lOcatiOnS OF rOSa<br />

PrOJect deSign<br />

and FabricatiOn<br />

SiteS<br />

Soyo<br />

Girassol<br />

Luanda<br />

Lobito<br />

SPS<br />

main contractor: FkS<br />

FkS-norway/kongsberg<br />

> management<br />

> engineering of systems and interfaces<br />

> Prefabrication of some manifold parts<br />

and well hookup <strong>com</strong>ponents<br />

> control and monitoring system<br />

Fmc-united kingdom/dunfermline<br />

> wellheads<br />

> christmas trees<br />

ANGOLA<br />

Fki/Friedlander-angola/luanda<br />

> guide base fabrication and testing<br />

> Jumper fabrication and testing<br />

Petromar-angola/Soyo<br />

> manifold foundations (ccF) and support<br />

structures (mSS)<br />

> Final fabrication of manifolds, assembly<br />

and testing<br />

> integration and testing of the subsea<br />

production system (SPS)<br />

USA<br />

Houston<br />

SurF<br />

main contractor: Saipem<br />

Saipem-France/Saint-Quentin-en-yvelines<br />

> management<br />

> engineering and procurements<br />

tissot-France/Saint-nazaire<br />

> riser tower foundation and buoyancy<br />

tank<br />

isleburn mackay & macleodunited<br />

kingdom/invergordon<br />

> upper and lower structures of the riser<br />

tower<br />

wellstream-united kingdom/newcastle<br />

> Flexible hoses connecting the riser tower<br />

to the FPSO<br />

kOP-norway/moss<br />

> umbilicals<br />

Washington<br />

trelleborg crP-uSa/houston<br />

> Syntactic foam <strong>com</strong>ponents for riser<br />

tower buoyancy system<br />

Petromar - angola/Soyo<br />

> Production fl owlines, Pipe in Pipe<br />

technology<br />

> water injection lines<br />

> riser tower assembly<br />

New Delhi<br />

Chenai<br />

SPS<br />

SURF<br />

FPSO - Engineering and the ICSS (integrated control and safety system)<br />

FPSO - Fabrication and Assembly<br />

liFting OPeratiOnS<br />

On the FPSO<br />

acergy<br />

> early Small lift: transport and lifting of<br />

substructure of module m4, installation<br />

guides for modules m1 and m4, free-fall<br />

life boat, temporary crane for hu<br />

heerema<br />

> transport and lifting of modules m1, m2,<br />

m4, m5 and m6<br />

Saipem<br />

> transport and lifting of modules m7a<br />

and m7b<br />

FPSO<br />

main contractor for engineering and<br />

the icSS (integrated control and safety<br />

system): Sofresid<br />

Sofresid-France/Pau and Paris-<br />

india/chenai<br />

> engineering and assistance in<br />

procurements of materials and equipment<br />

yokogawa-France/vélizy<br />

> control and safety system<br />

main contractor for Fabrication and<br />

assembly: Ponticelli<br />

Ponticelli-France/Émerainville<br />

> management of fabrication and<br />

assembly<br />

c.t.i. (Ondeo) - belgium/Seilles<br />

> Fabrication of module m5<br />

Invergordon<br />

eiffel-France/Fos-sur-mer<br />

> Fabrication of modules m1, m2, m4 and m6<br />

> Fabrication of the free-fall life boat<br />

structure<br />

UNITED KINGDOM<br />

Saint-Quentin-en-Yvelines<br />

Saint-Nazaire<br />

FRANCE<br />

NORWAY<br />

Kongsberg<br />

Oslo<br />

Moss<br />

London<br />

Brussels<br />

BELGIUM<br />

Paris Seilles<br />

Pau<br />

Dunfermline<br />

Newcastle<br />

Vélizy<br />

Emerainville<br />

Fos-sur-Mer<br />

Portumo-angola/luanda<br />

> Prefabrication of reinforcing and<br />

supporting structures for the<br />

new equipment and modules and<br />

all interconnection piping<br />

Portumo/Spie/Prezioso-angola/girassol<br />

> Offshore assembly works and hookup<br />

to girassol<br />

Sonamet-angola/lobito<br />

> Fabrication of modules m7a and m7b<br />

> Fabrication of the substructure of<br />

module m4<br />

> Fabrication of installation guides for<br />

modules m1 and m4<br />

logistical support for works on board<br />

the FPSO: Prosafe<br />

> chartering of the Flotel regalia<br />

11