12.07.2015 Views

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>The</strong> case <strong>for</strong> a Tees CCS network<strong>Final</strong> Report An „Anchor only‟ or point-to-point system (here the cost is modelled as incrementalcost of fitting CO 2 capture facilities on the proposed Progressive Energy IGCCplant at Eston Grange). A „Small‟ system, (here modelled as including the existing and planned sources >1MtCO 2 /year but excluding the existing Tata Steel Europe steelworks sites(currently mothballed) and MGT biomass site (exempt from the ETS). A „Medium‟ system (here modelled as including all existing and planned sources>1 MtCO 2 /year). A „Large‟ system with all the sources above 50 ktCO 2 /year in the Tees Valley <strong>for</strong>which CCS is considered technically feasible.Importantly, capture costs benefit from economies of scale, so that inclusion of largevolumes of CO 2 at low CO 2 cost at Teesside of £36/t CO 2 , CCS is cost competitive withthe deployment of, <strong>for</strong> example onshore wind, and considerably more competitive thansome other renewable energy technologies. 48Table 1 Economics of CO 2 capture in the Tees Valley 49DescriptionAnchoronlySmall Medium LargeNo. of point sources 1 5 8 35Annual CO 2 captured(Mt CO 2 /year)Lifetime CO 2 avoided(20 years)Incremental capital cost ofcapture and compressionIncremental operating andenergy costs <strong>for</strong> captureand compression of CO 25 14 22 2683 Mt 262 Mt 377 Mt 434 Mt£151 m 50 £1.1 bn £2.0 bn £3.1 bn£55 m/yr £187 m/yr £298 m/yr £371 m/yrMean average £/tCO 2captured£15 £<strong>21</strong> £24 £30Mean average £/tCO 2abated£18 £25 £29 £3648 For example public support <strong>for</strong> microgeneration technologies can be measured at up to £1,000/t CO 2 avoided.49 Based on cost of service <strong>for</strong> 20 years, assuming cost of capital is <strong>10</strong>%. Refers to incremental cost of fittingcapture facilities within a new IGCC power station. See Appendix <strong>for</strong> details.50 Incremental cost relative to an IGCC plant only, see <strong>for</strong> example NETL (2007) Cost and Per<strong>for</strong>mance Baseline<strong>for</strong> Fossil Energy Plants – Volume 1: Bituminous coal and natural gas to electricity final <strong>report</strong> DOE/NETL-2007/<strong>12</strong>81 Available at http://www.netl.doe.gov/energy-analyses/pubs/deskreference/index.html20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!