13.07.2015 Views

DRAFT IS-GPS-705A Comment Resolution Matrix - GPS.gov

DRAFT IS-GPS-705A Comment Resolution Matrix - GPS.gov

DRAFT IS-GPS-705A Comment Resolution Matrix - GPS.gov

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>IS</strong>-<strong>GPS</strong>-705 CRMCID Originator/Org. Page/Para Importance <strong>Comment</strong> PO <strong>Resolution</strong> & Concurrence NotesFinal To: Is: HofmanConcurrence: Concurwhich is a picture, thus making it difficultfor correction. The figure needs to beRationale: Spelling incorrectRationale:converted to an OLE object for ease ofupdating. This can be deferred when thedocument goes into DOORS.22 Thomas NagleA<strong>Comment</strong>: Editorial comment – the dot of UDRA is PO <strong>Resolution</strong>: AcceptGPCin wrong place.19 Thomas NagleGPCPage: 89Para:20.3.3.7.5Page: 59Para: Table 20-IAFrom: UDRA (dot over the R)Final To: UDRA dot over the D)Rationale: Correction.<strong>Comment</strong>: Editorial comment. Under the“Parameter” column, add the parameter symbolsand move the parameter descriptions to the nextcolumns.From:Final To: WNn Week Number URAoeINDEX SV AccuracyRationale: 5/23/08: comment and correcteddocument real-time.Concurrence: ConcurRationale:PO <strong>Resolution</strong>: A/CRationale: 5/23/08: Will incorporate into document.Concurrence: ConcurRationale:06-sept-09: ICC tried to place the dot backover the "D". Because of the difficulties inresolution of MS Word, the placement maynot be perfect. This change will beaddressed in the next revision as well sincethe document will be placed in DOORS afterthis revision.11 Jun 08: Changes added to document.5/23/08 Will incorporate into document.06-sept-09: ICC verified noted changeswere in document as well s new Titledescriptions "parameter" and "parameterdescription" were placed in document.Updated PO resolution to A/C.15 Thomas NagleGPCPage: 40Para: 20.3.3ARationale: Clarity and consistency.<strong>Comment</strong>: Editorial commentFrom: From “… (UDRA) may be worse thanindicated in the respective message types, and theSV should be used at the user’s own risk.”PO <strong>Resolution</strong>: RejectRationale:Concurrence: Concur5/23/2008 Withdrawn comment. Thecomment #48 of this CRM is the same.Final To: TO “… (UDRA) may be worse thanindicated in the respective message types.”Rationale:11 Thomas NagleGPCPage: 1Para: 2(Section 1.2)3-6ARationale: “The SV should be used at the user’sown risk” is not needed here.<strong>Comment</strong>: The sentence states “The JointProgram Office (JPO) administers approvals underthe auspices of the Configuration Control Board(CCB), which is <strong>gov</strong>erned by the appropriate JPOPO <strong>Resolution</strong>: AcceptRationale:5/23/08: Will update documentaccordingly. 06-sept-09: ICC confirmedthere is no JPO reference. Replaced "JPO"with "<strong>GPS</strong> Wing" on front cover. Page as23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!