhancements $ 143<br />

$ 36<br />

$ 179<br />

2010 <strong>Transit</strong> Enhancements $ 148<br />

$ 37<br />

$ 186<br />

2011 <strong>Transit</strong> Enhancements $ 154<br />

$ 38<br />

$ 192<br />

2012 <strong>Transit</strong> Enhancements $ 159<br />

$ 40<br />

$ 199<br />

<strong>2013</strong> <strong>Transit</strong> Enhancements $ 165<br />

$ 41<br />

$ 206<br />

TOTAL $ 905 $ - $ - $ - $ - $ 226 $ - $ - $ - $ - $ - $ 1,132<br />

TOTAL<br />

July 11, 2007 310


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Security<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 981114<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Security: Capitalization of security costs.<br />

Project Justification:<br />

These expenditures are to abate operating costs by shifting the expenses to capital financing. According to FTA guidelines, at least 1% of Section 5307 funds<br />

must be used for security purposes.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/ Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> 1% Security<br />

$ 135<br />

$ 34<br />

$ 169<br />

2009 1% Security<br />

$ 143<br />

$ 36<br />

$ 179<br />

2010 1% Security<br />

$ 148<br />

$ 37<br />

$ 186<br />

2011 1% Security<br />

$ 154<br />

$ 38<br />

$ 192<br />

2012 1% Security<br />

$ 159<br />

$ 40<br />

$ 199<br />

<strong>2013</strong> 1% Security<br />

$ 165<br />

$ 41<br />

$ 206<br />

TOTAL $ 905 $ - $ - $ - $ - $ - $ 226 $ - $ - $ - $ - $ 1,132<br />

TOTAL<br />

July 11, 2007 311


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Preventive Maintenance<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 98112<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

Fiscal Year/Project<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Bus System - General: Capitalization of preventive maintenance<br />

Project Justification:<br />

FY <strong>2008</strong> Budget is for $1,445 of FTA 5307 funding with a local match of $361 of LTF funding. This complies with the FTA 80/20 match requirement. The<br />

balance of the LTF funding is Operating Funds.<br />

Significant Changes Since Last SRTP:<br />

<strong>Omnitrans</strong> funds Preventive Maintenance after funding all capital programs. This number will fluctuate with each SRTP as new programs become critical for<br />

<strong>Omnitrans</strong>.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Preventive Maintenance $ 1,445<br />

$ 3,581<br />

$ 5,026<br />

2009 Preventive Maintenance $ 8,824<br />

$ 2,206<br />

$ 11,031<br />

2010 Preventive Maintenance $ 8,478<br />

$ 2,119<br />

$ 10,597<br />

2011 Preventive Maintenance $ 1,413<br />

$ 353<br />

$ 1,766<br />

2012 Preventive Maintenance $ 4,876<br />

$ 1,219<br />

$ 6,094<br />

<strong>2013</strong> Preventive Maintenance $ 8,393<br />

$ 2,098<br />

$ 10,491<br />

TOTAL $ 33,428 $ - $ - $ - $ - $ - $ 11,577 $ - $ - $ - $ - $ 45,005<br />

TOTAL<br />

July 11, 2007 312


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Management Information Systems<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: SBD31055<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Administration Equipment: Purchase Management Information Systems (MIS) for East and West Valley facilities and provide training for<br />

new/upgraded equipment.<br />

Project Justification:<br />

MIS equipment will be used to replace/supplement outmoded equipment now in use and incorporate new technologies. The goal is to improve operational<br />

efficiency.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Management Information Systems $ 1,084<br />

$ 271<br />

$ 1,355<br />

2009 Management Information Systems $ 1,929<br />

$ 482<br />

$ 2,411<br />

2010 Management Information Systems $ 1,104<br />

$ 276<br />

$ 1,380<br />

2011 Management Information Systems $ 5,648<br />

$ 1,412<br />

$ 7,060<br />

2012 Management Information Systems $ 1,525<br />

$ 381<br />

$ 1,907<br />

<strong>2013</strong> Management Information Systems $ 855<br />

$ 214<br />

$ 1,069<br />

TOTAL $ 12,146 $ - $ - $ - $ - $ 3,036 $ - $ - $ - $ - $ - $ 15,182<br />

TOTAL<br />

July 11, 2007 313


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Office Equipment<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: SBD31073<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Administration Equipment: Purchase office equipment for East and West Valley facilities.<br />

Project Justification:<br />

Equipment will be used to replace worn out furnishings, expand and update administrative/support capabilities. The goal is to improve operational efficiency.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Office Eq. & Furniture $ 10<br />

$ 10<br />

2009 Office Eq. & Furniture $ 11<br />

$ 11<br />

2010 Office Eq. & Furniture $ 11<br />

$ 11<br />

2011 Office Eq. & Furniture $ 12<br />

$ 12<br />

2012 Office Eq. & Furniture $ 12<br />

$ 12<br />

<strong>2013</strong> Office Eq. & Furniture $ 12<br />

$ 12<br />

TOTAL $ - $ - $ - $ - $ - $ 68 $ - $ - $ - $ - $ - $ 68<br />

TOTAL<br />

July 11, 2007 314


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Stops and Zones<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: SBD31075<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Bus System - Passenger Facilities ( Benches, Shelters, etc.): Purchase stops and zones equipment to replace, improve, or enhance stops in fixed route<br />

operation.<br />

Project Justification:<br />

Equipment will be used to replace/supplement current amenities at fixed route bus stops. Equipment is needed to accommodate continuation and expansion<br />

of fixed route service.<br />

Significant Changes Since Last SRTP:<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP TOTAL<br />

<strong>2008</strong> Stop and Zones<br />

$ 20<br />

$ 5<br />

$ 25<br />

2009 Stop and Zones<br />

$ 50<br />

$ 13<br />

$ 63<br />

2010 Stop and Zones<br />

$ 21<br />

$ 5<br />

$ 27<br />

2011 Stop and Zones<br />

$ 32<br />

$ 8<br />

$ 39<br />

2012 Stop and Zones<br />

$ 66<br />

$ 16<br />

$ 82<br />

<strong>2013</strong> Stop and Zones<br />

$ 34<br />

$ 8<br />

$ 42<br />

TOTAL $ 223 $ - $ - $ - $ - $ 56 $ - $ - $ - $ - $ - $ 279<br />

July 11, 2007 315


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Replacement Paratransit Vehicles<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID:<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

Fiscal Year/Project<br />

20040211<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Paratransit - Vehicles (Repl.: Gas/Diesel): Purchase replacement paratransit vans. Vans will be lift-equipped and run on conventional fuel source, unless a<br />

CARB approved engine is found that meets <strong>Omnitrans</strong> service requirements.<br />

Project Justification:<br />

Vehicles being replaced will have reached standard replacement life of 4 years/100,000 miles. The following replacements are planned: <strong>2008</strong> - 25, 2009 - 25,<br />

2010 - 10, and 2012 - 25.<br />

Significant Changes Since Last SRTP:<br />

The funding pattern of the Paratransit fleet changed as <strong>Omnitrans</strong> moved up delivery of Paratransit Vehicles. <strong>Omnitrans</strong> took delivery of 25 vehicles in FY<br />

2006 and should take delivery of an additional 25 in FY 2007. This will "smooth" the replacement pattern.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Paratransit Vehicles - 25 $ 1,557<br />

$ 401<br />

$ 441<br />

$ 2,399<br />

2009 Paratransit Vehicles - 25 $ 1,613<br />

$ 403<br />

$ 2,017<br />

2010 Paratransit Vehicles - 10 $ 715<br />

$ 179<br />

$ 894<br />

2011 Paratransit Vehicles $ -<br />

$ -<br />

$ -<br />

2012 Paratransit Vehicles - 25 $ 2,044<br />

$ 511<br />

$ 2,555<br />

<strong>2013</strong> Paratransit Vehicles $ -<br />

$ -<br />

$ -<br />

TOTAL $ 5,929 $ - $ 401 $ - $ - $ 1,534 $ - $ - $ - $ - $ - $ 7,864<br />

TOTAL<br />

July 11, 2007 316


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Capitalization of Leases<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: SBD43012<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Fiscal Year/Project<br />

Project Description:<br />

Capitalization of Operating facility lease for West Valley Access and Omnilink service / Voice/data communications base station and antenna tower sites. This<br />

also includes capitalization of the Tire Lease.<br />

Project Justification:<br />

<strong>Omnitrans</strong> does not own appropriate property and facilities for these purposes and therefore these expenditures can be shifted to capital financing.<br />

Significant Changes Since Last SRTP:<br />

During the FY <strong>2008</strong> budget year, <strong>Omnitrans</strong> made a decision to capitalize its Tire Lease in accordance with capitalization procedures. This had a significant<br />

impact on the increase expenditures in Capitalizatin of Leases total funding request.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Capitalization of Leases $ 561<br />

