16.07.2015 Views

minutes of the 2nd expert appraisal committee (eac ... - eRc India

minutes of the 2nd expert appraisal committee (eac ... - eRc India

minutes of the 2nd expert appraisal committee (eac ... - eRc India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.16.4. The Committee after deliberation recommended <strong>the</strong> proposal for granting EC with followingspecific Conditions:i. Coal transportation shall be by mechanically covered trucks for loading and unloading.ii. Green belt in and around <strong>the</strong> coal washery should be fur<strong>the</strong>r intensified.iii. Automatic sprinkler system at <strong>the</strong> railway siding should be installed.iv. No extension for <strong>the</strong> work <strong>of</strong> railway siding will be sought by <strong>the</strong> proponent.v. No wastewater will be discharged into drains / water resources.vi. In <strong>the</strong> proposed expansion, technology used for <strong>the</strong> washing <strong>of</strong> coal is wet process. Closedcircuit water system will be adopted in <strong>the</strong> proposed expansion. project. Zero effluentdischarge system will be maintained.vii. The proponent should adhere to all <strong>the</strong> conditions stipulated in letter <strong>of</strong> Central GroundWater Board letter no.21-4(102)/CGWA/2011/174.viii. The assurances given during <strong>the</strong> Public Hearing and as per <strong>the</strong> action plan developed by <strong>the</strong>proponent should be implementedix. The CSR cost should be Rs 5 per Tonnes <strong>of</strong> Coal produced which should be adjusted as per<strong>the</strong> annual inflation.2.17 Chhinda OCP Expansion (0.18 MTPA to 0.65 MTPA in <strong>the</strong> existing ML area <strong>of</strong> 106.68ha) <strong>of</strong> M/s Western Coalfields Ltd., Tehsil Parasia, dist. Chindwara, Madhya Pradesh -EC based on TOR granted on 15.07.2011 - Reconsideration.2.17.1 The compliance report submitted by <strong>the</strong> RO, MoEF was deliberated. The compliance reporthas indicated that several conditions are ei<strong>the</strong>r partly complied or not complied. However, <strong>the</strong>proponent has submitted additional information and claimed that <strong>the</strong> report submitted by <strong>the</strong>Ro, MoEF could be reviewed taking into consideration <strong>the</strong> information submitted by <strong>the</strong>proponent. The Committee, <strong>the</strong>refore, asked <strong>the</strong> proponent to take up <strong>the</strong> matter with <strong>the</strong> RO,MoEF. The Committee asked <strong>the</strong> Member Secretary to request <strong>the</strong> RO, MOEF to submit arevised compliance report for fur<strong>the</strong>r consideration <strong>of</strong> <strong>the</strong> Committee.2.18 Ukni Deep Opencast Coalmine Project (expn. in prodn. From 2.20 MTPA to 3.50 MTPAand expn.in ML area from 940 ha to 1285.12 ha) <strong>of</strong> M/s Western Coalfields Ltd., locatedin dist. Yavatmal, Maharashtra - EC based on TOR granted on 28.10.2010-Reconsideration.2.18.1 The compliance report submitted by <strong>the</strong> RO, MoEF was deliberated. The compliance reporthas indicated that several conditions are ei<strong>the</strong>r partly complied or not complied. However, <strong>the</strong>proponent has submitted additional information and claimed that <strong>the</strong> report submitted by <strong>the</strong> Ro,MoEF could be reviewed taking into consideration <strong>the</strong> information submitted by <strong>the</strong> proponent. TheCommittee, <strong>the</strong>refore, asked <strong>the</strong> proponent to take up <strong>the</strong> matter with <strong>the</strong> RO, MoEF. The Committeeasked <strong>the</strong> Member Secretary to request <strong>the</strong> RO, MOEF to submit a revised compliance report forfur<strong>the</strong>r consideration <strong>of</strong> <strong>the</strong> Committee.2.19 Kathara Opencast Expansion Coal Mine Project (0.96 MTPA normative and 1.90MTPA peak in an 792.81 ha) <strong>of</strong> M/s Central Coalfields Ltd. located in Block Bermo,District Bokaro, Jharkhand - EC based on TOR granted on 31.12.2008 -Reconsideration.2.19.1 The proposal is <strong>of</strong> Kathara Opencast Expansion Coal Mine Project (0.96 MTPA normativeand 1.90 MTPA peak in an 792.81 ha) <strong>of</strong> M/s Central Coalfields Ltd. located in Block Bermo,District Bokaro, Jharkhand - EC based on TOR granted on 31.12.2008.2.19.2 The proponent made <strong>the</strong> presentation and informed that:i. It is an expansion <strong>of</strong> existing old mine project <strong>of</strong> M/s CCL to which Ministry accorded TORvide letter no. J-11015/482/2008-IA.II (M) dated 31.12.2008.MoM_ 2 nd EAC_Oct201335

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!