PortugalPortugalConcession of Douro Litoral HighwaysConstruction of highways A43, A41 and A32, withtwo or three traffic lanes each. Over 70 km ofextension and 20 millions m 3 in earth works. Theproject, which includes 11 km of double tunnels,a new bridge over the River Douro and two tunnels,was started in January 2009. The A41 and A43Highways are already open to traffic, and the A32should be concluded by September 2011.ZAGOPE – Construções e Engenharia, S.A. | Annual Report 2010