$ 140<br />

$ 701<br />

2009 Capitalization of Leases $ 583<br />

$ 146<br />

$ 729<br />

2010 Capitalization of Leases $ 555<br />

$ 139<br />

$ 694<br />

2011 Capitalization of Leases $ 583<br />

$ 146<br />

$ 729<br />

2012 Capitalization of Leases $ 612<br />

$ 153<br />

$ 765<br />

<strong>2013</strong> Capitalization of Leases $ 642<br />

$ 160<br />

$ 802<br />

TOTAL $ 3,536 $ - $ - $ - $ - $ - $ 884 $ - $ - $ - $ - $ 4,420<br />

TOTAL<br />

July 11, 2007 317


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Revenue Equipment<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 20040805<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Improvement, upkeep, or replacement of equipment used in revenue service.<br />

Project Justification:<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Revenue Equipment $ -<br />

2009 Revenue Equipment $ -<br />

2010 Revenue Equipment $ -<br />

2011 Revenue Equipment $ -<br />

2012 Revenue Equipment $ -<br />

<strong>2013</strong> Revenue Equipment $ 398<br />

$ 100<br />

$ 498<br />

TOTAL $ 398 $ - $ - $ - $ - $ 100 $ - $ - $ - $ - $ - $ 498<br />

TOTAL<br />

July 11, 2007 318


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Alternative Fueling Facilities<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID:<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

20040829<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Fueling Facilities: Rehabilitation and maintenance of alternative fueling facilities.<br />

Project Justification:<br />

Various maintenance equipment will be replaced, repaired and/or refurbished to enhance fueling capabilities and to replace parts that have become worn or no<br />

longer able to meet up-to-date air quality standards. Refurbishment will occur every 4 years.<br />

Significant Changes Since Last SRTP:<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP TOTAL<br />

<strong>2008</strong> Alt. Fueling Facilities Maint. $ 62<br />

$ 16<br />

$ 78<br />

2009 Alt. Fueling Facilities Maint. $ 65<br />

$ 16<br />

$ 81<br />

2010 Alt. Fueling Facilities Maint. $ 153<br />

$ 38<br />

$ 191<br />

2011 Alt. Fueling Facilities Maint. $ 102<br />

$ 26<br />

$ 128<br />

2012 Alt. Fueling Facilities Maint. $ 120<br />

$ 30<br />

$ 150<br />

<strong>2013</strong> Alt. Fueling Facilities Maint. $ 75<br />

$ 19<br />

$ 93<br />

TOTAL $ 577 $ - $ - $ - $ - $ 144 $ - $ - $ - $ - $ - $ 721<br />

July 11, 2007 319


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Chino Transcenter<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 20020807<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

X<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

The Chino Transcenter serves as the transportation hub for <strong>Omnitrans</strong>' West Valley Service and provides inter-county transit connections to Los Angeles and<br />

Orange Counties. Phase II of the project involves building additional bus bays for future inter-county routes to/from Los Angels and Riverside Counties.<br />

Project Justification:<br />

The existing facility has reached capacity with three different transit agencies stopping at this location.<br />

Significant Changes Since Last SRTP:<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP TOTAL<br />

<strong>2008</strong> Chino Transcenter<br />

$ -<br />

$ -<br />

$ -<br />

2009 Chino Transcenter<br />

$ 267<br />

$ 67<br />

$ 333<br />

2010 Chino Transcenter<br />

$ -<br />

$ -<br />

$ -<br />

2011 Chino Transcenter<br />

$ 1,754<br />

$ 439<br />

$ 2,193<br />

2012 Chino Transcenter<br />

$ -<br />

$ -<br />

$ -<br />

<strong>2013</strong> Chino Transcenter<br />

$ -<br />

$ -<br />

$ -<br />

TOTAL $ 2,021 $ - $ - $ - $ - $ 505 $ - $ - $ - $ - $ - $ 2,526<br />

July 11, 2007 320


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Ontario Transcenter<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 981118<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

In conjunction with the City of Ontario, Omnitans is creating a Transcenter in downtown Ontario, California. This project was funded in FY 2006 at $190,654<br />

and in FY 2007 at $200,640. These amounts were funded with FTA 5309 and STAF funds.<br />

Project Justification:<br />

The funding for this project was appropriated in 2006 under SAFETA-LU. The funding was for four years and started in FY 2006. <strong>Omnitrans</strong> will only need to<br />

provide a match to the FTA Section 5309 Funding.<br />

Significant Changes Since Last SRTP:<br />

The amount budgeted in FY <strong>2008</strong> is a result of Section 5309 FY07 Appropriations.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP TOTAL<br />

<strong>2008</strong> Ontario Transcenter $ - $ 201<br />

$ 50<br />

$ 251<br />

2009 Ontario Transcenter $ - $ 243<br />

$ 61<br />

$ 303<br />

2010 Ontario Transcenter $ -<br />

$ -<br />

2011 Ontario Transcenter $ -<br />

$ -<br />

2012 Ontario Transcenter $ -<br />

$ -<br />

<strong>2013</strong> Ontario Transcenter $ -<br />

$ -<br />

TOTAL $ - $ 443 $ - $ - $ - $ 111 $ - $ - $ - $ - $ - $ 554<br />

July 11, 2007 321


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Chaffey Transcenter<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID:<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

X<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

The Chaffey College Transcenter will provide a centralized location, integrated into the campus, for several <strong>Omnitrans</strong> routes to pick up and drop off<br />

passengers. The stop will have shelters, seating areas and information kiosks.<br />

Project Justification:<br />

The student population of the Chaffey College campus continues to grow.. Providing convenient public transportation service can reduce the demand for<br />

parking stalls and provide opportunities for post-high school education for young adults that do not own a car.<br />

Significant Changes Since Last SRTP:<br />

Chaffey Transcenter is scheduled to receive STIP funding in FY <strong>2008</strong> to pursue this project.<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

Fiscal Year/Project<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP TOTAL<br />

<strong>2008</strong> Chaffey Transcenter $ -<br />

$ 3,000 $ 3,000<br />

2009 Chaffey Transcenter $ -<br />

$ -<br />

2010 Chaffey Transcenter $ -<br />

$ -<br />

2011 Chaffey Transcenter $ -<br />

$ -<br />

2012 Chaffey Transcenter $ -<br />

$ -<br />

<strong>2013</strong> Chaffey Transcenter $ -<br />

$ -<br />

TOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3,000 $ 3,000<br />

July 11, 2007 322


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Mid-Valley Facility<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 990603<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Administrative & Maintenance Facility: Architectural, engineering, and construction costs for development of site for revenue service. Phase I is for<br />

the development of the paratransit facility.<br />

Project Justification:<br />

The Mid Valley Phase I project is to develop a paratransit facility to replace the existing Rancho Cucamonga facility that is currently being leased by<br />

<strong>Omnitrans</strong>. This funding is in addition to the funding received in the FY 2007 Budget. The FY 2007 budget amount is $15,993,047.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Architecture/design $ 2,633<br />

$ 624 $ 575<br />

$ 3,831<br />

2009 Architecture/design $ -<br />

$ -<br />

$ -<br />

2010 Architecture/design $ -<br />

$ -<br />

$ -<br />

2011 Architecture/design $ -<br />

$ -<br />

$ -<br />

2012 Architecture/design $ -<br />

$ -<br />

$ -<br />

<strong>2013</strong> Architecture/design $ -<br />

$ -<br />

$ -<br />

TOTAL $ 2,633 $ - $ - $ - $ - $ 624 $ 575 $ - $ - $ - $ - $ 3,831<br />

TOTAL<br />

July 11, 2007 323


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Mid-Life Vehicle Rehabilitation<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 200089<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

Bus System - Buses Rehab - Mid-life repair of coaches and replacement of worn/outmoded parts.<br />

Project Justification:<br />

<strong>Omnitrans</strong> replaces and updates and overhauls parts on buses in order to keep them running.<br />

Significant Changes Since Last SRTP:<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Fiscal Year<br />

Federal<br />

State/Local<br />

Carl<br />

Program/ Budget<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766 Moyer LTF Art. 3 STIP TOTAL<br />

<strong>2008</strong> Mid-life Rehab $ 280<br />

$ 70<br />

$ 350<br />

2009 Mid-life Rehab $ -<br />

$ -<br />

2010 Mid-life Rehab $ -<br />

$ -<br />

2011 Mid-life Rehab $ -<br />

$ -<br />

2012 Mid-life Rehab $ -<br />

$ -<br />

<strong>2013</strong> Mid-life Rehab $ -<br />

$ -<br />

TOTAL $ 280 $ - $ - $ - $ - $ - $ 70 $ - $ - $ - $ - $ 350<br />

July 11, 2007 324


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Facility Improvements<br />

SRTP #:<br />

Omni Budget #:<br />

Project ID: 20020806<br />

Program Code:<br />

FTA Scope:<br />

Status:<br />

no change<br />

new project<br />

scope change<br />

funding change<br />

Local $ > 20%<br />

Project Description:<br />

<strong>Transit</strong> - Facilities: Improvement/upkeep of existing facilities.<br />

