14<br />

THE SUBSEA<br />

INSTALLATION<br />

IN IMAGES<br />

KEY DATES<br />

February to May 2006:<br />

1 st subsea installation campaign,<br />

consisting of:<br />

> installation of manifold and riser<br />

tower foundations,<br />

> laying of two water injection lines<br />

and two production loops<br />

(Pipe-in-Pipe),<br />

> installation of manifolds,<br />

> installation of riser protection<br />

structures.<br />

November 2006 to February<br />

2007: 2 nd subsea installation<br />

campaign consisting of:<br />

> towing to site and installation<br />

of the riser tower,<br />

> installation of the spools at<br />

the base of the riser tower and<br />

the fl exible jumpers,<br />

> installation of the manifold<br />

spools,<br />

> laying of umbilicals and service<br />

lines.<br />

Design production:<br />

Photos credits: Stéphane<br />

de Bourgies, Thierry<br />

Gonzalez, Laurent Pascal,<br />

Olivier Robinet, DR/<strong>Total</strong>,<br />

DR/Saipem<br />

Infographics: Bip Info, Idé.<br />

©<strong>Total</strong> - August 2007