13.07.2015 Views

Terms of Reference - INDIVIDUAL CONSULTANT ... - UNDP

Terms of Reference - INDIVIDUAL CONSULTANT ... - UNDP

Terms of Reference - INDIVIDUAL CONSULTANT ... - UNDP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Impact <strong>of</strong> Results:The impact <strong>of</strong> assisting the REDD+ Moratorium WG to produce the Post-Moratorium Concept Notewill ensure timely preparation for conducting broad consultation with stakeholders regarding thenext steps required after the Moratorium ends in May 2013. In turn, through well-preparedengagement <strong>of</strong> stakeholders it is anticipated that a consensus on the next steps will be reached,wide-spread ownership achieved and, accordingly, recommendations submitted to the President.Schedule:No. Deliverables Due Date1. a. Glossary <strong>of</strong> <strong>Terms</strong>, Acronyms andAnnotations with clear and succinctsnippets <strong>of</strong> information regarding theMoratorium, its background, achievementsand implementation.b. Document Plan providing a detailedstructure and definitive plan <strong>of</strong> thecontents for the Concept Note based on indepthinterviews with the Moratorium WGand other stakeholders as directed.2. a. General Narrative regarding theachievements, challenges and lessonslearnt during the current two-yearMoratorium period; and Key Issuessurrounding the preferred next step <strong>of</strong> theMoratorium to be tabled at a FGD for thedevelopment <strong>of</strong> the Concept Note.b. Preliminary Draft Concept Note thatincludes the general content developedand the information obtained through theFGD and subsequent interviews with theMoratorium WG. Submitted for editorialreview.3. a. Draft Concept Note which incorporateseditorial comments and other inputs fromthe Moratorium WG and other designatededitors/referees.b. Penultimate Draft Post-MoratoriumConcept Note based on conclusionsreached by participants <strong>of</strong> the Workshop.Submitted to the Moratorium WG and itsdesignated review board for final review.3-Dec-201217-Dec-201231-Dec-201214-Jan-201328-Jan-201311-Feb-2013PaymentSchedulePaymentAmount19-Dec-2012 25%16-Jan-2013 25%13-Feb-2013 25%c. Final Post-Moratorium Concept Note. 25-Feb-2013 27-Feb-2013 25%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!