Project Justification:<br />

Facility improvements and upkeep are necessary to make sure that they are kept in working order and do not fall into disrepair. Each year the maintenance<br />

department identifies specific projects that are included in this allocation.<br />

Significant Changes Since Last SRTP:<br />

Fiscal Year/Project<br />

POTENTIAL FUNDING SOURCES SUMMARY (IN $000's)<br />

Federal<br />

State/Local<br />

5307 5309 5310 CMAQ JA/RC STAF LTF AB2766<br />

Carl<br />

Moyer LTF Art. 3 STIP<br />

<strong>2008</strong> Facility Improvements $ 692<br />

$ 173<br />

$ 865<br />

2009 Facility Improvements $ 197<br />

$ 49<br />

$ 246<br />

2010 Facility Improvements $ 513<br />

$ 128<br />

$ 641<br />

2011 Facility Improvements $ 205<br />

$ 51<br />

$ 257<br />

2012 Facility Improvements $ 163<br />

$ 41<br />

$ 203<br />

<strong>2013</strong> Facility Improvements $ 40<br />

$ 10<br />

$ 50<br />

TOTAL $ 1,808 $ - $ - $ - $ - $ 452 $ - $ - $ - $ - $ - $ 2,261<br />

TOTAL<br />

July 11, 2007 325


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX D – CITY GENERAL PLAN SUMMARIES<br />

July 11, 2007 326


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

CITY OF CHINO<br />

Overview<br />

The “City of Chino General <strong>Plan</strong>” was last adopted in 1981 and recent amendments were made to the<br />

Circulation Element (1992) and the Housing Element (2001). The City is in the midst of doing a<br />

comprehensive update with the primary consultant Design Community and Environment (DC&E). The<br />

original 1981 General <strong>Plan</strong> lists various implementation polices to guide the development and<br />

redevelopment of public and private lands.<br />

Key Relevant Points<br />

The City of Chino has designated few specific areas for development opportunities. Bounded by Chino<br />

Hills parkway, Ramona Avenue and State Highway 71, the triangle-shaped 13 acre property is zoned for<br />

commercial and office uses. Lands adjacent to Central Avenue are also planned for commercial<br />

development with a mix of office and retail.<br />

Other prominent corridor-adjacent areas that are zoned for commercial uses are North Central Avenue<br />

and Pomona Freeway at Benson Avenue.<br />

CITY OF CHINO HILLS<br />

Overview<br />

The “City of Chino Hills General <strong>Plan</strong>” is currently undergoing a comprehensive update. The Circulation<br />

Element and Land Use Element have been updated in 2000 and 2005 respectively. The General <strong>Plan</strong><br />

intends major commercial growth with master-planned communities. The City adopted an Economic<br />

Incentive Zone (EIZ) to encourage commercial development on key sites throughout the community.<br />

Key Relevant Points<br />

Prime retail sites have been identified at:<br />

• Chino Hills Parkway & Pipeline Center<br />

• Chino Hills Promenade<br />

• Rolling Ridge Plaza<br />

• Woodview Plaza<br />

New transit plan includes:<br />

• Service along Peyton Drive from Riverside Drive to Soquel Canyon Road to<br />

Central and to Chino Hills Parkway to serve more residential areas.<br />

• Increased frequency on <strong>Omnitrans</strong> Route 71 along Grand Avenue, Chino Hills<br />

Parkway and Pipeline Avenue to provide access to major new developments.<br />

• Regional transit access to other cities, e.g., Grand Avenue service from City of<br />

Chino to City of Diamond Bar.<br />

July 11, 2007 327


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Carbon Canyon Road service including Brea Mall passing through Chino Hills.<br />

<strong>Omnitrans</strong> runs Routes 65 (Central Avenue) and 72 (Monte Vista Avenue, Pipeline Avenue, and Grand<br />

Avenue).<br />

State Route 71, the largest roadway within the city, is scheduled to be improved from suburban highway<br />

to full Freeway.<br />

CITY OF COLTON<br />

Overview<br />

The “City of Colton General <strong>Plan</strong>” was updated in 1987 in association with Community Systems<br />

Associates, Inc. The Land Use Element and the Circulation Element were updated in 1986 and 1996<br />

respectively.<br />

Key Relevant Points<br />

Significant portions of the northwestern part of the city have been redesignated from medium and highdensity<br />

residential to low-density zones. This area is north of San Bernardino Avenue and west of<br />

Meridian Avenue.<br />

Large vacant pieces of land that lie north of Valley Boulevard and that are bisected by Meridian Avenue<br />

have been eliminated as medium-density residential zones to provide more industrial development<br />

opportunities. Some areas east of Cooley Drive have been redesignated from medium-density to lowdensity<br />

residential.<br />

Areas north of Valley Boulevard and intersected by La Cadena Drive have been designated high-density<br />

residential to meet housing needs in the central city area. <strong>Plan</strong>ned community development is<br />

designated in areas north of I-215 fronting the Santa Ana River. High-density residential zoning is also<br />

designated in areas east of Mount Vernon near Fairway drive. The largest concentration of high-density,<br />

however, is in the area bounded by Rancho Avenue, Olive Street, Valley Boulevard, and Mount Vernon.<br />

High-density residential development is also planned in these areas:<br />

• East and west of La Cadena Drive and C Street<br />

• North and south of Washington Street (which pivots at Barton Road)<br />

• North and south of Fairway Drive east of Mount Vernon Avenue<br />

Currently, the Colton Redevelopment Agency has three areas for future redevelopment:<br />

Major employers<br />

• Santa Ana River industrial area west of Hunts Lane<br />

• West end of industrial project west of Hermosa Avenue and south of San<br />

Bernardino Avenue<br />

• Mount Vernon corridor extending eastward along Fairway Drive to the I-215<br />

freeway<br />

July 11, 2007 328


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Stater Bros Markets – 10,000<br />

• Arrowhead Regional Medical Center – 2,000<br />

• Colton Joint Unified School District – 2,000<br />

• Trinity Child and Family Services – 1,190<br />

CITY OF FONTANA<br />

Overview<br />

The “City of Fontana General <strong>Plan</strong>” was updated in 2003 and the consultants who worked on the various<br />

elements in the document were:<br />

• Michael Brandman Associates: Open Space & Conservation, EIR<br />

• The <strong>Plan</strong>ning Center: General <strong>Plan</strong><br />

• Meyer Mohaddes Associates, Inc: Circulation<br />

• Earth Consultants International: Safety<br />

• Realty Research Associates: Economic Analysis<br />

• David Taussig & Associates, Inc: Fiscal Analysis<br />

• Research Network Ltd: Public Survey<br />

• Psomas & Associates: GIS<br />

• Hunt Research Corporation: Structural Fire Risk Assessment<br />

• CRM Tech: Cultural Resources<br />

The City adopted a new General <strong>Plan</strong> in 1993 that set aggressive programs for:<br />

• Revitalization of Downtown with development of the Civic Center and Senior<br />

Housing Project<br />

• Implementation of the Robert W. Weddle Capital Improvement Program for<br />

street, sewer, and storm drain improvements<br />

• Commitment to expanding recreational opportunities for its residents<br />

• Modernizing and improving major commercial corridors along Valley Boulevard<br />

and Foothill Boulevard<br />

July 11, 2007 329


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Key Relevant Points<br />

Over 30% of the city’s land is vacant as of the year 2001, especially in the northern portion of the city.<br />

The City plans to create and adopt policies to improve development on scattered in-fill opportunities<br />

located in the central core of the city, and provide significant opportunity areas south of Slover Avenue<br />

and east of Sierra Avenue, and south of Jurupa Avenue in the southeast corner of the city. The physical<br />

connections between Downtown, Metrolink station, <strong>Transit</strong> Plaza, and surrounding community are<br />

planned for improvement.<br />

Major intersection improvements and traffic control installation systems are taking place along Alder<br />

Avenue, Randall Avenue, Baseline Avenue, Foothill Avenue, Maple Avenue, Ceres Avenue, and Walnut<br />

Avenue.<br />

The land use plan provides the following acreage with a final build-out that could generate 105,992 jobs:<br />

• 2,440 acres of community and general commercial development<br />

• 8,150 acres of light and general industrial uses<br />

• 1,086 acres of mixed-use development<br />

Public transportation is provided by <strong>Omnitrans</strong> and there are two existing bus transit terminals in the City<br />

of Fontana: the Fontana Metrolink Station and the South Fontana Transcenter. <strong>Omnitrans</strong> routes that<br />

provide services to the city are Routes 10, 14, 15, 19, 20, 29, 61, 66, 67, and 71. <strong>Omnitrans</strong> is in talks<br />

with Caltrans to construct a transit center between Cherry and Citrus Avenues that would serve as a rest<br />

point for commuters on the I-10 Freeway and also as a park-n-ride facility.<br />

