The Development of Indonesian Railways - UNCRD
The Development of Indonesian Railways - UNCRD
The Development of Indonesian Railways - UNCRD
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Cont’d …Jabodetabek RailwayDouble-Double Tracking Between Manggarai-CikarangPurpose :.Increasing line capacity, so the volume <strong>of</strong> train travel canbe higher.Objective:Strategic Projects to separate the operation betweencommuter trains & long-distance trains , to preventbottlenecks traffic when double track north <strong>of</strong> Java hasbeen operated in 2014.Investment: IDR 8.3 TrilionStatus:•<strong>The</strong> contract <strong>of</strong> electrification work (package B1) betweenBekasi-Cikarang already Signed on October 2012.•Package B2(2) & Package A proposed fund by SUKUK(SBSN2014)Program 2013:•Electrification Bekasi-Cikarang (Loan JICA)•Infrastructure enhancement between Jatinegara-Bekasi•Bridge construction (Jatinegara-Bekasi)•Land aquisition (on Package A site)