13.07.2015 Views

policies and procedures for the acquisition of medical materiel

policies and procedures for the acquisition of medical materiel

policies and procedures for the acquisition of medical materiel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MIL STD–785(Reliability Program <strong>for</strong> Systems <strong>and</strong> Equipment Development <strong>and</strong> Production).MIL STD–881(Work Breakdown Structure <strong>for</strong> Defense Materiel Items).MIL STD–882(System Safety Program <strong>for</strong> Systems <strong>and</strong> Associated Subsystems <strong>and</strong> Equipment: Requirements <strong>for</strong>).MIL STD–1388–1(Logistic Support Analysis).MIL STD–1388–2(Logistic Support Analysis Data Element Definitions).MIL STD–1472(Human Engineering Design Criteria <strong>for</strong> Military Systems, Equipment, <strong>and</strong> Facilities).MIL STD 1474B(Noise Limits For Army Materiel).MIL–HDBK–472(Maintainability Prediction).MIL–M–73035(Front-End Analysis).MIL–M–36036(New-Look Operator’s Manuals).MIL–M–63037(Organizational DSIGS Logic Tree Style).MIL–M–63038(Organizational, DSIGS Maintenance).MIL–M–63040(Extension Training Materiels).Appendix BNONDEVELOPMENT ITEM (NDI) ACQUISITION MODELNote: See <strong>the</strong> NDI <strong>acquisition</strong> flow chart (fig 3-1) a fold-in page, located at <strong>the</strong> end <strong>of</strong> <strong>the</strong> regular size pages.B–1. Event 1: Coordinated Materiel Proposal.a. References.(1) AR 70-1.(2) AR 71-9.b. Description. Materiel proposals may originate from any user or staff source identifying a need <strong>for</strong> a new item ormodification or improvement <strong>of</strong> existing item. The primary action <strong>of</strong>fice is <strong>the</strong> logistician who will assign a projectnumber <strong>and</strong> <strong>for</strong>ward to <strong>the</strong> combat developer <strong>for</strong> coordination with MEDMAP participants. The purpose <strong>of</strong> clearingthrough <strong>the</strong> logistician is to establish a central control point to monitor <strong>and</strong> track actions through <strong>the</strong> MEDMAP.B–2. Event 2: Review <strong>and</strong> Analysis.a. References.(1) AR 7D-1.(2) AR 71-9.b. Description. The combat developer will staff <strong>the</strong> proposal with <strong>the</strong> Joint Working Group (JWG) members <strong>for</strong>preliminary review. This may be done ei<strong>the</strong>r telephonically or by document review. If <strong>the</strong> consensus is that <strong>the</strong>proposal is valid. it will be scheduled <strong>for</strong> final review <strong>and</strong> decision by <strong>the</strong> JWG. The JWG will normally meet32 AR 40–60 • 15 March 1983

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!