Major employers<br />

• Kaiser Medical Center – 5,400<br />

• Fontana Unified School District – 3,300<br />

• Target Distribution Center – 1,200<br />

• California Street Industries – 1,000<br />

CITY OF GRAND TERRACE<br />

Overview<br />

The “City of Grand Terrace General <strong>Plan</strong>” was last updated in 1988 with recent amendments to the<br />

Housing Element (1999), Air Quality Element (1999), and Noise Element (2003). Willdan Associates<br />

worked with the City for the 1988 update; currently, Jameson Group started work to comprehensively<br />

update the General <strong>Plan</strong> document.<br />

Key Relevant Points<br />

The City plans to continue an expeditious processing of residential development proposals and permits.<br />

There are 138 acres of commercial property within the city. Strip commercial uses are located on Barton<br />

Road, with highest concentration between Mount Vernon and Michigan Avenues. A neighborhood<br />

shopping center is at the intersection of Mount Vernon Avenue and Barton Road. It is the intent of the<br />

General <strong>Plan</strong> to carefully monitor new commercial uses along Barton Road.<br />

July 11, 2007 330


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The Barton Road Specific <strong>Plan</strong> is being amended to permit low and moderate-income housing for senior<br />

citizens. The City plans to study High Grove as a possible commuter rail station, and also as a hub for<br />

public transit to serve Barton Corridor, parks and other activity centers. One of the implementing actions<br />

is to work with <strong>Omnitrans</strong> and SANBAG to improve internal circulation and regional connectivity.<br />

To accommodate future traffic volume, some of the major transportation routes that are designated for<br />

significant improvements are:<br />

• Barton Road corridor<br />

• Michigan Street from Commerce Way to Barton Road<br />

• Barton Road/I-215 interchange<br />

• La Cadena Drive<br />

• Mt. Vernon Avenue and Commerce Way proposed to be improved to secondary<br />

highway standards<br />

• Main Street, west of Michigan<br />

The City plans to study High Grove as a possible commuter rail station that would serve as a bus transit<br />

hub serving activity centers including the Barton corridor, parks, and schools. Actions to work with<br />

SANBAG to ensure access to regional transit and commuter rail are addressed in the San Bernardino<br />

County Comprehensive Transportation <strong>Plan</strong>.<br />

Other actions that are planned to be implemented include:<br />

• Promotion and facilitation of bicycle usage through citywide network of bikeways.<br />

• Development of human-scale buildings to encourage pedestrian movement.<br />

• Creation of convenient and affordable bus service by coordination with regional<br />

transit agencies.<br />

• Improvement of internal circulation and connections by coordination with<br />

<strong>Omnitrans</strong> and SANBAG.<br />

The Circulation Element covers five technical memorandums:<br />

• Issue Identification<br />

• Existing Conditions Analysis<br />

• I-215 Freeway Access Analysis<br />

• Circulation Improvement Fee Program<br />

• Technical Amendments<br />

July 11, 2007 331


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

CITY OF HIGHLAND<br />

Overview<br />

The “City of Highland General <strong>Plan</strong>” was updated in March 2006 in association with a consultant (The<br />

<strong>Plan</strong>ning Center, based in Orange County). Five themes have basically formed the benchmark that<br />

shaped the policies and these are:<br />

Key Relevant Points<br />

• Invigorating key activity centers<br />

• Preserving the natural setting<br />

• Stimulating jobs and economic health<br />

• Revitalizing neighborhoods<br />

• Strengthening historic links<br />

The Land Use <strong>Plan</strong> has designated enough land to accommodate 21,000 units and 72,000 residents by<br />

2030. 60% of the city’s 11,948 acres is designated for residential uses and more than 20% is for open<br />

spaces. East Highlands Ranch <strong>Plan</strong>ned unit development to the east of SR-30 has been the prime<br />

shaper of the development in the city. The City plans to promote mixed-use development of the Town<br />

Center and Golden Triangle to foster social interaction.<br />

Out of the four quadrants formed by the intersection of Baseline and Palm Avenue, significant vacant land<br />

exists on the northwest quadrant and this will be the focus of totally new development.<br />

Many of the mid-block commercial uses along Baseline, which is the principal east-west corridor through<br />

the city, are redesignated to medium-density residential uses.<br />

Golden Triangle, formed by two creeks and Boulder Avenue, is a collection of vacant and agricultural<br />

lands. The few constraints for a successful master-planning effort are congestion on 5 th Street and the<br />

elimination of excellent visual resources. The General <strong>Plan</strong> aims to mitigate these constraints and<br />

facilitate a master-planned, mixed-use development. New uses will be oriented along City Creek and a<br />

new specific plan is going to be planned.<br />

To encourage the flow of industrial workers from San Bernardino International Airport (SBIA), the General<br />

<strong>Plan</strong> has designated the 5 th Street corridor to be a major employment center that includes Business Parks<br />

and other industrial land uses.<br />

Victoria Avenue, the prime entry point to the airport from I-210, is going to expand and have a<br />

concentration of commercial uses specifically at Baseline, Pacific Street, and Highland Avenue. This<br />

avenue is also seen as a potential new interchange for the I-210 Freeway.<br />

Another prime residential area known as Seven Oaks area is envisaged in the General <strong>Plan</strong> to have good<br />

access points, trail connections, open spaces, and preservation of existing natural resources. Strong<br />

connection to the Historic Village District is being emphasized.<br />

The Circulation Element of the City’s <strong>Plan</strong> mentions the connection of I-210 with SR-30 by 2007 and<br />

proposed expansion of SR-30 to six lanes near Highland. Several <strong>Omnitrans</strong> buses operate in the city.<br />

The City plans to provide park-n-ride regional bus and carpool facilities. Other goals are:<br />

• Work with <strong>Omnitrans</strong> to provide more service to the eastern side of the city<br />

July 11, 2007 332


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Ensure accessibility of disabled to public transportation<br />

• Coordinate to provide “safe, clean and attractive” bus shelters<br />

Finally, the City plans to study feasibility of implementing Variable Parking District Overlays along the<br />

Base Line Historic District to improve the existing condition of parking-deficient development.<br />

CITY OF LOMA LINDA<br />

Overview<br />

The “City of Loma Linda Draft General <strong>Plan</strong>” was updated in 2005 in association with LSA Associates.<br />

The vision of the General <strong>Plan</strong> is to make the city a small, pedestrian-friendly university town, avoiding<br />

high-density development but providing a variety of housing opportunities that utilize the natural assets of<br />

this hilly area and open spaces.<br />

Key Relevant Points<br />

24% of the existing land area is residential, 9% institutional and 3% commercial, 0.5% industrial and 63%<br />

is open space. There is a “Special <strong>Plan</strong>ning Area D” that consists of dispersed residential uses especially<br />

along Mission Road and Redlands Boulevard. The area is bounded Redlands Boulevard on the north,<br />

California Street on the east, the new alignment of Mission Road on the south, and the Edison<br />

transmission towers to the west. The General <strong>Plan</strong> intends the area to have a mixed-use character. The<br />

public also envisions a heritage park within the planning area for recreational uses.<br />

“Special <strong>Plan</strong>ning Area E”: This area located south of new Mission Road is intended to promote a livework<br />

studio environment. “Special <strong>Plan</strong>ning Area F,” between Barton Road and San Timoteo Creek and<br />

west of California Avenue, is also being planned for mixed-use on certain portion of the existing orange<br />

groves. Similarly, “Special <strong>Plan</strong>ning Area H,” located east of California Street and south of Barton Street,<br />

has vacant lands and orange groves that are being planned for mixed-use development. Providing<br />

access to and improving circulation patterns on Barton Street are primary goals. Finally, “Special<br />

<strong>Plan</strong>ning Area I” is zoned in the future for mixed-use development at the intersection of Mountain View<br />

Avenue and Barton Road, bounded on the east by the Edison easement.<br />

<strong>Omnitrans</strong> is the primary public transportation provider, operating five routes in the city; Riverside <strong>Transit</strong><br />

Agency also operates one route.<br />

The Capital Improvement Program and the Final 2002 Regional Transportation Improvement Program<br />

(RTIP) identify the following improvements:<br />

• Provide traffic signal coordination and timing interconnect at seven traffic signals<br />

and install emergency preemption of traffic signal operation; Anderson<br />

Street/Tippecanoe Avenue from University Court to Hospitality Lane<br />

• Widen existing bridge from three lanes to four lanes, add pedestrian walkway to<br />

outside of bridge; Mountain View Avenue from Van Leuven to Prospect<br />

• Widen intersection and install traffic signals and drainage; Redlands Boulevard at<br />

California Street<br />

• Widen from four lanes to six lanes; Redlands Boulevard from east city limits to<br />

west city limits<br />

July 11, 2007 333


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Widen from two to six lanes; California Street from Barton Road to Redlands<br />

Boulevard<br />

Widening roadway and extending Evans Street interchange are noted in the <strong>Plan</strong>. Key intersections<br />

marked for improvements are:<br />

• Additional lanes at the intersection of California Street and Redlands Boulevard<br />

