13.07.2015 Views

policies and procedures for the acquisition of medical materiel

policies and procedures for the acquisition of medical materiel

policies and procedures for the acquisition of medical materiel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>the</strong> technical data package, <strong>the</strong> draft MFP, ILS plans, <strong>and</strong> type classification (if required). A final DA-approved BOIP<strong>and</strong> MOS decision are required if <strong>the</strong> item is type classified. If this is <strong>the</strong> IPR decision, proceed to event 31.(2) Request additional data or testing to support an NDI decision. Issues to be resolved <strong>and</strong> <strong>the</strong> means to obtain <strong>the</strong>additional data or to conduct <strong>the</strong> testing will be identified. This includes <strong>the</strong> type <strong>and</strong> source <strong>of</strong> funds.(3) Use ano<strong>the</strong>r <strong>acquisition</strong> strategy because NDIs cannot satisfy <strong>the</strong> requirement.The MADP review minutes will be submitted to OTSG <strong>for</strong> resolution (in <strong>the</strong> absence <strong>of</strong> concurrence between <strong>the</strong>participants) or <strong>for</strong> approval.B–19. Event 23: Conduct Technical Feasibility Test.a. References.(1) AR 70-1.(2) AR 70-10.(1) AR 71-3.b. Description. The mission assignee agency conducts this test to provide more data <strong>for</strong> technical evaluation asrequested by NDI decision IPR.B–20. Event 24: Conduct User Testing.a. References.(1) AR 70-1.(2) AR 70-10.(3) AR 71-3.b. Description. The operational tester (through <strong>the</strong> designated test organization) conducts this test to examinecommercially available equipment <strong>and</strong> validate training <strong>materiel</strong> <strong>and</strong> o<strong>the</strong>r aspects <strong>of</strong> <strong>the</strong> ILSP, An IPR can request thistest to provide additional data <strong>for</strong> decisionmaking reviews.B–21. Event 25: Technical Feasibility Test <strong>and</strong> User Test Reports.a. References.(1) AR 70-1.(2) AR 70-10.(3) AR 71-3.b. Description. The mission assignee agency <strong>and</strong> <strong>the</strong> test organization will submit <strong>the</strong>se reports <strong>for</strong> update <strong>of</strong> <strong>the</strong>PMP.B–22. Event 26: Update ILS Program <strong>and</strong> PMP.a. References.(1) AR 70-1.(2) AR 71-3.(3) AR 700-127.b. Description. Test data from <strong>the</strong> TFT <strong>and</strong> user test will be used to update <strong>the</strong> ILS program <strong>and</strong> later <strong>the</strong> PMP. Themission assignee agency will coordinate <strong>the</strong>se updates.B–23. Event 28: ILS.a. References.(1) AR 70-1.(2) AR 70-10.(3) AR 71-3.b. Description. See event 20.B–24. Events 29 <strong>and</strong> 30: NDI MADP Review (II) <strong>and</strong> Approval.a. References.(1) AR 70-1.(2) AR 71-9.b. Description. This review is required only to review <strong>the</strong> additional date requested in event 21 <strong>and</strong> to make adecision to enter <strong>the</strong> <strong>acquisition</strong> or deployment phrase. MIMER item not requiring type classification will proceed toevent 31 (st<strong>and</strong>ardization).B–25. Event 31: St<strong>and</strong>ardization.a. References.36 AR 40–60 • 15 March 1983

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!