Commissioning | 336.11 Commissioning reportThe boiler can be operated with a gas or dual fuel burner.Commissioning steps1. Flush the heating system.2. Fill the heating system with water.3. Vent the heating system.4. Carry out tightness test.5. Switch on the control unit.▶ Boiler-specific parameters set and recorded.6. Ensure the function of all safety equipment.7. Check the fuel line for tightness.8. Start the burner.9. Complete the burner test report regarding the individualoutput stages.10. Conduct a tightness test on the hot gas side.After a short time in operation, tighten the screws in thecombustion chamber door to prevent leakage around thedoor as a result of the packing cord settling.11. Check the flange connections and fitting after the boiler hasbeen heated up and retighten.12. Check flue path for tightness.13. Check the flue gas temperature.14. Carry out a function test on all safety equipment and recordthis.15. Instruct the system user and hand over technicaldocumentation.16. Enter the fuel used in the table( "General" operating instructions).17. Confirm commissioning by a competent person.▶ Carefully complete the commissioning report for the relevantapproved burner.▶ Sign all completed commissioning work and enter the date.Comments (signature)Company stamp/signature/dateTable 15 Commissioning reportSB625WS/SB745WS6 720 805 218 (2013/02)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!