• Additional lanes at the intersection of Benton Street and Barton Road<br />

• Additional lanes at Anderson Street and Redlands Boulevard<br />

• Two-way center left turn lane at the intersection of the proposed Evans Street<br />

• Realignment of Mission Road intersection to coincide with Orange Avenue<br />

intersection<br />

For transit policies, the City of Loma Linda plans to achieve the following:<br />

Major employers<br />

• Ensure that the site design of new developments provides for pedestrian access<br />

to existing and future transit routes and transit centers through specific review<br />

during the development review process.<br />

• Preserve options for future transit use when designing roadway and highway<br />

improvements.<br />

• When applicable, include <strong>Omnitrans</strong> in the review of new development projects,<br />

and require new development to provide transit improvements in proportion to<br />

traffic demands created by the project. <strong>Transit</strong> improvements may include direct<br />

and paved access to transit stops; provision of bus turnout areas and bus<br />

shelters; and roadway geometric designs to accommodate bus traffic.<br />

• Encourage ridership on public transit through use of City information sources<br />

(e.g., City website and mail-outs) to provide information on transit services.<br />

• Require community care facilities and large age-restricted developments (50<br />

units or more, but excluding facilities designed for “active” adults) to provide<br />

transportation services for the convenience of residents as a condition of<br />

development.<br />

• Loma Linda University Medical Center – 6,390<br />

• Loma Linda University – 3,700<br />

• Jerry L. Pettis Veterans Hospital, Loma Linda – 1,490<br />

July 11, 2007 334


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

CITY OF MONTCLAIR<br />

Overview<br />

The “City of Montclair General <strong>Plan</strong>” was last updated in 1999 and amendments were made to the Land<br />

Use element to reflect the development changes over the recent years. The General <strong>Plan</strong> encompasses<br />

5.28 square miles located within Montclair's boundary and also 1.2 square miles of unincorporated San<br />

Bernardino County within Montclair's sphere of influence, north of Phillips Boulevard between the Los<br />

Angeles County line and Benson Avenue.<br />

Key Relevant Points<br />

<strong>Omnitrans</strong>, Foothill <strong>Transit</strong>, Riverside <strong>Transit</strong> Agency, Metrolink, Amtrak, and Greyhound form the primary<br />

public transportation providers. Foothill <strong>Transit</strong> takes riders to Los Angeles County, and <strong>Omnitrans</strong><br />

services San Bernardino County. Public transit usage has increased in the last few years on all the 12<br />

routes that serve the city.<br />

New development plans are proposed at the Montclair Transcenter and along Fremont Avenue for<br />

pedestrian-friendly access and shutter services to provide good linkage. 55% of Montclair’s land use is<br />

classified as residential and only 9% is commercially zoned.<br />

I-210 construction is approved to begin in the Los Angeles County portion that would extend eastward.<br />

Construction will be in two sections on the San Bernardino side to reduce congestion. Adding High-<br />

Occupancy Vehicles (HOV) lanes on I-10 and widening of the Central Avenue underpass are part of the<br />

transportation plan. Richton-Huntington Drive connection, possible grade separation at Ramona Avenue,<br />

Union Pacific and the Southern Pacific Railroad tracks are future plans of the City.<br />

There are many trucking firms that operate in Montclair in addition to the Southern Pacific and Union<br />

Pacific Railroad.<br />

The existing commercial and industrial land uses north of I-10 and between Holt Boulevard and Mission<br />

Boulevard attract many people. Residential neighborhoods are predominant in the southern portion of I-<br />

10 Freeway up to Holt Boulevard.<br />

The City is planning to continue commercial plans typically along the following arterials:<br />

New developments<br />

• Mission Boulevard<br />

• Holt Boulevard<br />

• Large portion of Central Avenue<br />

• Monte Vista Avenue<br />

• Arrow Highway<br />

• Moreno Street<br />

• Between Mills and Amherst Avenues, on north side of Holt Boulevard, 106<br />

residences of 3-stories are being built.<br />

• 19 one- and two-story homes are going to be constructed on the south side of<br />

Mission Boulevard between Ramona and Monte Vista Avenues.<br />

July 11, 2007 335


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

<strong>Transit</strong> generators<br />

• 5,800 square-feet, multi-tenant commercial development was approved by the<br />

<strong>Plan</strong>ning Commission at the southwest corner of Mission Boulevard and Ramona<br />

Avenue.<br />

• North Montclair Downtown Specific <strong>Plan</strong> – proposes a mixed-use, transit-oriented<br />

development between the Montclair Gold Line/Metrolink station and the Montclair<br />

Plaza. Mixed-use development is intended to create a transit village with a range<br />

of medium to high-density housing, retail, commercial, and office development.<br />

This development will reinforce the significance of the Montclair Transcenter as<br />

an <strong>Omnitrans</strong> service focal point.<br />

• Montclair Plaza, a regional shopping center<br />

• Montclair Transcenter, located on Richton Street between Central Avenue and<br />

Monte Vista Avenue<br />

CITY OF ONTARIO<br />

Overview<br />

The “City of Ontario General <strong>Plan</strong>” was updated in 1992. General <strong>Plan</strong> intends major growth for the<br />

eastern portion of the city and over a dozen specific plans are either adopted or proposed.<br />

Key Relevant Points<br />

Important Land use policies:<br />

• Develop growth compatible with the existing and planned growth of Ontario<br />

International Airport.<br />

• Consolidation of parcels for a shopping center on the northwest corner of East<br />

Holt Boulevard and Grove Avenue.<br />

Goals of the Downtown Area are:<br />

• To preserve areas along Euclid Avenue, north of D Street to G Street, for<br />

expansion of office uses and additional commercial activities.<br />

• To promote special retail, entertainment and restaurant uses from Euclid to Fern<br />

Avenues and from Holt Boulevard to D Street.<br />

• To expand existing City Hall and County facilities from D Street south of Holt<br />

Boulevard and from Sultana Avenue west of Euclid Avenue.<br />

• To create strong functional linkage between Civic Center complex, Specialty<br />

Retail Center and Euclid Avenue by developing B Street as a major transitoriented<br />

street.<br />

Current capacity issues on different streets in the city are mentioned in detail in the Land Use Element.<br />

July 11, 2007 336


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Major commercial developments in Eastern Ontario:<br />

Major transfer center:<br />

Future Bus Service<br />

• Ontario center: 8 million square feet of office, commercial, residential, and<br />

industrial uses.<br />

• CA Commerce center: 1,420 acres of development.<br />

• Centerlake: 1.3 million square feet of commercial and business uses.<br />

• Village industrial park: Large-scale warehousing and distribution uses for<br />

Hyundai, Honda and Inland Container.<br />

• Ontario Mills Mall, located at 4th and Milliken, served by Routes 61, 60, 70, 71,<br />

75 and 90.<br />

The service is provided by <strong>Omnitrans</strong> and Southern California RTD. According to the General <strong>Plan</strong>, new<br />

local service routes are intended to link residential areas in the west to the new job centers in the east,<br />

using corridors such as D Street/Guasti Road and 4th Street/Inland Empire Drive.<br />

Local service is also being planned to link newer residential areas in the south, such as Creekside and<br />

Archibald Ranch, to the Ontario center, North Airport and downtown areas via Haven Avenue, Archibald<br />

Avenue, and Walnut Street.<br />

There is a general notion that the local transit service on I-10 corridor between Ontario Center and North<br />

Airport area should connect to industrial, office, hotel, and airport uses.<br />

Potential for Bus Terminals<br />

D Street between Euclid Avenue and Sultana Avenue could be a potential timed transfer corridor if more<br />

lines are added or bus frequency is increased.<br />

Growth and Travel Patterns<br />

• Ontario Airport continues to be a dominant economic force for the City but the<br />

potential for growth is small. Construction of United Parcel Service is expected<br />

to increase freight volume and traffic.<br />

• The airport has a location advantage spurring more commercial and industrial<br />

development.<br />

• Construction of more single-family residences plus closer multi-family<br />

development regulation is to be accomplished without affecting housing choices.<br />

• A major concern is a good connection between residents of Creekside and<br />

others south of Pomona Freeway and those who live in established<br />

neighborhoods (CPA’s 1, 3,4,10, and 11) within downtown Ontario.<br />

• In addition to restoration projects within Downtown and East Holt Special Study<br />

area, most of the City’s future development is likely to involve build-out of<br />

industrial and commercial uses that will take place in CPA’s 5, 6, and 8.<br />

July 11, 2007 337


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Unique areas that have special attention for development are:<br />

