13.07.2015 Views

Installation Instructions – RVR Solar Water Heating Kits - RVR.ie

Installation Instructions – RVR Solar Water Heating Kits - RVR.ie

Installation Instructions – RVR Solar Water Heating Kits - RVR.ie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Installation</strong> <strong>Instructions</strong><strong>Installation</strong> points to be checkedThe following points should be checked to ensure a safe and properly functioning solar water heating system.1. <strong>Installation</strong> of collectorsa) Collectors have been fastened to the roof to support collector weight and wind\snow loadsb) Collectors are properly or<strong>ie</strong>nted (between South-East and South-West)c) Potential for shading of collectors (trees, buildings, etc.) is limitedd) <strong>Water</strong>proofing and air sealing of collector-to-roof connections and pipe penetrations2. <strong>Solar</strong> Loopa) <strong>Solar</strong> loop pipe work is watertight\airtight under pressure)b) Pipe work in the solar loop has been insulated thoroughly (no significant gaps in slits or clips or jointsc) <strong>Solar</strong> loop insulation material to withstand collector stagnation temperaturesd) <strong>Solar</strong> loop external pipe and fittings insulated with UV resistant insulatione) Pipe penetrations of building fabric made good, debris removed from sitef) Pipes securely fixed but allowing for thermal movementg) Expansion and pressure release valve sized and installed correctlyh) Connection of solar loop to storage tank heat exchanger is correcti) Collection of anti freeze liquid from pressure rel<strong>ie</strong>ve valve in placej) Concentration of antifreeze is correctk) Pressure in the solar loop is correct after final bleeding.l) Flow rate in the solar loop is correctm) Anti reverse-circulation measure in place (e.g. non-return valves)n) Air bleeding of the loop (no audible or visible gases left in fully-filled systems)3. Controller and electrical worka) Sensors correctly placed and sensor wire correctly fastenedb) Electrical installation correct and safe (to BS 7671)c) Circulation indicator for the solar loop is presentd) Temperature readings and controller settings correct4. Domestic hot water installationa) Anti-water boiling controls are in placeb) Pressure release valve (unvented system) operating correctlyc) Overflow from safety valve (unvented system) piped to drain.d) Use of approved componentse) Hot water tank and pipes properly insulatedf) Ensure that unwanted circulation is prevented.g) Temperature interlock present between solar heated storage and auxiliary heatingh) Auxiliary heating set-up to allow raising water temperature above 60 deg. C regularly to avoid legionellarisksi) Anti-scalding measure in place (mixer valve installed)5. Commissioning and Handovera) Commissioning of solar heating system completed and ready for hand-overb) Maintenance instructions and schedules provided to customer/end userc) Customer/end user has been instructed in correct operation of systemd) System documentation and operating manual suppl<strong>ie</strong>d to end usere) Warranty documentation provided to customer19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!