12.07.2015 Views

4Motion Installation Manual, Ver.3.5 - Alvarion

4Motion Installation Manual, Ver.3.5 - Alvarion

4Motion Installation Manual, Ver.3.5 - Alvarion

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 1 - Introduction<strong>Installation</strong> Options1.6 <strong>Installation</strong> Options• The Macro Indoor BTS can be installed on a 19" or 21" (ETSI) rack. See Section 4.2.2. For details oninstalling the various modules in the BTS, refer to Section 4.3.2.• The mounting options of the outdoor components (ODU, Macro Outdoor BTS and antenna) are:» Pole Mounting:◊◊The 1x1 AU ODU can be mounted on a 1" to 4" pole. See “Installing 1x1 ODU” onpage 125.The 2x2/4x2 AU ODU and Macro Outdoor BTS can be mounted on a 1.5" to 14" poledepending on the pole construction. See “Installing 2x2 or 4x2 ODU” on page 135.» Mounting on a tower. See “Mounting the Antenna on a Tower” on page 198.» Mounting on an “H” Mounting Bracket for Antennas and ODUs. See Appendix B.• The Micro Outdoor BTS mounting options include light-poles, roof-top or wall mount. See“Connecting the Micro Outdoor BTS Cables” on page 111.<strong>4Motion</strong> <strong>Installation</strong> <strong>Manual</strong>11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!