13.07.2015 Views

accession program for agriculture and rural development in ... - MADR

accession program for agriculture and rural development in ... - MADR

accession program for agriculture and rural development in ... - MADR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Organisation <strong>and</strong> Methodology will be evaluated on the basis of therationale, strategy <strong>and</strong> <strong>program</strong>m<strong>in</strong>g proposed by the c<strong>and</strong>idate. Thissection will represent the 30% of the technical evaluation f<strong>in</strong>al score.CVs of key experts, which are compulsory, will be evaluated on the basis ofqualifications <strong>and</strong> skills, general <strong>and</strong> specific professional experience. Thissection will represent the 70% of the technical evaluation f<strong>in</strong>al score.F<strong>in</strong>ancial offers will be evaluated on the basis of the total contract value,compared to the maximum budget available <strong>for</strong> the contract.The contract is f<strong>in</strong>anced through Measure 4.2 „Technical Assistance” with<strong>in</strong>SAPARD Program <strong>and</strong> is a global price contract, mean<strong>in</strong>g that thecontractor will be paid only if the specified outcome is achieved <strong>in</strong> itscompleteness.With<strong>in</strong> the framework of the service contract, the f<strong>in</strong>anc<strong>in</strong>g could beeffectuated <strong>in</strong> two <strong>in</strong>stalments, but only after the presentation of the Firstversion of the Mid-Term Evaluation Updat<strong>in</strong>g Report <strong>and</strong> the F<strong>in</strong>al Mid-Term Evaluation Updat<strong>in</strong>g Report by the Contractor, <strong>and</strong> approval by theContract<strong>in</strong>g Authority of the Reports mentioned at po<strong>in</strong>t 7 of these ToR. Noadvance payments are <strong>for</strong>eseen.Subcontract<strong>in</strong>g with<strong>in</strong> the framework of the contract is allowed. The valueof the subcontracted services must not exceed 30% of the total contractvalue.4.5 Independence of the EvaluatorThe evaluation shall be carried out by an <strong>in</strong>dependent Contractor (experts)<strong>in</strong> the sense of no direct <strong>in</strong>volvement <strong>in</strong> the management, implementation<strong>and</strong> f<strong>in</strong>anc<strong>in</strong>g of the Program.The evaluator shall refra<strong>in</strong> from any relationship which would compromiseits <strong>in</strong>dependence or that of its personnel.The evaluator shall limit its role <strong>in</strong> connection with the project to theprovision of services.TERMS OF REFERENCE - Updat<strong>in</strong>g of Mid-Term Evaluation of the SAPARD Program 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!