1 month after application, the energy productiondata was retrieved and, as illustrated by thegraph (see previous page), an increase of 30%was recorded in the current field (and thereforethe power field) produced.The other graph (adjacent to this paragraph)corresponds to the energy produced by thesystem over the course of one sunny day, beforeand after treatment with WHITE REFLEX;it shows a significant improvement, especiallyin the hours in which albedo is at its worst (earlymorning and sunset).DIFFERENCE BETWEEN ANTICIPATED POWER AND ACTUAL POWERTimeBEFOREAfter application the effect of the paint couldbe detected immediately, albeit in a generalisedmanner, by using a solarimeter to measure solarradiation. Solar reflectance increased roughlysevenfold.AFTERIn conclusion, although the experiment is notyet complete, a roof with high solar reflectanceis entirely necessary for cylindrical cellsystems and WHITE REFLEX paint, thanks toits considerable application flexibility (it canbe used on almost all supports), should beMembrane - DifferenceMembrane+<strong>Index</strong> - Differenceconsidered as one of the most viable solutions.SOME RECOMMENDATIONSextracted from the “L’ENERGIA FOTOVOLTAICA” (<strong>PHOTOVOLTAIC</strong> ENERGY) publication by ENEACreating a photovoltaic system is not too complicated, but it is a jobwhich should be carried out by specialists. It is nevertheless useful tofamiliarise yourself with a few rules which should be observed in thedesign and application phases.The support structures should be constructed to last at least as longas the system itself, i.e. 25-30 years, and should be installed so as toallow easy access to modules for cleaning and replacement, and toelectric junction boxes for inspection and maintenance. They must alsobe entirely resistant to corrosion and wind.Photovoltaic generators installed on roofs must not interfere with thewaterproofing and insulation of the surfaces; in some cases it may benecessary to create fixed or mobile walkways.A gap must be left between modules, from a minimum of 5 mm for generatorsinstalled in parallel and near other fixed surfaces, up to 5 cm forgenerators which may be subjected to high wind pressures.In the case of roof- or wall-mounted modules, it is essential that a gapof 4-6 cm is left between them so as to guarantee sufficient air circulationand therefore effective cooling of the surface on which the moduleis installed.The interconnecting electricity cables and junction boxes must besuitably sized, conform to electrical regulations and guarantee thespecified insulation, protection and waterproofing classes as required.EDITO DA: ENEA - LUNGOTEVERE THAON DI REVEL, 76 - 00196 ROMA - LUGLIO 2006 - DESIGN: EDIZIONI ALTEA S.R.L. - STAMPA: PRIMAPRINT (VITERBO)S V I L U P P OS O S T E N I B I L EG22-065-022SVILUPPO S OSTENIBILEL’ENERGIA FOTOVOLTAICATechnical specifications<strong>ROOFS</strong> <strong>WITH</strong> <strong>PHOTOVOLTAIC</strong> <strong>SYSTEMS</strong>7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!