Final report for One North East And NEPIC 21/12/10 - The Carbon ...
Final report for One North East And NEPIC 21/12/10 - The Carbon ...
Final report for One North East And NEPIC 21/12/10 - The Carbon ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>The</strong> case <strong>for</strong> a Tees CCS network<strong>Final</strong> ReportTable 3 Description of onshore transport networksNetworkdescriptionAnchor-only Small Medium LargeNumber ofsourcesPeak capacity(Mt/yr)Onshore pipelinedistanceCapital cost <strong>for</strong>onshorepipeline(s)1 5 8 375 14 22 265 km 19 km 22 km 37 km£7.5 m £46 m £48 m £60 m3.5.2 Offshore pipelineChoices <strong>for</strong> the offshore pipeline will depend inter alia on routing issues, and engineeringjudgements on the potential <strong>for</strong> line pack, flexibility, stress management, availability of wallthicknesses, and vulnerability to incidental damage offshore. Larger diameter pipelinesminimise pressure drops, which may make operation easier to manage.For this <strong>report</strong>, the following assumptions are used, taken from interim outputs from theparallel engineering study 61 .61 See Appendix.24