START-UP REPORT FORMVoltage supply at panel line connection, pump onL1-L2 L2-L3 L3-L1Amperage load connection, pump onL1 L2 L3FINAL CHECKIs pump secured properly? Yes NoWas pump checked for leaks? Yes NoDo check valves operate properly?YesNoFlow: Does station appear to operate atproper rate?YesNoise level: Acceptable UnacceptableComments:NoDescribe and equipment difficulties during start-upInstalled by:Company:Person:Date:Maintained by:Company:Person:Date and time of start-upPresent at start-up:( ) Engineer’s name( )Contractor’s name( ) Operator’s name( ) others