• Grove Avenue Corridor Business Park<br />

• Town Center Study Area<br />

• East Holt Boulevard Study Area<br />

CITY OF RANCHO CUCAMONGA<br />

Overview<br />

The “City of Rancho Cucamonga General <strong>Plan</strong>” was updated in 2001 in association with the following<br />

consultants:<br />

• Psomas & Associates: GIS & Mapping<br />

• Purkiss Rose: Recreation Systems<br />

• Stanley R. Hoffman Associates, Inc: Economic and fiscal analysis<br />

• The Research Network: Library and recreation survey<br />

• Thirtieth Street Architects: Library planning and design guidelines<br />

• Urban Crossroads: Traffic analysis and transportation<br />

• Earth Consultants International: Geotechnical<br />

• Engineering Resources of Southern California: Civil Engineering<br />

• Hunt Research: Fire Protection<br />

• Michael Brandman Associates: EIR<br />

The General <strong>Plan</strong> Update specifically addressed economic development and land planning for “key<br />

opportunity areas” throughout the city. These “opportunity areas” were identified through special studies,<br />

namely a Recreation Needs Analysis and Recommendations Study, an update of the Library Master <strong>Plan</strong>,<br />

an update of the Foothill Fire Defense Study, and a new study of Police Services.<br />

Key Relevant Points<br />

The Land Use <strong>Plan</strong> aims to achieve two objectives. One is to increase mixed-use development along<br />

Foothill Boulevard and the Empire Lakes area. The other is consolidation of open space preserves.<br />

The following Specific <strong>Plan</strong>s and <strong>Plan</strong>ned Communities have been approved:<br />

• Industrial Area Specific <strong>Plan</strong>: The purpose of the plan is to make guidelines for<br />

industrial development and three zones have been identified in the southern<br />

portion of the city.<br />

July 11, 2007 338


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

o<br />

o<br />

o<br />

Zone A is bordered on the north by Arrow Route and North Town area, by Haven<br />

Avenue to the east, 4th Street to the south, and to the west by Cucamonga Creek<br />

and the City of Ontario.<br />

Zone B is bounded on the north by Foothill Boulevard, Devore Freeway (I-15) to the<br />

east, 4th Street to the south, and by Haven Avenue to the west.<br />

Zone C is bounded on the north by Foothill Boulevard, on Etiwanda and East<br />

Avenues, 4th Street and the City of Ontario to the south, and by I-15 to the west.<br />

• Sub-Area 18 Specific <strong>Plan</strong>: The purpose of this plan according to the General<br />

<strong>Plan</strong> is to provide a “broader mix of land uses than was originally permitted within<br />

the Industrial Area Specific <strong>Plan</strong>.” On the south of the <strong>Plan</strong> area is Fourth Street,<br />

on the east is Milliken Avenue, on the north is Atchison Topeka and Santa Fe<br />

(AT&SF) Railroad, and on the west is Cleveland Avenue and Utica Street.<br />

• Foothill Boulevard Specific <strong>Plan</strong>: The plan proposes a series of activity centers<br />

and gateways, linked through a unifying suburban parkway design.<br />

• Etiwanda Specific <strong>Plan</strong>: This rural area is located in the northeast corner of the<br />

city and the purpose of the <strong>Plan</strong> is to ensure long-term rural character.<br />

• Etiwanda North Specific <strong>Plan</strong>: The General <strong>Plan</strong> aims to make open space a<br />

prominent feature in these 6,840 acres of land, located just above the Etiwanda<br />

Specific <strong>Plan</strong> area.<br />

• Victoria Community <strong>Plan</strong>: With Victoria Park lane as the central corridor, the City<br />

plans to build residential villages and related uses in the 2,150 acres of land<br />

bounded on the north by Highland Avenue, the east by Etiwanda Avenue, and<br />

the south and west by the I-15, Arrow Route, Base Line Road, Milliken, Southern<br />

Pacific Railroad tracks and Deer Creek.<br />

• Terra Vista Community <strong>Plan</strong>: This central core area is planned for a mixed-use<br />

development along Foothill Boulevard and Haven Avenue.<br />

The most visible change from the General <strong>Plan</strong> is the approval of more than 700 acres of mixed-use<br />

development in the city.<br />

The Circulation Element proposed a coordinated effort to make 6 th Street a new interchange to alleviate<br />

congestion problems at 4 th Street and Foothill Boulevard. <strong>Omnitrans</strong> provides six fixed route services and<br />

Access services to the city residents, and the City mentions the agency’s proactive effort in improving the<br />

transit scenario.<br />

CITY OF REDLANDS<br />

Overview<br />

Adopted in 1997, the “City of Redlands General <strong>Plan</strong>” was prepared by Blayney, Dyett and Greenberg<br />

Associates. The document abides by six principles of Managed Development detailed in the introduction<br />

of the document. The “Phase I Strategic <strong>Plan</strong>” was completed recently and the City plans to send out an<br />

RFP for completion of Phase II.<br />

July 11, 2007 339


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Key Relevant Points<br />

Some of the aims of the General <strong>Plan</strong> are to:<br />

• Maintain the predominant single-family residential character of the city.<br />

• Locate low, medium and high-density uses near regional access routes and<br />

employment centers.<br />

• Continue mobile home parks.<br />

• Encourage residential units in downtown area.<br />

• Consider approval of medium-density houses in the East Valley Corridor special<br />

development district.<br />

• Encourage <strong>Plan</strong>ned Residential Developments and Specific <strong>Plan</strong>s in San<br />

Timoteo and Live Oak Canyon areas.<br />

• Focus development in the “Southeast Area <strong>Plan</strong>” bounded by Sunset Drive on<br />

the north, Alessandro Drive on the west, Live Oak Canyon Road on the south,<br />

and South Lane on the east.<br />

The Downtown Redlands Specific <strong>Plan</strong> makes specific proposals for the development of the downtown<br />

area between Redlands Boulevard and the I-10 Freeway. This includes two- and three-story mixed-use<br />

development in the Town Center District and industrial buildings in the Service Commercial District.<br />

In the East Valley Corridor (EVC) Specific <strong>Plan</strong>, 4,000 acres are planned for commercial and industrial<br />

establishments that total 37 million square feet and provide up to 90,000 jobs.<br />

The City plans to improve commercial strip development at four places:<br />

• Redlands Boulevard west of Texas Street<br />

• Colton Avenue west of Orange Street<br />

• Orange Street between Colton Avenue and Brockton Street<br />

• Mentone Boulevard between Wabash Avenue and Crafton Avenue<br />

No expansion on the University of Redlands campus is being planned currently. In the overall traffic<br />

scenario, the General <strong>Plan</strong> mentions need for comprehensive study to reduce congestion issues on the<br />

following road network:<br />

• Alessandro Boulevard<br />

• Sunset Drive<br />

• Timoteo Canyon Road<br />

• Live Oak Canyon Road<br />

July 11, 2007 340


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

CITY OF RIALTO<br />

Overview<br />

The “City of Rialto General <strong>Plan</strong>” was last updated in March 1992 by the Keith Company. Later<br />

amendments to the Land Use and Circulation Elements have been made in keeping with the original<br />

goals and policies. The City has currently hired EDAW to do a revised comprehensive update of the<br />

General <strong>Plan</strong> document.<br />

Key Relevant Points<br />

For the residential category, high-density housing, except that for senior citizens, has brought problems to<br />

the city and therefore extending high-density residential land use is considered undesirable. Yet as more<br />

land is available, affordable housing is looked as an important design element.<br />

The City has proposed a new industrial land use zoning category of varying intensity on large portions of<br />

vacant land. The City plans to focus redevelopment plans on several vacant in-fill sites along Foothill<br />

Boulevard and provide commercial business opportunities in the Central Business District. The document<br />

identifies in-fill sites for development along Foothill Boulevard within radii of 1, 3, and 5 miles. The<br />

downtown revitalization for $2.8 million is currently underway and this would bring more mixed-use<br />

commercial and residential development.<br />

After the completion of the I-210 Freeway extension to North Rialto, with four on and off ramps, retail and<br />

commercial growth are seen as added advantages on vacant adjacent lands. Currently a moratorium has<br />

been ordered on many development proposals along the I-210 corridor; the City plans to lift this action on<br />

December 20, 2006, when the Land Use Element would be updated. The properties most affected are<br />

located east of Alder Avenue, north of Baseline road, west of Ayala Avenue; also included are those<br />

properties that have frontage on Casmalia or Easton Avenue. Around 1500 acres of land along the I-210<br />

Freeway extension are marked for development, including the area around Rialto Municipal airport.<br />

A new Gateway Center is planned in the East Central sector, between Foothill Boulevard and the I-10<br />

Freeway, east of Cactus Avenue. This is a diverse area with some of the city’s oldest development.<br />

Caltrans has proposed a Route 30 extension parallel to the Highland Avenue, but due to the lack of a<br />

precise planning timeline, update of Land Use Element is deferred along this section of the corridor.<br />

Bloomington Avenue is one of the city’s most attractive streetscapes but its north-south grid creates a five<br />

point intersection with Riverside Avenue, creating confusion and danger for drivers. Its other terminus on<br />

Cedar Avenue is congested by traffic coming from and to Valley Boulevard and the I-10 Freeway. The<br />

City has a goal to improve this corridor and limit traffic by measures such as speed limits, crosswalks,<br />

signals, and stop signs.<br />

Other goals noted in the General plan are to:<br />

• Develop Rialto Avenue Corridor to become economically viable in the local area.<br />

