iv. The total geological reserve is 98.24 MT. The mineable reserve is 79.62 MT, extractablereserve is 71.66 MT. The per cent <strong>of</strong> extraction would be 90 %.v. The coal grades is 2552 kcal/kg having stripping ratio <strong>of</strong> 1:14.33 m3/t. The average Gradientis 1 in 11 to 1 in 7. There will be total 5 to 8 seams with thickness ranging from 0.5 m andabove.vi. The total estimated water requirement is 0.46 MGD. The level <strong>of</strong> ground water ranges from64 to 75 m bgl.vii. The Method <strong>of</strong> mining would be opencast mining with shovel- dumper technology.a. 60 m high dump with four decks (4x15m)b. Two Dumps namely D1 & D2. The D1:328 ha + D2:298 ha = 626 ha 60mc. Dump D1 - 142.62 Mcum: Dump D2 - 130.04 Mcum, Total : 272.66 Mcumd. 3 rd year from Mine operationviii. There are two external OB dump covering an area <strong>of</strong> 626 ha having a height upto 60 m (max)with <strong>the</strong> quantity <strong>of</strong> 272.66 mm3. The final mine voids will have an area <strong>of</strong> 25 ha at <strong>the</strong> voidfloor: 230 ha at surface (for <strong>the</strong> revised pit) with 125 to 165 m before filling and 57 m afterfilling will be depth. There are one internal dumps having an area <strong>of</strong> 711 ha and height 165 m.Out <strong>of</strong> total quarry area 941 Ha. backfilled quarry area will be 711 Ha which shall bereclaimed with plantation. A void <strong>of</strong> 25 ha with depth <strong>of</strong> about 57 mtrs, which is proposed tobe converted into water body.ix. The seasonal data for ambient air quality has been documented and all results at all stationsare within prescribed limits.x. The life <strong>of</strong> mine is 36 Years.xi. Transportation: Transportation <strong>of</strong> coal from pit to lignit handling area (LHP) at surfacethrough Dumper and from LHP to TPS through conveyor.xii. There is no R & R involved. There are 62 nos <strong>of</strong> PAFs.xiii. Cost: Total capital cost <strong>of</strong> <strong>the</strong> project is Rs. 461.52 Crore. The cost <strong>of</strong> production would beRs. 1896.98 /tones (avg). CSR Cost (Capital cost: Rs.2.15 / tonne <strong>of</strong> Coal. R&R Cost Rs. 4.88crore. Environmental Management Cost is Rs. 31.28 crore.xiv. Approvals: Ground water clearance obtained on 28.03.2011. The Mine Closure approvalobtained on 05.06.2009. Date <strong>of</strong> approval <strong>of</strong> mine plan is 05.06.2009 .Boards approvalobtained on 03.09.2009.xv. Wildlife issues: There are no national Parks, wildlife sanctuary, biosphere reserves found in<strong>the</strong> 10 km buffer zone.xvi. Forestry issues: Total forest area involved for mining 50.60 ha. Extent <strong>of</strong> forest land in <strong>the</strong>project is 52.245 ha. (for revised pit).xvii. Total afforestation plan shall be implemented covering an area <strong>of</strong> 1409 ha at <strong>the</strong> end <strong>of</strong>mining where reclaimed external OB dump is 626 Ha and Internal OB Dump 711 ha. GreenBelt over an area <strong>of</strong> 72 ha. Density <strong>of</strong> tree plantation 1500 to 2000 trees/ ha <strong>of</strong> plants.xviii. There are no court cases/violation pending with <strong>the</strong> project proponent.xix. Public Hearing was held on 23.12.2009 at Kolayat Tehsil Office near Project Site, BikanerRajasthan. The issues raised in <strong>the</strong> PH were regarding compensation, social care for public,priority as per eligibility and qualification etc.2.8.5 The proponent fur<strong>the</strong>r informed that:i. Backfilling <strong>the</strong> final mine void upto 57m below ground level i.e water table level (+144mlevel) has been examined in due consideration <strong>of</strong> leaving <strong>the</strong> khejri trees/plants found in <strong>the</strong>sou<strong>the</strong>rn forest patch. After leaving <strong>the</strong> entire sou<strong>the</strong>rn forest patch and <strong>the</strong> adjoining areas,which are not amenable for mining, <strong>the</strong> now proposed mine pit boundary has beenaccordingly marked..a. The final mine void details for <strong>the</strong> above mine pit boundary are as follows:b. Maximum depth <strong>of</strong> final mine void: 165 mc. Area at <strong>the</strong> floor <strong>of</strong> final mine void: 25 had. Area <strong>of</strong> final pit at ground level :230 haMoM_ 2 nd EAC_Oct201313

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!