13.07.2015 Views

Oyu Tolgoi Mining and Processing EIA

Oyu Tolgoi Mining and Processing EIA

Oyu Tolgoi Mining and Processing EIA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Oyu</strong> <strong>Tolgoi</strong> Project Environmental Monitoring Program (EPP)Table 2.1 Environmental Monitoring PlanMonitoring ParametersNo7 Noise <strong>and</strong> Vibration :Ambient noiseAir blast over-pressureGround vibrationOccupational Noise exposure-Recommended Location ofmonitoringAt the nearest permanent orsemi permanent residences, ifany. If no residences then at aminimum distance of 2 kmform the site boundary.-Monitoring at nearbyresidences ( if any) <strong>and</strong>accommodation locations oninitial blasts <strong>and</strong> then asrequired-Measure ground vibrationduring blast activity at nearbyresidences ( if any) <strong>and</strong>accommodation areas.-Workplace noise monitoringto be completed at locationsdetermined followingcommissioningPeriod <strong>and</strong> Frequency of monitoringInitial baseline ambient noise monitoringprior to operations--Initial blasts to be monitored at nearbyaccommodation areas <strong>and</strong> then asrequired-Initial blasts to be monitored <strong>and</strong> then asrequired-Initial testing during commissioningperiod <strong>and</strong> then annually or as required.PreliminaryCost Estimate(Million. MNT)35555585St<strong>and</strong>ards <strong>and</strong> Methods1. Taking photographs ofstructures expected to bedamagedA detailed plan <strong>and</strong>description of thestructures is to becompleted especiallynoting pre-existingcracks, broken windows<strong>and</strong> damage to interior orexterior2. The monitoring stationlocation in relationship tothe blast area,-The date <strong>and</strong> time,-A photographic record orfilm of the blast wherepossible,-Air blast,-Ground vibration,-Fly rock numbers size<strong>and</strong> distance,-A brief description of thegeological structureswithin the blasting zonePrepared by ECO-TRADE LLC., Environmental Consultants, Mongolia Client: Ivanhoe Mines Mongolia Inc(IMMI) XXKPart V. Chapter 2. Page 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!