• Promote commuter rail station location along Atchison Topeka Avenue and<br />

Santa Fe Avenue.<br />

• Redesign intersection of Rialto Avenue and Willow Avenue to connect Civic<br />

Center, Post Office and Downtown from the west.<br />

• Encourage location of high order retail centers along the western end of Foothill<br />

Boulevard to serve Rialto residents as well as to capture residents from far west.<br />

July 11, 2007 341


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Discourage residential development in proximity to the Highland Avenue corridor<br />

and to encourage the smooth extension of State Route 30.<br />

• Work with Caltrans to improve Foothill Boulevard by paving additional lanes,<br />

improve Baseline Road, and to coordinate east-west arterial improvements with<br />

Colton, San Bernardino, and Fontana.<br />

CITY OF SAN BERNARDINO<br />

Overview<br />

The “City of San Bernardino General <strong>Plan</strong>” was adopted in 2005 in association with the following<br />

consultants:<br />

Key Relevant Points<br />

• The <strong>Plan</strong>ning Center: General <strong>Plan</strong><br />

• Transtech Engineering, Inc: Circulation<br />

• Stanley R. Hoffman Associates: Economic Analysis<br />

• Psomas & Associates: GIS<br />

• San Buenaventura Research Associates: Historic Resources<br />

The City has approved preparation of Strategic Area <strong>Plan</strong>s to oversee the growth regulation and guidance<br />

in certain areas. These Specific <strong>Plan</strong>s are:<br />

• San Bernardino Valley College Strategic Area: Bounded by City of Colton to the<br />

west and south, Mill Street to south and K Street to north, this strategic area was<br />

marked for expansion to accommodate more college students and to explore<br />

opportunities for off-campus parking.<br />

• Santa Fe Depot Strategic Area: Bounded on the south by Rialto Avenue, I-215<br />

to the east, Viaduct Avenue to the west and BNSF rail line to the north, this land<br />

is being planned to integrate historic Santa Fe depot with surrounding<br />

neighborhoods and improve aesthetics.<br />

• Redlands Boulevard Strategic Area: The <strong>Plan</strong> plans a mixture of commercial,<br />

industrial and office uses to enhance economic viability.<br />

• Tippecanoe Strategic Area: This area west of San Bernardino International<br />

Airport (SBIA) is targeted for more economic linkage to the airport and better<br />

usage of the Santa Ana River. The <strong>Plan</strong> proposes signal synchronization and<br />

extension of Tippecanoe Avenue from the southern part of the city to Baseline<br />

Avenue. More cooperation with the Cities of Loma Linda and Redlands is also<br />

expected to extend Mountain View Avenue north of the river and intersection<br />

improvements at the I-10 Freeway.<br />

July 11, 2007 342


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Eastern Recreation Village Strategic Area: This area is being developed as a<br />

recreational and commercial area while enhancing the existing sports complex<br />

and bike trails.<br />

• Residential Conversion Strategic Area: The area is bound by 19th Street on the<br />

north, 18th Street on the south, Guthrie Street on the east, and Sterling Avenue<br />

on the west. There are plans to improve the current residential apartments and<br />

develop on vacant lots.<br />

• Southeast Industrial Strategic Area: Protection of existing industrial base and<br />

continuous redevelopment options are being considered for this area just south<br />

of the San Bernardino International Airport Strategic Area and north of the<br />

Southeast Strategic Area.<br />

• SBIA and Downtown Strategic Area: Many improvement plans for street lighting,<br />

parking, mixed-use development, and pedestrian-friendly street walks are<br />

underway for all areas surrounding SBIA and the historic core of the Downtown.<br />

• Corridor Strategic Area: Lot consolidations, density bonuses, and public<br />

amenities construction are the major plans on adjacent portions of land along a<br />

few corridors that include Mount Vernon Avenue, E Street, Baseline Street and<br />

Highland Avenue.<br />

The city also has public transportation provided by <strong>Omnitrans</strong>, demand-response services, and taxi<br />

services. Some of the Circulation Element policies are to:<br />

• Maintain a peak-hour level of service D or better at street intersections.<br />

• Provide designated truck routes for use by commercial/industrial trucking to<br />

alleviate negative impact on local streets.<br />

• Create good connection between bus stops with shelters and pedestrian/bicycle<br />

paths.<br />

• Work with <strong>Omnitrans</strong> to create transit corridors, like the current E Street linking<br />

CSUB to Hospitality Lane, “to increase transit ridership, reduce traffic congestion,<br />

and improve air quality.”<br />

COUNTY OF SAN BERNARDINO<br />

Overview<br />

The “County of San Bernardino General <strong>Plan</strong>” was adopted in 1989 and was prepared by the following<br />

consultants:<br />

• URS Corporation<br />

• Hogle – Ireland, Inc<br />

• Jacobson & Wack<br />

• RBF Consulting<br />

July 11, 2007 343


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Stanley R. Hoffman Associates, Inc<br />

• ISMS, Inc<br />

• Economics and Politics, Inc<br />

• Meyer, Mohaddes Associates<br />

• Psomas & Associates<br />

• Moore, Iacofano & Goltzman (MIG)<br />

The General <strong>Plan</strong> follows a set of key strategies that are focused on initiatives to be planned and<br />

implemented in identified Policy Areas. The airport is intended to be a “vibrant center for commerce and<br />

travel” that would attract and flourish more businesses in the surrounding areas. As part of the overall<br />

vision, the historic depot is going to be planned as a “versatile community.”<br />

Key Relevant Points<br />

Growth-related issues surrounding the Circulation Element in the General <strong>Plan</strong> centered around three<br />

issues:<br />

• Need for adequate services<br />

• Need for future growth plan<br />

• Enhancement of current operating efficiencies<br />

Many streets, arterials, and collectors are currently in the process of undergoing or are scheduled for<br />

significant improvements. The following is a partial list:<br />

• Widening<br />

• Baseline Road, City of Highland<br />

• E Street, City of San Bernardino<br />

• Haven Avenue, City of Rancho Cucamonga<br />

• Construction<br />

• Monte Vista Avenue, City of Montclair, City of Upland, County of San Bernardino<br />

• Milliken Avenue, City of Rancho Cucamonga (includes signalization)<br />

• Los Serranos Drive, City of Chino Hills<br />

• Butterfield Drive, City of Chino Hills<br />

• Right-of-Way Acquisition and Construction<br />

• Ramona Avenue, City of Chino, City of Chino Hills<br />

• Euclid Avenue, City of Chino<br />

July 11, 2007 344


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Riverside Drive, City of Chino<br />

• Fairfield Ranch Road, City of Chino<br />

• Highland Avenue, City of Fontana<br />

• Easton Avenue, City of Rialto<br />

• Grade Separations<br />

• Ramona Avenue, City of Montclair<br />

• Monte Vista Avenue, City of Montclair<br />

• Milliken Avenue, City of Ontario<br />

• State Street/University Parkway, City and County of San Bernardino<br />

• Hunts Lane, City of San Bernardino, City of Colton<br />

There are seven public transit agencies that operate in the San Bernardino County. Improvements on<br />

scenic routes, state highways, and bike trails are being planned on a countywide basis. <strong>Plan</strong>ning reports,<br />

corridor studies and other State and Federal programs are mentioned in the General <strong>Plan</strong>.<br />

CITY OF UPLAND<br />

Overview<br />

The “City of Upland General <strong>Plan</strong>” was adopted in 1982 with recent updates to the Land Use Element<br />

(1996), the Circulation Element (1996), and the Housing Element (2001). The original document was<br />

prepared by Castaneda and Associates. At present, the City is in the process of updating other elements<br />

of the original document. The Land Use Element contains updated land estimates with proposed land<br />

use pattern and distribution for the community.<br />

Key Relevant Points<br />

Four <strong>Omnitrans</strong> lines serve Upland: Routes 62, 64, 73 and 74. The document mentions that <strong>Omnitrans</strong><br />

has plans to add a shuttle service that will link residential areas with:<br />

• Upland Metrolink station<br />

• Montclair Transcenter<br />

• Neighborhood shopping centers and services<br />

Upland has two existing Paratransit services:<br />

• Dial-a-cab for senior citizens and persons with disabilities<br />

• Access service for disabled<br />

Some of the changes recommended in the Circulation Element are to:<br />

July 11, 2007 345


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Construct Campus Avenue between 20th and 23rd streets as a four-lane<br />

roadway<br />

• Widen 8th street between San Antonio Avenue to the east city limit<br />

• Redesign Foothill Boulevard between San Antonio and Redding Way, and at<br />

Memorial Park on the south side east of Eleventh Avenue, to provide on-street<br />

parking for commercial establishments and to increase the right-of-way<br />

CITY OF YUCAIPA<br />

Overview<br />

The “City of Yucaipa General <strong>Plan</strong>” was adopted in September of 1992 and was prepared in association<br />

with the following consultants:<br />

• J.L. Webb <strong>Plan</strong>ning, Inc<br />

• Weston Pringle & Associates<br />

• Stanley R. Hoffman Associates, Inc<br />

• G.A. Nicoll & Associates<br />

The major goal of the City's General <strong>Plan</strong> is to preserve the community's "rural atmosphere" based on the<br />

priorities that were identified from community participation. 37% of the city's total land is designated for<br />

