12.07.2015 Views

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>The</strong> case <strong>for</strong> a Tees CCS network<strong>Final</strong> Report£7/t CO 2 is expected as a cost of service <strong>for</strong> use of a common transport network with amaximum transported capacity of 22 Mt CO 2 /year. Table 5 presents a comparison of thenetwork options against the criteria introduced previously.Table 5 System per<strong>for</strong>mance criteria 75DescriptionMetricAnchorOnlySmall Medium LargeEnvironmentaleffectivenessFinanceabilityCosteffectivenessMtCO 2 /yrcapturedCombinedcapex <strong>for</strong>capture,transport andstorageAveragecapture cost£/tCO 2abatedTransport£/t CO 2Storage£/t CO 25 14 22 26£650 m £1.8 bn £3.0 bn £4.2 bn£18 £25 £29 £36£<strong>12</strong> £7.30 £7.40 £7.40£14 £13 £<strong>12</strong> £<strong>12</strong>Flexibility andstabilityLead time /complexityTotal £/tCO 2abatedRatio of sitescapturingCO 2 : sitesnot capturingRatio of CO 2emissionscaptured:emissionsnot capturedNumber ofsourcesconnecting£44 £45 £48 £551:35 5:30 8:27 35:05:<strong>21</strong> 14:<strong>12</strong> 22:4 26:01 5 8 35In addition to a system-wide perspective, which averages costs, individual emitters will bekeen to understand their own costs <strong>for</strong> implementing CCS. <strong>The</strong> marginal abatement costcurve (Figure 13) below shows the CO 2 abatement potential from individual sites, ordered75 See Appendix <strong>for</strong> further details.30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!