Application Data - continuedTABLE 2 – ELECTRICAL DATA NOTES:1. In<strong>com</strong>ing wire to chiller must be copper only. Aluminum wiring is not permitted.2. Lugs in Power Panel will accept in<strong>com</strong>ing wire range of #14 AWG through #1 AWG.3. Electrical system must be securely guarded.4. Field wiring must conform to NEC and all other applicable local codes.16 JOHNSON CONTROLS