Rural Living land uses.<br />

Key Relevant Points<br />

The city lacks any kind of dominant land use pattern. 48% of the existing land is open space and the rest<br />

is interspersed with residential development, a patchwork of vacant lots, mobile home parks, and chicken<br />

ranches. Based on several field visits and aerial maps, the City officially divided the whole land into four<br />

zones:<br />

• Rural area of Wildwood to the southeast<br />

• North Bench in the north<br />

• Central Core, oldest portion of the city<br />

• Dunlap acres in the west<br />

Compared to the average 4 dwellings per acre, the level of development in the city is only 1.3 homes per<br />

acre, suggesting a significantly low-intensity development.<br />

The Land Use <strong>Plan</strong> designates greater importance to rural living in the Wildwood canyon and North<br />

Bench areas, and a few portions in the Dunlap acres. Multi-family residential uses are allocated mainly to<br />

the central core, and commercial nodes are for specific nodes such as Oak Glen and Bryant, Yucaipa and<br />

5 th , Sand Canyon and Yucaipa, and Oak Glen and Yucaipa.<br />

July 11, 2007 346


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

The City zoned the land south of the I-10 freeway and east of the Live Oak Canyon Road as a master<br />

<strong>Plan</strong>ned Development with a mix of residential and commercial uses. In the Crafton Hills area, adjacent<br />

to the City of Redlands, the City of Yucaipa approved a 59-lot <strong>Plan</strong>ned Development that fronts onto<br />

Bryant Street and Mill Creek Road. The City is proposing to connect to the City of Redlands by Crafton<br />

Hills Drive, which is a limited access collector.<br />

The Circulation Element has noted significant improvements to the road network that includes Bryant<br />

Street, California Street, Yucaipa Boulevard, Avenue E, Wildwood Canyon Road, Avenue H, Oak Glen<br />

Road, 5 th Street, 14 th Street, Sand Canyon Road and Mesa Grande Road.<br />

July 11, 2007 347


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX E – GLOSSARY AND ACRONYMS<br />

July 11, 2007 348


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Access<br />

APC<br />

BRT<br />

COA<br />

Deadhead<br />

FTA<br />

GIS<br />

Headway<br />

Interline<br />

JPA<br />

LACMTA<br />

A demand-response, curb-to-curb service operated by <strong>Omnitrans</strong> and available<br />

to ADA-certified individuals.<br />

Automatic Passenger Counters. Automatic electronic equipment installed on a<br />

limited number of buses. The APCs count passengers boarding and alighting at<br />

each stop.<br />

Bus Rapid <strong>Transit</strong> is a broad term given to a variety of transportation systems<br />

that, through improvements to infrastructure, vehicles and scheduling, attempt to<br />

use buses to provide a service that is of a higher quality than an ordinary bus<br />

line. Each BRT system uses different improvements, although many<br />

improvements are shared by many BRT systems. The goal of such systems is to<br />

at least approach the service quality of rail transit while still enjoying the cost<br />

savings of bus transit. BRT applications range from express services using<br />

special purpose vehicles operating on exclusive right-of-ways to limited stop<br />

expresses operating along mixed traffic corridors with transit priority<br />

enhancements.<br />

Comprehensive Operational Assessment.<br />

Deadheading is a bus traveling when it is not in service. Deadheading can occur<br />

between the garage and the start or end of a route, or when a bus must travel<br />

between two routes.<br />

Federal <strong>Transit</strong> Administration.<br />

Geographic Information Systems is the generic name applied to a category of<br />

software that conducts spatial analysis and plots the results on maps. The<br />

leading provider of GIS software is ESRI, which has its headquarters in<br />

Redlands.<br />

Headway is the elapsed time between buses operating on the same route in the<br />

same direction. Headways on most <strong>Omnitrans</strong> routes are 15, 30, or 60 minutes.<br />

The integration of more than one bus route into a single schedule. When two<br />

routes are interlined, a specific bus would complete a trip on the first route, and<br />

then proceed to the second route before returning to the first route. The<br />

integration is transparent to the riders.<br />

Joint Powers Authority.<br />

Los Angeles County Metropolitan Transportation Authority.<br />

Layover or Recovery Time provided during the scheduled operation of a bus to provide time for the<br />

bus to regain the correct schedule (e.g. if a bus is operating late or early), or to<br />

provide a short break for the driver.<br />

LIM<br />

LTF<br />

MARTA<br />

Low-Income and Minority populations that are guaranteed equal access to<br />

services funded by the federal government under Title VI.<br />

Local Transportation Fund has been in existence since 1972 and is derived from<br />

a ¼ cent of the general sales tax collected statewide.<br />

Mountain Area Regional <strong>Transit</strong> Authority.<br />

July 11, 2007 349


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

OCTA<br />

OmniLink<br />

PCA<br />

Platform Hours<br />

Pulsing<br />

PVTA<br />

Regional Express<br />

Revenue Hours<br />

RTA<br />

Running Time<br />

SANBAG<br />

SCAG<br />

SCRRA<br />

Spare Bus Ratio<br />

SRTP<br />

Through Routing<br />

Timepoint<br />

Transcenter<br />

TOD<br />

VVTA<br />

Orange County Transportation Authority.<br />

A demand-response, curb-to-curb service available to the general public.<br />

A Personal Care Attendant is someone who travels with ADA-certified<br />

passengers to provide additional care.<br />

The actual time an operator is behind the wheel. It includes revenue and nonrevenue<br />

hours (deadheading and recovery time hours).The limit on platform time<br />

is 10 hours a day by California state law.<br />

Most routes operated by <strong>Omnitrans</strong> have timed connections at Transcenters. A<br />

pulse occurs when buses on several routes all arrive and depart a specific<br />

Transcenter at the same time.<br />

Pomona Valley Transportation Authority.<br />

The name applied to Route 90, which connects San Bernardino and Riverside.<br />

Time that a bus and coach operator or bus driver are scheduled to be on duty<br />

and operating on a route. It includes layover time, but not deadheading.<br />

Riverside <strong>Transit</strong> Agency.<br />

The actual travel time it takes for a bus to travel between two fixed points. It<br />

usually refers to the travel time between terminals or between timepoints.<br />

San Bernardino Associated Governments.<br />

Southern California Association of Governments.<br />

Southern California Regional Rail Authority (Metrolink).<br />

The number of buses available as backups relative to the number of buses<br />

required to meet the peak bus pullout requirements; spares cover breakdowns,<br />

accidents and overload situations. FTA recommends a 20% spare bus ratio.<br />

<strong>Short</strong> <strong>Range</strong> <strong>Transit</strong> <strong>Plan</strong>.<br />

Similar to interlining, but in this case, the two halves of the route share a common<br />

route number so that they appear as a single through route.<br />

A bus stop designated in the timetable by having a specific arrival and/or<br />

departure time.<br />

A major transfer point where buses are timed to make connections.<br />

<strong>Transit</strong>-oriented development, which concentrates compact, pedestrian-friendly<br />

housing, jobs and activities at locations easily served by transit.<br />

Victor Valley <strong>Transit</strong> Authority.<br />

July 11, 2007 350


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX F – CITY PROFILE SUMMARIES<br />

Available under separate cover.<br />

July 11, 2007 351


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX G – INDIVIDUAL ROUTE MAPS, CONSTRAINED AND<br />

UNCONSTRAINED PLANS<br />

July 11, 2007 352


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Route Maps for the Constrained <strong>Plan</strong>:<br />

July 11, 2007 353


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 354


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 355


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 356


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 357


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 358


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 359


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 360


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 361


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 362


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 363


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 364


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 365


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 366


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 367


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 368


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 369


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 370


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 371


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 372


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 373


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 374


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 375


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 376


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 377


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 378


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 379


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 380


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Route Maps that change or are added in the Unconstrained <strong>Plan</strong>:<br />

July 11, 2007 381


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 382


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 383


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 384


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 385


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 386


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 387


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 388


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 389


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 390


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 391


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

July 11, 2007 392


IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

APPENDIX H – LEDGER VERSIONS OF SELECTED MAPS<br />

July 11, 2007 393


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-1: Fixed Route Service (as of July 1, 2007)<br />

July 11, 2007 394


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-14: Trip Origins and Destinations – West Valley<br />

July 11, 2007 395


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 2-15: Trip Origins and Destinations – East Valley<br />

July 11, 2007 396


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-7: <strong>Omnitrans</strong> East Valley Fixed Route Weekday Coverage (6:00 a.m.) and Residential and Job Concentrations (2006)<br />

July 11, 2007 397


IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 4-8: <strong>Omnitrans</strong> West Valley Fixed Route Weekday Coverage (6:00 a.m.) and Residential and Job Concentrations (2006)<br />

July 11, 2007 398