13.07.2015 Views

PRINCIPLES AND PARAMETERS - Pinewood Studios

PRINCIPLES AND PARAMETERS - Pinewood Studios

PRINCIPLES AND PARAMETERS - Pinewood Studios

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4 <strong>Pinewood</strong> <strong>Studios</strong> Development Framework | <strong>PRINCIPLES</strong> <strong>AND</strong> <strong>PARAMETERS</strong>01 INTRODUCTIONT his document is the principal design document for approval as partof the <strong>Pinewood</strong> <strong>Studios</strong> Development Framework outline planningapplication. It contains baseline and parameter drawings followingan explanation of the defining set of principles that have informed theframework design.It comprises a set of written development principles and a series ofparameter plans for site layout, landscaping and ecology measures,building massing and gross external floor areas and access andcirculation. Together, these provide the framework within which moredetailed ‘reserved matters’ applications will be prepared in the future.An explanation of how the Parameter drawings are to be interpretedand applied is also provided.This document creates a flexible and adaptable approach to the futuredevelopment of the site, within clearly defined parameters, includingan anatomy of open space, access and movement, and massingand a set of written development principles. These Principles andParameters focus on the definition of open space, landscape, anddevelopment areas, and on the treatment and character of boundariesand different areas within the overall development. The primaryroad and access routes are established to ensure the site evolveswith a clear anatomy that endures as the phases of development areimplemented over time.The precise design scale and siting of each building and its individualappearance is left illustrative at this stage, allowing for future designdevelopment and evolution as the project is implemented over time.The parameters form the basis of the scheme assessed in theDFPrinciples and ParametersFOR APPROVALEnvironmental Statement.D&ADesign and Access StatementSUPPORTING INFORMATIONIMIllustrative MasterplanNOT FOR APPROVAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!