12.07.2015 Views

4Motion Installation Manual, Ver.3.5 - Alvarion

4Motion Installation Manual, Ver.3.5 - Alvarion

4Motion Installation Manual, Ver.3.5 - Alvarion

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Document HistoryDocument HistoryTopic Description Revision/Date Issued“Installing the BTS in a Rack” onpage 43Added ETSI bracket drawing May 2009“AU-ODU <strong>Installation</strong>” on page 122“Color Coding for Easy IF CableIdentification” on page 168“<strong>Installation</strong> of the “H” MountingBracket for Antennas and ODUs” onpage 252Revised and added:<strong>Installation</strong> instructions for various pole typesand number of ODUsOutdoor Macro BTS informationNew section for improving installation andmaintenanceAdded an option for larger “H” frames,corrected torques and component dimensionsMay 2009May 2009May 2009“Macro Outdoor BTS Equipment<strong>Installation</strong>” on page 72New chapter July 2009General Added Outdoor Macro BTS information August 2009“Replacing a PIU” on page 238Versions 2.5M2 and 3.0“NEBS Compliant BTS Grounding” onpage 54Table 3-1 IF Cable RequirementsRevised procedure (power connection to PIUbefore inserting it to the BTS)Complete revision of manual:Added Micro Outdoor BTS chapterAdded IF Combiner chapterAdded power feeder installationAdded a new GPS type, and information forthe GPS for the Micro Outdoor BTSReplaced and added graphicsChanged the structure of the manualRemoved Appendix A - <strong>Installation</strong> Checklist.New section describing the requirements for aNEBS compliant installation of the MacroIndoor BTS.Corrected IF cable Return Loss from Maximumto MinimumAugust 2009November 2010January 2011January, 2011<strong>4Motion</strong> <strong>Installation</strong> <strong>Manual</strong>ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!