AngolaContainer Terminal for the Luanda PortThe rehabilitation of the container terminal forthe Luanda Port comprises a dock extensionof 55 m. The total area to renovate is of163 000 m 2 , 90% of each correspond to thecontainer patio, and 10% to the docks.The project is an important challenge for <strong>Zagope</strong>,considering the traffic around the Terminal andthe need to conciliate the works in the area andthe normal operation of the Port. In order to keepthe Port operational, the works in the docks havebeen divided in three stages so that 2-3 of theextension of the Terminal will be always availablethroughout the execution of the works.30 / 31