13.07.2015 Views

The Development of Indonesian Railways - UNCRD

The Development of Indonesian Railways - UNCRD

The Development of Indonesian Railways - UNCRD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. Double Track Rail Project (Java South Line) -610 KmMerakSERANGDKIJAKARTACikampekBantenBogorPadalarangSukabumiBANDUNGJawa BaratCirebon -PrupukBojonegoroCirebonBojonegoroTegalPekalonganSEMARANGGambringanBojonegoroPrupukJawa TengahGundihPurwokertoJawa TimurBanjarMadiunKertosonoKroyaKutoarjoSoloBangilDIY Kutoarjo - Yogya Malang -YOGYAKARTASoloBlitarPurwokerto -Kroya -KutoarjoPrupuk-PurwokertoSolo - MadiunMadiun -SurabayaSURABAYASidoarjoJemberBanyuwangiDouble Track Java South Line Rail Project (CIREBON – YOGYA – SURABAYA): 610 kmCIREBONPURWOKERTOKUTOARJOSOLOMADIUNSURABAYAPRUPUKKROYA• Rev. Design(2011)• Land Aqusition(2011)• Construction(start 2012)• Loan IP-548YOGYA74 km 56 km 28 km 76 km123 km• DTConstruction2013 - 2014• FundAllocation bySBSN Rp.1,5 T 2013 Rp.0,8 T 2014 Rp.0,7 TFinish /Operatedat the end <strong>of</strong>2011Design 2011Finish / Operated at200797 km• 2011 - 2012Track design, bridge& signal• 2013• EIA & Larap• Roadbed cons.IDR.15 M• Total investment :IDR. 2,33 Trilion156 km• 2011 - 2012Track design, bridge &signal• 2014• EIA & Larap• Construction (start 2015)• Total Investment:IDR. 3,59 Trilion

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!