13.07.2015 Views

3.1 Tritium Plant and Detritiation - General Atomics Fusion Group

3.1 Tritium Plant and Detritiation - General Atomics Fusion Group

3.1 Tritium Plant and Detritiation - General Atomics Fusion Group

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ITER G A0 FDR 1 01-07-13 R1.0recovery is achieved in a few hours. The resulting tritium permeation into the room throughthe gloves will be less than a few Ci, <strong>and</strong> retained by the normal vent detritiation system.<strong>Plant</strong> Exhaust FacilityUpper Port CellsN-VDS 2Equator Port CellsLower Port CellsS-VDSTokamak BuildingN-VDS 1S-ADS<strong>Tritium</strong> Process EffluentsVacuum Pumping Systems EffluentsFuelling Systems Purge GasGlovebox, Secondary Ernclosure Purge GasTritiated Water Holding Tank Purge GasHVAC-ILocal AirCoolerHVAC-IILocal AirCoolerNon <strong>Tritium</strong> ProcessRoomsTCWS EffluentTVS EffluentRoom Pressure ControlP/FH/CP/FH/CH/CH/FC/CH/FC/CC/CP/FP/FP/FExhaustFresh Air ExhaustFresh Air ExhaustFresh AirP/FH/FPre Filter C/C Cooling Coil Butterfly valveHEPA FilterH/CHeating Coil Glove valve (Normal Open)Glove valve (Normal Close)Process line (Normal Operation)Process line (St<strong>and</strong>by)Figure <strong>3.1</strong>-4Concept of Confinement <strong>and</strong> <strong>Detritiation</strong> System Configurationfor the <strong>Tritium</strong> Building<strong>Plant</strong> Description Document Chapter <strong>3.1</strong> Page 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!