13.07.2015 Views

Notice & Catalog SAIL-BSP-M&BP-IADC-FA-10160061 to be held ...

Notice & Catalog SAIL-BSP-M&BP-IADC-FA-10160061 to be held ...

Notice & Catalog SAIL-BSP-M&BP-IADC-FA-10160061 to be held ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Steel Authority of India Limited MARKETING & BUSINESS PLANNING DEPTTBHILAI STEEL PLANTb. Party shall remove and segregate refrac<strong>to</strong>ry bricks and shift <strong>to</strong> a designated place and sameshall <strong>be</strong> handed over <strong>to</strong> the shop. Equipment such as mo<strong>to</strong>rs, gear boxes, pulleys, electricalpanels / components etc., if any, shall <strong>be</strong> removed and handed over <strong>to</strong> the shop.c. Party shall provide PPE’s <strong>to</strong> all the workers. Full body harness with height passes <strong>to</strong> <strong>be</strong>provided for the workers, working at height.d. The party shall <strong>be</strong> responsible <strong>to</strong> ensure proper / safe use as per electrical safety rules of <strong>BSP</strong>.e. Scaffoldings, barricading, ladders etc. required <strong>to</strong> carry out the work shall <strong>be</strong> fabricated by theparty. Material for the fabrication shall <strong>be</strong> given by <strong>BSP</strong> free of cost and same shall <strong>be</strong>returned <strong>to</strong> <strong>BSP</strong> after use by the party at the designated place or as instructed by site engineer.f. Tools/ Tackles, consumables (Gas cutting sets, welding transformers, welding cable, gas,electrode, winch, c-block, etc.), handling and transporting equipment (hydra-moc/ crane,truck, trailer etc.) required for the job shall <strong>be</strong> arranged by the party.g. The contrac<strong>to</strong>r shall arrange <strong>to</strong> submit daily man power deployment report in duplicate andarrange proper supervision for safe execution of work.h. The party should employ workers designated for this job only with safety induction training.i. The party shall submit declarations for all materials brought inside the plant as per <strong>BSP</strong>norms.j. As the job involves cutting and removal of scraps at height, party may sublet these activities<strong>to</strong> an experienced <strong>BSP</strong> registered mechanical contrac<strong>to</strong>r.k. The contrac<strong>to</strong>r and his workers while providing service under the contract shall ensure that noloss or damage occurs <strong>to</strong> <strong>BSP</strong>’s property. In case of any loss or damage caused, contrac<strong>to</strong>rshall <strong>be</strong> liable <strong>to</strong> repair / replace within a reasonable time, otherwise the cost of repair /replacement will <strong>be</strong> levied on contrac<strong>to</strong>r’s account.l. The party shall properly s<strong>to</strong>re and safe guard dismantled scrap, steel supplied for fabricationof working structure <strong>to</strong> prevent damage / loss or theft on any account. Scrap should <strong>be</strong>periodically transported <strong>to</strong> clear the area as per site engineer’s instruction.m. Work shall <strong>be</strong> carried out as per instructions and guidance of site engineer in such a way tha<strong>to</strong>perational activities of the shop are not hampered.n. Bidder is requested <strong>to</strong> visit the site for assessment of weight of scrap, site condition andunderstand the scope of work <strong>be</strong>fore participating in tender.o. The party should have labour license for the man power deployed with ESIC coverage.41.3 <strong>BSP</strong> SCOPEa. Drinking water and electricity shall <strong>be</strong> supplied free of cost by <strong>BSP</strong> at suitable points. Noclaim or compensation for any failure in supply caused <strong>be</strong>yond the control of plant authoritywill <strong>be</strong> entertained.b. Electrical supply shall <strong>be</strong> given for running machines and lighting purpose at fixed pointsalready installed in the shop.41.4 GENERALa. No claim will <strong>be</strong> entertained in case the work is s<strong>to</strong>pped (after start) on any day due <strong>to</strong> anyreason. In this regard, the decision of the site engineer will <strong>be</strong> final and binding on the party.b. Estimated weight of the steel and cast iron scrap of cupola no.3 and associated structures is60T which may vary from actual weight by ±15%.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!