- Page 9 and 10: A: EXECUTIVE SUMMARYA.1 INTRODUCTIO
- Page 11 and 12: The GRMT committee was transformed
- Page 13 and 14: appointed by AP (in consultation wi
- Page 15 and 16: Consultation during the AuditThe st
- Page 17 and 18: Lack of Monitoring and Corrective A
- Page 19 and 20: process. This does not appear to ha
- Page 22 and 23: IFCPerformanceStandard &Section (#)
- Page 26 and 27: B.2 KEY EVENTS IN THE RESETTLEMENT
- Page 28 and 29: Compensation for Loss of AssetsMuch
- Page 30 and 31: During the review, ERM had sight of
- Page 32 and 33: construction process), no adequate,
- Page 34 and 35: S21’s failure to report back effe
- Page 36 and 37: IFCPerformanceStandard &Section (#)
- Page 38 and 39: IFCPerformanceStandard &Section (#)
- Page 41 and 42: C: EXECUTIVE SUMMARYLOOKING FORWARD
- Page 43: implementation of any such interven
- Page 47 and 48: PART ONEIntroduction to the Resettl
- Page 49 and 50: It should be noted that the IFC Per
- Page 51 and 52: A faction of the community at Sterk
- Page 53 and 54: The voice of those community member
- Page 55 and 56: Government Role-playersThe Governme
- Page 57: ENVIRONMENTAL RESOURCES MANAGEMENTL
- Page 61 and 62: PART TWO Table of Contents1 Topic 1
- Page 63 and 64: TOPIC 11 Avoid or Minimise Resettle
- Page 65 and 66: TOPIC 22 Land Acquisition and Land
- Page 67 and 68: Documentation of TransactionsThe EI
- Page 69 and 70: TOPIC 33 Identifying Affected Peopl
- Page 71 and 72: Concerns around the approach to, an
- Page 73 and 74: TOPIC 44 Effective Consultation and
- Page 75 and 76:
this review and therefore their rol
- Page 77 and 78:
elocation is discussed further in T
- Page 79 and 80:
This reaction was very surprising t
- Page 81 and 82:
and compensation process to the com
- Page 83 and 84:
The question raised here is whether
- Page 85 and 86:
TOPIC 55 Compensation5.1 WHAT THE I
- Page 87 and 88:
5.2.4 Provide Compensation for All
- Page 89 and 90:
IFCPerformanceStandards andSection
- Page 91 and 92:
y some community members does seem
- Page 93 and 94:
Be Accessible at No Cost and Withou
- Page 95 and 96:
Although the communities confirmed
- Page 97 and 98:
QualityAlmost 100 percent of those
- Page 99 and 100:
Erosion of social capital and netwo
- Page 101 and 102:
The current climate, with the deep
- Page 103 and 104:
elocation processes of the time. It
- Page 105:
9.3 PERFORMANCE ASSESSMENTAn assess
- Page 108 and 109:
PART THREE Table of Contents1 Topic
- Page 111 and 112:
TOPIC 11 Avoid or Minimise Resettle
- Page 113 and 114:
TOPIC 22 Land Acquisition and Land
- Page 115 and 116:
BOX 2.1 SUMMARY OF RELOCATIONAGREEM
- Page 117 and 118:
of the official land allocation pro
- Page 119 and 120:
TOPIC 33 Identifying Affected Peopl
- Page 121 and 122:
the extent to which the homeowners
- Page 123 and 124:
TOPIC 44 Effective Consultation and
- Page 125 and 126:
community members at the kgoro woul
- Page 127 and 128:
BOX 4.1SHORT AND LONG TERMOBJECTIVE
- Page 129 and 130:
During the SIA, a total of 12 focus
- Page 131 and 132:
• Consultation to be inclusive an
- Page 133 and 134:
communities, and even examples of m
- Page 135:
4.3.3 Consultation and Resistant Co
- Page 138 and 139:
an expectation in many of the resis
- Page 140 and 141:
Kgoshigadi Langa and AP. For reason
- Page 142 and 143:
BOX 5.2OBSTACLES EXPERIENCED DURING
- Page 144 and 145:
5.3 PERFORMANCE ASSESSMENTAn assess
- Page 146 and 147:
then be taken up by the committee m
- Page 148 and 149:
Grievance Mechanism to be Scaled to
- Page 150 and 151:
IFCPerformanceStandard &Section (#)
- Page 152 and 153:
As mentioned in Topic 5: Compensati
- Page 154 and 155:
While the standard of housing has a
- Page 156 and 157:
Unfortunately, however, a lot of il
- Page 158 and 159:
Apart from the initiatives listed i
- Page 160 and 161:
that such expectations present an e
- Page 162 and 163:
TOPIC 99 Implementation Planning an
- Page 164 and 165:
9.2.2 Ensure Adequate Capacity forI
- Page 166 and 167:
9.2.3 Monitoring and EvaluationThe
- Page 169 and 170:
ENVIRONMENTAL RESOURCES MANAGEMENTL
- Page 171:
ENVIRONMENTAL RESOURCES MANAGEMENTP
- Page 174 and 175:
1.3 KEY THEMESAND ASSOCIATEDRECOMME
- Page 176 and 177:
This negotiation process is only li
- Page 178 and 179:
structure or a sub-committee which
- Page 180 and 181:
• Anglo’s SEAT process allows f
- Page 182 and 183:
decision to replace all existing en
- Page 184 and 185:
may be available (e.g., benefits fr
- Page 186 and 187:
only has limited experience of form
- Page 189 and 190:
ENVIRONMENTAL RESOURCES MANAGEMENTP
- Page 191 and 192:
In spite of these improvements, wea
- Page 193 and 194:
ENVIRONMENTAL RESOURCES MANAGEMENTA
- Page 195 and 196:
Map A1 Regional Overview Map
- Page 197 and 198:
Annexure BList of Questions for Int
- Page 199:
KEY ISSUEImprove or at Least Restor
- Page 202 and 203:
Table D1.1 Stakeholder Consultation
- Page 204 and 205:
Date and TimeStakeholderPhase ofEng
- Page 206 and 207:
Photo A1 Old Crèche at Puka Sekhao
- Page 208 and 209:
Photo A5 New Motlhotlo Village Clin
- Page 210 and 211:
Photo A12 Ga Puka small ‘addition
- Page 212 and 213:
Photo A16 Ga-Puka 115m 2 medium hou
- Page 214 and 215:
Photo A21 7.5 km tarred access road
- Page 237 and 238:
Annexure FReferences
- Page 239:
Annexure GNon Technical Executive S
- Page 242 and 243:
How the Report was ResearchedERM tr
- Page 244 and 245:
ThemeEffectiveConsultationCompensat
- Page 246 and 247:
ThemeAvoid or Minimise Resettlement
- Page 248 and 249:
ThemeImplementation, Planning,Ensur
- Page 250 and 251:
Ka moo Pego e Nyakišišitšwego ka
- Page 252 and 253:
Morero Senyakwa sa Molawana wa Pank
- Page 254 and 255:
Morero Senyakwa sa Molawana wa Pank
- Page 256 and 257:
Morero Senyakwa sa Molawana wa Pank
- Page 258 and 259:
LIST OF TABLESGa Pila Executive Sum