05.12.2012 Views

Rosa - Total.com

Rosa - Total.com

Rosa - Total.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

06<br />

rosa:<br />

aN oPTIMIZED<br />

DEVELoPMENT sCHEME<br />

KEy DaTEs<br />

December 2005:<br />

> Start of the drilling campaign by the<br />

drillship Saipem 10000.<br />

> Arrival of the flotel Regalia and<br />

<strong>com</strong>mencement of integration works<br />

onboard the Girassol FPSO.<br />

June 18, 2007:<br />

First oil from the <strong>Rosa</strong> E reservoir.<br />

July 21, 2007:<br />

Start production from the <strong>Rosa</strong> D reservoir.<br />

september 2007:<br />

Start of the drilling campaign by<br />

the drillship Pride Angola.<br />

october 2007:<br />

Start of water injections.<br />

A drilling campaign begun in December<br />

2005, scheduled to last until mid-2008,<br />

mobilizing two drillships.<br />

Two subsea installation campaigns: one<br />

from February to May 2006 and the other<br />

from November 2006 to March 2007.<br />

Two lifting campaigns to install the modules<br />

in October 2006 and February 2007.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!