21.07.2015 Views

R-Series Operation Manual - BJM Pumps

R-Series Operation Manual - BJM Pumps

R-Series Operation Manual - BJM Pumps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Typical 3 phase Auto Control 1Before installing a pump, check the pump rotation to insure that wiring has beenconnected properly to power source, and that the green lead of power cord (See wiringdiagram), is connected to a valid ground, momentarily energize the pump, observing thedirections of kick back due to starting torque. Rotation is correct if kick back is in theopposite direction of rotation arrow on the pump casing. If rotation is not correct,switching of any two power leads other than ground will provide the proper rotation.Three phase pumps have integral motor overload protection. It is recommended that allthree phase pumps using a motor starting device also incorporate motor overloadprotection. <strong>Pumps</strong> must be installed in accordance with the National Electrical Codeand all applicable local codes and ordinances. <strong>Pumps</strong> are not to be installed in locationsclassified as hazardous in accordance with National Electrical Code, ANSI/NFPA 70.Connect pump to a junction box, outlet box, control box, enclosure with a wiringcompartment that meets NEC and local codes. The provision for supply connectionshall reduce the risk of water entry during temporary, limited submersion and shallcomply with the applicable requirements of the Standard for Enclosures for ElectricalEquipment, UL 50, or the standard for Metallic Outlet Boxes, UL 514A, and the standardfor Motor-Operated Water <strong>Pumps</strong>. UL 778.TROUBLE SHOOTINGDisconnect the power source to the pump BEFORE attemptingany type of trouble shooting, service or repair.13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!