12.07.2015 Views

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

Final report for One North East And NEPIC 21/12/10 - The Carbon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>The</strong> case <strong>for</strong> a Tees CCS network<strong>Final</strong> ReportTable 3 Description of onshore transport networksNetworkdescriptionAnchor-only Small Medium LargeNumber ofsourcesPeak capacity(Mt/yr)Onshore pipelinedistanceCapital cost <strong>for</strong>onshorepipeline(s)1 5 8 375 14 22 265 km 19 km 22 km 37 km£7.5 m £46 m £48 m £60 m3.5.2 Offshore pipelineChoices <strong>for</strong> the offshore pipeline will depend inter alia on routing issues, and engineeringjudgements on the potential <strong>for</strong> line pack, flexibility, stress management, availability of wallthicknesses, and vulnerability to incidental damage offshore. Larger diameter pipelinesminimise pressure drops, which may make operation easier to manage.For this <strong>report</strong>, the following assumptions are used, taken from interim outputs from theparallel engineering study 61 .61 See Appendix.24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!